9,341 km
NH LENGTH
UPTO YEAR 2014
6,302 km
Adding new
National Highways
in Rajasthan
9,561 km
2,511 km
2014 - 2018
2010 - 2014
6
Construction of roads
in Rajasthan
3,263 km
1,207 km
2014 - 2018
2010 - 2014
Constructed Constructed
length length
7
Road Projects
awarded in Rajasthan
1,523 km 4,797 km
8
Accelerated NH Development
under Central Road Fund (CRF)
in Rajasthan
Yr 2010 - 2014 Yr 2014 - 2018
81 84
Projects
Projects
9
Landmark Projects
in Rajasthan
10
Cable Stayed Bridge across River
Chambal on Kota Bypass along NH-76
on the East-West Corridor
Connecting the last mile of the Golden Quadrilateral
At a Glance
1.4 km length 40 months
Construction Period
Rs. 275 Cr total cost
11
Benefits
• Uninterrupted traffic flow from Porbandar
(Gujarat) to Silchar (Assam) on East-West
corridor NH-27
• Kota City Decongested
• Accidents and vehicle pollution lowered
• Reduced traffic over old Chambal Bridge at
Nayapura, Kota
• National Ghariyal Sanctuary protected
through zero construction on Chambal River
Salient Features
700 m long Cable stayed bridge
400 m Viaduct
300 m Approach Road
Dual 3 lane carriageway
40 m surface clearance from Chambal river
2.5 m Noise barrier
1.5 m side footpath
Bridge Behaviour Monitoring
Fully lit
12
Proposed Expressways passing
through Rajasthan
Sl. Name of Total Total Estimated Benefitted Districts
No. the Project Length in Length in Capital Cost
(km) Rajasthan (in Rs. Cr)
(km)
1 Bathinda- 626 489 24,500 Hanumangarh, Churu,
Ajmer Green Field Sikar, Nagaur, Ajmer
Expressway
Salient Features
13
14
6 laning of Jaipur Ring Road between
Agra Road and Ajmer Road section
under NHDP Phase-VII
1st Milestone scheduled on 18.05.2018;
delivered on 12.04.2018
At a Glance
46.4 km length Rs. 810 Cr total cost
Benefits
• Will ease heavy traffic from NH-11 Agra
road, NH-8 Ajmer road, NH-12 Tonk Road &
SH-12 Malpura Road
• Will ensure seamless connectivity to nearby
districts
• Will result in greater economic benefits by
saving travel time, fuel and cost
• Will enhance access to places of religious
importance such as Ajmer and Pushkar
• Will boost tourism in Rajasthan and Delhi
• Proposed Interchanges on the Ring Road at
vital crossings will result in uninterrupted,
smooth and safe flow of traffic
• Will create new opportunities for the people
Salient Features
2 Toll plazas 31 Underpasses
1 Major bridge 1 PUP
2 Minor bridges 36 Culverts
2 Flyovers Partially access
controlled
2 ROBs
15
4 Laning of
Kota-Darah section
At a Glance
34.33 km length 2 year Construction
Period
Rs. 396 Cr total cost
on EPC Mode
Benefits
• Boost industry and trade in Kota & Jhalawar
districts
• Improve connectivity between Rajasthan and
Madhya Pradesh with the rest of central India
Salient Features
34.33 km main 1 ROB
Carriageway with
7 Minor Bridges
concrete pavement
8 VUP
9.52 km Service
Road with concrete 21 Box culverts
pavement
35 HP culverts
16
Development and Operation of
Sikar-Bikaner section via Sikar
Bypass and Bikaner Bypass to
2-lane & PS
At a Glance
237.58 km length 2 year Construction
Period
Rs. 650.84 Cr
total cost
Benefits
• Improve connectivity of Sikar, which is
located in the heart of Rajasthan to Punjab.
• Provide better connectivity to Bikaner, a
major tourist destination in Rajasthan.
