Maintenance Manual of 6M33 Series Industrial Diesel Engine
Foreword
6M33 series diesel engine is of high speed diesel engine independently developed by Weichai
Power Co., Ltd and manufactured by Baudouin (Weifang) Power Co., Ltd. This series diesel engine
features the advantages of compact structure, high reliability,excellent power, economy and
emissionindicators.The series is also quick to start, simple to operate and easy to maintain.And
especially the emission indicator meets the international advanced emission standard.
This maintenance manual describes the safety precautions, maintenance methods, common
inspection and adjustment and troubleshooting of 6M33 series diesel engine. We have expended
every effort to make the contents of this manual systematic, simple and practical. But judging the
malfunction cause of diesel engine is a really precise work. Before the cause is basically identified,
do not disassemble the diesel engine casually, or it will not only eliminate the malfunction, but also
lead to more serious malfunction due to improper assembly after disassembly. The inspection and
maintenance of critical components particularly the electronic control system and the turbocharger
shall be performed by experienced personnel using dedicated instruments. Persons who are
Following the continuous increasing and improvement of 6M33 series diesel engine
variants, all changes will be made without further notice. Please access http://www.weichai.com
Recommendations and opinions on further product improvement from you are welcome.
July, 2016
2
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Special Notice
Before the operations, the operator of the diesel engine must carefully read this maintenance
manual and strictly abide by the operation and maintenance practices specified in this
manual.
The diesel engine has been tested strictly in accordance with the testing specification of
our company before delivery. It’s prohibited to adjust the ECU data or increase the power
of the diesel engine without permission. Note that failure to observe this requirement
The rotor of the turbocharger generally rotates at high speeds when the engine is in
operation. It is strictly prohibited to have any moving objects (for examples, hands, tools,
cotton yarns) appear near the inlet of the turbocharger, otherwise serious injury or damage
could occur. The rotor can only be removed by turbocharger maintenance specialists or by
The number of uses for important bolts is limited and shall not exceed the specified reuse
times.
The oil and fuel added to the diesel engine must be of the grades specified in the operation
and maintenance manual. Dedicated clean filters must be used for the addition. Before
addition, the fuel shall settle for 72 hours. Before driving the vehicle, check that the coolant
It’s prohibited to run the diesel engine without the air filter, in order to prevent the supply
After the cold start of the diesel engine, slowly increase the engine speed, instead of running
at high speed suddenly or long-term idling. After the running under heavy load, run the
engine at low speed for 5~10min before stopping, instead of stopping the engine suddenly
After the engine is stopped, if the temperature of working environment is probably below 0℃
and the coolant without antifreeze additive is used, fully drain the coolant from the water
3
Maintenance Manual of 6M33 Series Industrial Diesel Engine
The checking and repair for all parts of the electric system must be fulfilled by the
The checking and repair for all parts of electronic control system must be fulfilled by the
The diesel engine is oil sealed at the time of delivery to prevent rusting. The oil sealing
period for diesel engine is generally one year. At the expiration of one year, it should be
4
Maintenance Manual of 6M33 Series Industrial Diesel Engine
5
Maintenance Manual of 6M33 Series Industrial Diesel Engine
6
Maintenance Manual of 6M33 Series Industrial Diesel Engine
7
Maintenance Manual of 6M33 Series Industrial Diesel Engine
1
Maintenance Manual of 6M33 Series Industrial Diesel Engine
2
Maintenance Manual of 6M33 Series Industrial Diesel Engine
3
Maintenance Manual of 6M33 Series Industrial Diesel Engine
6 M 33 X XXX EX XX
Variant code
Emission level
Power code
Type code
Displacement
Moteur diesel
Number of cylinders
4
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Length 1820
Overall
Width 1036
dimentions (mm)
Height 1406
Weight (kg) 2090
During the hoisting, maintain level the centerline of engine crankshaft. It’s prohibited to hoist
in tilted or one sided. Hoist up and down should be slowly. (See Figure 1-6).
Correct Wrong
◆ After the diesel engine is unpacked, the user shall firstly check the diesel engine and its
accessories as per the delivery packing list, and check the engine appearance for damage
(1) Wipe the anti-rusting layer and anticorrosive agent on the exposed parts;
(2) Check the water plug and oil plug, check for water temperature and oil temperature
sensors, and ensure that all parts to be self-provided are completely fitted.
Notice: Do not start the diesel engine before it’s correctly installed and connected at the final
position. When the diesel engine is running in an enclosed environment, keep well ventilated to
5
Maintenance Manual of 6M33 Series Industrial Diesel Engine
(1) The engine oil shall meet the specification, otherwise it will probably lead to insufficient
engine oil pressure and thus abnormal wear and difficult to start. The engine oil must be
extremely clean.
(3) Open the oil filler cap and add the engine oil. The engine oil must be filtered by the filter
(4) Place the diesel engine at a level position and withdraw the oil dipstick to check the oil
level. For the first adding, add the oil till the level reaches the upper limit of oil dipstick.
◆ Adding of fuel
(1) The diesel fuel used shall meet the specification.
(2) The diesel fuel used must be clean. It's better to place the diesel fuel under stationary state
for more than 72 hours before adding. The diesel fuel shall be added into the fuel tank via
(1) Loosen the outlet port screw of the fuel delivery pump by half turn. Operate the manual
pump of fuel delivery pump, till the diesel fuel overflows, and then tighten the screw.
(2) Loosen the air bleeding screw on the fuel filter. Operate the manual pump of fuel delivery
pump, till the diesel fuel overflows, and then tighten the screw.
(3) Loosen the fuel return port screw of fuel pump, operate the manual pump of fuel delivery
pump, till the diesel fuel overflows, and then tighten the air bleeding screw.
(4) Continue to operate the manual pump, check the fuel pipeline for presence of leakage, and
◆ Adding of coolant
The coolant is mixed from softened clean water and anticorrosive agent or antifreeze. Ensure
Add coolant through the water filler port of radiator or heat exchanger and bleed the air from
6
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Check the coolant level. If the coolant is insufficient, add coolant. If the diesel engine remains
hot, do not add a great deal of coolant. Dramatic temperature change could cause damage to the
engine parts. If there is no coolant under special cases, it’s allowed to slowly add cold water in
moderate temperature. Add the coolant through the filler port, till the coolant overflows. Start the
engine. While the engine is running (1,000r/min), continue to add the coolant, till the coolant level
The engine oil level shall be between upper and lower markings on the oil dipstick. If
necessary, add engine oil through the engine oil filler port.
Check all accessories of diesel engine for reliable connections and solve any abnormal
phenomenon. Check the starter system for normal wiring and check and ensure that the
Before starting the engine, operate the acceleration and stop control levers on the fuel
injection pump to ensure flexible motions. Rotate the crankshaft of diesel engine for
Turn the key to position “1” to power on the control panel. The “oil pressure warning
lamp" automatically will turn on for 10s (Sfety line test of ultra-low engine oil pressure).
It’s recommended to test the indicator lamps, bulbs, and buttons once (by pressing the
Turn the key to position “START” to start the engine and then release the key. The key
7
Maintenance Manual of 6M33 Series Industrial Diesel Engine
At the start of diesel engine, if the diesel engine fails to start within 10s, immediately release
If the engine can’t be started by three consecutive attempts, stop the attempt and find out and
During the working of engine, the “oil pressure warning lamp” and the "battery power”
◆ The auxiliary starter shall be used to start the diesel engine under cold temperature. By
activate the electric heating flange via relay, the engine can be started successfully under
low-temperature environment.
◆ After the start of diesel engine, idle the engine for 3min, and then increase the speed to
1000r/min to 1200r/min with some load. Only when the coolant temperature is above
60ºC and the oil temperature is above 51ºC, can the engine running with full load. The
◆ In the first running-in period of 60h (the first 3000km running), the diesel engine should
work with load less than the moderate load.
◆ When driving in slops, decrease the speed in time. The diesel engine should not work for a
long time at maximum torque. Also, the engine should not be operated for a long time
◆ Parameters and checking locations to be observed at all times during operation are as
below:
a) Oil pressure of main oil passage:≥200 kPa(idling working conditions), (450~650) kPa
8
Maintenance Manual of 6M33 Series Industrial Diesel Engine
◆ Check the exhaust color, to estimate the performance of the injector and the load of the
engine. In the case of serious black or white smoke, stop and check the engine.
◆ Check the diesel engine for presence of water, gas, and oil leakages. If any, stop the
a) The fuel consumption is relatively low at max torque, and increases along with the
rotation speed rise.
b) The torque reaches its peak value within the medium speed range;
c) The engine power increases along with the speed rise, and reaches its rated value at
rated speed.
temperature in winter.
seasons.
c) Coolant: Add antifreeze additive into the cooling system and choose the coolant of
d) Start: The auxiliary starter can be adopted if necessary in winter. After starting the
engine, only operate the engine with load and high speed when the oil pressure and
e) Before the cold season begins, be sure to check the electrolyte liquid level, viscosity
and unit voltage. If the engine is not going to be operated for a long time and under
very low temperatures, the battery should be removed and stored in a warmer room.
f) Shut-down of the engine: When shutting down the engine in a cold climate, unload the
engine first and then run the engine at idling speed for 1 to 2 minutes. And then stop
the engine after the water and oil temperaturesdecreased. The coolant with antifreeze
additives should not be drained out after shutdown. Otherwise, open the drain valve or
9
Maintenance Manual of 6M33 Series Industrial Diesel Engine
plug on the engine body, oil cooler cover, radiator and water inlet pipe to drain the
◆ Avoid shutting down the engine at full load. Before the shut-down, engine load and speed
should be reduced, and the engine should operate at idle speed or low-load condition for 3
to 5 minutes to allow the piston, cylinder head, liner, bushing and turbocharger have
enough time to cool down, in order to avoid cylinder and bearing damage. This is
particularly important for turbocharging engines because the bearing and oil seal in the
turbocharger are to be affected by the high temperature of the exhaust gas. When the
engine is running, the heat will be transferred away by the cycling lubricating oil. But
when the engine shuts down suddenly, the turbocharger temperature will increase greatly
◆ Turn the key switch to position “OFF” or press the stop button to stop running of engine,
till the flywheel stops rotation or the speed indicator on the instrument panel points zero.
