Capeco Labor Performance
Capeco Labor Performance
1 mixer (9-11
4.02 Foundation beams m3 20.00 0.2 2 2 8 p3) +1 vibrator
2 mixer (9-11
8.02 48mm subfloor m2 80.00 0.3 3 1 6 p3) +1 vibrator
AVERAGE PERFORMANCE OF LABOR FOR BUILDING WORKS
11.01 Forging and covering of stair steps rubbed ml 8.00 0.1 1 1/2
finish 0.17x0.28 thickness 3cm
Forging and covering of staircase steps with
11.02 colored cement finish of 0.17x0.28 thickness ml 5.00 0.1 1 1/2
3cm
Stair landing rubbed finish base 3 cm
11.03 m2 20.00 0.1 1 1
17.07 Standard Mailbox D=1.20m, h=2.20m und 3.00 0.1 1 1 10 0 mixer (9-11
p3) +1 vibrator
Concrete cubes F'C=175 KG/CM2 0.60x0.60 1 mixer (9-11
17.08 P/connection to mailbox C/pipe Ø 8" und 10.00 0.1 1 1 1 p3) +1 vibrator
CEMENT DOSING TABLE AVERAGE YIELD OF MASONRY WORK
DOSAGE REV. CONCRETE CEMENT WATER BOTTLE SAND JAR GRAVEL POT
GPO. UNI YIELD (JOR) CONCEPT
10 CM. BAG 19 LTS. 19 LTS. 19 LTS.
WALLS AND FLOORS
F'C=100 KG/CM2
1.0 3.0 8.0 8.5 FLOORS
CASTLES AND DALAS
1.0 2.5 5.5 6.5 2 M2 10.00 CONCRETE SURFACE FOR FLOORS, THICKNESS OF 8-10 CM
F'C=150 KG/CM2
SLABS AND FOOTINGS
1.0 2.0 4.0 6.0 5 M2 35.00 INTEGRAL BRUSHED FINISH ON SURFACE
F'C=200 KG/CM2
COLUMNS AND CEILINGS
1.0 1.5 3.5 4.5 5 M2 18.00 FINE NON-INTEGRAL POLISHED FINISH
F'C=250 KG/CM2
DISIFYING TABLE FOR CONCRETE RESISTANCE 4 M2 50.00 ARMED WITH MESH ON FLOORS
STRENGTH PER M3 OF CEMENT WATER BOTTLE SAND JAR GRAVEL POT
6 M2 5.00 UNFIRM CERAMIC FLOORS
CONCRETE BAG 19 LTS. 19 LTS. 19 LTS.
F'C=100 KG/CM2 5.0 12.0 32.0 34.0 6 M2 7.00 TILE FLOORS 15X15X1.0 CM, A 2 CM
F'C=150 KG/CM2 6.5 12.5 27.5 32.5 6 M2 7.00 TILE FLOORS 10X20X1.0 CM, A 2 CM
F'C=200 KG/CM2 7.5 13.0 26.0 39.0 6 M2 13.00 TILE FLOORS 30X30X2.50 CM
F'C=250 KG/CM2 8.0 11.3 26.3 33.8 5 M2 11.00 MOSAIC FLOORS 20X20X2.0 CM
MORTAR DOSING TABLE 6 M2 9.50 MOSAIC TERRAZO FLAT S/JTA MET. 50X50X2.50CM
SAND (19 LTS CANS) 1 BAG OF 50 KG + No. OF 19 LTS SAND CANS. (Add enough 6 M.L. 18.00 MOSAIC PIECE 10X20X2.0 CM
water to form a plastic mass of toothpaste-like consistency.)
3 FLOORS, SURFACE, BANKS AND GARNISHES (Add 4 19 liter cans 6 M.L. 18.00 PIECE TILE 10X15X30 A 40 CM
of gravel. Per 50 kg bag.)
