ArcFlash Example7
ArcFlash Example7
Setup
Load the project file named “AF-Example7”. (The solution to this example is located in a
directory called “Solution7”. Open the solution project only to compare against your exercise
once completed.)
Utilize the Library from C:\ETAP xxx\lib (xxx= ETAP version currently being used)
Please make sure to have the following Options (Preferences) selected prior to beginning this
exercise:
Procedure
Step1
Open study case “AF-1-Phase”
In the “Info” page, select to include “Panel”, “UPS” & “1-Phase” systems under the 1-
Ph/Panel/1-Ph UPS Subsystem section
Navigate to the “AF Method” page and select the 1-Phase option under the Bus Fault Current
section. (This option automatically faults all 1-phase buses connected below the items selected in
the Info page.)
Run AF calculation and name the report “AF-1-Phase”. Answer the following questions:
1.1 What bolted short-circuit current level is used by the program to determine the 1-phase arcing
currents? (Clue: look at the display options and select Ibf-Bolted Fault Currents)
_____________________________________________________________________________.
1.2 What buses have arcing current variation problems? (Clue: Use the AFRA to determine this)
_____________________________________________________________________________.
Step2
Open study case “AF-1-Phase”.
In the “AF Method” page, activate the options “Energy Level for LV Equipment”
In the “AF FCT” page, activate the “Limit Maximum FCT” (set to 2 seconds) under the Fault
Clearing time (FCT) section.
Open the UPS1 editor, go to the Rating page, and change the Bypass switch to Open under the
Short Circuit Analysis section.
Run AF and name the report “AF-1-Phase-MaxFCT”
2.1 Based on the low voltage and transformer kVA criteria, which bus was automatically assigned a low
hazard?
_____________________________________________________________________________.
2.2 Which buses have a final clearing time longer than 120 cycles?
_____________________________________________________________________________.
2.3 What is the effect of the Bypass switch in the Arc Flash calculation? Why is the current contribution
so drastically reduced?
_____________________________________________________________________________.
2.4 For which bus does the program determine that the “First Upstream Protective Device” does not clear
the fault?
_____________________________________________________________________________.