NDT Penetrant Test Report
NDT Penetrant Test Report
PROJECT :
PURE DATA CENTER JKT01
LOCATION :
SYSTEM :
HVAC
SUB SYSTEM :
BUFFER TANK 1
8500 LITER - Ø 1900 MM, H 3575 MM – 150 PSI
JOINT NUMBER :
ASNT NDT
Drawing Reference : -
Material Reference : JKT01-TAT-DC1-R2-TS-W-56005 R2
Joint Number NDT-Penetrant Test = 39 Joint Horisontal
Joint Number NDT-Penetrant Test = 6 Joint Vertical
EDY SETYAWAN
ASNT NDT Level II Joint Number NDT-Penetrant Test = 0 Joint Nozzle
Certificate:
026.R/SDIT/NDT-
Joint Number NDT-Penetrant Test = 0 Joint Support
PT/XII.2021 Total Joint Number NDT-Penetrant Test = 45 Joint
TABLE OF CONTENT
3. DOCUMENTATION.………………………………………………………….…104
3.1 Documentation Buffer Tank 1-NDT-Penetrant Test…………………....……… …..105
4. ATTACHMENT ………………………………………………………………....125
4.1 Certificate ASNT NDT Level II…………………………………………………..……....126
4.2 Certificate Welding Inspector ………………………………………………………....128
CHAPTER 1
CHAPTER 2
WELDING SCHEMATIC
Report No. : 01/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1.................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 01/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900-BT1-J1.2.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 02/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1.................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 02/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900-BT1-J1.3.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 03/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1.................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 03/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900-BT1-J1.4.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 04/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1.................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 03/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900-BT1-J1.5.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 05/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1.................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 05/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900-BT1-J1.6.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 06/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1.................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 06/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900-BT1-J1.7.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 07/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1.................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 07/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900-BT1-J1.8.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 08/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1.................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 08/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900-BT1-J1.9.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 09/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1.................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 09/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900-BT1-J1.10.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 10/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1.................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 10/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : TANK 1-C1.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 11/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 11/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : TANK 1-C1.A.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 12/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 12/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : TANK 1-C1.B.................................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 13/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 13/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : I 1500 - BT1 - J1.1................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 14/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 14/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : I 1500 - BT1 - J1.2................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 15/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 15/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 13-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : I 1500 - BT1 - J1.3................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 16/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 16/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900 - BT1 - J2.1................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 17/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 17/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : Ø 1900 - BT1 - J2.2................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 18/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 18/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : Ø 1900 - BT1 - J2.3................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 19/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 19/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900 - BT1 - J2.4................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 20/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 .................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 20/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Satiawan
Date : 01-04-2022................................................................................. Joint No : Ø 1900 - BT1 - J2.5................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 21/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 21/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Satiawan
Date : 01-04-2022................................................................................. Joint No : Ø 1900 - BT1 - J2.6................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 22/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5...........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 22/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900 - BT1 - J2.7................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 23/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 23/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900 - BT1 - J2.8................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 24/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 24/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900 - BT1 - J2.9................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 25/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 25/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900 - BT1 - J2.10................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 26/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ................................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 26/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : TANK 1-C2......................................... Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 27/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5 ..........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 27/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : TANK 1-C2.A......................................... Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 28/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5 ..........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Hot Pass W5 Accepted , After Repair Repair 1P- Incomplete Penetration No Defect Indication
Filler W5 Accepted , After Repair Repair 1F- Incomplete Fusion No Defect Indication
Capping W5 Accepted , After Repair Repair 1F- Incomplete Fusion No Defect Indication
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : TANK 1-C2.A......................................... Position of Groove : 6G
Report No. : 28/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT.............................. Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : TANK 1-C2.B......................................... Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 29/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5 ..........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 29/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : I 800- BT1 -J2.1 ( TANK 1.T1 ).................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 30/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5 ..........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 30/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : I 800- BT1 -J2.2 ( TANK 1.L1 ).................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 31/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5 ..........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Capping W5 Accepted , After Repair Repair SI- Slag Inclusion No Defect Indication
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : I 800- BT1 -J2.2 ( TANK 1.L1 ).................. Position of Groove : 6G
Report No. : 31/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : I 800- BT1 -J2.3 ( TANK 1.T2 ).................. Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 32/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5 ..........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 32/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900- BT1 -J3.1................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 33/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5 ..........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 33/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900- BT1 -J3.2................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 34/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 34/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900- BT1 -J3.3................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 35/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 35/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900- BT1 -J3.4................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 36/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 36/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900- BT1 -J3.5................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 37/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 37/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900- BT1 -J3.6................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 38/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 38/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900- BT1 -J3.7................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 39/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 39/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : Ø 1900- BT1 -J3.8................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 40/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 , W5..........................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 40/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900- BT1 -J3.9................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 41/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 41/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : Ø 1900- BT1 -J3.10................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 42/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 42/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki , Suhadi Sastiawan
Date : 01-04-2022................................................................................. Joint No : TANK 1 - C3........................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 43/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 43/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : TANK 1 - C3.A........................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 44/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 44/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Project Package : PURE Data Centre JKT01-Bekasi....................................................... Document No. : PDC-JKT01-NDT-PT............................ Description :
…............................................................................................... Revision No. : R0...................................................... Appicable Mat. : ASME Section IX
Location : LOGOS Metrolink Logistic Hub Bekasi............................................... Issued Date : 21-03-2022........................................... Welder Name : Basuki
Date : 01-04-2022................................................................................. Joint No : TANK 1 - C3.B........................................ Position of Groove : 6G
WELDING SCHEMATIC
Report No. : 45/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 1 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
SKETCH
Figure 2
PT Procedure : ASME Section V..............
Acc. Standard : ASME Section IX..............
Welder Stamp No. : W1 ..............................
Welder Type : Double V Groove.............
Material Thk : 10 mm........................
Material Spec. : ASTM A36...........
Weld Process : SMAW...........................
DEVELOPER CLEANER/REMOVER
Type:
Type: Water : …..................................................................................................
˅ Drying : Magnaflux SKD-S2…………. Wet Post : ……...............................................................................................
˅ Solven : Magnaflux SKC-S............................................................................
Report No. : 45/PDC/JKT01/HVAC/BT1/NDT/PT Location : Warehouse DME Tangerang Date : 14-10-2022 Run Pipe Spec. : N/A Tank Size : Ø 1900 MM
Client : PT TATAMULIA NUSANTARA Page : 2 of 2 WPS No. : 001/WPS/DEM/ASME/20 Split Tee Spec. : N/A Weld Process : SMAW
Part of Weld Number Welder Code Accepted Rejected Remarks
Remarks :
EDY SETYAWAN
ASNT NDT PT MT Level II
Document No.
CHAPTER 3
DOCUMENTATION
CHAPTER 4
ATTACHMENT