& BARA AND DET AAPL PEAR TMD HOPE OC agi
2S City Government of Addis Ababa Design 2» cet
Construction Works Bureau
dete AG, Joy Dol
Ana ANY Whey AdtALC rn Lei amaaley
RARE HRA WT PS Ade NERD RIN %
5 ne RA MON PS Ade ANAROD, RN
> 0a NA WOT PT Nee ANAK, RINE
5% ANAK Rae HA WRT PS hes NRO, INAS
2 ARCH HRA MET PF hee AAEM Ri
> AKA AM NEA NET PS hee NLA RIM
© an ta When Ps Ae Ne ROD, HI
> ArAA hea hee PS he ANEROD HINA
> ANA hber RA WbeH PS Aes AnaROT, RNA
> Ans Hits HEA MEY PS hee NDEROT, Lr
> ANeL Inds HRA WheY PS he NLD KIM
> One Aes AneARE ne
> Anah non oIs Gat annAaTy
> Adah NOM oe annAary
2 nae Ams nnEARE He
> antag, Pay aanaeny
3 > ahh) ONS Neve ACTH AC
2 > ae Aer ncret
5 > Anan Ana heer AARC FINE Ne
> ATM enes AOTC Anna
> andres nanben 320
nan
> aenebed nese eR f \
> aranens murens Fie HCE |
~
\ J
Q parce) @® g
TRINA Mar enaaicicen endsicty Atte rock Cedgnand astnigmnsicascen®grt conANA HA ET AOA RC PUMLIG TAH. PE Oct
Construction Works Bureau
‘oureet_—_
ourket
© PAR $2015 NR Gow 4H Ef Goo. ensnreriiy eT
LeDae #, irect cost) Lo~ahs-a
DAL ACA AILPaMEOY OAD AOA NET EEE CANES TIA meee
AE ANP WTC 64/2011 Aime AAT cowed OME PTY PD NewTG
AMI NILE LAOH MY cour NANLIE TMS Meme Ae
MITER POLLO £2015 9.9" PAF GA Gook PRINDEHTD meee MOE PD
(Direct cost only) he AttARO- ANCO- KL Te some” PRIA woyrsy
Praag
FACE BOOK:- Addis Ababa Design and Construction works bureau **
TELEGRAM: Addis Ababa Design and Construction works bureau
2. TWITER® Ads Ababa Gesign and Construction works bureau
none .
= ame pas
Amine phd, (AavIMICR)
PrvneTIR eee
ALENT TIAA TANI PD Poss INE OE
asin.
eo 8. 8 ® a
BRIN MiP anasencon e@AaciCly Aa ADebaDeianand, cdcaignndconcton@gnal comfl UNAHAIN Rte RN Le
=y — CiyGovernment of Adds Ababa Design fawn
Construction Works Bureau
92015 9.9" P4a <
Gat PTS
NPE OPE PD
(DIRECT COST)
PGRmap
MAD MIO ET AOPRAC AMIN Me MAAK ATE MMO
nn onc bhatt Ta 9oT #2 ARPRE Ocm (Orwea!) IF
{ACR (Pl) #tAe PC MIAO AME EHNA MUI BUM PHT
92 nh FeEEK TUE Punter her ANC FeO
Aggmivay NETS teTMNeHT MI henteh NMC ALE th
ORMEHED TEN) SM GOT 2 MINE NOPE ttHee
(retreat) 7H 36 CE (Pt] ON ELT FIONA He Om #2 TSR
co ae7 4eRva
LEP AeNPR EMH ALemE RORTERINN HGbIRPRLaN NIE RA
DAVE AF AG Mee DEEP HtHeRE (tes!) MF ACE Prot)
anec touNse ear api WR hd 1G HPT, (Ort Coe)
eee ear) teh NURETERE OLe Ik ee BrRA
arti Mec oxic senna (venass) HF FER (OM) MO
FTIMg he wan #5 ebRA EIN UNE een AMAA Bee
eee ee
Aevoma WERE OEeNnE PALE arr mL RCN NE OPE
he aan #2 onesie” PEO was RAKE EECIRA1. gurpe 72 fans (0)