◆ For the engines that there is no antifreeze in the circulating water, drain the cooling water
after shut-down in cold weather to prevent freezing damage to the engine. The draining
valve under the oil cooler can be used to drain the water inside the engine. The drain plug
on the radiator should also be removed to discharge the cooling water in the radiator.
10
Maintenance Manual of 6M33 Series Industrial Diesel Engine
2.1 Fuel, Lubricating Oil, Coolant, and Auxiliary Materials for Diesel Engine
2.1.1 Fuel
For Weichai Power Stage II, China III, EGR series and China IV, China V series diesel engines,
grade CF-4, CH-4, CI-4 and CJ-4 oil should be used respectively. For gas engine, special oil for gas
engine should be used.
For the first filling of oil pan, the oil level should be reach the upper marking on dipstick. The
oil capacity of 6M33 series diesel engine is about 60.5L, and oil grade should be CF-4 or above.
See Table 2-1 for the relationships between oil viscosity and temperatures.
Note:
1) Before starting the diesel engine, allways check the engine oil level in oil pan.
11
Maintenance Manual of 6M33 Series Industrial Diesel Engine
2) Do not check the oil level while the diesel engine is running.
The freezing point specification for Baudouin engine special coolant includes -25ºC, -35ºC,
and -40ºC. Please choose Baudouin special coolant of different freezing points based on the local
environmental temperature.The principle is to choose the coolant with freezing point lower than the
local minimum temperature of about 10 degrees, see Table 2-2.
Note:
1) Make sure to periodically check the coolant and, to prevent the corrosion damage,
timely replace depending on actual situations.
2) It’s prohibited to use water or low quality coolant as the engine coolant.
The auxiliary materials and sealant application is shown in table 2-3 amd table 2-4.
Table 2-3 Auxiliary Materials Used for Diesel Engines
SN. Name Color Purpose and location
Molykote pulver Applied on flat and smooth metal surface to
1 (fine molybdenum Black prevent seize
powder) For example, the outer surface of cylinder liner
Molykote G-N
Lubrication before the lubricating oil pressure
Plus
builds up.
2 (Molybdenum Dark grey
For example, applied onto the intake valve
disulfide, oil
stem
solution)
12
Maintenance Manual of 6M33 Series Industrial Diesel Engine
13
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Oil dipstick
Belt
14
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Figure 2-3 Oil filler port, drain plug and oil filter
15
Maintenance Manual of 6M33 Series Industrial Diesel Engine
C. Using the feeler gauge, check the clearance between valve bridge top plane and valve
rocker arm (figure 2-5). If the clearance is too large or too small, adjust the adjustment
bolt on the rocker to meet the above-mentioned clearance requirement.
16
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Adjustment
bolt
D. After the checking of 1st cylinder or 6th cylinder, turn the engine crankshaft for 360º to
make the 6th or 1st cylinder to working stroke and then check and adjust the remaining
valves.
17
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Fuel filter
Intake
Exhaust manifold
manifold
18
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Caution: It’s absolutely prohibited to run the engine without air filter, otherwise dust
and impurities will get into the diesel engine and cause early wear of engine.
Disassemble the filter element from the air filter and flap lightly the end face to fall off the
dust or blow backward (from the inside out) with compressed air.
19
Maintenance Manual of 6M33 Series Industrial Diesel Engine
6M33 series diesel engine is designed and manufactured under strict quality assurance system
and each delivered diesel engine passed the specified tests. In addition, the diesel engine is a kind
of high precision machinery and the long-term guarantee of its functionality is closely related to the
normal maintenances. The causes leading to earlier failure of diesel engine are generally as below:
◆ Operation against rules or improper management and use.
◆ Failure to fulfill maintenance as specified or even repair instead of maintenance.
◆ Unqualified parts, especially the counterfeit products procured due to temptation of cheap
prices, which will greatly shorten the service life of diesel engine;
◆ Inappropriate grade of fuel or lubricating oil or unqualified fuel or lubricating oil.
The commonly used diagnostic methods for engine failures are generally:
◆ Observation: Observe the characteristics, such as exhaust, to determine the failure (Fig.
3-1).
◆ Listening: According to the abnormal sound, determine the nature and extent of the failed
location (Fig. 3-2).
20
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Cause Troubleshooting
(1) Starter does not work Troubleshoot the electric circuit failure
(2) Ambient temperature is too low Use auxiliary starting device
Expel the air; Check the pipe joints for leakage and repair
(3) Air trapped in fuel system
if any
(4) The inlet filter screen or hose of
Remove dirt. Check fuel cleanliness
fuel supply pump clogged
Check the plunger and delivery valve; Repair or replace
(5) Faulty fuel injection pump
the damaged parts
(6) Damage or leakage of valve train
Check and adjust
or fuel supply pipe
(7) High-pressure fuel pipe damaged
Repair or replace
or fuel leakage
(8) Fuel injector failure Check the atomization of fuel injector
Check the valve and cylinder gasket for leakage and
(9) Insufficient compression
check for worn piston rings; Repair or replace the faulty
pressure in cylinder
parts if any
21
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Cause Troubleshooting
Check the fuel pipe and its joint for leakage; Check
(1) Air trapped in fuel system whether the bleeder screw is securely tightened; Expel
the air out of the fuel system
Take down the filter body. Remove dirt and moisture; If
(2) Fuel filter clogged
necessary, replace the filter element
(3) Poor fuel quality with excessive
Clean the filter, and replace fuel
moisture
Check, clean and repair the piston and valve of the fuel
(4) Fuel supply pump does not work
supply pump
(5) Idle speed too low Re-adjust
Cause Troubleshooting
Check the air filter and intake pipe; Clean or
(1) Intake system (air filter) clogged
replace the filter element
Check and adjust the valve timing; Check the
(2) Exhaust back pressure is too high
exhaust pipe for clogging. Remove clogging if any
(3) Insufficient pressure in turbocharging Check and troubleshoot the leakage in the
system connecting pipe
(4) Turbocharger works abnormal Replace the assembly
(4-1)Compressor, turbine flow passage
Clean or replace
clogged
(4-2) Floating bearing failure Replace
(4-3)Carbon or sludge deposit in the back
Clean
of turbine and compressor
22
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Cause Troubleshooting
Check the air filter and intake pipe for
(1) Intake system clogged
clogging; Remove clogging if any
Check the exhaust pipe and brake valve for
(2) Exhaust back pressure too high
clogging; Remove clogging if any
Replace fuel in accordance with the
(3) Poor fuel quality
requirements
Check the fuel pipe for clogging; Remove
(4) Fuel pipe clogged
clogging if any
Check the fuel pipe for leakage; Remove
(5) Leakage of fuel pipe
leakage if any
(6) Instable atomization of fuel injector Check, adjust and repair the fuel injector
Adjust the valve clearance and fuel supply
(7) Incorrect valve or fuel supply timing advance angle in accordance with the
requirements
(8) Gas leakage from cylinder gasket Check the compression pressure in the cylinder
(9) Excessive bearing shell gap, diesel engine
Check and overhaul the diesel engine
overhaul is needed
Replace the cylinder liner, piston and piston
(10) Piston scuffing
rings
(11) Insufficient pressure in turbocharging Check and troubleshoot the leakage in the
system connecting pipe
(12) Turbocharger works abnormal Check and replace the assembly
(13) Damage or leakage in intercooler Replace or repair
23
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Cause Troubleshooting
(1) Intake pipe clogged or high exhaust back
Clean the intake or exhaust pipe
pressure
(2) Poor fuel quality Clean the fuel system, replace fuel
(3) Incorrect valve or fuel supply timing Adjust according to requirements
(4) Instable atomization of fuel injector Check, repair or replace
(5) Excessive fuel injection Check and adjust
(6) Insufficient pressure in turbocharging Check and troubleshoot the leakage in the
system connecting pipe
(7) Turbocharger works abnormal Check and replace the assembly
(8) Damage or leakage in intercooler Replace or repair
(9) Incorrect working point of smoke limiter Readjust
Cause Troubleshooting
24
Maintenance Manual of 6M33 Series Industrial Diesel Engine
3.2.7 Oil gathering at the air inlet port and inlet pipe of turbocharger
Cause Troubleshooting
(3) Oil pan level too high, excessive oil Check and release appropriate amount of oil
Cause Troubleshooting
Cause Troubleshooting
25
Maintenance Manual of 6M33 Series Industrial Diesel Engine
joint
(8) Pressure regulator valve in main oil passage
Check, clean or repair the valve
failure
(9) Main oil passage clogged Check and clean
(10) Excessive bearing shell gap, or damaged
Check and replace
bearing shell
(11) Excessively-worn parts and components Check and overhaul the diesel engine
Check whether diesel fuel smell comes from the
engine oil; Measure the flash point of the engine
(12) Diesel fuel leaking into engine oil
oil, which shall not be lower than that of new
engine oil
Cause Troubleshooting
(1) Coolant level in expansion tank is too low Check for leakage; Add coolant
(2) Radiator of expansion tank clogged Clean the radiator
Adjust the belt tension in accordance with the
(3) Slack water pump belt
requirements
(4) Damaged washer or worn impeller of water
Check, repair or replace
pump
Check the water pipe, pipe joint and washer;
(5) Damaged water pipe is sucking air in
Replace the damaged ones
(6) Thermostat failure Replace
(7) Expansion tank clogged Check, clean and repair the expansion tank
Check the oil level; If any leakage, repair it and
(8) Insufficient oil in oil pan
add engine oil
Cause Troubleshooting
(1) Air filter element is unqualified or damaged Check and replace the air filter element
Check the intake pipe, gasket and connecting
(2) Short circuit of air intake system
sleeve; Repair or replace the damaged ones
(3) Engine oil filter element is not replaced Replace the filter element at the required
timely interval
Check the oil level; Check for and repair
(4) Insufficient oil in oil pan
leakage. Add engine oil
26
Maintenance Manual of 6M33 Series Industrial Diesel Engine
(5) Engine oil grade is not compliant Replace with compliant engine oil
(6) Engine oil quality failure to meet
Use engine oil of compliant grade
requirements
(7) Oil passage clogged Clean the oil passage
(8) Piston ring is broken or worn Replace the piston ring
(9) cylinder liner or piston is worn or piston Take down and inspect the piston and cylinder
scraping liner; Repair or replace the damaged ones
(10) Crankshaft axis is not in line with the axis
Check and repair the mounting bracket
of driven shaft
Check the cumulative driving distance to see
(11) Part/component is worn excessively
whether overhaul is needed
Cause Troubleshooting
Cause Troubleshooting
(2) Poor contact of circuit Check the circuit, and tighten the terminals
27
Maintenance Manual of 6M33 Series Industrial Diesel Engine
Cause Troubleshooting
(3) Poor contact of electric brush Clean or replace the electric brush
Clean the oil stain; Polish the commutator by
(4) Commutator is dirty or burnt using sandpaper, or replace the commutator
assembly
(5) Terminal unsoldered Resolder
28
Industrial 6M33 Series Diesel Engine Service Manual
4.1 Overview
During dismantling and assembling of diesel engine, please follow operating instructions in
this manual strictly and pay attention to operation steps containing danger and safety marks, so as
to ensure personal safety and avoid accidents.
