Index
Index
l
Index Terms Links
ria
A
ate
AASHTO system 8
Absorption field 195
Acceptable risks 152
Acquisition, of borrow 130
dM
Aeration 112
Aerobic systems 194 224
Cromaglass 225
Rotordisk 240
Air-drying (laboratory compaction) 23
hte
Approach fills 55 61
Architect 2 129
Arrow hammer 110
Co
Artificial fills 53
case histories 56 72
Elastizell 72
expanded polystyrene (EPS) 71
l
history (of development) 69
ria
hybrid design 73
patents 70
research 71
ate
Solite 73
Styrofoam HI 54
Artificial subbase 63
Ash, fills 74
dM
ASTM Compaction Requirements 22
ASTM designations 144
Atterberg Limits 8 130
B
hte
presumptive 139
Bedrock, depth 130
Blasting 131
Co
Blunders, avoidance 12 16
Boiling 87
Boring(s) 117
l
Boring depths 135
ria
Boring inspection 157
Boring program 138
Borrow:
ate
area, mound 118
changing 40 103 120
heterogeneous 118
loading equipment 131
dM
sources 130
texture, changes 120
Breaching 91 92
Bridging, in fills 103
Building codes 132
hte
C
California Bearing Ratio 115 122
rig
levels of 154
Changing borrow 40 103 120
Cheap jobs 151 152
Co
Cinder fills 62
Classification:
plastic soils 20
l
of soils 104
ria
Classification system(s) 8 211
auxiliary 5
Clay(s), lean, fat 20
ate
Clay fill 117
Client 128 129
Coefficient of permeability 87
Cohesionless soils 3
dM
Cohesive soils 3
Cold weather 121
Cold weather gear 157
Collapse, of clays 108
Communication with clients 154
hte
Compacted clays 94
Compacted density, condition 21
Compaction:
blunders 12
rig
definition 17
field 3
granular soils 124
py
history 12
laboratory 3
modified Proctor 14
Co
moisture content 18 25
standard and modified Proctor 15
standard Proctor 13
l
degree of compaction 119 122
ria
field density testing 126
by index properties 125
nuclear method 126
ate
plate loading 123
pocket penetrometer 125
proof rolling 126 132
special circumstances 126
dM
water balloon 126
Compaction curves, locations, shapes 20
Compaction Data Book 40 47
corrections 50
Compaction equipment 132
hte
Compactor(s) 103
hand 109
types 104
Compleat field inspector 156
rig
Core wall 86
Coring operations 177 252
Correction 129
l
Cost:
ria
factors 151
pressures 45
Styrofoam 55
ate
Critical exit hydraulic gradient 91
Cut-and-cover construction 62
Cutoff wall 86
dM
D
D10 size 11 218
Dense sand 108
Density corrections 50
Density gradients 81
hte
l
Drying, scarification 120
ria
Dry of optimum 83 95
Dumped backfills 106
ate
E
Earth dam(s) 2 86 117
caveat 84
Earth structures 87 92
dM
Earthwork contractors 169
Earthwork equipment 131
Elephants 106
Elevation measurements 157
Embankment 95
hte
stability 99
End-result specifications 26 115 119
End-result and suggested method 119
Energy (of) compaction 110
rig
l
Excavated surfaces 117
ria
Excavating 117
Excavation, ease of 131
Excavation equipment 131
ate
Exclusion, in laboratory compaction test 23
Exculpatory clauses 156
Expansiveness 84 86
Expensive jobs 151
dM
Expert witness 127
F
Fat clays 49
Favors, gratuities 185
hte
Floating foundation 62
Flocculent structure 95
Flood control dams 99
Flooding 109
rig
Flotation 68
Field clothing 157
Field density checks 120
py
locations 120
Field equipment lists 157
Field moisture 116
l
Field tests, soil texture 214
ria
Fill 5 101
condition 101 117
controlled 101
ate
correction measures 121
load-bearing 101
partially controlled 101
placement 118
dM
special 101
texture 101 117
uncontrolled 101
undulation 17 24
use of 117
hte
waste 73
Fill compaction 86
Fill control procedures 134
Fill inspector 44
rig
Foam plastic:
fills 53
poured 64
Co
rigid 64
Foundation:
design 138
Foundation (Cont.)
