0% found this document useful (0 votes)
23 views1 page

B01 TL101P1

Download as pdf or txt
Download as pdf or txt
Download as pdf or txt
You are on page 1/ 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

TL101P1 B01 047 PO 22E OWNER:


SHEET NO. BLDG NO. PROJECT NO.

MATCH LINE
FOR CONTINUATION REF TO
R R

CLIENT:

TL101P2
Q Q

MAIN CONSULTANT:

P
1 2 3 4 5 6 7 8 9 10 11 12 P

SUB CONSULTANT:

6000 6000 6000 6000 6000 6000 6000 4000 4000 4000 4000 4000

ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-1 ITR-1 ITR-1
N N

ITR-2
Notes

ITR-2

ITR-1
A
VIP ENTRANCE
G 036

ITR-2

ITR-2

ITR-1
M M
8000

ITR-2

ITR-2

ITR-1
CONFERENCE HALL
G 039
OPEN TO ABOVE
DRAIN SHAFT

L L
B BUFFET
ITR-2

ITR-2

ITR-1
G 041
OPERATIONS MANAGER OPERATIONS EMPLOYEES
G 050 G 049

TRANSPORTATION MANAGER VIP ENTRANCE


EMPLOYEES ENTRANCE TRANSPORTATION EMPLOYEES
G 051 G 035
G 053 G 052
ITR-2

ITR-2

ITR-1
8000

LOUNGE TOILET
K K
TOILET G 038 G 037
G 040

MALE TOILET CORRIDOR


ITR-2

GARBAGE ROOM

ITR-2

ITR-1
G 056 G 054 G 045
C ESCAPE CORRIDOR PANTRY GAS CABINET
SERVICE PROVIDER
G 043 ELEVATOR LOBBY
G 062 LOBBY G 044
G 042
J G 057 J
CONTROL ROOM ACCESS PANEL
ITR-2

G 063

ITR-2

ITR-1
DRAIN SHAFT
8000

H.C TOIET INNER COURT


G 058 G 055 LIMIT OF SLAB ABOVE
GAS CABINET BATTERY ROOM MAIN ATRIUM
OPEN TO ABOVE
STAIRS G 048 G 002
FEMALE TOILET
ITR-2

ITR-2

ITR-1
G 061 LOBBY GAS CABINET
G 060
G 059
H
HVAC SHAFT IT H
CCTV G 046
STORAGE
G 064
D ELEC. CLOSET
G 047
OPEN TO ABOVE
ITR-2

ITR-2

ITR-1
GAS CABINET
OUT

IN SIDE ENTRANCE LOBBY


G 003

G CCTV MANAGER SECURITY EMPLOYEES CONTROL POINT & RECEPTION G


GAS CABINET SECURITY MANAGER
8000

G 067
ITR-2

ITR-2

ITR-1
G 068 G 069 G 070

SERVER ROOM CONNECTION SYSTEMS


G 065 G 066
ITR-2

ITR-2

ITR-1
E
F F

ENTRANCE BORCHE
Sunday, September 25, 2022 1:33:39 PM

G 001

001
ITR-2

002
ITR-2

ITR-1
8000

KEY PLAN

E E
ITR-2

ITR-2

ITR-1
F
PART PART
1 2
Sheet size - ISO A0 (841* 1189 mm)

ITR-2

ITR-2

ITR-1
D D
ITR-2

ITR-2

ITR-1
ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-2 ITR-1 ITR-1 ITR-1
A DEC-2022 DETAILED DESIGN
C REV C
DATE ISSUED FOR DRW CHK TL PM
100 mm

6000 6000 6000 6000 6000 6000 6000 4000 4000 4000 4000 4000 PROJECT DATA:

AL SOKHNA PORT RENOVATION

MAIN BUILDING
1 2 3 4 5 6 7 8 9 10 11 12 AL AIN AL SOKHNA , EGYPT.

DISCIPLINE

B TELECOMMUNICATIONS B
50 mm

SHEET TYPE
NORTH OF DWG.
LOW CURRENT SYSTEMS
Scanning scale

SHEET TITLE

GROUND FLOOR PARTIAL PLAN


PART 1 OF 2

°
99
TRUE_NORTH SCALE PROJECT NO. SITE NO/BLDG NO SHEET NO. REV .
10 mm

A 1:100 047 PO 22E B01 TL101P1 A A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
THIS DRAWING AND ITS CONTENT IS PRODUCED BY THE ARCHITECTURE AND URBAN ENGINEERING CONSULTANTS, ALL RIGHTS RESERVED.