For the reason that the diesel engine is dismantled in reverse installation procedures, only one
item is selected for instruction in this maintenance manual unless otherwise specified herein.
Tightening torque of special bolts will be specified in relevant installation procedures, and
unless otherwise specified herein, please refer to Chapter V, Tightening Torque of Standard Bolts.
This sign is a world-recognized “safety warning sign” for industrial purposes, which stresses
the importance of the following information. Please make sure that you know what potential risks
are and how to ward off such risks. The violation of such warning information can lead to property
loss, personal injury and even personal casualty.
The common danger signs are usually used to indicate general warning. In this manual, the
warning informations are classified as per the levels of hazard effect (minor injury-related, severe
injury-related, and death related).
This warning sign indicates a potential hazard which can lead to serious
injury even death or great property loss, if the occurrence cannot be
avoided.
CAUTION The cautions in this manual can indicate how to properly operate
and safely use the engine manufactured by the company.
However, the potential hazards cannot be removed by reading the
manual. The considerations will not be beneficial to the correct
use unless the implicatureis properly understood.
29
Industrial 6M33 Series Diesel Engine Service Manual
The warning information in the manual cannot cover all possible conditions! To apply an
application or method beyond those recommended in this manual, make sure that the operation will
never cause any danger to you, to others or to the equipment.
Picture Definition
Wear hand protectors
No fire
No smoking
No mobile phones
Combustibles
During use of the diesel engine, many potential dangers may occur without any signs. Hence,
this manual cannot give warning instructions for all kinds of potential danger. If the procedures
taken by you are not recommended ones, please ensure the same procedures are safe to operate and
do not result in any damage to property.
30
Industrial 6M33 Series Diesel Engine Service Manual
To use a method or tool beyond those recommended in this manual, the user shall always
ensure the personal safety, avoid danger of life to the user or to others, meanwhile, make sure that
the use, maintenance or repair method will not result in damage risk or safety hazard.
The following “health care considerations” are specified to reduce the risk of engine
maintenance staffs suffering from any contamination.
a) Avoid repeated exposure to used oil for a long time;
b) Wear the protective clothing and water-proof gloves properly, if available;
c) Do not place the oily rag in the pocket;
d) Avoid contaminating clothes especially underwear with oil;
e) Wash working clothes regularly, and throw away the oil-impregnated clothes and shoes that
cannot be cleaned up;
f) In case of cut and injury, take first-aid measures as soon as possible;
g) Before working, always apply some protective cream which will make it easier to remove
the oil in case that the skin is contaminated with mineral oil;
h) Use soap and hot water, or liquid soap and nail brush to wash hands for the convenience of
removing all oil stains. If the grease secreted by skin is washed off, the product containing lanum
can moisturize the skin;
i) Do not clean the skin with any gasoline, kerosene, fuel, thinner or solvent;
j) If the skin is discomfort, seek for medical care immediately;
k) Remove oil from the parts before transportation, if available;
l) If the eyes are under threaten, wear goggles or protective mask. Always prepare eyes wash
liquid within reach;
m) To repair the engine, do not splash oil or other liquid on the floor. If hydrocarbon or other
liquid leaks unexpectedly, take all essential measures to isolate the area to keep the environment
clean and to protect the personnel from injury;
n) The hydrocarbon, ethylene, glycol or petroleum shall be transferred, stored and recycled
31
Industrial 6M33 Series Diesel Engine Service Manual
under the safety and environment standard in the local country.The following "Precautions for
health protection" are to reduce pollution risks.
Please observe relevant environmental protection laws and regulations with respect to disposal
of waste oil and hydrocarbons. For details, consult local officials.
1) Most accidents in connection with use, maintenance and service of diesel engine are
resulted from failure to observe safety rules and basic precautions. So, you should know risks you
face and take corresponding preventive measures to avoid occurrence of accidents. To conduct
operation, maintenance and service of the diesel engine, you should be trained, and have relevant
skill and use appropriate tools.
2) Failure to follow relevant instructions given in this manual may result in serious accidents,
even endangering the operator's life. Baudouin(Weifang) Power Co., Ltd. cannot foresee all
potential risks. Similarly, guidelines and instructions specified in this manual are not exhaustive.
3) Before proceeding with maintenance or repairing, a signboard containing "Don't Use" or a
similar sign should be placed on the starter switch.
4) Before use of the barring rod, necessary preventive measures should be taken.
5) Ensure that the maintenance site and surrounding environment are suitable for safe
operation.
6) Ensure the maintenance workshop or area around the diesel engine is clean and neat.
7) Before working, please take off your ring, necklace and watch. Please wear a suitable
working uniform.
8) Before working, please check whether corresponding protective equipment (goggles, gloves,
shoes, masks, working uniform, helmet, etc.) are within effective life.
9) Do not use faulty or unsuitable tools.
10) Stop the diesel engine during maintenance or service.
32
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
The cylinder head is located on the upper portion of the cylinder block and combined with
piston head to form the combustion chamber. The parts connected with the cylinder head include
air filter, intake manifold, exhaust manifold, water outlet pipe, fuel injector, cylinder head cover,
cylinder head gasket, and some parts of valve mechanism, as shown in the Figure 4-1.
Fuel injector
Rocker arm High pressure
Thermostat oil pipe
Water outlet pipe
Exhaust manifold Intake manifold
Cylinder head
lubricating oil pipe
Oil-gas Air filter
separator
2) Disassembly
a) The disassembling steps are indicated in turn:
b) Disassemble the air filter. Refer to the disassembling instruction of intake and exhaust
system for details.
c) Disassemble the fuel return pipe of fuel injector and the high pressure fuel pipe. Refer
to the disassembling instruction of fuel system for details.
d) Disassemble the thermostat and water outlet pipe.
e) Disassemble the exhaust manifold. Refer to the disassembling instruction of intake
33
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
Engine
hanger plate
Hexagon
bolt
2) Disassembly
a) Disassemble the parts fixed on the hanger plate, loosen the hexagon bolts fixing the
engine hanger plate in turn, and take out the hanger plate, as shown in Figure 4-2:
3) Inspection and Maintenance
a) Before installation the hanger plates, distinguish the front hanger plate from the rear
one. The front hanger plate shall be installed at the front side of the engine (the fan
side). The rear hanger plate shall be installed in the rear side of the engine (the
flywheel side);
b) Check the front and rear hanger plates for cracking and other failure and check the
hexagon head bolts for presence of failure. Replace with new parts if necessary.
4) Assembly
a) Tighten the M12 hex bolts that attach the hanger plates to the end plates.
1) Exploded view
Hexagon socket
Cylinder head cylindrical head screw
cover
Rubber O-ring
Cylinder head
cover gasket
2) Disassembly
a) Loosen the cylinder head cover bolts in turn and vertically take out the cylinder head
cover and cylinder head cover gasket, as shown in the Figure 4-3.
