SCADA Training
SCADA Training
1. Monitor
2. Control.
SCADA system enables to operate Sub transmission (33kV/66kV/11kV) electrical equipment remotely.
There is various analog & Digital signals report from each grid sub stations
Real-time control is the SCADA system, which acquires data from different sources, pre-processes, it and
stores it in a database accessible to different users and applications
SCADA
• SCADA CONCEPTS
• COMPONENTS
• APPLICATIONS
• COST/BENEFITS
SCADA CONCEPTS
CONTROL CONTROLLED
CENTRE PLANT
COMMUNICATION
SYSTEM
CONTROLLED PLANT
• Remote Terminal Unit (RTU)
• Interfacing panels consisting of
1) Transducers,
2) Relays, contactors
CONTROLLED PLANT
D25 GE
Pannel control
PT Close
Potential Trip
Field Free Contact
TRANSDUCER
COMMUNICATION
METERING MONITORING CONTROL PROTECTION INTERFACES
RMS (V&I) AUTO-RECLOSE OVER-CURRENT FRONT END
EVENTS
POWER GRAPHIC
(ACTIVE, CHECK EARTH FAULT
FAULTS SYNCHRONISM TERMINAL
REACTIVE,
TOTAL) STATUS OVER VOLTAGE
INTERLOCKING
POWER
FACTOR ALARMS PROGRAMMING UNDER VOLTAGE IEC 61850
TOOL (IEC 61131)
FREQUENCY CLIENT-SERVER
APPARATUS
CONTROL GOOSE(PUBLISHING)
PHASE
GOOSE(SUBSRIBING)
TAP POSITION (4-20 ma) BREAKER
SAMPLE VALUES
WINDING,OIL TEMP (SUBSCRIBING)
(4-20 ma) ISOLATOR
TRANSDUCERS
TYPES
Self powered
Auxiliary Powered
• Convert inputs into low power signals (4.20 milli amps) that
can be accepted by the RTU.
• Should have linear characteristics over the operating range.
INTERFACING
• The connection between the controlled plant and the RTU is termed as
interfacing.
• Interfacing panel will house transducers, contactors and relays.
• Breaker status sensing is done by the auxiliary switch Normally Open (NO) and
Normally Closed (NC) contacts.
• If the only one contact (NO / NC) is used for sensing the status of breaker /
isolator, it is called as single bit indication.
• Ensure that the cable lengths between the PT, CTs and RTU kept as short as possible to
avoid excessive drop.
• When the station area is large and cable lengths are excessive explore the distributed
RTU concepts.
INTERFACING CONSIDERATIONS (contd.)
• Connect SCADA earth to the substation earth to avoid differential voltages occuring during
faults which are likely to damage the sensitive electronic equipment.
• When the station area is large and cable lengths are excessive explore the distributed RTU
concepts.
• Connect SCADA earth to the substation earth to avoid differential voltages occuring during
faults which are likely to damage the sensitive electronic equipment.
COMMUNICATION SYSTEM
Communication system selected should have
• Expandability & flexibility
• Reliability
• Two way communication capacity
• Ability to meet data requirement
CLASSIFICATION OF COMMUNICATION
Govt. of India to fund the project through the Universal Service Obligation Fund (USOF). Rs.
20,000 Cr.($4B)
As per a study conducted by the World Bank, with every 10 per cent increase in
broadband penetration, there is a 1.4 per cent increase in GDP growth
Indian Government mission
• IEC 60870-5-104 :- It is an extension of IEC 101 protocol with the changes in transport,
network, link & physical layer services to suit the complete network access.
The MCS is the real-time nucleus of the EMS/DMS. The MCS shall be a high-availability system
characterized by high-speed data collection and presentation functions. The MCS may collect,
process, and store real-time data from different data sources
44
EMS/DMS Architecture
45
NETWORK ARCHITECHTURE
46
NETWORK ARCHITECHTURE CONT…
Name of the Server Functions on the Server
Information Management (IM) & RAID Source Data Management Data Maintenance
Real Time Control (RTC) Data Processing Supervisory Control
Telecontrol Interface (TC) Telecontrol Interface
User Interface (UI) User Interface (HMI)
47
NETWORK ARCHITECHTURE CONT…
User Interface (UI):-
The UI server is a workstation that supports UI consoles. The console represents the link between the user
and the power system. It is used to display information and accept user input. The UI server is mainly used
for visualizing and controlling the network.
48
Type of load management
• Forced Load shedding
Load shedding of high AT&C loss feeders from SCADA during emergency requirement
• Tie-Line overloading
Automatic load shedding during overloading of 33kV/66kV line
• Transformer Overloading
Automatic load shedding during overloading of power transformer
49
EMS (Energy Management System)
EMS application like Availability based tariff, STLF, Load shedding, Dispatch training
simulator etc.
STLF & load shedding application is used for load forecasting and automatic UFR or
DLR shedding respectively
Dispatch training simulator is useful for new operator to train with simulation of fault
& tripping etc.
Real-Time Operation
BaSiDi is the main window that appears after login. Various applications, list and network world maps can
be open from this displayed
51
SUMMARIES
(1) NETWORK
a. SCADA Network
b. DMS Network
(2) System and Alarm Summaries
a. GenSum ; b. Relay ; c. Critical ; d. Trip ; e. LimViol
(3) Data Modes
a. Study Mode
b. SDM Mode
c. DTS
(4) Tag & Status Summaries
a. Tags
b. Remove from operation
c. Permit to Work
d. Control Inhibit Summary
52
Lalit Kumar
Assistant Manager BD Group
TATA POWER DELHI DISTRIBUTION LIMITED
+91-9958294879