Implementation Training
Day 1
1
Housekeeping
Emergency Exits
Toilets
Mobile Phones
Breaks
Lunch
Please restrict email
to break times
2
Today
Duration Break Start End
Topic (mins) Exercise duration Time Time
3
Preview of tomorrow
Duration Break Start End
Topic (hours) duration Time Time
DAY 2
Implementation and Operation 50 09:00 09:50
Checking 40 09:50 10:30
Break 15 10:30 10:45
Management Review 20 10:45 11:05
Use of tools and online aids 60 11:05 12:05
Project Plan 30 12:05 12:35
Lunch 60 12:35 13:35
Financial Analysis 30 13:35 14:05
Workshop - prepare presentations 5 65 14:05 15:15
4
Today
Duration Break Start End
Topic (mins) Exercise duration Time Time
5
Purpose of the course
Access to energy is becoming more costly and
environmentally damaging
The era of cheap energy is over (in many countries!)
Reduce energy consumption (kWh or GJ, etc.)
• Reduce cost
• Reduce GHG emissions
Role of energy efficiency
Benefits of a systematic approach to energy management
6
7
Would you allow this
man to make a $500
purchase on behalf of
your company?
What about $10,000?
8
Introductions
Name
Company
9
Today
Duration Break Start End
Topic (mins) Exercise duration Time Time
10
Climate Change Policy Scenarios
Source: IEA/ UNIDO 2010
11
Company Competitiveness
Benchmarking study in Russian Foundry sector
Energy
savings
12
Energy efficiency potentials in Russian industry
Technical savings potential (%)
OECD Developing
Sector and Product
countries countries
Petroleum refineries 10-15 70
Chemical and petrochemical
Steam cracking (excluding feedstock) 20-25 25-30
Ammonia 11 25
Iron and Steel 10 30
Cement 20 25
Pulp and Paper 25 20
Textile 10 20
Food and beverage 25 40
Other sectors 10-15 25-30
Source: UNIDO 2008 and 2011
13
13
13
Industrial Energy Efficiency Benefits
Energy efficiency has demonstrated, time and again, that
It saves industrial firms money
It reduces production and product costs
It increase reliability of operations
It has a positive effect on productivity and competitiveness
It can offer attractive financial and economic returns
Reduces risk/exposure to rising energy prices
Increases security of supply
….
15
Purpose of today’s training
Build enterprises’ and EE consultants’ understanding of
Energy Management Systems in line with ISO 50001
Benefits of EnMS & ISO 50001, and resource requirements for
implementation
Enable enterprises to put together a high-level project
management plan (time, resources, costs..) to implement EnMS
Enable enterprises to initiate the development and
implementation of an EnMS
16
Some terms to understand
Energy Management System (EnMS)
Systematic approach to the management of energy
use
Energy Management System Standard EnMS
Standardised approach to implementing an
EnMS
You may decide to base your EnMS on a Standard
standard e.g. ISO 50001:2011
Certification of EnMS
You may decide to have your EnMS certified to a Certification
standard
Self-evaluation and self declaration of
conformance
17
Discussion:
18
Today
Duration Break Start End
Topic (mins) Exercise duration Time Time
19
How does it work?
Reduce
kWh
Is it Make
working? Changes
What are
Do it! you going
to do?
20
Energy Management System
Management
participation
Management
Based on the concept of:
Yes
Responsibility
Plan
Management
Review
Policy Do
Check
Act
Planning
Implementation
Checking
& Operation
Day to day
operations
21
Six Key Concepts
Management
participation
1. Commitment
Management Yes
Responsibility • Roles and Responsibilities
Management
Review
Policy 2. Significant Energy Users
(SEUs)
Planning
3. Energy Performance
Indicators (EnPIs)
4. Opportunities List
Implementation
Checking
& Operation
5. Operational Control
Day to day
operations
6. Review
22
Tools – “UNIDO EnMS Tools.xls”
• Self-assessment • ER6 Maintenance Criteria
• Roles and Resp. (Key Concept #1) • ER6 Critical Op Param
• Scope • ER7 Technical Audits
• Policy • ER8 Opportunities List (KC #4)
• ER1 Data • Training
• ER2 Trends • Documents
• ER3 SEU List (KC # 2) • Op Cont (KC #5)