3) Inspection and Maintenance
a) Check the cylinder head cover for presence of cracking and other damage. If any,
replace with new cylinder head cover;
b) Upon detection of oil permeation or leakage at cylinder head cover gasket, check the
cylinder head gasket for failure and replace with new cylinder head cover gasket.
4) Assembly
a) The cylinder head cover gaskets can be used only once. Replace with new ones in
case of repair. Before installing cylinder head cover gasket, check and ensure that new
cylinder head cover gasket is free of manufacturing and use defects and damages;
b) Wipe clean the top face of cylinder head and assemble cylinder head gaskets correctly
in turn;
c) Apply oil to the rubber O-ring, install O-ring into groove of cylinder head cover, wipe
clean the cylinder head cover, and assemble the cylinder head covers onto the cylinder
head in correct sequence;
d) Install and tighten the cylinder head cover bolts.
36
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
Flanged bolt
Hose clamp
Cylinder head
Hollow bolt lubricating oil pipe
Sealing gasket
Cylinder head
lubricating oil inlet pipe
Hollow bolt
Combination
sealing washer
2) Disassembly
a) Loosen the hollow bolts fixed on the cylinder block and cylinder head and take out the
lubricating oil pipes of cylinder head, as shown in Figure 4-4:
3) Inspection and Maintenance
a) Check the oil pipes for presence of oil permeation and leakage. Upon detection of oil
permeation or leakage, judge the failure state and replace with new lubricating oil
pipes or sealing gaskets.
4) Assembly
a) Fix the cylinder head lubricating oil pipe assembly onto the cylinder head and cylinder
block by using hollow bolts with sealing gasket.
37
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
Auxiliary bolt,
cylinder head
Main bolt,
cylinder head Washer
Clamping
block
Cylinder head
Valve stem
sealing sleeve
Cylinder head
gasket
2) Disassembly
As shown in Figure 4-5:
a) Loosen nuts of cylinder head auxiliary bolts and take out clamping blocks;
b) Loosen the cylinder cover main bolts;
c) Before disassembling the cylinder head, ensure that the fuel injectors are disassembled,
otherwise the fuel injector nozzle will be easily damaged during the placement of
cylinder head;
d) Disassemble the cylinder head and place the disassembled cylinder head on a paper
board to avoid wearing upper surface of combustion chamber and other sealing
surfaces. If the more than one cylinder heads aredisassembled, mark the cylinder
heads with cylinder numbers for problem analysis;
e) Disassemble the cylinder head gasket. And mark the cylinder numbers on the cylinder
head gaskets for problem analysis;
f) Check and replace the cylinder head auxiliary bolts if necessary;
g) Dismantle the intake and exhaust valves by referring to Instructions for Dismantling
of Valve Mechanism;
38
Industrial 6M33 Series Diesel Engine Service Manual
h) Disassemble the valve stem sealing sleeve by using the special tooling or use pliers to
clamp the outer wall of valve stem sealing sleeve and rotate upward to lift out the
valve stem sealing sleeve.
3) Inspection and Maintenance
a) Cylinder head
Before dismantling of the cylinder head, first inspect whether there is water
leakage, oil leakage, gas leakage and other abnormal phenomena, so as to accurately locate
position where the problem occurs, and accurately analyze the problem.
Clean the cylinder head, and clean the surface of the combustion chamber, valve
seat, intake and exhaust valves, intake and exhaust ports, and remove the carbon deposit
and mucilage, as well as inspect surface conditions.
b) Appearance inspection
Inspect discoloration and crack of the cylinder head carefully, and in case of crack,
carry out penetrant inspection.
c) Valve sinkage
The valve sinkage is the vertical distance from the bottom surface of the valve to
the bottom surface of the cylinder head, and the difference between the valve sinkage
measurement value and the required value can reflect the wear of the valve and valve
seat. It is possible to use depth micrometer to measure the valve sinkage as shown in
Figure 4-6;
For the required valve sinkage value, refer to the Table 4-3, and if the valve
singkage exceeds the permissible range, it is required to replace the cylinder head with
a new one to ensure reliability of the engine. If the valve sinkage does not exceed the
permissible value, dismantle the valve for inspection and then inspect the sealing
surface of the valve seat ring. Check whether there is apparent wear and abnormal
39
Industrial 6M33 Series Diesel Engine Service Manual
damage to the valve and the sealing surface of the valve seat ring.
sleeve.
g) Cylinder head bolt
The cylinder head main bolt can be reused for at most three times.
4) Assembly
a) Install the cylinder head gasket;
The cylinder head gasket can be used once only, and in case that it is returned for
repairing, it must be replaced with a new one;
Wipe clean the top plane of cylinder block and place the cylinder head gasket as
per the corresponding pin holes;
Inspect whether the cylinder head gasket is assembled properly.
b) Attach the cylinder head gasket and then install the cylinder head to the cylinder
block;
Wipe clean the cylinder head carefully and ensure that there is no dust, debris,
sand and other contaminants, and then further wipe clean the bottom surface of the
cylinder head;
Inspect whether there is foreign bodies in the cylinder, and the top surface of
cylinder head gasket is clean;
Use the guide rods to screw them into the cylinder head bolt holes;
The cylinder head gasket shall be free of distortion, deformation, and damage.
41
Industrial 6M33 Series Diesel Engine Service Manual
c) Install the cylinder head main bolts loosely. Apply an appropriate amount of
lubricating oil to the threads and support faces of cylinder head main bolts.
d) Add the clamping blocks and circular washers, loosely install the cylinder head
secondary bolts, and assemble end plates on two ends of cylinder block;
e) Apply an appropriate amount of lubricating oil to the threads and support faces of
cylinder head secondary bolts;
f) Tighten the cylinder head main and secondary bolts in five rounds:
①For the 1st round: Pre-tighten the main bolts in the numerical sequence with the torque
of 80N.m; then pre-tighten the secondary bolts in the alphabetic sequence (A-->G,
H-->N) with the torque of 80N.m. Before pre-tightening the secondary bolts, be sure to
loosen them, which have already been slightly tightened manually;
②For the 2nd round: Tighten the main bolts by 60º in the numerical sequence; then tighten
the secondary bolts by 60º in the alphabetic sequence;
③For the 3rd round: Tighten the main bolts by 60º in the numerical sequence; then tighten
the secondary bolts by 60º in the alphabetic sequence;
④For the 4th round: Tighten the secondary bolts by 60º in the alphabetic sequence;
⑤For the 5th round: Tighten the secondary bolts by 30º in the alphabetic sequence.
42
Industrial 6M33 Series Diesel Engine Service Manual
g) Assemble the sealing bush of the valve stem on the valve guide;
43
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
44
Industrial 6M33 Series Diesel Engine Service Manual
1 Engine Block 1
2 Cylinder Liner 6
3 O-ring 12
4 O-ring 6
5 O-ring 6
6 Main Bearing Cap 6
7 Thrust Bearing Cap 1
8 Main Bearing Bolt 14
9 Camshaft bush 1
10 Camshaft bush 6
11 Bowl Plug 5
12 Parallel Pin 1
13 φ10 Pulling Rivet 5
14 Piston Nozzle Set 6
15 Parallel Pin 16
16 Bowl Plug 4
17 Handhole Cover 1
45
Industrial 6M33 Series Diesel Engine Service Manual
18 Gasket 1
19 Oil Filling Tube 1
20 Hexagon Head Bolt 2
21 Plain Washer 1
22 Rivet 1
23 Oil Filling Plug 1
24 Lowerthrust plate 1
25 Upperthrust plate 1
26 Handle Cover Gasket 3
27 Hexagon Head Bolt 39
28 Handhole Cover 1
29 Handle Cover Gasket 1
30 Handhole Cover 2
31 Main Bearing Upper Shell 7
32 Main Bearing Lower Shell 7
33 Sensor Seat 1
34 O-ring 1
35 Hexagon Screw Plug 1
36 Screw Plug 1
Hexagon Socket Head Cap
37 Screw
4
3) Disassembly
The disassembly of the engine block group is in the reverse order of assembly.
4) Inspection and Maintenance
a) Check the machined surfaces of the engine block for burrs, oil stain, and
collision-caused damage. If any, remove them using an oilstone, abrasive paper or
towel.
b) Check the oil passages, water passages, and cavities in the engine block for metal
chips, burrs, and flashes. If any, remove them using an air blower gun or wire brush.
c) Try installing the tappet. Check the roughness and chamfer of the tappet hole. Check
the tappet hole for burrs and flashes.
d) Check the chamfer of the cylinder liner hole for collision-caused damage.
e) No impression may be found in any seal surface.
5) Assembly
a) Apply evenly Loctite 277 threadlocker to the mating face of the cup plug. Install the
46
Industrial 6M33 Series Diesel Engine Service Manual
cup plug to the right side, front end, and rear end of the cylinder block. Remove the
surplus threadlocker from the cup plug;
b) Using the expander, expand the corresponding locations in the cylinder block, then put
gently the thrust main bearing cap and other main bearing caps in place. A dowel pin
is used for positioning the thrust bearing cap. Before installing the thrust bearing cap,
install the thrust plate.
c) Apply a proper amount of lubricating oil to the threads and support surfaces of the
fourteen M24 main bearing bolts. First pre-tighten these bolts. Then tighten them in
the sequence (A~N). Two tightening methods may be used.