failure 127
selection 138
l
suitability 132
ria
Four-year fill option 224
Frost action 87 92
Frost-susceptible soils 92
ate
Frozen soil 121
G
Garbage 74
dM
Garbage In, Garbage Out 156
Geodex 105
Geostick 81 139
Geotechnical engineer 2
Glacial till 131
hte
Glass, as fill 74
Graded filter 97
Grade-separation case study 61
Grain size distribution 214 218
rig
H
py
Highway(s) 58
insulation 56
Honeycomb structure 95
l
Horizontality measurements 157
ria
Hydraulic fills 101
Hypothetical case histories 57
ate
I
Index properties 2 123
as design basis 151
Index property variations 42
dM
Infiltrator system 209 223
Infrastructure repair 93
In situ 46
Inspection 128 134
Inspector 128 134 140 143 154
hte
181 184
Instant moisture balance, use 24
Insulation 56 77
rig
J
Jacked sample method 145
Jetting 109
py
L
Laboratory procedures 251
Co
l
Legal costs 243
ria
Level adjustments 164
Liability insurance 243
Lift preparation 118
ate
Lift thickness 115 118
Lightweight fills 53
Lime-stabilized soils 122
Limitations, reasonable 155
dM
Limiting zone 193 195
Liquefaction 92
Liquid limit 125
Litigious society 126
Load-bearing fills 116
hte
M
Major problems 26
ninety-five percent fixation 29
Co
standard-modified ignorance 26
Making do 105
Marginally permeable 87
l
Mineralogy 117
ria
Moisture computation 111
Moisture content 118
Moisture control 110
ate
adjustments 118
Moisture and energy sensitivity 21 25
Moisture sensitivity 49 99
Mottling 195
dM
N
National Dam Inspection Program 87
National Sanitation Foundation 225
Non-load-bearing fills 116
hte
Nonplastic, fines 48
Nonspecialists 1 2 43 114
Nuclear density method 148
rig
O
Observer 128
Odors 102
py
Organics 103
OSHA 132
Ottawa sand 125 143
Ozone depletion 68
l
Pace length 160
ria
Passes, number of 119
Payment, terms 129
Percentage compaction 119
ate
for clays 83
example 36
method of determining 32
Percent fines 41 48
dM
Percent saturation 25
Perched water table 197
Percolation testing 193 203
Permanency 55
Permeability 50
hte
l
Poleset 64
ria
Postcompaction precautions 121
Precast foam fills 53
Precompaction equipment 131
ate
Pressure bulb 135
uses, exceptions, limitations 137
Presumptive bearing capacity 81
Proctor density 122
dM
bearing capacities 38
correlations 38
Professional liability insurance 127
Proof rolling 132
Pumping 93
hte
Q
Qualitative fill control 179
Quantity, of borrow 130
rig
R
Rain problems 120 121
Random selection technique 179
Co
Reconnaissance 156
Record keeping 157 180
Reinforced earth 63
l
Relative density 34 97 107
ria
Report writing 176
Representative batches, preparation 24
Representative samples 118 173
ate
Research 47
Retaining structures 63 108
Richter scale 11
Road bases 115 122
dM
Roadway embankments 116
Rock 97
estimate, quantity 131
rippability chart 131
ripping, blasting 131 187
hte
Roofing 87
Route construction 93
Rubber, as fill 73 74
Rubble fills 103
rig
S
Sample bags 162
py
l
losses 90
ria
pressures 90
Select fill 10 22 25 96 117
See also Septic systems
ate
Seminars available 220 252
Septic systems:
additives (chemical, biological) 237
aerobic systems 224
dM
alternating systems 191 229
background technology 191
bed systems 192 206
Cook County Cortege 211
Department of Environmental Resources 194 202 230 240
hte
design/construction 206
dribble stone 219 228
environmental regulations 191 194 195 197 222
experimental systems 194
rig
l
Rotordisk system 224
ria
seasonal high water table 195
seepage analysis 191
select fill 211
ate
septic tank no-no’s 231
septic tank pumping 235 236
site investigation/evaluation 195
standard systems 191 206
dM
suspended solids 207 231
Tabasco sauce(!) 223
test pits (probes) 193 195
Thetford system 226
trench backfill 209
hte
computation 107
plates 120
Shear failure 99
py
Shocks 92
Silts 21 93 98
Simulation, of field conditions 110 142
Sliding 99
Slope stability 99
Soft wet clay 108
l
Soil classification, visual 163 215
ria
Soil Conservation Service (SCS) 130
Soil identification, classification 189 214
Soil maps 130
ate
Soil sampling 252
Specialist’s services 118 131
Specifications 3 114
authority 128
dM
careless 31
enforcement 126 185
evaluation 129
implementation 126
nontechnical aspects 129
hte
responsibility 128
special criteria 122 126
Specific gravity 19
Split spoon sampling, granular soils 217
rig
of excavations 181
Standard Penetration Test 32 46 216
Static loadings 125
Co
Structure of clays 94
Styrofoam HI 54
Subbases 122
l
Subgrade 95 115 137
ria
Subgrade modulus 123
Subgrade stabilization 58
Subsidence 175
ate
Suggested guide specifications 116
Suggested method and end result 115
Supercompactors 105
Surface damage 121
dM
Surveying techniques 161
T
TALB 20
Tamping rollers 104
hte
sampling 162
Test strips 119
Textural tests 145
py
Texture 20 117
acceptable 126
conformance 142
Co
of borrow 130
Time, pressures 45
Total cost context 57
l
Traffic vibrations 107
ria
Trench backfill 106
ate
Unacceptable end results 129
Uncompacted fills (densities) 81
Unconfined compressive strength 125 139 217
Undulation of fill 120
dM
Unified Soil Classification System 104
Uniformity coefficient 46 51 223
Unsuitable material 117
Uplift pressure 85
Utility installations 56
hte
V
Varved clays 136 189
Vector control 102
rig
W
Washington Densometer 144
l
Waste fills 73
ria
case stsudies 73
energy conservation proposal 76
environmental regulations 75
ate
geotextile reinforcement 75
rabbits (!) 78
research 75
rubber plastic 78
dM
steel slag 77
telephone books 77
tire residue 77
tires (shredded) 75
Waste materials 73
hte
Water absorption 55
Water balloon method 144
Water table, depth 130
Weather restrictions 120
rig
definition/delineation 199
policy 201
Wet of optimum 83 95
l
ria
ate
dM
hte
rig
py
Co