False Ceiling Level: LEGEND: (Standard)

The document contains information about gas piping installation including: - Operation Pressure is listed as 900 mbar - Test Pressure is listed as 06 bar - A legend is provided defining various piping components and accessories such as ball valves, pressure regulators, gas meters, etc.

Uploaded by

tarique mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
46 views1 page

False Ceiling Level: LEGEND: (Standard)

The document contains information about gas piping installation including: - Operation Pressure is listed as 900 mbar - Test Pressure is listed as 06 bar - A legend is provided defining various piping components and accessories such as ball valves, pressure regulators, gas meters, etc.

Uploaded by

tarique mohammed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Operation Pressure = 900 mbar

Test Pressure = 06 bar

False Ceiling Level

LEGEND: (Standard)
D/D - DROP DOWN BV BALL VALVE GM - GAS METER

R/A - RAISE ABOVE IV ISOLATING VALVE TR - TRANSITION FITTING


- HIGH LEVEL SV SOLENOID VALVE G C P -GAS CONTROL PANEL

FFL - FINISH FLOOR LEVEL PR PRESSURE REGULATOR GMB GMB- GAS METER BOX
AFFL - ABOVE FINISH FLOOR LEVEL EPB EMERGENCY PUSH BUTTON FACP FACP- FIRE ALARM CONTROL PANEL
FR - FIRE RESISTANT S SIREN / SOUNDER - EXTERNAL POWER SUPPLY
1PR - 1STAGE PRESSURE REGULATOR PG PRESSURE GAUGE
IVB- ISOLATION VALVE BOX
S
GA

GA S
S

HRV HYDROSTATIC RELIEF VALVE


GA

S
A
S G
GA

2PR - 2ND STAGE PRESSURE REGULATOR

GA S
S

GA
GA

S
GA S
S
GA

S
GA
GA S

GA
GSAS
GA S
GA S

3PR - 3RD STAGE PRESSURE REGULATOR FIRE EXTINGUISHER 2PRVB- 2PR VALVE BOX
S

FE
GA
GA S
G

GA
A S

GA S

GA S
S

S
GA
G

GA S
AS

GA S

GA S
GA S
S
GA

A S
G
GA
S

FD - FLOW DIRECTION HOSE


VAPOR PIPE ST STRAINER (ST)
LIQUID PIPE EXP.PROOF GAS DETECTOR
ELECTRICAL WIRING
GAS DETECTOR

DWN CHKD APD


REV. DESCRIPTION Date APD
(ACC) (ACC) (ACC)
00 ISSUED FOR APPROVAL BK MJ AJ AJ

01 ISSUED FOR APPROVAL BK MJ AJ AJ

CONTRACTOR'S REVIEW & COORDINATION


CHECKED/COORDINATED
DISCIPLINE
DATE SIGNATURE

AR - ARCHITECTURAL

CV - CIVIL

EL - ELECTRICAL

ME - MECHANICAL

ST - STRUCTURAL

LS - LANDSCAPE

ID - INTERIOR DESIGN

OT - OTHERS

CONSULTANT'S STAMP APPROVAL

UNITED DEVELOPMENT COMPANY


MASTER PLAN DEVELOPER OF THE PEARL - QATAR
CONSULTANT:

MAIN
CONTRACTOR:
Construction Development Company LLC
Building No. 29, Al Rawabi Street, Street No. 840, Al Muntazah
P.O.Box 8388, Doha - Qatar
TEL. +974 40371712, 40371714, 40371718 (Ext. 101)
FAX. +974 40375751

FUEL
CONTRACTOR:

KEY
PLAN:

PROJECT:
FIVE STAR HOTEL & RESIDENCE AT MARSA ARABIA
THE PEARL - QATAR - BALL ROOM KITCHEN- PIPE EXTENSION OF TANK CODE-3022 C

DRAWING
TITLE: SCHEMATIC, CAUSE AND EFFECT FOR LPG SYSTEM

THIS IS A CAD DRAWING AND MUST NOT BE ALTERED MANUALLY


Scale: AS SHOWN Original Drawing Size: A0
Drawing Number: UG-LPG-2022-035-03