Manual tightening
1st round: Pre-tighten the main bearing bolts in the sequence to the torque of
(180±10) Nm;
2nd round: Tighten these bolts by 60º in the sequence;
3rd round: Tighten these bolts by 60º in the sequence.
Tightening with a pneumatic impact wrench
1st round: Pre-tighten the main bearing bolts in the sequence to the torque of
(180±5) Nm;
2nd round: Tighten these bolts by 120º in the sequence.
Front
end
d) Tap the parallelpin into the pin hole in the engine block. Align the pin hole in the
piston cooling nozzle with the parallel pin. Tighten the hollow bolt to the torque of 45
Nm.
6) Torque specification
The bolts except for those important ones shall be tightened according to the general
tightening specification.
47
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
1 Flywheel Housing 1
2 Timing Gear chamber 1
3 Cover Plate 1
4 Cover Plate 1
5 Hexagon Head Bolt 3
6 Hexagon Head Bolt 3
7 Rear Oil Seal 1
Flywheel Housing Coupling
8 Ring
1
25 Gasket 1
3) Disassembly
The removal of the flywheel cover is in the reverse order of installation.
4) Inspection and Maintenance
a) Check for completeness of parts against the table of parts.
b) Check the statuses of flywheel housing, engine block, and timing gear chamber and
ensure that all junction surfaces are free of burrs, oil dirt, and impact damages.
5) Assembly
a) Clean and degrease the mating faces of the timing gear chamber and flywheel housing.
Apply silicone sealant to the mating face of the timing gear chamber.
Strike the parallel pin into the engine body and mount the flywheel housing onto the
timing gear chamberby using the overhead crane. Apply Loctite 242 threadlocker to the
threads of the eight M12×120 bolts and the six M12×85 bolts. To fix the flywheel
housing to the timing gear chamber, tighten these bolts in the sequence as shown in
Figure 4-16 to the torque of (120±10)Nm (for flanged hex bolts) or (105±10) Nm (for
hex bolts). After the proper tightening, add the paint sealing for the bolts.
49
Industrial 6M33 Series Diesel Engine Service Manual
b) Apply a proper amount of lubricating oil to the mating faces of the front oil seal and
the crankshaft timing gear. Using the special tool, press the oil seal onto the crankshaft
timing gear. The axial distance from the oil seal to the inner face of the flywheel
housing shall be 3mm.
1) Exploded view
50
Industrial 6M33 Series Diesel Engine Service Manual
1 Front cap 1
4 Parallel pin 2
3 Front oil seal 1
2 Hexagon head bolt 14
3) Disassembly
The removal of the front end cover is in the reverse order of installation.
4) Inspection and Maintenance
a) Check that the mating faces of the cylinder block and the oil pan are clean without
grease or impact damage.
5) Assembly
a) Strike the dowel pin into the mating face of the engine block;
b) Apply evenly silicone sealant onto the front end cover;
c) Mount the front end cover onto the engine body by using overhead crane. Apply a
little Loctite 242 threadlocker to the threads of the bolt. Tighten the bolts.
51
Industrial 6M33 Series Diesel Engine Service Manual
Rod Mechanism
1) Exploded view
1. Engine block
2. Crankshaft assembly
3. Main bearing shell
4. Main bearing cap
5. Main bearing bolt
6. Piston and
connecting rod
7. Crankshaft timing
gear
8. Parallel pin
9. Flywheel housing
10. Flywheel assembly
11. Flywheel bolt
12. Oil pump gear
13. Front end cover
14. Vibration damper
bolt
15. Vibration damper
16. Pulley
17. Pulley bolt
52
Industrial 6M33 Series Diesel Engine Service Manual
out of the flywheel housing (9). Attach the slings of the overhead crane to the two
M12 bolts. Using the overhead crane, remove the flywheel. Remove the guide stud.
c) After removal of the flywheel housing (9), remove the crankshaft timing gear (7).
Remove the parallel pin (8).
d) Using the torque wrench or tightening machine, remove the connecting rod bolts (28)
from the observation hole in the engine block. Remove the connecting rod caps (27).
Draw the piston group (18, 19, 20, 21, 22, and 23) together with the connecting rod
shank (24) out of the cylinder liner. Remove the upper and lower bearing shells (25,
and 26) of the connecting rod.
e) Using the long nose pliers, remove the internal circlip (22) from the piston (21).
Remove the piston pin (23) and the connecting rod shank (24). Using the piston ring
spreader, remove the trapezoidal-barrel-face piston ring (18), twist-taper-face piston
ring (19), and coil-spring-loaded piston ring (20);
f) Turn the engine block upside down. Remove the main bearing cap (4) and main
bearing lower shell (3). Using the overhead crane, liftand move the crankshaft
assembly (2). Remove the main bearing upper shell (3).
4) Inspection and Maintenance
a) Apply lubricating oil to the flanged faces of the flywheel bolt. Tighten the flywheel
bolts in the sequence as shown in Figure 4-20:
Manual tightening:
Tighten the bolts in three rounds: 1st round, to the torque of 80Nm; 2nd round, to the
torque of 300Nm, and 3rd round, to the torque of (600±50)Nm.
Usethe tightening machine:
First, slightly tighten the bolts manually. Then tighten the bolts, using the tightening
machine in two rounds: 1st round, to the torque of 300Nm, and 2nd round, to the
torque of (600±25)Nm. Finally, apply paint to the bolts.
54
Industrial 6M33 Series Diesel Engine Service Manual
b) Apply lubricating oil to the heads of the crankshaft pulley bolts. Tighten the bolts in a
diagonal sequence in two rounds: 1st round, to the torque of 80Nm, and 2nd round, to
the torque of (300±20)Nm.
c) Apply lubricating oil to the heads of the vibration damper bolts. Tighten the bolts in a
diagonal sequence in two rounds: 1st round, to the torque of 80Nm, and 2nd round, to
the torque of (140±10)Nm.
d) Apply lubricating oil to the threads and support surfaces of the connecting rod bolts:
Manual tightening:
Tighten the bolts in three rounds: 1st round, to the torque of 70Nm; 2nd round, to the
torque of 200Nm, and 3rd round, to the torque of (350±30) Nm.
Use the tightening machine:
First, slightly tighten the bolts manually. Then tighten the bolts, using the tightening
machine, in two rounds: 1st round, to the torque of 200Nm, and 2nd round, to the
torque of (350±15)Nm.
Finally, apply paint to the bolts. These bolts can be reused for at most three times.
5) Assembly
a) Heat the oil pump gear (12). Place it onto thefront end journal of the crankshaft
assembly (2). Place the parallel pin into the pin hole at the rear end of the crankshaft.
Turn the engine body upside down. Clean the main bearing holes. Place the main
bearing shells (3) in these holes. Apply a proper amount of lubricating oil to the main
55
Industrial 6M33 Series Diesel Engine Service Manual
bearing shells. Using the overhead crane, move the crankshaft assembly (2) into the
main bearing holes in the engine block (1). Install the main bearing caps (4) according
to the requirements;
b) Using the piston ring spreader, install the trapezoidal-barrel-face piston ring (18),
twist-taper-face piston ring (19), and coil-spring-loaded piston ring (20) to the pistons
(21). Place the connecting rod shank into the inner chamber of the piston. Insert the
piston pin (23) through the piston pin hole and connecting rod bushing, and fix the
piston pin by using circlips (22);
c) Push the already-assembled piston group (18, 19, 20, 21, 22, and 23) together with the
connecting rod shank (24) into the cylinder liner. Using the torque wrench or
tightening machine, tighten the connecting rod bolts (28) according to the
requirements;
d) Clean the crankshaft timing gear (7) andinstall it onto the rear end of the crankshaft
with aligning the parallel pin (8);
e) After installation of the flywheel housing (9), screw the guide stud into the threaded
hole at the rear end of the crankshaft. Using the overhead crane, align the pin hole in
the flywheel with the parallel pin (8), hoist the flywheel andpush the flywheel onto the
crankshaft assembly (2) with the help of the guide stud. Remove the guide stud, and
tighten the flywheel bolts (11) by using the tightening machine;
f) After installation of the front end cover, tighten the vibration damper bolts (14), for
fixing the vibration damper (15) to the crankshaft pulley (16); and tighten the
crankshaft pulley bolts (17), for fixing the crankshaft pulley (16) to the crankshaft
assembly (2).
56
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
Intake rocker arm Exhaust rocker arm
assembly assembly
Sleeve
Rocker arm shaft
Hexagon bolt Hexagon bolt
Rocker arm Rocker arm support
support
Valve bridge subassembly Valve bridge base
Upper retainer for the valve spring Valve collet
Outer valve spring Inner valve spring
Cylinder head Lower retainer for the valve spring
2) Disassembly
a) Remove the rocker arm shaft support, rocker arm, and rocker arm shaft. For
details, refer to section 4.4.3;
b) Remove the intake and exhaust valves. For details, refer to section 4.4.5;
c) Remove the tappet and push rod. For details, refer to section 4.4.4;
d) Remove the gear train. For details, refer to section 4.4.6.
e) Remove the camshaft. For details, refer to section 4.4.2;
3) Assembly
a) Install the camshaft. For details, refer to section 4.4.2;
b) Install the gear train. For details, refer to section 4.4.6;
c) Install the tappet and push rod. For details, refer to section 4.4.4;
d) Install the intake and exhaust valves. For details, refer to section 4.4.5;
e) Install the rocker arm support, rocker arm, and rocker arm shaft. For details,
refer to section 4.4.3.
