KEY PLAN

TRAFFIC CONTROL LAYOUT


SPEED LIMIT 60 k.m/h
ROAD SIDE SHOLDER LANE TEMPORARY CLOSURE

LEGEND:

MEN AT WORK

SPEED LIMIT
60

CLOSE SHOULDER LANE

ELECTRONIC SIGN BOARD (KEEP LEFT ARROW)

KEEP RIGHT

TRANSITION AREA TRANSITION AREA


SAFETY CONE (Space -3m)

FLASHER LIGHT

WORKING AREA
90 320
40 25 120

06
60
200 500 m
200 300 m
END

CENTER MEDIAN CENTER MEDIAN

00 29.11.2022 ISSUED FOR APPROVAL


Rev. Date Description DR CKD APP
DRAWING STATUS
H.S.E

CLIENT

PROJECT TILTLE
CONTRACT NO.: 103-S4
OPERATION AND MAINTENANCE
OF LANDSCAPE ASSETS ON ABUDHABI ISLAND
NORTH WEST

CONSULTANT

CONTRACTOR
AL Dhafra Irrigation System L.L.C.
Tel. : +971 2 642 88 12, Fax : +971 2 642 88 13
P.O.Box : 127519, ABU DHABI, U.A.E
E-mail : [email protected] Web: www.adis.ae

Work Description CONTRACTOR

1- Remove for Agriculture Waste. DETOUR TYPICAL DRAWINGS


(Center Median)

2- Remove for Dead of trees and palms. DATE


DESIGNED
20.12.2022 SCALE
SHEET No.
N.T.S @ A3

3-Shaping for High Trees. DRAWN


CHECKED
APPROVED
I.E
O.K
O.K
CONTRACT No.
DRG. No.
S-103-S4

ADIS-S103-S4-SD-GN-03
REV.
00

2022-027946
KEY PLAN
TRAFFIC CONTROL LAYOUT
SPEED LIMIT 60 k.m/h
ROAD SIDE SHOLDER LANE TEMPORARY CLOSURE

LEGEND:

MEN AT WORK

SPEED LIMIT
60

CLOSE SHOULDER LANE

ELECTRONIC SIGN BOARD (KEEP LEFT ARROW)

TRANSITION AREA TRANSITION AREA


KEEP RIGHT

SAFETY CONE (Space -3m)

FLASHER LIGHT

WORKING AREA

CENTER MEDIAN CENTER MEDIAN

500 m 200
300 m
60

DNE
120 25 90
320

00 29.11.2022 ISSUED FOR APPROVAL


Rev. Date Description DR CKD APP
DRAWING STATUS
H.S.E

CLIENT

PROJECT TILTLE
CONTRACT NO.: 103-S4
OPERATION AND MAINTENANCE
OF LANDSCAPE ASSETS ON ABUDHABI ISLAND
NORTH WEST

CONSULTANT

CONTRACTOR
AL Dhafra Irrigation System L.L.C.
Tel. : +971 2 642 88 12, Fax : +971 2 642 88 13
P.O.Box : 127519, ABU DHABI, U.A.E
E-mail : [email protected] Web: www.adis.ae

Work Description CONTRACTOR

1- Remove for Agriculture Waste. DETOUR TYPICAL DRAWINGS


(Center Median)

2- Remove for Dead of trees and palms. DATE


DESIGNED
19.12.2022 SCALE
SHEET No.
N.T.S @ A3

3-Shaping for High Trees. DRAWN


CHECKED
APPROVED
I.E
O.K
O.K
CONTRACT No.
DRG. No.
S-103-S4

ADIS-S103-S4-SD-GN-03
REV.
00

2022-027946