Salient Features
17
Ongoing Projects of MoRTH in Rajasthan
Sl. Lok sabha Project Name NH No. Sanctioned Total Date of Likely
No. constituency (New) Cost/TPC Length Start date of
(Rs. Cr) in km completion
1 Ajmer, Ajmer-Nagaur 89 425.00 148.25 Mar-13 Mar-19
Nagaur section
2 laning with Paved
Shoulder under PPP
2 Chittorgarh 4 laning of 79 & 113 511.21 117.00 Jan-13 Mar-18
Chittorgarh-Neemach
& 2 laning with
Paved Shoulder
of Nimbahara
Pratapgarh under
PPP
3 Nagaur, 2 laning with Paved 11 378.07 108.26 Jan-14 Apr-19
Bikaner Shoulder of Nagaur-
Bikaner section under
PPP
4 Bikaner, Development & 15 501.08 172.38 Sep-13 Mar-19
Ganganagar operation of Bikaner-
Suratgarh section
under PPP
5 Ajmer, 4 laning of Beawar- 8 900.00 116.00 Oct-09 Oct-20
Rajashmand Gomti section under
PPP
6 Nagaur Construction of 58 & 62 155.76 19.23 Sep-16 Oct18
Nagaur bypass on
EPC mode
7 Barmer, Up-gradation to 325 179.32 24.71 Jul-17 Jul-19
Jalore 2 lane with paved
shoulder Balotra to
Sanderao via Jalore
section (Pkg-II)
8 Jalore, Pali Up-gradation to 325 163.54 34.42 Jul-17 Jul-19
2 lane with paved
shoulder Balotra to
Sanderao via Jalore
section (Pkg-III)
9 Sikar, Construction of 2 11 116.31 27.85 Apr-18 Oct-19
Jhunjhunu lane with paved
shoulder Fatehpur to
Jhunjhunu section
10 Tonk, Sawai Widening, 552E 187.82 33.90 Apr-18 Oct-19
Madhopur Strengthening and
Reconstruction of
Sawai Madhopur to
Sheopur section
11 Churu, Construction of 2 709E 163.95 54.67 May-18 Nov-19
Jhunjhunu lane with paved
shoulder of Rajgarh-
Hariyana Border
section.
12 Barmer Up-gradation to 325 131.28 31.25 May-18 Nov-19
2 lane with paved
shoulder of Balotra to
Sanderao via Jalore
section
13 Banswara Up-gradation to 927A 96.90 23.88 May-18 Nov-19
2 lane with paved
shoulderof Wajwana
– Banswara section
14 Udaipur Upgradation to 2 lane 58E 370.3 58.03 Nov-18 Dec-19
with paved shoulder
of Kundal-Jhadol
section
18
Ongoing Projects of MoRTH in Rajasthan
Sl. Lok sabha Project Name NH No. Sanctioned Total Date of Likely
No. constituency (New) Cost/TPC Length Start date of
(Rs. Cr) in km completion
15 Udaipur Upgradation to 2lane 58E 341.79 59.70 Nov-18 Nov-19
with paved shoulder
of Jhadol-Daiya
at Gujarat Border
section
16 Ajmer Construction of 79 12.59 1.8 Feb-17 Dec-18
service road on both
side of the existing
road on Ajmer-
Nasirabad road
17 Jhalawar Construction of 12 80.68 4.20 Feb-17 Sep-18
4 lane Cement
Concrete road in
Jhalawar City
18 Jhunjhunu Strengtheining of 11 44.9481 31.7 Feb-18 Jan-19
Jhunjhunu- Chirawa
section
19 Jaipur Strengthening of 148B 11.4927 5 Feb-18 Jan-19
Paniyala Mod to
Hariyana Border
section
20 Kota, Strengthening of 52 30.295 20 Feb-18 Jan-19
Jhalawar existing pavement on
NH-12
21 Ajmer Strengtheining of NH- 89 4.199 1.8 Mar-18 Oct-18
89 in Nagaur City
19
Ongoing Projects of NHAI in Rajasthan
20
Ongoing Projects of NHAI in Rajasthan
