0% found this document useful (0 votes)
212 views18 pages

Capeco Labor Performance

This document provides average labor productivity rates for various building construction tasks. It lists tasks like earth moving, formwork installation and removal, concrete placement and curing. For each task, it specifies the unit of measurement (e.g. m2, m3), expected daily yield in that unit for an 8 hour day with a standard crew, and any necessary equipment. Crews generally include a foreman, operator and 1-2 laborers, though some tasks require additional personnel. The document aims to estimate labor needs and schedules for common building works.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
212 views18 pages

Capeco Labor Performance

This document provides average labor productivity rates for various building construction tasks. It lists tasks like earth moving, formwork installation and removal, concrete placement and curing. For each task, it specifies the unit of measurement (e.g. m2, m3), expected daily yield in that unit for an 8 hour day with a standard crew, and any necessary equipment. Crews generally include a foreman, operator and 1-2 laborers, though some tasks require additional personnel. The document aims to estimate labor needs and schedules for common building works.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 18

AVERAGE PERFORMANCE OF LABOR FOR BUILDING WORKS

YIELD GANG EQUIPMENT


No. DEPARTURE UND DAILY (8 FOREMA OPERATO OFFICIA PEO N AND/OR
HOURS) N R L TOOLS
1.00 EARTH MOVEMENTS
1.01 Masonry Demolition m2 16.00 0.1 1.0 camber
Excavation for Isolated Footings in Normal
1.02 dry terrain. Depth from 1.40 to 1.70 m m3 3.50 0.1 1.0 beak and lamp

1.03 Elimination of Excess Material up to an m3 7.00 0.1 1.0 forklift truck


average distance of 30.00m
1.04 m3 40.00 0.1 1
Land filling up to 0.20m deep without tamping beak and lamp
1.05 Filling with own material Manual m3 7.00 0.1 1.0 beak and lamp
01 hand trample
1.06 Leveling and tamping for false floor m2 120.00 0.1 1.0
2.00 SIMPLE CONCRETE
2.01 Corridor Foundations m3 25.00 1.0 1.0 2.0 8.0
2.02 Overlays
1 mixer (9-11
to. 0.25m wide m3 12.00 1.0 1.0 2.0 8.0 p3)
1 mixer (9-11
b. 0.15m wide m3 10.00 1.0 1.0 2.0 8.0 p3)
2.03 2" false floor
Regulated m2 100.00 0.1 1 - 3 -
Empty m2 200.00 0.2 2 1 6 1 mixer (9-11
p3)
2.04 3" screed for footings m2 80.00 0.2 2 1 6 1 mixer (9-11
p3)
3.00 FORMWORKS
Surrounding Formwork up to 0.30m high
3.01
Qualification m2 40.00 0.1 1 1
Formwork m2 14.00 0.1 1 1
Stripping m2 28.00 1 2
3.02 Foundation Beam Formwork
Qualification m2 50.00 0.1 1 1
Formwork m2 10.00 0.1 1 1
Stripping m2 35.00 1 2
3.03
Formwork for supporting walls (01 side)
Qualification m2 48.00 0.1 1 1
Formwork m2 12.00 0.1 1 1
Stripping m2 50.00 1 2
3.04
Formwork for supporting walls (02 sides)
Qualification m2 40.00 0.1 1 1
Formwork m2 10.00 0.1 1 1
Stripping m2 40.00 1 2
3.05 Cistern formwork (01 inner face)
Qualification m2 45.00 0.1 1 1
Formwork m2 14.00 0.1 1 1
Stripping m2 30.00 1 2
3.06 Cistern formwork (01 inner face and one
outer face)
Qualification m2 40.00 0.1 1 1
Formwork m2 12.00 0.1 1 1
Stripping m2 24.00 1 2
3.07 Typical column formwork
Qualification m2 40.00 0.1 1 1
Formwork m2 10.00 0.1 1 1
Stripping m2 40.00 1 2
3.08 Face column formwork
Qualification m2 40.00 0.1 1 1
Formwork m2 6.00 0.1 1 1
Stripping m2 25.00 1 2
3.09 Typical beam formwork
Qualification m2 40.00 0.1 1 1
Formwork m2 9.00 0.1 1 1
Stripping m2 36.00 1 2
3.10 Face beam formwork
Qualification m2 40.00 0.1 1 1
Formwork m2 6.00 0.1 1 1
Stripping m2 12.00 1 2
AVERAGE PERFORMANCE OF LABOR FOR BUILDING WORKS
YIELD GANG EQUIPMENT
No. DEPARTURE UND DAILY (8 FOREMA OPERATO OFFICIA PEO N AND/OR
HOURS) N R L TOOLS
3.11 Lightened slab formwork
Qualification m2 75.00 0.1 1 1
Formwork m2 12.00 0.1 1 1
Stripping m2 36.00 1 2
3.12 Solid slab formwork
Qualification m2 60.00 0.1 1 1
Formwork m2 15.00 0.1 1 1
Stripping m2 15.00 1 2
3.13 Stair formwork
Qualification m2 28.00 0.1 1 1
Formwork m2 6.00 0.1 1 1
Stripping m2 18.00 1 2
3.14 Elevator shaft formwork
Qualification m2 40.00 0.1 1 1
Formwork m2 10.00 0.1 1 1
Stripping m2 20.00 1 2
3.15 Elevator shaft formwork
Qualification m2 40.00 0.1 1 1
Formwork m2 10.00 0.1 1 1
Stripping m2 20.00 1 2
3.16 Elevated tank formwork (vat)
Qualification m2 20.00 0.1 1 1
Formwork m2 12.00 0.1 1 1
Stripping m2 20.00 1 2
3.17 Frieze box formwork
Qualification ml 96.00 0.1 1 1
Formwork ml 24.00 0.1 1 1
Stripping ml 72.00 1 2
4.00 REINFORCED CONCRETE
1 mixer (9-11
4.01 Shoes m3 25.00 0.2 2 2 8 p3) +01 vibrator

1 mixer (9-11
4.02 Foundation beams m3 20.00 0.2 2 2 8 p3) +1 vibrator

cured m2 80.00 0.1 1


1 mixer (9-11
4.03 Foundation Slabs m3 22.00 0.2 2 2 8 p3) +1 vibrator

cured m2 88.00 0.1 1


1 mixer (9-11
4.04 Supporting Walls (0.20m or more) m3 10.00 0.2 2 2 10 p3) +1 vibrator

cured m2 80.00 0.1 1


1 mixer (9-11
4.05 Partition (0.10 to 0.15 m) m3 8.00 0.2 2 2 10 p3) +1 vibrator

cured m2 90.00 0.1 1


1 mixer (9-11
4.06 Columns m3 10.00 0.2 2 2 10 p3) +1 vibrator

cured m2 90.00 0.1 1


1 mixer (9-11
4.07 Solid Beams and Slabs m3 20.00 0.2 2 2 10 p3) +1 vibrator

cured m2 90.00 0.1 1


1 mixer (9-11
4.08 Lightened Beams m3 25.00 0.3 2 2 11 p3) +1 vibrator

cured m2 90.00 0.1 1


1 mixer (9-11
4.09 Stairs m3 12.00 0.3 2 2 10 p3) +1 vibrator

cured m2 90.00 0.1 1


1 mixer (9-11
4.10 Elevator Box m3 8.00 0.3 2 2 10 p3) +1 vibrator

cured m2 90.00 0.1 1


AVERAGE PERFORMANCE OF LABOR FOR BUILDING WORKS
1 mixer (9-11
4.11 Tank m3 10.00 0.3 2 2 10 p3) +1 vibrator
AVERAGE PERFORMANCE OF LABOR FOR BUILDING WORKS