*2.5 7.9 5 / 16 0.49 2.48 0.384 217 6 M2 3.50 GLASS BLOCK WALL 10X20X20 CM. INC. RFZO. JOINTS
*3 9.5 3/8 0.71 2.98 0.557 150 5 PZA 2.00 40X60 CM RECORDS. WITH PROF. AVG 1.25M
*4 12.7 1/2 1.27 3.99 0.996 84 5 PZA 6.00 RECORD COVER 40X60 CM.
*5 15.9 5/8 1.99 5 1.580 53 2 M.L. 35.00 WATERPROOFING IN FOUNDATIONS
*6 19.1 3/4 2.87 6 2.250 37 5 M.L. 26.00 SEWERS OF 15 CM DIAM. LAYING AND JOINING
*8 25.4 1 5.07 7.98 3.975 21 5 M2 7.50 BLACKSMITH PLACEMENT
*10 31.8 1 1/4 7094 9.99 6.225 13 2 M2 30.00 ROOF WATERPROOFING BY LAYER
*12 38.1 1 1/2 11.4 11.97 8.938 9 GRAY OR WHITE CEMENT GROUT
** = R-6000 (6 METER LONG RODS) CONCEPT UNIT AMOUNT
* = R-42 (12 METER LENGTH RODS) 1,300 TON CEMENT + 3% DESP. TON 1.339
MINIMUM BEND DIAMETER 0.900 M3 OF WATER + 30% DESP. M3 1.170
DIAMETER D= NOMINAL DIAMETER GRAY OR WHITE CEMENT PASTE
ROD
MINIMUM No. VAR CM No. VAR CM CONCEPT UNIT AMOUNT
#3, 4 & 5 3.5D 3 3.320 8 12.701 1,500 TON CEMENT + 3% DESP. TON 1.545
6 M2 4.50 VITRICOTA TYPE COATING 6 X 20 X 18 CM RATIO 1:1:4 0.300 0.150 1.000 0.280
6 M2 5.00 VITRICOTA TYPE COATING 6 X 20 X 1.8 CM RATIO 1:1:6 0.255 0.125 1.050 0.279
5 M2 9.00 MOSAIC COVERING 20 X 20 X 2 CM RATIO 1:1:8 0.215 0.100 1.095 0.278
6 M.L. 16.00 RATIO 1:1:10
NOZZLE INCL. CUTTING AT 45º VERIFIED MATERIAL 0.180 0.085 1.065 0.275
3 M2 43.00 SURPRICE FOR LAYING ON FACADES RATIO 1:1:12 0.150 0.075 1.185 0.273
2,321 TON/M3
PV ASPHALT 1.75 TON/M3 LOOSE
COMPACT
40 M3/HR COMP
MIXED LAYING SUBRA LAYER. WATER 0.25 40 M3/HR MOTONIV VIBR
100 M2/HR
PAVEMENTS
PAVED RA
Concrete yield/indirect/per
manufacturing Unit rend/direct/jor unit Gang
Demolition of flattening on
Facade of 0-6 meters inc.
m3 1st station hauling m2
yield/indirect/per
Concrete placement Unit rend/direct/jor unit Gang
Demolition of roof flooring
includes shoveling and
Squad 4 hauling 1st est. m2
(4 Laborer + 1
Cyclopean Concrete m3 Bricklayer) Demolition of tile lambrin in
Concrete in large areas inc. haulage
Foundation includes Squad 3 1st est. m2
pouring, vibrating and (7 Laborer + 1
curing m3 10.00 0.100 Bricklayer) Demolition of tile lambrin in
small areas inc. carry 1st
est.
Concrete in Columns
and Walls includes Squad 4 m2
pouring, vibrating and (4 Laborer + 1
curing m3 Bricklayer) Walls Unit
yield/indirect/per
Dallas and Castles Unit rend/direct/jor unit Gang Demolition of 10 cm hollow
Chain Conc. block wall. esp. inc.
20x20 cm. 4 Squad 16 (1 drowned castle m2
Var.3/8", Stirrups 1/4" Laborer + 1
@ 20 cms. ml 10.00 0.100 Bricklayer) Demolition of adobe wall
includes hauling 1a.
