Scope: 1. Lntroductron 1
Scope: 1. Lntroductron 1
l
ria
ate
dM
1. lntroductron 1
1.I Purpose and Scope 1
1.2 Importance and Nature of Earthwork 2
1.3 Important Definitions 3
hte
l
-sol- 26
ria
4.1 Standard-Modified Ignorance 26
4.2 The Ninety-fivePercent Fixation 29
4.3 Correlations of Standard and Modified
Proctor Densities 38
ate
4.4 Bearing Capacities of Roctor Densities 38
4.5 Changing Borrow 40
4.6 Problems Evolvingfrom Traditional Practice 43
4.7 Cost and Time Pressures:A Summary 45
4.8 Glossary 46
dM
5. Applied Research and Devdopment 47
5.1 Effects of Specific Index Property Variations 47
5.2 Artificial Fills 52
5.3 Waste Materials as Fills 73
5.4 Effects of Mechanical Laboratory Compactors 80
hte
5.10 Glossary 84
Contrasting Requirements 86
6.2 Potential Problemswith Earth Structures 87
6.3 Controlled and Uncontrolled Fills 101
6.4 Nonstandard and Special Fills 101
Co
l
7.4 Specification and Project Evaluation 129
ria
7.5 Glossary 132
ate
8.2 The Compleat Field Inspector 156
8.3 Case Histories 166
8.4 Glossary 189
9. SepticSysterns 190
dM
9.1 BackgroundTechnology 191
9.2 Site Investigation and Evaluation 195
9.3 Design and Construction 206
9.4 Renovation/Repair of Marginally PerformingSystems 229
9.5 Maintenance 230
9.6 Septic System Management 240
hte
I O . Techonomlcr 242
10.1 EngineeringDesign 242
10.2 Legal Costs 243
rig
ReOerences 253
Co
Index 259