YIELD GANG EQUIPMENT


No. DEPARTURE UND DAILY (8 FOREMA OPERATO OFFICIA PEO N AND/OR
HOURS) N R L TOOLS
cured m2 90.00 0.1 1
1 mixer (9-11
4.12 Elevated tank m3 10.00 0.3 2 2 10 p3) +1 vibrator

cured m2 90.00 0.1 1


4.13 kg 250.00 0.1 1 1 Wire Shear
Construction Iron (Placement Enablement) Black No. 16
Wire Shear
4.14 Hollow Brick, Rise and Placement: kg 250.00 0.1 1 1 N e
l a g d r r o ill N
°
12x30x30 pz 2000.00 0.1 1 1 9 e 1 up
ofloor n 6to
el 30 m
15x30x30 pz 1600.00 0.1 1 1 9 from placement
20x30x32 pz 1300.00 0.1 1 1 9 location.

5.00 MASONRY WALLS AND PARTITIONS


5.01 KK brick wall of singing m2 8.00 0.1 1 1/2 simple scaffold
5.02 Singing Tambourine Brick Wall m2 7.50 0.1 1 1/2 simple scaffold
5.03 m2 6.00 0.1 1 1/2
Standard running brick wall (6x12x24) head simple scaffold
5.04 Standard ordinary brick wall (6x12x24) made m2 7.00 0.1 1 1/2
of rope simple scaffold
5.05 Standard ordinary brick wall (6x12x24) on m2 7.00 0.1 1 1/2
edge simple scaffold
5.06 m2 3.50 0.1 1 1/2
Running brick wall facing head simple scaffold
5.07 Rope facing running brick wall m2 5.50 0.1 1 1/2 simple scaffold
5.08 Previ (gap) brick wall head m2 4.50 0.1 1 1/2 simple scaffold
5.09 Rope previ (gap) brick wall m2 11.50 0.1 1 1/2 simple scaffold
6.00 PLASTERED PLASTERS AND MOLDINGS
6.01 Primary plastering (striped) thickness 1.50 m2 15.00 0.1 1 1/2 Scaffold
6.02 cm
Interior plastering thickness 1.50 cm
paddling m2 34.00 0.1 1 1/2 Scaffold
tarring m2 20.00 0.1 1 1/2 Scaffold
6.03 Outdoor plastering thickness 1.50 cm
facade
paddling m2 25.00 0.1 1 1/2 scaffolding
facade
tarring m2 12.00 0.1 1 1/2 scaffolding
6.04 Column plastering - surface m2 8.00 0.1 1 1/2 scaffold
6.05 Placing of edged columns ml 20.00 0.1 1 1/3 scaffold
6.06 Beam plastering - surface m2 6.50 0.1 1 1/3 scaffold
6.07 Placing beams - edges ml 18.00 0.1 1 1/3 scaffold
6.08 spill clothing ml 18.00 0.1 1 1/3 scaffold
6.09 1.00m burgundy ml 25.00 0.1 1 1/3 scaffold
Plaster plaster on brick walls e = 1.cm
6.1 m2 20.00 0.1 1 1/2 scaffold
7.00 CEILING
Ceiling with plaster without strips thickness
7.01 1.0 cm m2 14.00 0.1 1 1/3 scaffold
Plaster ceiling with strips thickness 1.0 cm
7.02 m2 12.00 0.1 1 1/3 scaffold

7.03 Ceiling with mix with ribbons, thickness 1.50


cm with ribbons thickness 1.50 cm
Puffing and tapes m2 20.00 0.1 1 1/2 scaffold
Coating m2 6.00 0.1 1 1/2 scaffold
7.04 Stair Bottom Dress m2 8.00 0.1 1 1/2 scaffold
8.00 FLOORS AND PAVEMENTS
1 mixer (9-11
8.01 40mm subfloor m2 100.00 0.3 3 1 6 p3) +1 vibrator

2 mixer (9-11
8.02 48mm subfloor m2 80.00 0.3 3 1 6 p3) +1 vibrator
AVERAGE PERFORMANCE OF LABOR FOR BUILDING WORKS

YIELD GANG EQUIPMENT


No. DEPARTURE UND DAILY (8 FOREMA OPERATO OFFICIA PEO N AND/OR
HOURS) N R L TOOLS
Venetian tile floor 20X20 base 1.0 cm
8.03 m2 9.00 0.1 1 1/2
Venetian tile floor 30X30 base 1.0 cm
8.04 m2 12.00 0.1 1 1/2
8.05 Ceramic floor hexagonal base 3 cm m2 8.00 0.1 1 1/2
8.06 Vinyl tile floor m2 40.00 0.1 1 1/2
8.07 Travertine marble floor base 2 cm m2 5.00 0.1 1 2
2" uncolored concrete floor 4cm base
8.08 m2 120.00 0.3 3 1 6
2 mixer (9-11
8.09 2" concrete floor with 4cm base m2 100.00 0.3 3 1 6 p3) +1 vibrator

8.10 4" Uncolored Concrete Floor m2 105.00 0.3 3 1 6


8.11 4" staking for sidewalks m2 200.00 0.1 1 1 8 compactedfr
8.12 4" sidewalk, 2m wide
Regulated m2 30.00 0.1 1 1
1 mixer (9-11
emptied m2 100.00 0.3 3 1 6 p3) +1 vibrator

cured m2 200.00 0.1 1


8.13 6" concrete track
Regulated m2 50.00 0.1 1 1
1 mixer (9-11
emptied m2 200.00 0.4 4 4 14 p3) +1 vibrator

cured m2 200.00 0.1 1

8.14 2" cold asphalt layer with equipment m2 1600.00 0.5 3 8


sweeper, paver,
rollers, dumper

8.15 2" hot asphalt binder with equipment m2 1600.00 1 2 8


sweeper, paver,
rollers, dumper
9.00 COUNTERPLACES
9.01 Venetian Tile Counter Base 10X20 base 1.0 ml 18.00 0.1 1 1/3
cm
9.02 ml 24.00 0.1 1 1/3
Uncolored cement plinth 0.10me = 2 cm
Uncolored cement plinth 0.20me = 2 cm
9.03 ml 20.00 0.1 1 1/3