• ER3 SEU - Motors • Procurement
• ER3 SEU - Heat Users • Design
• ER3 SEU - Lighting • Non-conformities
• ER4 Drivers • Legal
• ER5 EnPIs (KC # 3) • Internal Audits
• ER5 Measurement Plan
23
Today
Duration Break Start End
Topic (mins) Exercise duration Time Time
25
Content/ Structure
1. What is being proposed?
2. The Current Situation
• Energy consumption and costs
• Energy cost trends
3. What is Energy Management?
4. What can be achieved?
5. What could/can we achieve?
6. How does it work?
7. What do we do next?
26
What is being proposed?
Reduced operating costs
27
The current situation – energy trends
3,000,000 39,000,000
2,500,000 38,500,000
2,000,000 38,000,000
1,500,000 37,500,000
Cost p.a.
1,000,000 37,000,000
kWh p.a.
500,000 36,500,000
consumed
- 36,000,000
Jan-11
Mar-11
Jun-11
Jan-12
Mar-12
Jun-12
Feb-11
Feb-12
Jul-11
Oct-11
Jul-12
Oct-12
Dec-10
Apr-11
May-11
Aug-11
Sep-11
Nov-11
Dec-11
May-12
Aug-12
Sep-12
Nov-12
Dec-12
Apr-12
28
Relative % of turnover
29
What can be achieved?
30
What can we achieve?
4,000,000
3,500,000
3,000,000
2,500,000
2,000,000
1,500,000
1,000,000
500,000
31
What is energy management?
It is how we propose to manage our use of energy!
Technical improvement
32
What can be achieved?
33
Our current level of energy management
34
How does it work?
Reduce
kWh
Is it Make
working? Changes
What are
Do it! you going
to do?
35
What sort of actions will we take?
Operation and maintenance initially
• Fix leaks
• Fix insulation
• Switch off
• Run optimum equipment
• Optimum settings
• Check controls
• Training
• Maintain improvements
36
What do we do next?
Make a decision to go ahead
37
See you in 15 minutes!
38
Today
Duration Break Start End
Topic (mins) Exercise duration Time Time
39
Management Role – Commitment (Key
Concept #1)
Management
participation
Give commitment
Management Yes
Responsibility
Sign policy
Management
Review
Policy Allocate resources
Assign responsibility
Planning Top management
representative
Give support
Implementation
Checking
& Operation
Make decisions
Day to day
operations
40
This is the foundation of the system
Most managements have limited resources
They can’t give all of us everything we want
They need to be persuaded that this is a good idea
Maybe they have if you are here!
You need to show quick results to sustain their interest
Your efforts will reduce costs
This feeds directly into increasing profits
You will improve the organisations environmental
performance
This is very good public relations
Make the boss feel good
You need to keep them convinced
41
Important Roles
We want someone at the top level of the organisation to
lead the energy management activities
• Direct the activities
• Represent energy management at senior level
• Gain support for energy management
• This is the management representative
We want someone to run the EnMS on a daily basis
• Know it in detail
• Coordinate its development
• Represent it at external audits
• This is the energy manager
In some cases both of these roles will be the same
person, in others the duties may be split
42
Management representative responsibilities
Implementing of the energy management system;
Reporting to top management on the performance of the
energy management system;
Reporting to top management on the energy performance
of the organisation;
Formation of an energy management team;
Plan and direct energy management activities;
In a larger organisation, most of the day to day energy
work may be completed by others, e.g. energy manager.
43
Energy Manager
In some organisations, this may be the same person as the
management representative
Often not a full time job;
For example, maintenance or engineering manager or engineer
Probably a technical person with energy engineering knowledge
Role
• Implement the EnMS
• Owns the EnMS
• Manages energy use
• Acts as auditee for the EnMS
Responsibility
• Varies with organisation
• Implementation
• Energy budget
• Reporting
44
Energy management team
Decide structure and membership based on size and
complexity of your organisation
Representatives from relevant departments
Production, finance, engineering, operations, senior management
representative, energy manager or engineer, etc.