“AUPE eu, NIE AIM Nak! ERAGE BP ORE HOLE Raven HAP
maakt Foetus) MMA! feYs fod MA ae Fenn aya
wok FLAN HEP YH NIE PEE NOS REX KIA ARIE AB UE
TENE MNS eas) AVIS ALT AUPE sh 92 TERY sagan see
2 Ime) NU BRANAY RDCREY FS amy id A FTERD ABH Nad
boone
5 AREN SAE RIL INE Nh md FOE NON 10% FHP cee
(ay meh nas
FAROE AIS AS 6 me tZenT Ni ER HOR am, DHE Con ed
swan
+ MAN © ON aw me A447 Mh Om Ben eA
(TO A MAM homed 2ne PLOY THA OOP HT TONE ent
980:
238m)
rem #2 Nson99000 AC WAT Ar Iam COPE Kae 99
aca FO tone
+ FTeK Poe ngomGO000 AC MAR IBBEONDBO AE AL 118
ee eae 82 lay I BONA
+ From #2%6 1600260080 4¢ Mt SER 86009 IC A OH
PETA fae m2 ead 90 a8
+ FTeME woe. manseoer009 AC Nh $OA000H000 He A 0H
Tenet me 92 lay nine
+ ns090900000 4 MME AU TH THE toe #2 la NOR OA7 an ana cay a aang TG TAT TOPO
tana
THs aay
least a
Tiles ea
Tea ey ‘a — tas
Toes =r ie
1.2 molting Work of ent sears HP Oca Ba Wa
a =
ia aT Se
bea
ptt[Excavation and earth work 1444
stu Sharaee and exeaatn ech)
[ska cin Sontunt See oo = sa
[esas sings conan eee Tar =} a
Pesan ess 4soneunt eens oe Tr
braiseaet tase ayo
Siast ouuny dat eats
re an
Seton =the
i scat sf
‘aan fed SE
tletese
= onreno ‘DescRIPTION nr] ausee to
eee! a
— ® [may
7a sn na ran oe be poo GAR
a | _ saan
S]ELCAVATION ANO EARTH WORK aaa
“fee cesgeetatat aa
SHIPKE raneh sev. so rec
ST SRA TATRA | ag
Fg ara aan UNTER —Taf emeeraeeseaie
‘apcea emer eee
sa =e
ah ensign eee
Licieanrenn a meee
2 os a =
Sees
ees
et aaa
See eee es
eomeaauees! =
=Fear a
RE EST gal a Se ATR SE
TRG CaN feo wh Wk
Sa] ar Gro essa Terao saa
Ine oats fcomet ed wank
Tail come teense TSS Ser =| aan
STEEL REINFORCEMENT
IMasonary & block work
i
wal|a occ aa ee ea
bow Ast Tain we =
7a a eta pape ua ape om a
Bestest kare ca TNT a
[ras sem foun usages Sn
oe cer pe Se SO TT ST
fy prt ewan Stns Sy alu opt d
4 [otontntiteweust fg winter dg Pea easement |? | ooo
foment ceg ns sae ae fo mn
aman
ee
ee
a
[Seo a Ts isan an Taped i a aa oT
afafate
[aan Te Sapa Gyan Dod Cog wn ahead Neal Soa Tape =a
fn re ey ements Cpr a ing eto asf eG
fla ane meal al of i ng Sra itr pcg Se el
fsa ting cd crn et mn er ewe
Etichete Raat ce
enter
= f1 Roof work =
eee ——
eee ——
oe os
fee eee ate
Tan —|—:
— ——-
iis See =}—=,
Se a
Seca aerate zs
Prepared by- Tesh7} CARPENTRY AND JOINERY "
ICeling om
13a ane = se
i a = aera
= ar60s
isle sng we r saa
in
alia a a a = amas
Tasheenanege betas) = SL
Pees by Teina}a}alala
ke
le
Sa
alatalatalalalalalalala|alalalalalalala{alalalalala|alalalala|
K
[REINFORCEMENT BAR.