9.04 ml 17.00 0.1 1 1/3


Uncolored cement plinth 0.30me = 2 cm
9.05 Anodized aluminum co-base h = 2" ml 30.00 0.1 1 1/2
9.06 Cedar wood cot 3/4"X 2" ml 30.00 0.1 1 1/2
9.07 Cedar wood cot 3/4"X 3" ml 30.00 0.1 1 1/2
10.00 PIECES
Majolica plinth 15x15 base 2.00 cm
10.01 m2 4.00 0.1 1 1/3
Majolica plinth 11x11 base 2.00 cm
10.02 m2 3.00 0.1 1 1/3
COVERING OF STANDERS AND STAIRS
11.00

11.01 Forging and covering of stair steps rubbed ml 8.00 0.1 1 1/2
finish 0.17x0.28 thickness 3cm
Forging and covering of staircase steps with
11.02 colored cement finish of 0.17x0.28 thickness ml 5.00 0.1 1 1/2
3cm
Stair landing rubbed finish base 3 cm
11.03 m2 20.00 0.1 1 1

11.04 Stair landing polished colored cement finish m2 12.00 0.1 1 1


base 3 cm
AVERAGE PERFORMANCE OF LABOR FOR BUILDING WORKS

YIELD GANG EQUIPMENT


No. DEPARTURE UND DAILY (8 FOREMA OPERATO OFFICIA PEO N AND/OR
HOURS) N R L TOOLS
12.00 COVERS
24x24x3 clay pastry brick set with mixture
12.01
settled m2 30.00 0.2 1 1
Setting m2 40.00 0.1 1 1/2
12.02
24x24x3 clay pastry brick set with mud
settled m2 21.00 0.2 1 1
Setting m2 50.00 0.1 1 1/2
12.03 2" Mud Cake Roof Coverage m2 40.00 0.2 2 4
13.00 WOOD CARPENTRY
13.01 2"x3" Cedar Insulated Railing ml 6.00 1
13.02 35 mm Plywood Doors m2 2.00 1
14.00 PAINT
14.0 To the tempera of ceiling and walls
Primer m2 45.00 1
Paint m2 40.00 1
14.02 To the latex of ceilings and walls, two coats m2 33.00 1
14.03 Contrazocalo painting with varnish ml 60.00 1 11/2
15.00 SANITATION
15.01 Placement of sanitary devices piece 4.00 0.2 2 1
15.02 Placement of sanitary accessories (trash can, piece 8.00 0.1 1 1 1/2
soap dish)
15.03 Drain outlet PVC pipe 2" or 4" piece 4.00 0.1 1 1
15.04 2" bronze sump piece 4.00 0.1 1 1/2
15.05 Bronze 4" log piece 4.00 0.1 1 1/2
16.00 ELECTRICAL INSTALLATIONS
16.01 Outlet for Bracket with PVC pt 4.00 0.1 1 3/4
16.02 Spoth Light output with PVC pt 4.00 0.1 1 3/4
16.03 pt 4.00 0.1 1 3/4
Outlet for simple bipolar outlet with PVC
16.04 Heater outlet with PVC pt 5.00 0.1 1 2
16.05 Kitchen outlet with PVC pt 8.00 0.1 1 1
GENERAL ITEMS SANITATION WORKS
17.00
01
Machine Trenching P/Tub110 mm H=1.50, Backhoe to
17.01 ml 50.00 0.1 1 1
a=0.60

17.02 Manual excavation H=0.80 m, a=0.60 ml 6.50 0.1 1 01 peak and


Lampa
17.03 ml 120.00 0.1 1
Refine and shape bottom for pipe 110 - 200 Lamp
17.04 Support Bed. Ø=110 - 200 mm with sifted ml 110.00 0.1 1
material E=0.15 m Lamp
Filled and compacted with material sifted
Lampa and
17.05 over a tube key H = 0.30m, A = 0.60 m ml 75.00 0.1 1
vibroposon
barrettes Rings
Supply and installation of 110 - 200mm PVC- and lubricants
17.06 ml 400.00 0.1 1 3
UF CLASS A1 pipe

17.07 Standard Mailbox D=1.20m, h=2.20m und 3.00 0.1 1 1 10 0 mixer (9-11
p3) +1 vibrator
Concrete cubes F'C=175 KG/CM2 0.60x0.60 1 mixer (9-11
17.08 P/connection to mailbox C/pipe Ø 8" und 10.00 0.1 1 1 1 p3) +1 vibrator
CEMENT DOSING TABLE AVERAGE YIELD OF MASONRY WORK
DOSAGE REV. CONCRETE CEMENT WATER BOTTLE SAND JAR GRAVEL POT
GPO. UNI YIELD (JOR) CONCEPT
10 CM. BAG 19 LTS. 19 LTS. 19 LTS.
WALLS AND FLOORS
F'C=100 KG/CM2
1.0 3.0 8.0 8.5 FLOORS
CASTLES AND DALAS
1.0 2.5 5.5 6.5 2 M2 10.00 CONCRETE SURFACE FOR FLOORS, THICKNESS OF 8-10 CM
F'C=150 KG/CM2
SLABS AND FOOTINGS
1.0 2.0 4.0 6.0 5 M2 35.00 INTEGRAL BRUSHED FINISH ON SURFACE
F'C=200 KG/CM2
COLUMNS AND CEILINGS
1.0 1.5 3.5 4.5 5 M2 18.00 FINE NON-INTEGRAL POLISHED FINISH
F'C=250 KG/CM2
DISIFYING TABLE FOR CONCRETE RESISTANCE 4 M2 50.00 ARMED WITH MESH ON FLOORS
STRENGTH PER M3 OF CEMENT WATER BOTTLE SAND JAR GRAVEL POT
6 M2 5.00 UNFIRM CERAMIC FLOORS
CONCRETE BAG 19 LTS. 19 LTS. 19 LTS.
F'C=100 KG/CM2 5.0 12.0 32.0 34.0 6 M2 7.00 TILE FLOORS 15X15X1.0 CM, A 2 CM
F'C=150 KG/CM2 6.5 12.5 27.5 32.5 6 M2 7.00 TILE FLOORS 10X20X1.0 CM, A 2 CM
F'C=200 KG/CM2 7.5 13.0 26.0 39.0 6 M2 13.00 TILE FLOORS 30X30X2.50 CM
F'C=250 KG/CM2 8.0 11.3 26.3 33.8 5 M2 11.00 MOSAIC FLOORS 20X20X2.0 CM
MORTAR DOSING TABLE 6 M2 9.50 MOSAIC TERRAZO FLAT S/JTA MET. 50X50X2.50CM

SAND (19 LTS CANS) 1 BAG OF 50 KG + No. OF 19 LTS SAND CANS. (Add enough 6 M.L. 18.00 MOSAIC PIECE 10X20X2.0 CM
water to form a plastic mass of toothpaste-like consistency.)