21
In-Principle declaration NH in Rajasthan
24 Baap-Shekhasar-Sihda-Ramdevra 50.00
25 Baap-Jambha-Motai-Padiyal-Renisar-Bhojasar-Aau 50.00
26 Pokharan-Sankda-Bhainsda-Fatehgarh 80.00
22
In-Principle declaration NH in Rajasthan
30 Sanderao-Bali-Sadri 43.00
34 Uniyara-Indragarh 27.00
35 Lakheri-Itawa-Mangrol 61.00
36 Nachna-Ramdevra-Falsund-Baytu 210.00
37 Nathusari-Bhadara-Sindhmukh-Sadulpur-Malsisar-Jhunjhunu- 200.00
Gudha-Udaipurwati (Haryana-13.00 and Rajasthan-200.00)
38 Jurhara-Palwal (Haryana- 66.00 and Rajasthan - 3.00) 3.00
39 Dungargarh-Sardarshahr-Taranagar-Rajgarh-Bahal-Ovara-Kairu- 180.00
Lohani (Haryana-46.00 and Rajasthan-180.00)
40 Soyla-Osian-Tinwari-Balesar 126.00
41 Suratgarh-Baropal-18SPD-Jhakharanwali-Bherusari-Rawatsar 57.00
23
Key Indian National Highways
SRINAGAR
Jammu
Jalandhar
DELHI
Gurgaon
Jaipur Agra Lucknow Gorakhpur
Ajmer Muzaffarpur
Gwalior Kanpur
Allahabad Guwahati
Jhansi Purnea
Shivpuri
Udaipur Varanasi SILCHAR
Barhi
Ahmedabad Panagarh
Rajkot Vadodara Lakhnadon Kharagpur KOLKATA
PORBANDAR Surat
Nagpur
Bhubaneshwar
MUMBAI
Pune
Satara Hyderabad Vishakhapatnam
Arabian Sea
Eluru Vijayawada
Belgaum LEGEND
Chilakaluripet
Golden Quadrilateral
Tumkur
Hosur CHENNAI
Bangalore Ranipet North South Corridor
Selam Krishnagiri
Bay of Bengal East West Corridor
COCHIN Madurai
Lakshadweep
KANYAKUMARI
Indian Ocean
24
National Highways - India Story
Fast tracking National Highway Development
NH LENGTH
NH LENGTH
91,287 km 1,26,350 km
Yr 2010-2014 Yr 2014-2018
New NH
34,391.5 km
+
In principle NH length
51,980 km
New NH
Total
20,353.2 km
86,371.5 km
25
National Highways - India Story
22.5
km
16.6 2017-2018
km
12 2015-2016
km
2016-2017
2 3 2 3
km km km km
2014-2015
2013-2014
2012-2013
2010-2011 2011-2012 Rate of Highway
construction per day
Construction of roads
Rs. 3 lakh Cr worth investments in the road sector in 4 years
Significant growth of 158%
Yr 2014 - 2018
Total Cost
Rs. 1.16 lakh Cr
Total Cost
Rs. 3 lakh Cr
26
National Highways - India Story
Accelerated NH development
under Central Road Fund (CRF)
Significant increase of 207.6% in cost of CRF
works sanctioned for the upgradation & improvement
of roads /bridges in the Nation
2,876
Yr 2010 - 2014
Projects
935
Projects
Total Cost
Total Cost
Rs. 8,613.51 Cr Rs. 48,186.57 Cr
Yr 2014 - 2018
27
Transforming India’s Transport Sector
Key initiatives in 2014 -2018
Over the past four years, various smart initiatives on
Indian National Highways have resulted in transparent
processes, last mile connectivity, safer roads, upskilling,
new opportunities and employment for the people.
28
Anti Lock Braking System Model Automated
ensuring vehicle and Centres for checking
passenger safety fitness of vehicles
29
Manzilen Abhi
Aur Bhi Hain
30
31
www.nitingadkari.org
www.spread.ooo
www.facebook.com/nitingadkary
www.twitter.com/nitin_gadkari