Chain Conc. Squad 16 season m2
10x15 cm. 4
Var.3/8", Stirrups 1/4" (1 Laborer + 1
@ 20 cms. ml 12.00 0.083 Bricklayer) Demolition of 15 cm hollow
block wall. esp. inc.
Chain Conc.
Squad 16 drowned castle m2
15x15 cm. 4
Var.3/8", Stirrups 1/4" (1 Laborer + 1
@ 20 cms. ml 11.00 0.090 Bricklayer)
Demolition of 7 cm red
Conc. Chain 10x20
Squad 16 partition wall. thickness m2
cms. 4 Var.3/8",
Stirrups 1/4" @ 20 (1 Laborer + 1
cms. ml 11.00 0.090 Bricklayer)
Demolition of 14 cm red
partition wall. thick without
Conc. Chain 20x25
Squad 16 coating. m2
cms. 4 Var.3/8",
Stirrups 1/4" @ 20 (1 Laborer + 1
cms. ml 9.00 0.110 Bricklayer) Demolition of partition wall
yield/indirect/per with dala and flattened
Mouthpieces Unit rend/direct/jor unit Gang castle m2
Squad 16 Demolition of 10 cm
2 cm mix board. thick (1 Laborer + 1 reinforced concrete floor.
to receive waterproof. m2 20.00 0.050 Bricklayer) esp. m2
Squad 16
3 cm mix board. thick (1 Laborer + 1
to receive waterproof. m2 20.00 0.050 Bricklayer)
Squad 16
Chamfer with 15x15 (1 Laborer + 1
cm partition pieces. ml 25.00 0.040 Bricklayer)
Squad 16
15x15 cm concrete (1 Laborer + 1
chamfer. ml 25.00 0.040 Bricklayer)
Roof waterproofing
with 2 layers of
emulsion and 1 of Squad 16
fiber and application. (1 Laborer + 1
of paint on top m2 40.00 0.0250 Bricklayer)
Squad 16
12 cm red partition (1 Laborer + 1
parapet. of thickness m2 7.00 0.1400 Bricklayer)
yield/indirect/per
Firm and flat Unit rend/direct/jor unit Gang
Simple concrete
pavement of 5 cm. Squad 16
conc thickness made (1 Laborer + 1
in work m2 30.00 0.033 Bricklayer)
Simple concrete
pavement of 8 cm. Squad 16
conc thickness made (1 Laborer + 1
in work m2 25.00 0.040 Bricklayer)
Simple concrete
pavement of 10 cm. Squad 16
conc thickness made (1 Laborer + 1
in work m2 25.00 0.040 Bricklayer)
Simple concrete
pavement of 1 5 cm. Squad 16
conc thickness made (1 Laborer + 1
in work m2 20.00 0.050 Bricklayer)
Simple concrete
pavement of 5 cm. Squad3
conc thickness (6 Pawn +2
premixed m2 120.00 0.0083 Bricklayer)
Simple concrete
pavement of 8 cm. Squad3
conc thickness (6 Pawn +2
premixed m2 90.00 0.011 Bricklayer)
Simple concrete
pavement of 10 cm. Squad3
conc thickness (6 Pawn +2
premixed m2 80.00 0.0125 Bricklayer)
Simple concrete
pavement of 15 cm. Squad3
conc thickness (6 Pawn +2
premixed m2 50.00 0.020 Bricklayer)
Block and partition yield/indirect/per
walls Unit rend/direct/jor unit Gang
Red Partition Wall
5.50 cms. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 7.00 0.143 Bricklayer)
Red Partition Wall
12.00 cms. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 6.00 0.167 Bricklayer)
Red Partition Wall
17.50 cms. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 4.50 0.222 Bricklayer)
Red Partition Wall
24.00 cms. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 3.50 0.286 Bricklayer)
