Work Schedule
Work Schedule
Check design Assembly Debbugging Trial Run Pre -Acceptance FINAL -Acceptance Completed Delay Improvement
Dec-22 Jan-23 Feb-23 Mar-23 Apr-23 May-23 Jun-23 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-24 Feb-24 Mar-24
Name Project Name NO. Project Description
48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 1 2 3 4 5 6 7 8 9 10 11 12 13
Coating Machine_R&D BT2.340 Completed
Crimping Machine BT2.417 Completed
Auto Washing Glass Sensor BT2.422 Completed
Plan completed New project started
Measurement machine for SON NTC BT2.419 Debbuging 1. BT2. 420
2. BT2. 423
Inspection & Packing Air Integral sensor B58100A854AV1 BT2.423 Trial run
Dwi
HCII Coating Machine BT2.401 Assembly
Dip coating machine for MST BT2.436 Assembly
Type line 2 EOL Testing BT2.429 Assembly
Type line 2 Laser Marking & Packing BT2.429 Assembly
Time Plan for MST Line (Soldering, HCII Coating, Dip Coating & R-Measu
No Machine Station
BT2.401.001.000_SAFETY COVER
BT2.401.002.000_FRAME TABLE
BT2.401.004.000_TRAY INPUT
BT2.401.006.000_STRIP PUSHER
BT2.401.007.000_IMMERSION TEST
BT2.401.008.000_VALIDATION CHECK
BT2.436.001.000_FRAME ASSEMBLY
BT2.436.005.000_PULL UP STATION
BT2.436.006.000_COATING BATH
BT2.420.001.000_FRAME ASSEMBLY
BT2.420.002.000_CONVEYOR UNLOADING NTC
BT2.420.003.000_NTC TRANSFER TO INDEX TABLE
BT2.420.004.000_INDEX TABLE
BT2.420.005.000_AOI & NTC ALIGNMENT
BT2.420.006.000_TEMPERATURE BATH
BT2.420.007.000_MEASUREMENT STATION
BT2.420.008.000_NTC DRYING STATION
BT2.420.009.000_NTC UNLOAD & TRANSFER STATION
BT2.420.010.000_REJECT PULLOUT STATION
4 Measurment
BT2.420.011.000_NTC CLASS TRANSFER CONVEYOR
BT2.420.012.000_FIXTURE UNLOAD STATION
BT2.420.013.000_FIXTURE
BT2.420.014.000_NTC INPUT TRANSFER CONVEYOR
BT2.420.015.000_NTC OUT TRANSFER CONVEYOR
BT2.420.016.000_NTC LOADING STATION
BT2.420.017.000_NTC OUT TRANSFER CONVEYOR
BT2.420.018.000_NTC OUT BIN
BT2.420.019.000_NTC LOADING STATION V2
BT2.420.020.000_NTC LOADING STATION V3
Time Plan for Type 2 Line (Module 1 - Pin insert, Winding & Soldering), (Module 2 - Soldering AOI & Robotized molding), (M
No Machine
Month
Station PIC Status
CW
Plan
BT2.429.001.000_CONVEYOR TRANSFER Hengki
Actual
Plan
BT2.429.002.000_COVER CONVEYOR Hengki
Actual
Hengki/Naufal/ Plan
BT2.429.003.000_BASE MACHINE
Dwi Actual
Plan
BT2.429.004.000_COVER MACHINE AOI Hengki/Dwi
Actual
Plan
BT2.429.005.000_MEASUREMENT UNIT Dwi
Actual
Plan
BT2.429.006.000_AOI Hengki/Dwi
Actual
Plan
BT2.429.007.000_TRANSPORT DISCARGE UNIT Hengki/Dwi
Actual
Plan
BT2.429.008.000_OUTPUT Dwi
Actual
Plan
BT2.429.009.000_LASER MARKING Dwi
Actual
Hengki/Naufal/ Plan
BT2.429.010.000_BASE MACHINE & COVER SOLDERING
Dwi Actual
Plan
BT2.429.011.000_PIN INSERT Naufal
Actual
Plan
BT2.429.012.000_WIRE WINDING Naufal
Actual
Plan
BT2.429.013.000_SOLDERING Naufal
Actual
Plan
BT2.429.014.000_AOI SOLDERING Hengki
Actual
Plan
BT2.429.015.000_BASE MACHINE & COVER AOI SOLDERING Hengki/Naufal/Dwi
Actual
Plan
BT2.429.016.000_PNP Axis Fixture Naufal
Actual
40 41 42 43 44
2 3 4 5 6 9 10 11 12 13 16 17 18 19 20 23 24 25 26 27 30 31 1 2
44 45 46 47 48 49
3 6 7 8 9 10 13 14 15 16 17 20 21 22 23 24 27 28 29 30 1 4 5 6
49 50 51 52 1 2
7 8 11 12 13 14 15 18 19 20 21 22 25 26 27 28 29 1 2 3 4 5 8 9
2 3 4 5 6 7
10 11 12 15 16 17 18 19 22 23 24 25 26 29 30 31 1 2 5 6 7 8 9 12
7 8 9 10
13 14 15 16 19 20 21 22 23 26 27 28 29