Cross functional cooperation
Common and shared goal
45
Sample energy management team
(committee)
Management
Representative
Chairperson
Energy Manager
Coordinator
47
Roles and Responsibility (key concept #1)
48
Policy
Management
participation
Management
Management commitment
Yes
Responsibility
Not just a signature!
Management
Review
Policy
Define scope of EnMS
Appropriate to scale
49
Energy Policy document
It is an official document that demonstrates support and
commitment to improving energy performance
Doesn’t need to go into detail
Scope and boundaries of the system
Which plant, buildings, energy sources (water?) are included
The policy (and EnMS) should be appropriate to the nature and
scale of the operations
Small organisation -> simple EnMS
Large organisation -> simple EnMS!
Review and update regularly
Changes are usually minimal
Prepare at an early stage
Possibly update after planning if required
50
Policy should include
Commitment to continual improvement of energy performance through
the development and achievement of relevant objectives and targets.
51
Example
As an energy intense manufacturer of specialty glass, XYZ
Company strives to reduce its energy consumption and costs
and promote the long-term environmental and economic
sustainability of its operations. We are committed to:
Reduce energy intensity by 25% in 10 years in our manufacturing
and distribution operations
Ensure continual improvement in our energy performance
Deploy information and resources to achieve our objectives and
targets
Uphold legal and other requirements regarding energy
Consider energy performance improvements in design and
modification of our facilities, equipment, systems and processes
Effectively procure and utilize energy-efficient products and
services
52
Scope
Rationale for excluding any
Included Excluded source
Electricity LPG in the kitchen
Water
Natural Gas
53
Boundaries
Rationale for excluding
Included Excluded any area
Production
systems remote warehouse facility
All buildings
All utilities
54
Today
Duration Break Start End
Topic (mins) Exercise duration Time Time
55
Planning
56
Planning How much energy am I using?
Where am I using it?
Management
participation
Management
Which are significant users?
Yes
Responsibility
What is driving it?
Management
Review
Policy Who is influencing its use?
Do I need to have an energy audit?
If yes, focus it
57
Legal and other requirements
Probably good to review this first as it may impact later
decisions
It is part of the context
Develop a list of all requirements that might apply to your
energy use:
• Local, national and regional laws, e.g. EU Emission trading
scheme
• Corporate requirements, e.g. reports, plans, data, etc.
• Management requirements, e.g. monthly performance, annual
budget, etc.
• Voluntary agreements, e.g. with energy agency or customers
• Relevant standards e.g. ISO 50001
Review the list for compliance at regular intervals
58
Legal Tool
59
Develop plans
ER1. Energy bill and
sub-meter data
ER8. Identify
opportunities for
improved performance,
review and decide on
action plans
60
How much energy am I using?
How many people here know how much energy
their organisation used in the 12 months ending
last month?
How much did it cost?
How much did you use last year?
How much are you going to use next year?
How are you performing against your budget?
• Why are there deviations?
Are you using too much energy?
• If so, how much should you be using?
61
Acquire bills and sub-meter data
Review the data you already have:
• Bills include both energy consumption, cost and other parameters
You may have sub-meters
• Manually or automatically read
See tool Billing
62
ER2 – analyse trends
ER1. Energy bill and
sub-meter data
ER8. Identify
opportunities for
improved performance,
review and decide on
action plans
63
Actual annualised electricity usage and
costs
Blue line is consumption
Red bars are cost
64
Quantify SEUs
ER1. Energy bill and
sub-meter data
ER8. Identify
opportunities for
improved performance,
review and decide on
action plans
65
Significant energy users (Key concept #2)
66
Which systems?
What is the single largest energy user in your
organisation?
How much energy does it use?
What drives that use?
What causes it to increase or decrease?
Which people affect the energy use of that item/system?
67
How to quantify each energy user
Do you have sub-metering?
• This is the best situation
• Ideally automatically logged to a database
• Manually read also gives good information
• Are meters accurate and working
• Is data collection working and accurate
Do you have local meters?
• kW, A, flowrate, etc.
• These can be read manually and calculated/estimated
• Care with time of readings
Quantification or estimation of use
• Motor List
• Heat Balance
68
Motor list
69
What is the second largest user?
