0% found this document useful (0 votes)
49 views4 pages

SCM490 - 13 - ClearQuest Integration

Uploaded by

s.peermohd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views4 pages

SCM490 - 13 - ClearQuest Integration

Uploaded by

s.peermohd
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

Lab 13

ClearQuest® Integration
The purpose of this Laboratory is to review the materials covered in Module 13. By
answering these questions, you will be reminded of some of the key points about
integrating Rational® ClearQuest® with:
 Rational® Unified Change Management (UCM)
 Rational® ClearCase® (CC)
 Rational® Visual Source Safe (VSS)

Objectives

By answering the review questions in this exercise, you will:

 Identify the steps required to configure UCM/CQ, CC/CQ, and VSS/CQ.

 Describe the basic functionality of the UCM/CQ, CC/CQ, and VSS/CQ.

Exercise 13.1: Answer the following questions:

1. In the UCM/CQ integration, which level of UCM objects must be ClearQuest-


enabled?

2. True or False: You can use both the UCM/CQ integration and the CC/CQ
integration in the same project.

© Copyright IBM Corp. 2003 13 - 1


Course materials may not be reproduced in whole or in part without the prior written permission of IBM.
Student Workbook

3. True or False: In the CC/CQ integration, the request sets are implemented in CC as
a set of hyperlinks attached to a version.

4. In order to implement the UCM/CQ integration for change management, which


versions of ClearCase and ClearQuest are required?

5. True or False: You can have one ClearQuest schema run both the CC/CQ
integration and the VSS/CQ integration at the same time.

6. True or False: You cannot use the Rational Synchronizer to synchronize change
request records in Rational ClearQuest and requirement specifications in Rational
RequisitePro.

7. What is the difference between Update and Synchronize in Rational ClearQuest


Project Tracker?

13 - 2 © Copyright IBM Corp. 2003


Course materials may not be reproduced in whole or in part without the prior written permission of IBM.
SCM490 Mastering Rational ClearQuest Administration

Answers for Exercise 13.1:

1. Project.

2. False. At the project level, you can only select either UCM/CQ or CC/CQ, but not
both.

3. True.

4. Starting from ClearCase Version 4.0 and ClearQuest Version 2.0, UCM/CQ
integration is supported.

5. False. Any single ClearQuest schema can have either the CC/CQ integration or the
VSS/CQ integration, but never both.

6. True

7. Update is a one-way transfer of data from ClearQuest to Microsoft Project 2000.


Synchronize is a two-way transfer of information, with updates flowing first from
the ClearQuest database to the project plan and then from the project plan back to
the ClearQuest database.

© Copyright IBM Corp. 2003 13 - 3


Course materials may not be reproduced in whole or in part without the prior written permission of IBM.
Student Workbook

13 - 4 © Copyright IBM Corp. 2003


Course materials may not be reproduced in whole or in part without the prior written permission of IBM.

You might also like