3 FLOORS, SURFACE, BANKS AND GARNISHES (Add 4 19 liter cans 6 M.L. 18.00 PIECE TILE 10X15X30 A 40 CM
of gravel. Per 50 kg bag.)

3 FLATTENED AND COATING IN POLYSTYLENE PANELS MARTELINATED


3 FLATTENED AND HIGH RESISTANCE COATINGS 1 M2 4.00 FINE HAMMERING ON FLOOR
8 to 10 FLATTENED, ENJARRES, REPELLATED AND TORTED 1 M2 2.00 FINE HAMMERING ON COLUMNS
7 to 9 JOINTING OF BLOCK, PARTITIONS AND MOSAIC 1 M2 3.00 FINE HAMMERING ON WALLS
8 to 10 BRAZA STONE FOUNDATIONS 1 M2 2.00 FINE HAMMERING ON BEAMS AND SLABS
9 to 11 TEMPLATES ROOFS
TABLE OF AREAS, PERIMETERS AND THEORETICAL WEIGHTS OF RODS 1 M3 2.00 TEZONTLE FILLINGS ON ROOFS
DIAM. NOMINAL 5 M2 20.00 TORTED ON HELMET
AREA IN PERIMETER IN
No. KG X M. L. PZA X TON
PUL. INCHES CM2 CM. 5 M2 11.00 BRICKING AND BRUSHING
»»
-- 5 / 32 0.12 -- 0.100 1666 5 M2 7.00 APPARENT BRICKWORK
-

** -- 3 / 16 0.18 -- 0.133 1253 5 M.L. 24.00 PEDACY CHAMFERS


-
** -- 1/4 0.32 -- 0.250 667 SEVERAL
-
** -- 5 / 16 0.49 -- 0.384 434 3 PZA 19.00 PLATE MADE 50X100 CM
-

*2.5 7.9 5 / 16 0.49 2.48 0.384 217 6 M2 3.50 GLASS BLOCK WALL 10X20X20 CM. INC. RFZO. JOINTS
*3 9.5 3/8 0.71 2.98 0.557 150 5 PZA 2.00 40X60 CM RECORDS. WITH PROF. AVG 1.25M
*4 12.7 1/2 1.27 3.99 0.996 84 5 PZA 6.00 RECORD COVER 40X60 CM.
*5 15.9 5/8 1.99 5 1.580 53 2 M.L. 35.00 WATERPROOFING IN FOUNDATIONS
*6 19.1 3/4 2.87 6 2.250 37 5 M.L. 26.00 SEWERS OF 15 CM DIAM. LAYING AND JOINING
*8 25.4 1 5.07 7.98 3.975 21 5 M2 7.50 BLACKSMITH PLACEMENT
*10 31.8 1 1/4 7094 9.99 6.225 13 2 M2 30.00 ROOF WATERPROOFING BY LAYER
*12 38.1 1 1/2 11.4 11.97 8.938 9 GRAY OR WHITE CEMENT GROUT
** = R-6000 (6 METER LONG RODS) CONCEPT UNIT AMOUNT
* = R-42 (12 METER LENGTH RODS) 1,300 TON CEMENT + 3% DESP. TON 1.339
MINIMUM BEND DIAMETER 0.900 M3 OF WATER + 30% DESP. M3 1.170
DIAMETER D= NOMINAL DIAMETER GRAY OR WHITE CEMENT PASTE
ROD
MINIMUM No. VAR CM No. VAR CM CONCEPT UNIT AMOUNT

#3, 4 & 5 3.5D 3 3.320 8 12.701 1,500 TON CEMENT + 3% DESP. TON 1.545

#6 and 8 5D 4 4.445 10 22.259 0.700 M3 OF WATER + 30% DESP. M3 0.910


# 10 7D 5 5.570 12 30.481 PLASTER PASTE
# 12 8D 6 9.549 CONCEPT UNIT AMOUNT
GROUP INTEGRATION TABLE 0.810 TON PLASTER + 3% DESP. TON 0.834
1 0.10 CAPTAIN+1.0 PAWN 0.900 M3 OF WATER + 30% DESP. M3 1.170
2 0.25 OFFICER +1.0 PAWN WHITE CEMENT PASTE MARBLE POWDER 1:3
3 1.0 OF. CARPENTER + 1.0 ASSISTANT CONCEPT UNIT AMOUNT
4 0.5 OF. FIERRERO + 1.0 HELPER 0.540 TON WHITE CEMENT + 3% DEP. TON 0.556
5 1.0 OFFICER + 1.0 PAWN 2,100 TON OF MARBLE DUST + 5% DESP. TON 2.205
6 1.0 OF. SPECIALIST + 1.0 PAWN 0.280 M3 OF WATER + 30% DESP. M3 0.364
AVERAGE YIELD OF MASONRY WORK WHITE CEMENT PASTE MARBLE POWDER
GPO U
YIELD (JOR) CONCEPT CONCEPT EMC (TON) Q. SEA. (TON) WATER
1
PRELIMINARIES AND FOUNDATION 1:3 RATIO 0.540 2.100 0.280
2 M2 50.00 CLEAN AND TRACE 1:4 RATIO 0.440 2.200 0.275
1 M3 4.00 EXC. LAND 0.00-2.00 M PROPORTION 1:5 0.380 2.300 0.272
1 M3 2.00 EXC.SOFT TEPETATE 0.00-2.00 M WHITE CEMENT-LIME-MARBLE POWDER PASTE 1:1:6
1 M3 18.00 TRANSPALOING 0.00-2.00 M CONCEPT UNIT AMOUNT
1 M3 5.00 CARRYING WITH TRUCK 20.00 M 0.270 TON WHITE CEMENT + 3% DEP. TON 0.278
1 M3 7.00 FILLED IN LAYERS, COMPACTED WITH tamping 0.125 TON OF CALHYDRA + 3% DEP. TON 0.129
1 M2 35.00 COMPACTION OF STRAINS WITH tamping 2,100 TON OF MARBLE DUST + 5% DESP. TON 2.205
2 M2 14.00 TEMPLATES BETWEEN 0.07 AND 0.10 M 0.280 M3 OF WATER + 30% DESP. M3 0.364
5 M3 3.00 BRAZA STONE FOUNDATIONS WHITE CEMENT-LIME-MARBLE POWDER PASTE
ENABLED AND ARMED WITH REINFORCEMENT STEEL CONCEPT EMC (TON) CAL (TON) Q. SEA. (TON) WATER
4 TON 0.17 IN FOUNDATION RATIO 1:1:6 0.270 0.125 2.100 0.280
4 TON 0.16 IN STRUCTURE RATIO 1:1:8 0.220 0.100 2.200 0.278
4 TON 0.13 ROOM AND ASSEMBLY OF 1/4" AND 5/16" WIRE RATIO 1:1:10 0.190 0.085 2.300 0.276
SHARING AND UNSHIMMERING, NON-APPARENT FINISH RATIO 1:1:12 0.135 0.075 2.400 0.274
3 M2 9.50 ON FOUNDATIONS FORMULA TO CONVERT TO PLANK FOOT.
3 M2 7.50 IN RECTANGULAR COLUMNS A= SHORT DIMENSION IN INCHES
3 M2 6.00 IN CIRCULAR COLUMNS A" B= LONG DIMENSION IN INCHES C= DIMENSION IN
PT=
3 M2 8.50 IN TRABES 3.657 METERS OF THE PIECE
3 M2 9.00 ON SLABS