We need to know the answers to the previous questions
for all significant users (SEUs)
Ideally we keep working on the list until we know where at
least 80% of our energy is going
This list of SEUs will be the basis of most of the rest
of our system
Remember that a SEU can be either a large user or one
with good performance improvement potential.
70
Heat balance
Use what you know:
• Steam flow
• Feedwater flow (= steam flow approximately)
• Fuel flow (heat flow = fuel flow * efficiency)
• Gas bills
• Hot water flow and temperature difference (dT) (Q=m*Cp*dT)
Build up a balance
• Heat in = heat out
• If you have a significant gap, you may need to measure it
• Ultrasonic flowmeters, portable heat meters
• More challenging than electrical power
Typically fewer measuring points
71
Heat Users
72
SEUs
Estimated Equipment Contribution to Annual Energy Cost
0% 10% 20% 30% 40% 50%
Air Compressors - 75 kW
Water Chillers - 17.5 kW
Cooling Towers - 30 kW
Refrigeration - 963 kW
2 x Dough Blender - 45 kW
12 x Dough Sheeter - 1.5 kW
Cheese Blender - 22 kW
Extructor - 15 kW
Grinder - 75 kW
Vemag - 22 kW
2 x Oven Circ. Fan - 22 kW
2 x Oven Exh. Fan - 4 kW
Lighting - 25 kW
Other Equipment - 18 kW
Baking Oven - 586 kW
Baking Oven - 146 kW
73
Quantify drivers
ER1. Energy bill and
sub-meter data
ER8. Identify
opportunities for
improved performance,
review and decide on
action plans
74
Establish energy variables
Terminology: drivers, driving factors, variables, energy
factors, etc.
75
What is driving this use?
Top level electricity and fuel
Each SEU driver
If you can’t quantify a variable is there a real reason
• There rarely is a legitimate reason
• Maybe you are simply out of control
There are often indicators of significant savings from this
step
• Anomalies
• Demonstrate with examples
See tool Drivers
76
Energy Metrics
Details this afternoon.
Consider the drivers for each SEU
This relationship may be your baseline
Energy Performance Indicators (EnPI)
Baseline
Baseload
Regression Analysis
CUSUM
Link to checking
77
Baselines and EnPIs
ER1. Energy bill and
sub-meter data
ER8. Identify
opportunities for
improved performance,
review and decide on
action plans
78
Establish energy performance indicators
(EnPIs) (key concept #3)
Varying levels of complexity
Absolute energy consumption
Simple but ignores activity levels
Simple Ratios
Easy to use but can be misleading
Take account of activity levels
Can only deal with single variables
Regression analysis
More complex
Quantifies driver effects
Allows comparison of actual against expected use
Try to have an EnPI for each SEU
Tool EnPIs
79
Measurement Plan
Once SEUs are known
• Including variables
Reporting requirements can be specified
What meters and measurements are required to deliver
these reports?
How much can be achieved with existing instruments?
Manual vs. automated
List what new instruments are required
• Each new instrument should be able to justify its cost
• Don’t forget installation cost
• Electricity and liquid flow meters can be good value
• Gas flow meters tend to be expensive (steam, compressed air,
etc)
80
Sample measurement plan
81
Review operational control
ER1. Energy bill and
sub-meter data
ER8. Identify
opportunities for
improved performance,
review and decide on
action plans
82
Review Operation control
This is aligned with the review of training needs
It additionally checks operating and maintenance procedures
Check operating procedures
Are operators familiar with the energy impact of
operations?
Check maintenance procedures
Check maintenance frequencies
Are maintenance staff familiar with the energy impact of
their work?
This review will help to assess training needs
83
Types of people who impact energy cons
Immediate and direct impact
• SEU Operators
• Maintenance and external service personnel
Influencers
• Managers, supervisors, leaders
Production people
People who see things differently
• Cleaners
• Security
• Safety Officers
84
Significant people
Who operates the SEUs?
Who maintains the SEUs?
Who engineers the SEUs?
Who manages the SEUs?
85
Training Matrix
Make a list of all people who need to be trained
Make a list of potential training materials/courses
Develop a training matrix
• Who does what and when
• Use it also to record completion of each course
• If your organisation already has a training tracking system, use it.