[spy ante on rca hard race f RUS, CHS oS
online tne cat anu nste oso wot mrad nm mss9 FINISHING WORKS
3 LASTERING
55] Goal nme antag (73 To Faas = aa
rs onsen pang (13) Wo eae = aa
Sls cous eve og goed ars = E00
0 Gov ar etn Esa vr re = 3
Tislioan doer ate Sa oT = seta
Pan a can nt we TO RTE ar oss
pan Gara Ontos Sunes Vato wt oe Epes coor aoeam_—| a a7
$e Coo Cpu paar anor Va wa oe End etn nd [nF eae
32/PONTING
S.3/FLOORING.
alien na Cag = To
a Sa sed oO = 9
teense = sae
33 snr ek Con RD = asim
33enr r Corn og = ors
33 slate Be Pech fr = ayn
33: oteto om rr Foes ar = sates
53: yay ck Ee epg an capa — aba
3:5 ed a Si Eo epg wh on oa pa eg =P sous
3331s ng So = co
33: foc Sam eT) = ea
321] en aa og = E56
3339] Sov aes = Seal
San Sono hae Toy 3 = ese
reperdoy-bethem at ml
Ep ap° FINISHING WORKS
‘Sa|WALL TLE CLADING.
area oie gad Comrise = Tara
Sours wa iss GEOOOSr] ra Sana
[ay ad ey a meno ena wl bontaaartcincanet san |! aa
| rs nde ean ota wth care oe
|S it Gn Cary = Sse
Bess bo PUG wal i ips eng = a3
‘| WNDOW SILL
353] son Tha ew a aa ST = ie
ga) Sonm Tek ao ch Me in I) = sass
Es 36nn Tk on = ass
5 ]THREAD,
".[WARBLE THREAD
cs asta
Ha] Ser Sor ek al ese cs FE
Ea ten orn tek ales 3 a sa
Esl oem orn tek male es 3 cs ra
53| GRANITE THREADS
Tes ens oom ae Cane Tae TL = Toe
suis So Gran Tae 13) cs 7825
ts] Sam se om Mek es Tes (0) = sin
33 TERRAZZO THREAD
33] Sons ise Terc ase 13, ca esr
SS it Toera tease (13) a ar
IseR
lwaReLE RISER
(GRANITE RISER
nn Ta Terese a =a
Snes a THE Ters ee 9 ra Sn
repr Bethea ma
Spx9 FINISHING WORKS SR
Tare
‘Sosa we 9) rs 15657
[rat reste
32 | on batt oa a TTD = Tass
Tosa. Wrshol
EE a a
33]shiing
35 ian RC aa a maa
aa] soon ar rg = xa
Siahng os oman a nat
55] ies hada a a3
| Seo ak Tos a a7
0 Copping
a5 ban Ba ae a Ta
se Sin ot ra ng = imu
a 2 Be pg] a i757
Sie 2 ot ras cg = Sn
eile spp
sre Bethan ad ms
BA Besone FO,
peperdbySetabem and malsBoIBEC ATA
exsaenone
na vr [Somes
2o
ta st ra
Stim
3 z
oe 2s[ELECTRICAL WORK
fk eh TT
SE ae RT IGT
age \PRS HE, a el RG eT
FS a a
FoI DT pe TTT
FS MCR ec RG TTR
oe SANE ae A ape TTT
SR a TARR STINT[SaTBA Mas Ot ca ganna oT
eS a TIT
opr ct A co STRATE
est neh Maia cap an panama TIT
—% oe
etsaaa nog a oe oo ay
veto enutigecp sm eg a
TAF a pe PVC CTT
faa ia tno ns
ae ¥ “TE a a eA Gir PTE
Ties aaa a se aa
"ase ors camino =a
Sis a oe Fe Nor RST aa
farsa re a
epee ae ae ST TP
er J ste
age — EaTa a a AT ST TST
Taine tte oe aT TTTF | al
Tago en
ee RA Se aaa TRF =
Tice pe TT TTT a
13 he SDC] Fe RTA an SVT a
[acy ge eine pot eso cae
[rier inept me
1 aaa aN =
13) spa sansa oes CACO | a
Fees = Tar
3 mitts epg ce ar
fname ety cs lm ag
/of ne (a sc wl ene Renn
[So mics acted ane oe
fn cap ty gn ne a
ons a
eds onan res
eee rete ren
ce als
toe ap Oat Sane Sao
ie afd Ean a
anata a
Wai ean aT RTE OO Teng Fd
[reer nest cn
{rei afar
ieee aa
foe aae te Se eal cae
cae
[sere esc one aoa]
staa
i anes ta RTECS GTR oie
[tren roto ot et el ve