57
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
Camshaft assembly
Hexagon bolt
Hexagon bolt
Thrust plate
58
Industrial 6M33 Series Diesel Engine Service Manual
camshaft bearing shell from being impacted.
3) Inspection and Maintenance
a) Inspect whether the cam surface in contact with the tappet is worn or not, and
whether the main bearing journal is seized or worn;
b) Inspect whether the hexagon bolts fixing the timing gear is bent or deformed,
and tooth broken of the camshaft timing gear occurs or the tooth surface is worn
seriously.
4) Assembly
a) After dismantling, inspect the camshaft and timing gear. If wear occurs or a big
deviation in other parameters is produced, it is required to repair them, or have
them replaced with a new camshaft and/ or timing gear;
b) Clean the camshaft bore, inspect the camshaft bushing for damages due to
impacting. Repaired part is not allowed to use. Apply an appropriate amount of
lubricating oil into the camshaft bushing by an oiler, without any oil flow or
drip;
c) Install the camshaft, wipe clean the camshaft, check the camshaft for collision
damage, connect the camshaft and camshaft guide sleeve together, and apply an
appropriate amount of lubricating oil. Insert carefully the camshaft and the
camshaft guide through the camshaft bushing. Be sure not to cause damage to
the camshaft bushing;
d) Place the camshaft thrust plate at the rear end of the engine. The grade 10.9
M8×20 hex bolts shall be used to fix the thrust plate. Apply Loctite 242
threadlocker to the heads of the bolts. Tighten the bolts to the torque of 32Nm;
e) Note that the axial clearance between the thrust plate and camshaft shall be
uniform. Check that the camshaft can rotate smoothly without sticking.
59
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
Exhaust rocker Intake rocker
arm assembly Socket head cap screw
arm assembly
Socket head cap screw Rocker arm
shaft
Sleeve
Rocker arm
support
Rocker arm
support
Valve bridge
Valve bridge subassembly
subassembly
Cylinder
head
Valve bridge base
Figure 4-23 Exploded View of Rocker Arm and Rocker arm Shaft
2) Disassembly
a) Turn the crankshaft, and observe whether the rocker arm is rotated flexibly;
b) Measure clearance of individual valves, and inspect change in clearance of the
valves;
c) If the rocker arm rotates inflexible, or the valve clearance varies greatly, loosen
the socket head cap screw, and carefully remove the rocker arm support, rocker
arm, and the sleeve. Make marks on them to avoid confusion with those of other
valves.
3) Inspection and Maintenance
a) Clean the rocker arm, observe appearance of the rocker arm, and determine
whether there is crack and other defects;
b) Inspect whether the rocker arm hole is worn or abraded, and measure its
diameter;
c) Inspect the rocker arm adjusting screw, and determine whether the arc surface
60
Industrial 6M33 Series Diesel Engine Service Manual
ofthe other side of the rocker arm is worn;
d) Check the oil passages for blockage;
e) Measure diameters of the rocker arm hole and rocker arm shaft, and then
calculate their fit clearance.
4) Assembly
a) Inspect whether the parts to be assembled are clean, and free from collision
damages, scratches and rust;
b) Install the valves. See the relative section. Slightly tighten manually the four
M10×35 socket head cap screws, for fixing the valve bridge base to the cylinder
head. Apply a proper amount of lubricating oil to the valve bridge base. Dripping
of lubricating oil shall not be permitted;
c) Clean the intake rocker arm assembly, exhaust rocker arm assembly, rocker arm
support, rocker arm shaft, sleeve, and socket head cap screw. Install rivets at
both ends of the rocker arm shaft. Apply a proper amount of lubricating oil to the
mating face of the rocker arm shaft. Dripping of lubricating oil shall not be
permitted;
d) Insert the rocker arm shaft through the intake rocker arm, sleeve, and exhaust
rocker arm. Then place them on the rocker arm supports. Align the gap of the
rocker arm shaft with the threaded holes in the rocker arm supports. The bosses
of the rocker arm supports shall be placed opposite to each other;
e) Insert the four M10×75 socket head cap screws into the threaded holes in the
rocker arm supports;
f) Apply Loctite 242 threadlocker to the threads of the bolts for the valve bridge
base. Tighten the bolts. Apply lubricating oil to the valve bridges. Install the
valve bridges to the valve bridge base. Check that the valve bridges can move
smoothly in the valve bridge base without sticking. In the case of any sticking,
replace the valve bridges.
g) Check that the valve bridges align with the valves. In the case of any
misalignment, adjust the valve bridge base. Finally, tighten the bolts for the
valve bridge base;
h) Slightly tighten manually the socket head cap screws for fixing the rocker arm
shaft subassembly to the cylinder head;
i) Apply Loctite 242 threadlocker to the threads of the screws for fixing the rocker
arm shaft supports. Tighten the screws to the torque of 54Nm. The axial
61
Industrial 6M33 Series Diesel Engine Service Manual
clearance of the rocker arm shaft shall be 0.4 to 0.6mm.
j) Check and adjust the clearances of intake and exhaust valves:
① Turn to the top dead center of each cylinder and adjust the valve clearance.
Specified cold valve clearances: (0.3±0.03)mm for the intake valves, and
(0.4±0.03) mm for the exhaust valves;
② Sequence for adjusting valve clearances: With the piston of the 1st cylinder
staying at top dead center, adjust the intake valve clearances of the 1st, 2nd
and 4th cylinders, and the exhaust valve clearances of the 1st, 3rd and 5th
cylinders. Rotate the crankshaft by 360º, and then adjust the remaining valve
clearances
③ Check the valve timing of the 1st cylinder and record the result.
Valve timing of 6M33 series diesel engine:
Intake valve opens: (34±5)º before top dead center.
Intake valve closed: (40±5)º after bottom dead center.
Exhaust valve opens: (61±5)º before bottom dead center.
Exhaust valve closed: (27±5)º after top dead center.
62
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
Tappet
Engine block
64
Industrial 6M33 Series Diesel Engine Service Manual
65
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
66
Industrial 6M33 Series Diesel Engine Service Manual
b) Inspect the individual gears for tooth surface spalling or tooth flank breakage,
and the load bearing surface of the bolt is crushed, and the tapped holes or
through holes on the gear are deformed;
c) Check the intermediate gear shaft and intermediate gear bushing for excessive
wear. Check their oil orifices for clogging.
4) Assembly
a) Before the assembly, check that all the parts are free of manufacturing and
functional defects including damage;
b) Install the intermediate gear shaft (4) to the engine block. Install the intermediate
small gear (5). Tighten the flanged hex bolts (7) for the spacer a (6) to the torque
of (70±5)Nm. Manually rotate the gear to check whether it can rotate smoothly;
c) Rotate the intermediate small gear (5) so that one of its two marked teeth
moving to the lower left and the other marked tooth moving to the lower right.
Install the idlergear shaft (8) to the engine block. Fix the idler gear (9), and
spacer b (10) to the oil idlergear shaft (8) using the flanged hex bolts (11), which
shall be tightened to the torque of (95±5)Nm. Note: At the moment, two marked
teeth of the idler gear move to the upper left and another two marked teeth move
to the upper right, and the lower right marked tooth of the intermediate small
gear lies in the middle of the upper left two teeth of the idler gear. Check
whether the two gears rotate smoothly;
d) Rotate the intermediate small gear (5) to the state before installing idler gear.
Position the camshaft timing gear (2) using the dowel pin. Fix the camshaft
timing gear to the camshaft using the flanged hex bolts (3), which shall be
tightened to the torque of (65±5)Nm. Note: At the moment, the lower left
marked tooth of the intermediate small gear lies in the middle of the two marked
teeth of the camshaft timing gear, and the pin hole in the camshaft timing gear
becomes horizontal;
e) The installation of the fuel injection pump shall be completed. Fix the
fuelinjectionpump gear (12) and pressure plate (16) to the fuel injection pump
using the flanged hex bolts (17), which shall be tightened to the torque of
128Nm. Note: At the moment, the lower left marked tooth of the intermediate
small gear lies in the middle of the upper right two teeth of the idler gear, and the
marks on the gear, pressure plate and fuelinjectionpump hub align with each
other. The arrangement of rear gear trainis shown in Figure 4-27;
67
Industrial 6M33 Series Diesel Engine Service Manual
68
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
Intake manifold Air filter
Exhaust manifold
Turbocharger
2) Disassembly
a) Loosen the fixing bolts and the hose clamps of the air filter. Remove the air filter and
its hose;
b) Loosen other hose clamps. Remove the outlet joint pipe from the turbocharger
compressor;
c) Loosen the exhaust manifold heat shield fixing bolts. Remove the exhaust manifold
heat shield assembly;
d) Loosen the inlet and outlet oil pipes fixing bolts of the turbocharger. Remove the inlet
and outlet oil pipes and their gaskets;
e) Loosen the exhaust tailpipe fixing bolts and the turbocharger fixing bolts. Remove the
turbocharger;
f) Loosen the exhaust manifold fixing bolts. Remove the exhaust manifold and its gasket.
For details, refer to section 4.6.3 “Disassembly, Inspection, Maintenance and
69
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
70
Industrial 6M33 Series Diesel Engine Service Manual
件数
序号 Pos 中文名称Designation 英文名称Designation
Quan.