PAINTS AND WATERPROOFING CALHYDRA-SAND MIXTURE 1:3


YIELD UNIT CONCEPT CONCEPT UNIT AMOUNT
1/8 M2 L.T. PRIMARY 0.250 TON CALHYDRA + 3% DEP. TON 0.258
2/1 LT PRI L.T. THINNER 1,000 M3 OF SAND + 8% DESP. M3 1.080
1/4 M2 L.T. PAINT 0.270 M3 OF WATER + 30% DESP. M3 0.351
AVERAGE YIELD OF MASONRY WORK CALHYDRA-SAND MIXTURE
U
1
GPO YIELD (JOR) CONCEPT CONCEPT CAL (TON) SAND (M3) WATER (M3)
SHAPING MAKEUP 1:3 RATIO 0.250 1.000 0.270
3 M2 17.00 ON FOUNDATIONS 1:4 RATIO 0.200 1.070 0.260
3 M2 8.50 IN RECTANGULAR COLUMNS PROPORTION 1:5 0.170 1.130 0.255
3 M2 4.00 IN CIRCULAR COLUMNS PROPORTION 1:6 0.145 1.180 0.250
3 M2 10.00 IN TRABES PROPORTION 1:7 0.125 1.220 0.245
3 M2 10.00 ON SLABS RATIO 1:8 0.110 1.250 0.240
3 M.L. 15.00 SHARING AND UNSHIMMERING WITH SONOTUBE
1:9 RATIO 0.100 1.270 0.235
WET SLABS PROPORTION 1:10 0.090 1.285 0.230
2 BOX 100.00 PLACE BLOCK UP TO 20X40X40 CM MORTAR-SAND MIXTURE 1:4
2 BOX 40.00 PLACE BLOCK UP TO 35X60X60 CM CONCEPT UNIT AMOUNT
2 BOX 40.00 SMALLER LINE CELLULATED RETICULAR MEzzanine
0.300 TON MORTAR + 3% DEP. TON 0.309
2 BOX 30.00 CELLULATED RETICULAR MEzzanine1,150
MAINM3
LINE
OF SAND + 8% DEP. M3 1.242
CASTING (DOES NOT INCLUDE THE MANUFACTURING OF CONCRETE)
0.290 M3 OF WATER + 30% DESP. M3 0.377
2 M3 1.50 ON FOUNDATIONS MORTAR-SAND MIXTURE
2 M3 0.85 ON COLUMNS AND WALLS CONCEPT DEATH. (TON) SAND (M3) WATER (M3)
2 M3 0.95 IN BEAMS AND SLABS 1:4 RATIO 0.300 1.150 0.290
2 M3 0.80 IN WET SLABS PROPORTION 1:5 0.260 1.200 0.285
1 M3 10.00 CONCRETE CURING WITH WATER IN SUP. HORIZONTAL
PROPORTION 1:6 0.225 1.240 0.280
1 M2 300.00 CONCRETE CURING WITH WATER PROPORTION 1:7 0.195 1.270 0.275
1 M2 100.00 CONCRETE CURING WITH WATER IN SUP. VERTICAL
RATIO 1:8 0.170 1.290 0.270
COMMON OR LIGHTWEIGHT NOT APPARENT PARTITION WALLS CEMENT-SAND MIXTURE 1:2m
5 M2 11.00 0.07 M THICK CONCEPT UNIT AMOUNT
5 M2 10.00 0.14 M THICK 0.600 TON CEMENT + 3% DESP. TON 0.618
5 M2 8.00 0.21 M THICK 1,000 M3 OF SAND + 8% DESP. M3 1.080
5 M2 6.00 0.28 M THICK 0.275 M3 OF WATER + 30% DESP. M3 0.358
5 M2 40.00 OVERPRICE FOR APPARENT FACE CEMENT-SAND MIXTURE
PYRAMID TYPE BLOCK WALLS CONCEPT EMF. (TON) SAND (M3) WATER (M3)
5 M2 10.00 0.10 M THICK 1:2 RATIO 0.600 1.000 0.275
5 M2 9.50 0.12 M THICK 1:3 RATIO 0.510 1.100 0.272
5 M2 9.00 0.15 M THICK 1:4 RATIO 0.430 1.120 0.266
5 M2 8.50 0.20 M THICK PROPORTION 1:5 0.360 1.150 0.261
5 M2 80.00 OVERPRICE FOR APPARENT FACE PROPORTION 1:6 0.300 1.190 0.257
EXTRUDED BLOCK WALL PROPORTION 1:7 0.250 1.240 0.252
6 M2 4.50 5X10X15 IN 10 CM THICK RATIO 1:8 0.210 1.300 0.246
6 M2 5.00 6X10X20 IN 10 CM THICK CEMENT-SIDED SAND MIXTURE 1:2m
6 M2 5.50 10X10X20 IN 10 CM THICK CONCEPT UNIT AMOUNT
6 M2 5.50 10X15X20 IN 15 CM THICK 0.630 TON CEMENT + 3% DESP. TON 0.649
6 M2 55.00 OVERPRICE FOR APPARENT FACE 1,000 M3 OF SAND + 8% DESP. M3 1.350
CASTLES AND CHAINS 0.285 M3 OF WATER + 30% DESP. M3 0.370
5 M.L. 30.00 CASTLE CENTER BLOCK 1 DIAM. (3/8") CEMENT-SAND MIX CERNIDAm
5 M.L. 10.00 CASTLES AND CHAINS 15 X 15 WITH 4 DIAM. (3/8") CONCEPT EMF. (TON) SAND (M3) WATER (M3)
5 M.L. 9.50 1:2 RATIO
CASTLES AND CHAINS 15 X 20 WITH 4 DIAM. (3/8") 0.630 1.000 0.285
5 M.L. 8.00 1:3 RATIO
CASTLES AND CHAINS 15 X 30 WITH 4 DIAM. (3/8") 0.540 1.050 0.280
5 M.L. 25.00 SURPRICE FOR APPARENT FACE CAST. AND CAD.1:4 RATIO 0.440 1.100 0.278
COATINGS PROPORTION 1:5 0.380 1.150 0.275
5 M2 19.00 MIX REPEELINGS PROPORTION 1:6 0.310 1.170 0.273
5 M2 14.00 MIX FLATTENED (ROATED) CEMENT-HEAT-SAND MIXTURE 1:1:4m
5 M2 11.00 FINE FLAT MIXTURES CONCEPT UNIT AMOUNT
5 M2 10.00 FLATTENED POLISHED CEMENT FLAVOR 0.300 TON CEMENT + 3% DESP. TON 0.309
5 M2 23.00 CONFITILLO ON FLATTENED 0.150 TON OF CALHYDRA + 3% DEP. TON 0.155
6 M2 4.00 1,000 M3INCLUDES
CERAMIC COATING OR VENETIAN MOSAIC, OF SAND + 8% DESP. M3 1.080
6 M2 4.50 REPELLING
TAPE COVERING 5.5 X 22 X 1 TO 6 X0.280
24 X M3 OF WATER + 30% DESP.
1 CM M3 0.364
6 M2 5.00 RECOVER FACHALET 10 X 20 X 1 TO 11 X 22 X 1 CM CEMENT-HALTHIDE-SAND MIXTURE
6 M2 5.50 TILE COATING CONCEPT EMC (TON) CAL (TON) SAND (M3) WATER