Develop training materials
If external help is required identify potential training
service providers
86
Types of training
UNIDO Program for system optimisation
• Steam systems
• Compressed air
• Pumps
• Fans
• Motors
• Process Heating
Waste water treatment operation and maintenance
Introduction to the EnMS
Energy Vigilance (cleaners, security, safety)
EnPIs
87
Training matrix
88
Critical operating parameters
Each SEU has operating parameters which affect its
energy use
These need to be identified, quantified, recorded and
communicated, monitored and controlled
Boiler examples:
• Pressure, Total dissolved solids (TDS), stack temperature
(variable), stack O2, condensate return rate, feedwater tank
temperature
• Refrigeration examples:
• Delivery temperature, condensing temperature (temperature lift),
evaporator and condenser approach temperatures,
• Compressed air
• Pressure, dryness, pressure drops
89
Critical operating parameters
90
Maintenance criteria
91
Energy Audits (assessments)
ER1. Energy bill and
sub-meter data
ER8. Identify
opportunities for
improved performance,
review and decide on
action plans
92
System Optimisation
Examine the whole system and not individual components
Establish user requirements and specification
Examine opportunities with use
Examine opportunities with distribution
Examine opportunities with generation last.
93
Examine potential for renewables and
alternative energy sources
Which renewable sources are available?
Solar (thermal or photovoltaic)
Wind power
Biomass
Which renewable technologies are economical with these
resources?
Which alternative energy sources are available?
Waste heat recovery
Fuel switching
Which might be economical?
Cogeneration (Combined Heat and Power (CHP)
94
Develop and maintain an opportunities list
ER1. Energy bill and
sub-meter data
ER8. Identify
opportunities for
improved performance,
review and decide on
action plans
95
Opportunity List (Key Concept #5)
Develop a list of all potential ideas
Select items for implementation
• Prioritisation
Plan and manage their implementation
Note: the name of this list doesn’t matter
alternatives include:
• Savings Register
• Opportunities list
• ECO Register
96
Opportunity List
97
Which opportunities to implement?
98
Relationship
99
Sample objectives
ID Description Resp Target Date Status
1 Reduce electricity consumption by 15% JB 31 Dec2014
2 Increase awareness of energy matters to MM 31 Dec 2013
90% of employees
3
4
5
100
Targets
• What is the task to be done, use action words
101
Sample targets
ID Description Resp Target Date Status
1 Train all boilers operators on energy JB 31 Dec2011
efficient operations
2 Carry out 4 energy awareness training MM 31 Dec 2011 1 comp
sessions
3 Increase condensate recovery rate to JB 31 Dec 2011 83%
90%
4
5
102
Measurement and Verification (M&V)
How will you demonstrate that you actually made the
savings?
Need to take account of driving factors
Different levels of M&V for different opportunities
depending on scale and complexity.
Usually applied to each individual action plan item
Can also be confirmed using EnPIs
103
Focus of SEUs
ER1. Energy bill and
sub-meter data
ER8. Identify
opportunities for
improved performance,
review and decide on
action plans
104
Targets and action plans
You need to express your overall targets as savings in
kWh (or GJ) per year
Your action plan savings (kWh or GJ) should equal or
exceed your targets
Your EnPIs should be able to show progress or alert to
lack of progress
105
Six Key Concepts
Management
1. Commitment
participation
Management
Responsibility
Yes • Roles and Responsibilities
Management Policy 2. Significant Energy Users
Review
(SEUs)
3. Energy Performance
Planning
Indicators (EnPIs)
4. Opportunities List
Implementation
Checking
& Operation
5. Operational Control
Day to day
operations
6. Review
106
See you in one hour!
107
Today
Duration Break Start End
Topic (mins) Exercise duration Time Time
108
Exercise – develop a plan for this building
ER1. Energy bill and
sub-meter data
ER8. Identify
opportunities for
improved performance,
review and decide on
action plans
109
See you in 15 minutes!