1 进气管 Intake Manifold 1
9 加热器 Heater 1
10 进气接管 Intake Connecting Pipe 1
13 螺塞 Screw plug 1
3) Disassembly
a) Loosen the socket head cap screws for the heater. Remove the heater and its intake
connectingpipe;
b) Loosen the socket head cap screws for the intake manifold cover. Remove the intake
cover and its gasket;
c) Loosen the intake manifold bolts in sequence, and remove the intake manifold and its
gasket.
4) Inspection and Maintenance
a) Check the intake manifold for welding defects. If necessary, replace it with a new one;
b) Check whether the intake manifold gasket is deformed, damaged or absence, and if
any, it is required to replace.
5) Assembly
a) The installation of intake manifold is in the reverse order of removal. The intake
manifold fixing bolts shall be tightened to the torque of 23 Nm.
71
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
5 卡箍 Clamp 4
6 套筒 Sleeve 24
3) Disassembly
a) Loosen the clamps of the expansion joint of exhaust manifold;
b) Loosen the exhaust manifold fixing bolts. Remove the front and rear exhaust
manifolds and their gaskets;
c) Remove the expansion joint and the intermediate exhaust manifold and its gasket.
4) Inspection and Maintenance
a) Inspect whether the exhaust manifold is cracked or damaged, and the flange is
deformed, and if any, it is required to replace the exhaust manifold with a new one;
72
Industrial 6M33 Series Diesel Engine Service Manual
b) Check the exhaust manifold flange for leakage, and replace if necessary;
c) Check whether the exhaust manifold gasket is deformed, damaged or absence, and if
any, it is required to replace;
d) Check the expansion joint and clamps for soot. If any, replace them with new ones.
5) Assembly
The installation of exhaustmanifold is in the reverse order of removal, and it should be
noticed during installation that:
a) Be sure to securely tighten the clamp for the expansion joint and exhaust manifold;
b) The exhaust manifold bolts should be applied with anti-seize sealant (molybdenum
disulfide), and tightened to a torque of (60±5) Nm, and the bolt can be re-used twice at
most.
1) Exploded view
73
Industrial 6M33 Series Diesel Engine Service Manual
16 O型橡胶密封圈 O-ring 1
17 固定板 Fixed Plate 1
18 组合垫圈 Assembled Sealing Washer 1
19 增压器支架 Turbocharger Bracket 1
20 增压器支架 Turbocharger Bracket 1
21 六角头螺栓 Hexagon head bolt 4
3) Disassembly
The disassembly procedure is in reverse order of assembly procedure.
4) Inspection and Maintenance
a) Inspect operation condition of the rotor
By lightly turning the air compressor impeller with hand, rotation of the impeller by more than
one turn indicates that it is in normal condition. If the impeller stops immediately, it indicates that
the bearing is worn abnormally or collision or jamming between the rotating part and the stationary
part occurs, it is required to analyze the causes and carry out troubleshooting.
74
Industrial 6M33 Series Diesel Engine Service Manual
75
Industrial 6M33 Series Diesel Engine Service Manual
d) Daily Maintenance:
Inspect whether the connecting pipe between the turbocharger and the engine is
loosened or not, and if any, eliminate the problem;
Inspect the turbocharger for gas or oil leakage, and if any, it is required to timely
eliminate the problem;
Inspect whether the fastening screws of the turbocharger are loosened or not, and
if any, it is required to eliminate the problem in time;
Inspect the air filter, and if the air filter has excessive dust accumulation, it
required to clean it in time.
76
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
6 卡箍 Clamp 1
7 卡箍 Clamp 3
8 转接头 Hexagon Head Bolt,Full Thread 1
77
Industrial 6M33 Series Diesel Engine Service Manual
3) Disassembly
The Disassembly procedure is in reverse order of assembly procedure.
4) Inspection and Maintenance
a) The maximum permissible intake resistance of diesel engine is 7kPa; Check the
maximum intake resistance only when the diesel engine is running at rated speed
under full load. When the intake resistance reaches the permissible limit, clean or
replace the filter element as per the manufacturer’s instructions.
b) Disassemble the filter element from the air filter and tap lightly the end face to fall off
the dust or blow backward (from inside out) by compressed air.
Caution:
Do not damage the filter paper;
Do not clean the filter paper with water or oil; or
Do not tap and knock the filter element forcibly.
5) Assembly
a) Install the air filter bracket to the engine;
b) Install the air filter;
c) Connect the pipe between the intake manifold and air filter. Fix the pipe using clamps.
78
Industrial 6M33 Series Diesel Engine Service Manual
79
Industrial 6M33 Series Diesel Engine Service Manual
2) Exploded view
High-pressure fuel
pipe assembly
Fuel injector
assembly
Low-pressure fuel
pipe assembly Shutting-down device
assembly
Fuel filter assembly
3) Disassembly
a) Remove the low-pressure fuel pipe;
b) Remove the high-pressure fuel pipe;
c) Remove the fuel injector;
d) Remove the fuel filter;
e) Remove the high-pressure fuel pump;
4) Assembly
The assembly procedure is in reverse order of disassembly procedure.
80
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
Fuel injection
pump
Hexagon flange
Hexagon flange bolt Rubber O-ring
bolt
Hollow bolt
Sealing washer
Fuel Plain Hexagon flange
Pressure
injection washer bolt
plate Lubricating oil pipe of
pump hub
fuel injection pump
2) Disassembly
a) Remove the flanged hex bolts forfixing fuel injection pump flange to the gear
chamber;
b) Remove the fuel injection pump and gear subassembly from the engine;
c) Remove the locking nut of the fuel injection pump;
d) Remove the flanged hex bolts for fuel injection pump body and fuel injection pump
flange;
e) Remove the fuel injection pump flange.
3) Inspection and Maintenance
a) The structure of fuel injection pump is shown in Figure 4-38. Manually rotate the
flywheel until the piston of the 1st cylinder reaches top dead center. At the moment,
the groove mark in the fuelinjectionpump gear and that in the fuelinjectionpump
flange shall align with each other.
81
Industrial 6M33 Series Diesel Engine Service Manual
4) Assembly
a) Fix the fuel injection pump body, fuel injection pump flange and fuel injection pump
hub using the flanged hex bolts;
b) Install the fuel injection pump drive gear and pressure plate so that the mark on the
drive gear aligns with the groove mark in the pressure plate. The drive gear locking
nut M24×1.5 shall be tightened to the torque of (300~340)Nm;
c) Rotate the fuelinjectionpump gear so that the marks in the fuelinjectionpump drive
gear, fuel injection pump hub, pressure plate and fuel injection pump flange align with
each other as shown in Figure 4-39;
82
Industrial 6M33 Series Diesel Engine Service Manual
Vertical
direction of
the engine
d) Manually rotate the flywheel until the piston of the 1st cylinder reaches top dead
center. To prevent the fuelinjectionpump drive gear from rotating during the
installation of alreadyassembled fuel injection pump assembly, temporarily install two
guide studs in the mounting holes of the gear chamber and fuel injection pump flange.
Install the fuel injection pump assembly. After completion of the final installation, the
fuel supply advance angle shall be 20º (which may be altered after type approval).
e) Sequence for tightening the fixing bolts for the auxiliary supports of fuel injection
pump:
Tighten the fixing bolts for the auxiliary supports of fuel injection pump in the
sequence as shown in Figure 4-40.
83
Industrial 6M33 Series Diesel Engine Service Manual
Pipe
1) Exploded view
2) Disassembly
a) Remove the high-pressure fuel pipe bracket;
b) Remove the high-pressure fuel pipe between the pump and the common rail;
c) Remove the high-pressure fuel pipe between the common rail to fuel injector.
Note: Baudouin special sleeve is required for disassembly.
84
Industrial 6M33 Series Diesel Engine Service Manual
3) Assembly
The assembly procedure is in reverse order of disassembly procedure.
Note: The nuts for high-pressure fuel pipe joints (M18×1.5 nut at fuel injection pump
end, and M16×1.5 nut at fuel injector end) shall be tightened to the torque of 40Nm.
85
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
86
Industrial 6M33 Series Diesel Engine Service Manual
The 6M33 series diesel engine only adopts the circulation of heat carrying fluid within a
closed loop.
The long and short circulations of the cooling system are controlled by the thermostat:
When the temperature of coolant is low, the thermostat closes so that the coolant returns
to water pump via bypass pipeline for cooling circulation, without flowing through the
radiator (Short circulation of coolant).
When the temperature of coolant is high, the thermostat opens so that the coolant
completely flows through the radiator and then flows into water pump for cooling
circulation (Long circulation of coolant).
Thermostat
Outlet pipe
circulation
Cylinder head
Short
Fan
Cylinder block
Engine
87
Industrial 6M33 Series Diesel Engine Service Manual
1) Exploded view
Gasket
Thermostat
Thermostat body
Thermostat cover
Thermometer
88
Industrial 6M33 Series Diesel Engine Service Manual
The water pump is located at the front end of diesel engine and is driven by a V-ribbed belt.
The V-ribbed belt automatic tensioner is fixed on the cylinder block through brackets to keep a
sufficient tension of V-ribbed belt.
1) Exploded view
4 Pipe joint 1
5 Rubber O-ring 1
89
Industrial 6M33 Series Diesel Engine Service Manual
Tightening
SN. Name Quantity Specifications
torque
9 Type 1 hexagon nut 2 M10 46Nm
12 Rubber O-ring 1
13 Rubber O-ring 1
3) Disassembly
a) Remove the fan;
b) Remove the V-ribbed belt.
c) Disassemble the water pump.