Hollow partition wall
5.00 cm. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 4.00 0.250 Bricklayer)
Hollow partition wall
10.00 cm. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 5.00 0.200 Bricklayer)
Hollow partition wall
12.00 cm. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 6.00 0.167 Bricklayer)
Manholes and yield/indirect/per
manholes unit
Unit rend/direct/jor Gang
rend/direct/jor yield/indirect/ per Gang
unit
Squad 19
260.00 0.003846
(1 Assistant + 1
Of. Electrician)
Squad 19
240.00 0.004166
(1 Assistant + 1
Of. Electrician)
Squad 19
220.00 0.004545
(1 Assistant + 1
Of. Electrician)
Squad 19
200.00 0.00500
(1 Assistant + 1
Of. Electrician)
Squad 19
180.00 0.00555
(1 Assistant + 1
Of. Electrician)
Squad 19
160.00 0.00625
(1 Assistant + 1
Of. Electrician)
Squad 19
140.00 0.00714
(1 Assistant + 1
Of. Electrician)
Squad 19
120.00 0.00833
(1 Assistant + 1
Of. Electrician)
Squad 19
100.00 0.01000
(1 Assistant + 1
Of. Electrician)
Squad 19
70.00 0.01428
(1 Assistant + 1
Of. Electrician)
Squad 19
65.00 0.01538
(1 Assistant + 1
Of. Electrician)
Squad 19
60.00 0.16666
(1 Assistant + 1
Of. Electrician)
yield/indirect/per
rend/direct/jor Gang
unit
Squad 19
3.50 0.2857
(1 Assistant + 1
Of. Electrician)
Squad 19
3.30 0.3030
(1 Assistant + 1
Of. Electrician)
Squad 19
2.00 0.5000
(1 Assistant + 1
Of. Electrician)
Squad 19
2.00 0.5000
(1 Assistant + 1
Of. Electrician)
yield/indirect/per
rend/direct/jor Gang
unit
Squad 19
5.00 0.2000
(1 Assistant + 1
Of. Electrician)
Squad 19
2.50 0.4000
(1 Assistant + 1
Of. Electrician)
Squad 19
1.25 0.8000
(1 Assistant + 1
Of. Electrician)
yield/indirect/per
unit
rend/direct/jor Gang
Squad 5
(1 Carp. ON + 1
26.0 0.038 helper)
yield/indirect/ per
rend/direct/jor unit Gang
Squad 1 (1 Pawn
1.17 0.085 + 0.05 corporal)
Squad 1 (1 Pawn
1.50 0.666 + 0.05 corporal)
Squad 1 (1 Pawn
0.19 2,039 + 0.05 corporal)
Squad 1
(1 Pawn + 0.05
0.75 1,330 corporal)
Squad 1
(1 Pawn + 0.05
1.34 0.714 corporal)
Squad 1
(1 Pawn + 0.05
25.0 0.040 corporal)
yield/indirect/per
rend/direct/jor unit Gang
Squad 1
(1 Pawn + 0.05
25.0 0.040 corporal)
Squad 1
(1 Pawn + 0.05
27.0 0.037 corporal)
Squad 1
(1 Pawn + 0.05
23.0 0.041 corporal)
Squad 1
(1 Pawn + 0.05
corporal)
15.0 0.067
yield/indirect/per
rend/direct/jor unit Gang
Squad 1
(1 Pawn + 0.05
33.0 0.030 corporal)
Squad 1 (1 Pawn
12.5 0.080 + 0.05 corporal)
Squad 1 (1 Pawn
12.3 0.081 + 0.05 corporal)
Squad 1 (1 Pawn
6.0 0.167 + 0.05 corporal)
Squad 1
(1 Pawn + 0.05
4.0 0.250 corporal)
Squad 1
(1 Pawn + 0.05
25.0 0.040 corporal)
Squad 1
(1 Pawn + 0.05
16.6 0.060 corporal)
Squad 1
(1 Pawn + 0.05
7.70 0.130 corporal)
Squad 1
(1 Pawn + 0.05
7.70 0.200 corporal)
Squad 1
(1 Pawn + 0.05
corporal)
12.00 0.830
yield/indirect/per
rend/direct/jor unit Gang
Squad 1
(1 Pawn + 0.05
11.00 0.090 corporal)
Squad 1
(1 Pawn + 0.05
corporal)
8.70 0.115