[ieee dint pn ncn ne
cass ep el a
fe tocraggy Oot ec Sena care
ferdus
[bee tne SURVECRACE ope
futon mi cl a a]
tony Fat ed ET“ag Fig ana Lamps
bree i fe fe lala fele iabelablaiaalablaalaaalla
EI
i} 1} fa fal fetal[rernavecl Oy iantgamed cairn
Soa ET
gt fi sl so
ire St Rees oe
fen atin crn os
Sea ie pt aT a oa
1
iin, SOR CDETisha erg hyo meme Re
[Ser anscaagecn gy se ena
ce ny cy ent eos
Tr ee! ec pa] rn
Te oe ag Saas a SRE ae a
Tale occas sac fon asergaAE aN
‘Tan er seem ee PEST
i = ae
TaN ca saan Sacto svale ce ssi |
ase
TWA em eee ari rem GACT
Tesi uigen 4] oer teeter
aduee 6 eenslr felefelalaletolaatelatelalafalf afl= a
420] SANTTARY INSTALLATION
fafa lela} faa} lalallalael
| i
2
lls flelaelalafella lalaftalajall falafelSeFoot path & General Paving works
Footpath sie walk brick (15°20°0.)stablished and
[compressed during preparation and rough surface} coloured
|concrete block on cement stalized sand base SOmm fine
beoregate including any jointing work Es 1056.43
Footpath side walk brick (15*30°0.)stablshed and
[compressed during preparation and rough surface} coloured
concrete block on mortar bedding including any jointing work
Es 1465.39
Footpath side walk brick (ection stablshed and
fcompressed during preparation and rough surface ) coloured
concrete block on mortar bedding including any jonting work.
sherman) nt sara]
root path se walk brick (ection) With #15 and 3em
length = 30em and thickness = Sem stablished and compressed
during preparation and rough surface} coloured conerete block
lon sand bedng including ny jointing work, :
a Es 1226.44
Footpath side walk yellow tes coloured conerete Block on
sfcement stablzed sand base SOmm fine aggregate including any
ining work. 1077.8
Footpath sie walk yellow thes coloured concrete block on
mortar bedang including any jointing work
rn 1386.70]
Footpath side walk Zig zag compressed precoloured concrete
‘fsiock on coment stablized sand ase SOmm fine agregate
nctacing any jointing work.
zany Jointing m 1033.03
Prepares byROAD WORK MAIN ITEMS
rem 2015 4TH QUARTER
Hal DESCRIPTION unit | DIRECT cost (wirHouT
‘OVERHEAD & PROFIT)
[Gnpping Inyer under the sub base Iayer( Granule)
[compacted to thickness of 200mm upto Skm
sistance. rar.2e|
[oravel sub base compacted to 96% AACRA test
[5-1 Density (Compacted layer of maximum
{soem s327.7|
lBase course compacted to 95% AACRA tost $11
ensity (Compacted layer of maximum 150mm) | _m" 1370.31
Pepa yank abe
=2015E.C 4TH
QUARTER
(ONLY DIRECT
ITEM DESCRIPTION UNIT cost)
DRAINAGE WORK
[Supply and construct concrete pipe Half ditch
[with all civil assistance works.
Supply and construct conerete pip closed
Iditch with all civil assistance works.
«sep sae Darel en cont poe = =
leaptaesty bane or cma por 3 ma
3S an] banat avon comresoes a a
ilsuptantuy baa troncmase sor a =a
Sea inst Darete Woorenoes tae a a
‘Supply and construct Reinforced concrete
pipe closed ditch with all civil assistance
|works.