6 M2 4.50 VITRICOTA TYPE COATING 6 X 20 X 18 CM RATIO 1:1:4 0.300 0.150 1.000 0.280
6 M2 5.00 VITRICOTA TYPE COATING 6 X 20 X 1.8 CM RATIO 1:1:6 0.255 0.125 1.050 0.279
5 M2 9.00 MOSAIC COVERING 20 X 20 X 2 CM RATIO 1:1:8 0.215 0.100 1.095 0.278
6 M.L. 16.00 RATIO 1:1:10
NOZZLE INCL. CUTTING AT 45º VERIFIED MATERIAL 0.180 0.085 1.065 0.275
3 M2 43.00 SURPRICE FOR LAYING ON FACADES RATIO 1:1:12 0.150 0.075 1.185 0.273

PERFORMANCES OF EQUIPMENT AND LABOR FOR THE CORRESPONDING CONCEPTS:


ACTIVITY MATERIALS, M. OF O. AND TEAM
27.7 M3/HR OF
EXCAVATION IN MAT B RETRO 40 M3/HR LOADER

REINFORCING STEEL 140 KG/JOR FIERRERO CREW + ASSISTANT

SHARING 12 M2/JOR CARPENTER CREW + ASSISTANT

MASONRY 2.5 M3/JOR MASON CREW + ASSISTANT

2,321 TON/M3
PV ASPHALT 1.75 TON/M3 LOOSE
COMPACT

FORMATION AND COMPACTION OF 250 M3/HR COMP 96 M3/HR COMP.


WATER 0.25 64 M3/HR MOTONIV
TERR ADIC. 815

33.3 M3/HR 40 M3/HR COMP


HYDRAULIC BASE WATER 0.25
MOTONIV VIBR

40 M3/HR COMP
MIXED LAYING SUBRA LAYER. WATER 0.25 40 M3/HR MOTONIV VIBR

0.013 M3/M2 125 M2/HR COMP


SEAL IRRIGATION 3-A EMUL 1.03 LT/M2
MAT 3A VIBR=TRUCK

IRRIGATION OF IMPREGNATION 1.2-1.5 LT/M2 143 LT/HR PETROLYZER

LEAGUE IRRIGATION 0.5 LT/M2

100 M2/HR
PAVEMENTS
PAVED RA

BUOYS 50 PZA/JOR 1 PAWN GANG

METAL DEFENSE 15ML/JOR CREW OF 1 MASON + 1 LABOR

RESTRICTIVE SIGN 86X86 CM 10 PZA/JOR CREW OF 1 MASON + 1 LABOR


yield/indirect/ per Concept Unit
Concept
Placing ironwork with Unit rend/direct/jor unit Gang TV output with polyduct
mortar includes Squad 16 salt
Flattened and pipe, incl. Wired
boat, and wiring
plumbing
Repelled and (1 Laborer + 1
anchoring m2 8.30 0.120 Bricklayer)

Flattening Plaster on Squad 8 Vinanel cable placement


ml
Plumb Walls and 1.5 (1 Helper + 1 no. 18
Placing Telephone output. with
cm ruler.sheet door
of thickness m2 12.50 0.080 Plasterer)
frames with mortar polyduct pipe, incl. boat, salt
Flattening of Plaster
includes hauling, Squad 16 and wiring
on Walls plumb Squad 8 Vinanel cable placement
plumbing and and (1 Laborer + 1 ml
level 1.5 cm. of (1 Helper +1 no. 16
patching ml 14.00 0.070 Bricklayer)
thickness m2 14.28 0.070 Yeserol)
Boards Unit
Placement and Squad 16
Flattening of Plaster Squad 8 Vinanel cable placement
reinforcement of (1 Laborer + 1 ml
on Burst Walls in 2 (1Bricklayer)
Helper + 1 no. 14
metal door frames piece 5.00 0.200 QO2 Charging Center inc.
cms. of thickness m2 14.28 0.070 Plasterer) piece
tablets
Flattening of Plaster Squad
Blacksmith
on Walls with a 1.5 Squad 168 Vinanel cable placement
placement, ml
cm trowel. ofanchoring (1
(1Laborer
Helper ++11 no. 12
and plumbing
thickness m2
m2 8.00
16.60 0.125
0.060 Bricklayer)
Plasterer) QO4 Cargo Center inc.
piece
yield/indirect/per tablets
Floor
PlasterLaying
flattening on Unit rend/direct/jor unit Gang
Squad 8 Vinanel cable placement
ceilings at level and ml
no. 10
ruler in 1 cm.on
Hammering thick to Squad+11
(1 Helper QO8 Cargo Center inc.
piece
receive Tyrol
concrete surface m2 15.00 0.066 Yeserol)
(1 Pawn +0 .05 tablets
(floors and steps) m2 4.00 0.250 corporal)
Plaster flattening on Vinanel cable placement
ceilings at level and Squad 8 ml
no. 8
1.5 cm a
Laying ruler.
20x40of cm Squad
(1 16 + 1
Helper
thickness
natural cobblestone m2 14.28 0.070 (1 Plasterer)
Laborer + 1
floor laid with mortar m2 14.00 0.070 Bricklayer)
Plaster flattening in Squad 8 Vinanel cable placement
ml
1.5 cm trowel (1Squad
Helper7 + 1 no. 6
ceilings. of thickness m2 16.60 0.060 Plasterer) + 1 Concept Unit
Installation of 50x50 (1 Assistant
cm marble tile floor. Of. Canceleria and Windows
set with
Fine mortar of mix
smoothing m2 14.00 0.070 Squad 16
Specialization) Vinanel cable placement
ml
indoors up to 3rd (1 Laborer + 1 no. 4
level m2 10.00 0.100 Bricklayer)
Squad 7
Laying ceramic tile
Fine smoothing of mix (1 Squad 16 + 1
Assistant Vinanel cable placement
ml
floor set withupmortar
on facades to 3rd Of.(1 Laborer + 1 no.of2 wooden
Demolition
or adhesive tile
level m2
m2 11.00
8.00 0.090
0.125 Specialization)
Bricklayer) gates m2