4) Inspection and Maintenance
a) Check the rotation of water pump bearing, abnormal sound, and failed seal.
b) The belt before assembly shall not be twisted or turned inside out.
5) Assembly
a) Check that the ring seals are not damaged. Replace the damaged ring seal with new
one if necessary;
b) Install the bracket to the water pump;
c) Install the O-ring. Fix the pipe joint to the water pump jacket;
d) Using bolts, fix the water pump bracket and water pump to the engine block;
For the 6M33 series diesel engine, the outlet water pipe of water pump is located at the engine
side and fixed to the cylinder head.
1) Exploded view
90
Industrial 6M33 Series Diesel Engine Service Manual
2 Rubber O-ring 3
6 Spring washer 4
7 Flange 2
8 Gasket 2
9 Connecting pipe 1
10 Plug screw 1
11 Rubber O-ring 6
91
Industrial 6M33 Series Diesel Engine Service Manual
3) Disassembly
Remove the flanged bolts from the outlet water pipe. Remove the outlet water pipe.
4) Inspection and Maintenance
a) Check the joints between the outlet water pipes and the joint between the outlet water
pipe and the cylinder head for leakage;
b) Check that the O-ring is not damaged. Replace the damaged O-ringwith new one if
necessary.
5) Assembly
The assembly procedures are in the reverse order of disassembly procedures.
Seen from the front end, the oil-gas separator is located at the front right end of the engine
block. As a result of separation, the gas enters the atmosphere via the outlet pipe, and the oil returns
to the oil pan.
1) Exploded view
92
Industrial 6M33 Series Diesel Engine Service Manual
2 Breather 1
3 Hose clamp 3
5 Oil-gas separator 1
6 Flat gasket 4
8 Hose clamp 2
9 Pipe clip 1
14 Gasket 1
3) Disassembly
Loosen the six bolts used for fixing the breather and the four bolts used for fixing the oil-gas
separator, remove the oil-gas separator.
4) Inspection and Maintenance
Check the seal of the oil-gas separator subassembly, replace it if necessary.
5) Assembly
The assembly procedures are in the reverse order of disassembly procedures.
93
Industrial 6M33 Series Diesel Engine Service Manual
For the 6M33 series diesel engine, a V-ribbed belt is used for driving the fan and a ventilation
fan is used according to the demand of diesel engine for power generation.
1) Exploded view
4 Fan 1
5 Spacer block 1
3) Disassembly
Unscrew six hexagon head bolts and take out spacer block, fan, and spring washer in turn.
4) Inspection and Maintenance
a) Check the fan rivets for looseness, check the fan blades for bending, and ensure the
normal working of fan.
94
Industrial 6M33 Series Diesel Engine Service Manual
b) Visually observe the V-ribbed belt for cracking and scratch and replace it if necessary.
The schematic diagram of the lubrication system of 6M33 series diesel engine is shown in
Figure 4-50. The lubrication system is a pressurized lubrication system. The gear oil pump is
located at the bottommost place of the engine. The oil pump is driven by the gear on the front of
crankshaft. All lubricating points and accessories requiring lubrication are connected by the
pipeline or conduit in the pressurized lubrication system. The splash lubrication mode is adopted to
lubricate the timing gear. The lubricating oil is splashed to the pistons for continuous cooling.
95
Industrial 6M33 Series Diesel Engine Service Manual
Piston
cooling
nozzle Bypass valve
Centrifugal Strainer
Pressure
regulator of oil filter
cooler
Oil pan
1) Exploded view
96
Industrial 6M33 Series Diesel Engine Service Manual
97
Industrial 6M33 Series Diesel Engine Service Manual
valve opens to drain oil thus maintains the pressure in the main oil passage within the set range.
c) Bypass valve
The bypass valve is also integrated with the oil cooler. If the pressure drop across the oil
cooler is greater than the opening pressure of the bypass valve, i.e. 2bar, the bypass valve opens. In
this case, the oil from the bypass valve directly enters the main oil passage, bypassing the oil
cooler.
The 6M33 series diesel engine is equipped with a centrifugal oil filter. The inlet oil passage of
centrifugal oil filter and the main oil passage of lubrication system are connected in parallel. The
centrifugal oil filter is installed on the right side of the oil pan.
1) Exploded view
98
Industrial 6M33 Series Diesel Engine Service Manual
4.9.4 Disassembly, Inspection, Maintenance and Assembly of Oil Cooler and Oil
Filter
1) Exploded view
99
Industrial 6M33 Series Diesel Engine Service Manual
The oil cooler is combined with the oil filter. Leaving the oil filter, the oil enters the oil
cooler for cooling.
3) Replacement of the oil cooler core
a) Using an M8 socket head wrench, loosen the M8 socket head screws of the oil cooler
100
Industrial 6M33 Series Diesel Engine Service Manual
cover. Using a general wrench, loosen the hex bolts of the oil cooler. Remove the oil
cooler cover. (Drain the coolant from engine before disassembling);
b) Clean the sealing junction surface between oil cooler cover and cylinder block and
replace the oil cooler cover gasket with new one;
c) Disassemble the oil cooler core with a M8 hexagon wrench and clean the flange
junction surface of oil cooler core;
d) Replace the O-ring of oil cooler core;
e) Install new oil cooler core and tighten the M8 hexagon socket head screws;
f) Put the oil cooler cover in original place. Tighten the socket head screws and hex
bolts.
4) Inspection and maintenance essentials of oil cooler
a) Apply Loctite sealant 242 to the threads before tightening the bolts;
b) All oil filters adopt full-flow one-time filter element. In the case of oil filter clogging,
the safety device located at the filter element will operate to prevent oil flow
interruption. Oil flow interruption can cause damage to the bearing shells. Replace the
filter element on schedule. In addition, replace the filter element when replacing the
oil.
5) Replacement of oil filter element
a) Clean the oil filter base;
b) Apply oil (instead of lubricating grease) to the sealing gasket;
c) Tighten the oil filter by hand and rotate by approximately 3/4 turn;
d) Check the oil level and pre-lubricate the engine. Re-check the oil level and when
necessary add sufficient oil. Ensure that the oil filter is free of oil leakage.
6) Inspection and maintenance of oil filter
101
Industrial 6M33 Series Diesel Engine Service Manual
a) Before disassembling the oil filter, remove the dirt from its surrounding area;
b) Loosen the filter element with oil filter wrench during replacement.
1) Exploded view
3) Disassembly
102
Industrial 6M33 Series Diesel Engine Service Manual
a) Prior to dismantling of the oil pan, drain the oil fully. Place a container uder the oil
drainage plug of the oil pan, and use a screw plug wrench to loosen the drainage plug
to drain the oil;
b) Disassemble the oil dipstick assembly. Do not damage the oil dipstick during
disassembling;
c) Disassemble the bolts connecting the oil pan and cylinder block with a wrench and
then separate the cylinder block from oil pan by using overhead traveling crane
(Notice to remove the silicone sealant at all times during separation and do not hoist
the cylinder block too high);
d) After the separation of oil pan, check the levelness and check for damage.
4) Inspection and Maintenance
Check that the mating faces of the cylinder block and the oil pan are clean without grease or
collision-caused damage.
5) Assembly
a) Apply evenly silicone sealant to the mating face of the oil pan.
b) Using the overhead crane, move the engine block onto the oil pan;
c) Apply Loctite 242 threadlocker to the threads of all the socket head cap screw bolts.
Tighten the bolts and remove the surplus silicone sealant from these bolts;
d) Place washers onto the hex screw plug and pipe joint. Fix them to the oil pan.
1) Oil type
Use CF15W/40 or higher grade of oil as specified by GB11122.
2) Oil tank capacity
For the 6M33 series diesel engine, the standard oil tank has a capacity of approximately 60.5L.
3) Replacement of oil
a) Stop the engine, use the manual pump for the replacement of oil;
b) Place the three-way connector to the "Drain" place shown in figure below;
103
Industrial 6M33 Series Diesel Engine Service Manual
Drain
Pre-lubrication
c) To collect used oil, connect a pipe to the outlet pipe of the manual oil pump;
d) Repeatedly operate the handle of the manual oil pump until all used oil drains out of
the engine;
e) Place the three-way connector to the "Pre-lubrication" place shown in figure;
f) Add fresh oil via the filler port into the oil pan.
Notice: Add clean oil into diesel engine oil tank, till the oil level reaches the upper
marking of oil dipstick. Start and idle the engine and check the oil filter and drainage plug for
oil leakage. Stop the engine, wait for approximately 5min for the oil to return from upper
parts into oil pan, and check the oil level once again. When necessary, add new oil till the oil
level reaches the upper marking of oil dipstick.
104
Industrial 6M33 Series Diesel Engine Service Manual
Circuit diagram
Variant code
At present, the starter motors equipped on Weichai engines adopt the electromagnetically
105
Industrial 6M33 Series Diesel Engine Service Manual
driven flexible engagement mode. According to drive gear engagement mode, it can be divided to
sliding armature starter motor and sliding fork gear starter motor (of which the latter accounts for a
high proportion), and according to drive mechanism, it includes direct drive starter motor (Equal
speed for starter motor rotor and starter motor gear) and reduction gear starter motor (The speed of
starter motor gear is less than rotor speed).
1) Exploded view
Stud
Starter motor
Spring washer
2) Disassembly
a) Remove the hex nuts and their spring washers;
b) Hold securely the starter motor, and take it out along the gear rotation axis.
106