Work Method Statement For Demolition
Work Method Statement For Demolition
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 1 of 9
Signature
:
Name:
Date:
Time:
Table of Content
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 2 of 9
Section Description
1.0 Introduction
2.0 Resources
2.1 Material
2.5 Qualification
3.3 Receiving
3.4 Handling
3.5 Storage
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 3 of 9
1.0 Introduction
This document shall address the typical works for the demolition for WP 11 CDE.
2.0 Resources
2.1 Materials
All materials used on site must be approved type and they are as follows: -
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 4 of 9
2.5 Qualification
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 5 of 9
- Location for storage and the type of material to store must be approved by Kinetics.
3.3 Receiving
- Upon arrival of the material, the consignment shall be verified by the supervisor to match
the packing list and inspected by Kinetics QAQC
- All material received at site shall be visually inspected for any damages in order to avoid of
work and also the quantity as per DO.
3.4 Handling
- Proper methods & equipment, i.e., trolley or pallet jack to be used for transferring of the
materials or tools.
- Supervisor shall monitor the work and ensure the work is complied with all safety
requirement.
3.5 Storage
- Proper barricade & barrier ownership tag to be used for materials storage.
- Daily housekeeping shall be carried out to ensure the cleanness of the area.
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 6 of 9
- Investigate & coordinate of existing buildings, structure, M&E which may affected the
progress of the works.
- The working areas must be barricade using barricade cone and safety tape to avoid people
to enter the working areas.
No Activity Sequence
1 a) To inform related Project Manager, System Owner and KINETICS EHS
management before start work for the day.
b) To obtain the entire relevant valid EHS document, SIPP and PTP before
start work.
c) To assign all the workers, stuff to attend safety induction before start work.
d) Get the valid permit for the workers and machinery to enter the site.
d) During the progress of activity, the work shall be under the continuous
supervision of an experienced foreman.
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 7 of 9
b) Obtained the entire relevant valid EHS document, SIPP and PTP before start
work.
d) Shall be use manpower to mobilize the materials into the work location and
storage area.
f) Get advised from KINETICS project management team for the location for
material storage.
g) Shall be used forklift to mobilize the materials into the work area if necessary.
h) Pallet Jack shall be used during work where necessary for mobilize the
material to work location needed.
4 To brief the workers on the job sequence and streamline their job for hazard
avoidance prior work starts.
6 To prepare the power supply to the working area by using extension wire for
temporary lighting if necessary.
7 Method Statement
Concrete Plinth Demolition
- Pre-inspection with Kinetic Engineer to confirm the demolish items and to
determine the existing structure and site condition.
- M&E services have to be completely terminated before the demolition start.
- Use either backhoe breaker or air compressor breaker to hack the concrete
plinths.
- Use oxy cutter to remove the rebar
- Use mobile crane to hoist the concrete debris from level 2 to level 1. Then
use forklift to transfer the debris to the cart away area.
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 8 of 9
steel.
- Use mobile crane or forklift to transfer the steel truss/frame
- The roof metal sheet and steel truss/frame have to return to kinetics.
Brickwall Demolition
- Pre-inspection with Kinetic Engineer to confirm the demolish items and to
determine the existing structure and site condition.
- M&E services have been completely terminated before the demolition start.
- Use air compressor breaker to remove the brickwall
- Forklift or trolley will be used to transfer the debris to the cart away area.
10 Housekeeping at end of each working day is a must for any scaffolding job.
Scaffolders on the site must ensure that:
- All equipment has been cleaned and stored correctly away from access
areas
- Never leave equipment in walkways or doors
- All fire exits and emergency access points are kept clear at all times and is
never blocked by equipment or rubbish
- Report any hazards you might find to a supervisor promptly
- Dispose of rubbish quickly and safely
- The gear is consolidated and is all out of harm’s way when handing over
scaffold
- Before leaving the site each day, make
Ref. no:
Prepared by:
(Signature)
Revision: 00
Name:
Date:
Contact no.:
Company: Page 9 of 9