Striped flattening of Squad 16 Vinanel cable placement


ml
mix indoors up to 3rd (1 Laborer + 1 no. 1/0
Foundations and
level m2 8.00 0.125 Bricklayer) concrete Unit
Installation of 8 cm Squad 16
adocrete floor. thick Squad 16
Striped on
flattening Vinanel cable placement
settled a 5 cm of
bed (1 Laborer + 1 ml
mix on facades up to (1Bricklayer)
Laborer + 1 no. 2/0
of sand. From esp. m2 10.00 0.100 Simple concrete foundation
3rd level m2 7.00 0.142 Bricklayer) demolition inc. 1st station
Squad 7
(1 Assistant + 1 hauling m3
Placing a clay floor Of. Vinanel cable placement
settled
Serratedwith mortar of
flattening m2 10.00 0.100 Squad 16
Specialization) Demolitionno.
of 3/0
fathom stone ml
Laying smooth
mix indoors up to 3rd (1Squad
Laborer
7+1 foundations assent.
mosaic
level floor laid with m2 7.00 0.142 Bricklayer)+ 1
(1 Assistant w/mortar m3
mortar Of.
m2 11.00 0.090 Specialization) Departures
Demolition of reinforced Unit
Squad
Squad167 concrete with recovery of
steel m3
(1 Assistant + 1
Serrated flattening
Laying ball of
stone floor Of.
mix Electrical outlet for lighting
laid on
on facades
mortar up to m2 11.00 0.090 (1 Laborer + 1
Specialization) with polyduct tube, incl. salt
3rd level m2 5.50 0.142 Bricklayer)
Demolition of reinforced
boat, and wiring
blacksmith yield/indirect/per concrete up to 3rd level.
placements Unit rend/direct/jor unit Gang
Squad 16 measured on bench m3
Laying a ball stone
floor sitting on a (1 Laborer + 1
Marine ladder
concrete base m2 5.00 0.200 Bricklayer) Electrical output for contact
placement includes Simple concretepipe,
demolition
with polyduct incl. salt
grooving, plumbing Squad 16 up toboat,
3rd level. measured
and wiring
and grouting (1 Laborer
Squad 16 + 1 on bench m3
Laying a ball stone
ml 20.00 0.050
floor settled on (1Bricklayer)
Laborer + 1
natural ground m2 8.00 0.125 Bricklayer)
Squad 7
Cobblestone demolition m2
(1 Assistant + 1
Of. Flattening and Coatings
Laying vinyl tile floor m2 28.50 0.035 Specialization) Unit

Concrete yield/indirect/per
manufacturing Unit rend/direct/jor unit Gang
Demolition of flattening on
Facade of 0-6 meters inc.
m3 1st station hauling m2

yield/indirect/per
Concrete placement Unit rend/direct/jor unit Gang
Demolition of roof flooring
includes shoveling and
Squad 4 hauling 1st est. m2
(4 Laborer + 1
Cyclopean Concrete m3 Bricklayer) Demolition of tile lambrin in
Concrete in large areas inc. haulage
Foundation includes Squad 3 1st est. m2
pouring, vibrating and (7 Laborer + 1
curing m3 10.00 0.100 Bricklayer) Demolition of tile lambrin in
small areas inc. carry 1st
est.
Concrete in Columns
and Walls includes Squad 4 m2
pouring, vibrating and (4 Laborer + 1
curing m3 Bricklayer) Walls Unit

Concrete in beams Squad 4


and slabs poured, (4 Laborer + 1 Demolition of 12 cm lattice.
vibrated and cured m3 Bricklayer) of thickness m2

yield/indirect/per
Dallas and Castles Unit rend/direct/jor unit Gang Demolition of 10 cm hollow
Chain Conc. block wall. esp. inc.
20x20 cm. 4 Squad 16 (1 drowned castle m2
Var.3/8", Stirrups 1/4" Laborer + 1
@ 20 cms. ml 10.00 0.100 Bricklayer) Demolition of adobe wall
includes hauling 1a.
Chain Conc. Squad 16 season m2
10x15 cm. 4
Var.3/8", Stirrups 1/4" (1 Laborer + 1
@ 20 cms. ml 12.00 0.083 Bricklayer) Demolition of 15 cm hollow
block wall. esp. inc.
Chain Conc.
Squad 16 drowned castle m2
15x15 cm. 4
Var.3/8", Stirrups 1/4" (1 Laborer + 1
@ 20 cms. ml 11.00 0.090 Bricklayer)

Demolition of fathom stone


Conc. Chain 20x30
Squad 16 masonry wall m2
cms. 4 Var.3/8",
Stirrups 1/4" @ 20 (1 Laborer + 1
cms. ml 8.30 0.120 Bricklayer)

Demolition of 7 cm red
Conc. Chain 10x20
Squad 16 partition wall. thickness m2
cms. 4 Var.3/8",
Stirrups 1/4" @ 20 (1 Laborer + 1
cms. ml 11.00 0.090 Bricklayer)
Demolition of 14 cm red
partition wall. thick without
Conc. Chain 20x25
Squad 16 coating. m2
cms. 4 Var.3/8",
Stirrups 1/4" @ 20 (1 Laborer + 1
cms. ml 9.00 0.110 Bricklayer) Demolition of partition wall
yield/indirect/per with dala and flattened
Mouthpieces Unit rend/direct/jor unit Gang castle m2

Plaster grouting on Squad 8 Demolition of partition wall


sharp and rounded (1 Helper + 1 with dala and castle with 2-
edges ml 22.00 0.045 Plasterer) sided flattening m2
Squad 16
Flattening grout on
sharp edges (1 Laborer + 1
Demolition of 28 cm
Bricklayer)
ml 20.00 0.050 partition wall. of thickness m2
Squad 16 Floors and Pavements Unit
Fine flattening
grouting on sharp (1 Laborer + 1
edges ml 20.00 0.050 Bricklayer) Demolition of asphalt
Cramped and Roofs yield/indirect/per pavement in small areas 5
Unit rend/direct/jor unit Gang to 8 cm. esp. m2

Squad 16 Demolition of 10 cm
2 cm mix board. thick (1 Laborer + 1 reinforced concrete floor.
to receive waterproof. m2 20.00 0.050 Bricklayer) esp. m2