110
Today
Duration Break Start End
Topic (mins) Exercise duration Time Time
111
Purpose of energy metrics
Objective support for decision making
Often subjective reasons
We need to know how much energy we are using
We need to know if performance is improving or not
We need to know if we are meeting targets
We need to be able to verify savings of improvements
We need to establish the following:
• Baseline
• Baseload
• Performance indicators (EnPIs)
Numerical basis
112
Energy Metrics
Various levels of complexity
Simple:
• Simple: consumption last month v same month last year
• Simple: compare actual consumption with budget
• Simple: annualised trend of cost and consumption
More complex (but beware!)
• Energy use per unit output
• Cooling energy per cooling degree day
• Specific energy consumption (SEC)
Regression analysis is usually the only way
Same principles apply to EnPIs and verification of
savings
113
What does this tell us?
114
Same gas data in annualised view
115
Annualised trend
Moving total of previous 12 months (or 52 weeks, etc)
Removes seasonal effects
Gives a real view of comparison v budget
Effects of a change stay for next 12 periods
Absolute numbers
• No allowance for changing drivers or activity levels
Very useful for forecasting, you can quickly judge what
next 12 months use will be
• You need to correct for known changes in output or other
116
Beware of simple ratios
Energy use per unit of output (Energy Intensity)
• e.g. kWh/T of product
• Useful in energy intensive industries for benchmarking internally
and externally
• Beware in others, especially in cases with large baseloads
• Almost of no value in judging energy performance
• Usually tracks output better than energy
Energy Efficiency (energy in compared with energy out)
• E.g. boiler efficiency is a useful indicator but beware:
• Decreasing boiler load through pipe insulation, leak repair or
demand management will almost always result in reduced boiler
efficiency due to lower loads
• Overall system efficiency will improve but not the boiler efficiency
117
Other indicators to be careful of
Specific Energy Consumption (SEC)
• For example air compressor SEC will usually increase if leaks are
repaired or demand reduced.
• This does not mean you shouldn’t reduce demand
• It means that care is needed in the use of this indicator
Coefficient of Performance (COP)
• Used as a measure of refrigeration plant performance
• = cooling load (kW) / electrical power to compressor (kW)
• COSP = cooling load (kW) / power to compressors plus
auxiliaries loads such as fans and pumps
• Often reduces as load reduces (centrifugal compressors can be
an exception)
118
What does this tell us about energy performance?
121
Problem: things make consumption vary
Weather
Daylight availability
Production throughputs
Mileages
Occupancy
…etc
122
Simple process
Energy = constant + slope X Production
123
124
Straight line formula
Y = mX + C
Energy (E) = Factor (F) * Driver (D) + Constant (c)
E = FD+c
In the previous case:
Gas = 47.947 * HDD + 14009
125
Difference between expected and actual
126
In general
Expected energy consumption can be any function of
relevant driving factors D
127
The main message
Establish relationships between energy consumptions and
appropriate energy variables
128
Baselines
Baseline is initial model
129
Baseline alternatives
Baseline will be used for future comparison of
improvements
Ideally based on regression analysis as shown
Can be absolute consumption, e.g. 1 GWh per annum
SEC: kWh per unit of output
Not desirable or indicative of real improvement
130
Targets
Alter the formula to reduce by targeted amount
E.G. multiply coefficients by 0.95
131
Historical baseline characteristic
Answers the question “how much would I have used in the
absence of my energy-saving measures?”
Allows absolute kWh savings to be computed
Gives clean, objective view
Production, weather, etc. already accounted for
132
Cumulative savings can be tracked
133
Baseload
The energy you use
when there is no
productive activity
Very often a major
opportunity for
improvement
Measure and
analyse baseload if
it is significant
14009 m3/mth in
this example
134
Energy Performance Indicators (EnPI)
Budget v actual consumption
Actual v expected or targeted consumption on a regular
basis (e.g. daily, weekly or monthly)
CUSUM of total energy and of each SEU
135
Today
Duration Break Start End
Topic (mins) Exercise duration Time Time
137
Tomorrow’s workshop
Break into 3 groups
1. Persuade your management that an EnMS is a good idea
2. Complete the planning phase of your EnMS development
3. Outline key EnPIs for your organisation
Each group will need:
A. One company to use as the organisation
B. Laptop with PowerPoint
C. Presenter
D. Person to prepare slides
65 minutes to prepare
7 minutes to deliver
138
Today
Day 1 End