Squad 16
3 cm mix board. thick (1 Laborer + 1
to receive waterproof. m2 20.00 0.050 Bricklayer)

Squad 16
Chamfer with 15x15 (1 Laborer + 1
cm partition pieces. ml 25.00 0.040 Bricklayer)
Squad 16
15x15 cm concrete (1 Laborer + 1
chamfer. ml 25.00 0.040 Bricklayer)

Tezontle filling on the Squad 16


roof includes lifting of (1 Laborer + 1
material m3 5.00 0.200 Bricklayer)

Roof waterproofing
with 2 layers of
emulsion and 1 of Squad 16
fiber and application. (1 Laborer + 1
of paint on top m2 40.00 0.0250 Bricklayer)
Squad 16
12 cm red partition (1 Laborer + 1
parapet. of thickness m2 7.00 0.1400 Bricklayer)
yield/indirect/per
Firm and flat Unit rend/direct/jor unit Gang

Simple concrete
pavement of 5 cm. Squad 16
conc thickness made (1 Laborer + 1
in work m2 30.00 0.033 Bricklayer)

Simple concrete
pavement of 8 cm. Squad 16
conc thickness made (1 Laborer + 1
in work m2 25.00 0.040 Bricklayer)

Simple concrete
pavement of 10 cm. Squad 16
conc thickness made (1 Laborer + 1
in work m2 25.00 0.040 Bricklayer)

Simple concrete
pavement of 1 5 cm. Squad 16
conc thickness made (1 Laborer + 1
in work m2 20.00 0.050 Bricklayer)

Simple concrete
pavement of 5 cm. Squad3
conc thickness (6 Pawn +2
premixed m2 120.00 0.0083 Bricklayer)

Simple concrete
pavement of 8 cm. Squad3
conc thickness (6 Pawn +2
premixed m2 90.00 0.011 Bricklayer)
Simple concrete
pavement of 10 cm. Squad3
conc thickness (6 Pawn +2
premixed m2 80.00 0.0125 Bricklayer)

Simple concrete
pavement of 15 cm. Squad3
conc thickness (6 Pawn +2
premixed m2 50.00 0.020 Bricklayer)
Block and partition yield/indirect/per
walls Unit rend/direct/jor unit Gang
Red Partition Wall
5.50 cms. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 7.00 0.143 Bricklayer)
Red Partition Wall
12.00 cms. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 6.00 0.167 Bricklayer)
Red Partition Wall
17.50 cms. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 4.50 0.222 Bricklayer)
Red Partition Wall
24.00 cms. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 3.50 0.286 Bricklayer)
Hollow partition wall
5.00 cm. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 4.00 0.250 Bricklayer)
Hollow partition wall
10.00 cm. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 5.00 0.200 Bricklayer)
Hollow partition wall
12.00 cm. thickness Squad 16
max. height (1 Laborer + 1
3.00mts m2 6.00 0.167 Bricklayer)
Manholes and yield/indirect/per
manholes unit
Unit rend/direct/jor Gang
rend/direct/jor yield/indirect/ per Gang
unit

Squad 19
260.00 0.003846
(1 Assistant + 1
Of. Electrician)

Squad 19
240.00 0.004166
(1 Assistant + 1
Of. Electrician)

Squad 19
220.00 0.004545
(1 Assistant + 1
Of. Electrician)

Squad 19
200.00 0.00500
(1 Assistant + 1
Of. Electrician)

Squad 19
180.00 0.00555
(1 Assistant + 1
Of. Electrician)

Squad 19
160.00 0.00625
(1 Assistant + 1
Of. Electrician)

Squad 19
140.00 0.00714
(1 Assistant + 1
Of. Electrician)

Squad 19
120.00 0.00833
(1 Assistant + 1
Of. Electrician)

Squad 19
100.00 0.01000
(1 Assistant + 1
Of. Electrician)

Squad 19
70.00 0.01428
(1 Assistant + 1
Of. Electrician)

Squad 19
65.00 0.01538
(1 Assistant + 1
Of. Electrician)

Squad 19
60.00 0.16666
(1 Assistant + 1
Of. Electrician)
yield/indirect/per
rend/direct/jor Gang
unit

Squad 19
3.50 0.2857

(1 Assistant + 1
Of. Electrician)

Squad 19
3.30 0.3030

(1 Assistant + 1
Of. Electrician)
Squad 19
2.00 0.5000
(1 Assistant + 1
Of. Electrician)

Squad 19
2.00 0.5000

(1 Assistant + 1
Of. Electrician)
yield/indirect/per
rend/direct/jor Gang
unit

Squad 19
5.00 0.2000
(1 Assistant + 1
Of. Electrician)

Squad 19
2.50 0.4000
(1 Assistant + 1
Of. Electrician)

Squad 19
1.25 0.8000
(1 Assistant + 1
Of. Electrician)

yield/indirect/per
unit
rend/direct/jor Gang

Squad 5
(1 Carp. ON + 1
26.0 0.038 helper)

yield/indirect/ per
rend/direct/jor unit Gang

Squad 1 (1 Pawn
1.17 0.085 + 0.05 corporal)

Squad 1 (1 Pawn
1.50 0.666 + 0.05 corporal)

Squad 1 (1 Pawn
0.19 2,039 + 0.05 corporal)

Squad 1

(1 Pawn + 0.05
0.75 1,330 corporal)

Squad 1

(1 Pawn + 0.05
1.34 0.714 corporal)

Squad 1
(1 Pawn + 0.05
25.0 0.040 corporal)
yield/indirect/per
rend/direct/jor unit Gang

Squad 1
(1 Pawn + 0.05
25.0 0.040 corporal)

Squad 1
(1 Pawn + 0.05
27.0 0.037 corporal)

Squad 1
(1 Pawn + 0.05
23.0 0.041 corporal)
Squad 1

(1 Pawn + 0.05
corporal)
15.0 0.067
yield/indirect/per
rend/direct/jor unit Gang

Squad 1
(1 Pawn + 0.05
33.0 0.030 corporal)

Squad 1 (1 Pawn
12.5 0.080 + 0.05 corporal)

Squad 1 (1 Pawn
12.3 0.081 + 0.05 corporal)

Squad 1 (1 Pawn
6.0 0.167 + 0.05 corporal)

Squad 1

(1 Pawn + 0.05
4.0 0.250 corporal)

Squad 1
(1 Pawn + 0.05
25.0 0.040 corporal)

Squad 1

(1 Pawn + 0.05
16.6 0.060 corporal)

Squad 1
(1 Pawn + 0.05
7.70 0.130 corporal)

Squad 1
(1 Pawn + 0.05
7.70 0.200 corporal)
Squad 1
(1 Pawn + 0.05
corporal)
12.00 0.830
yield/indirect/per
rend/direct/jor unit Gang

Squad 1
(1 Pawn + 0.05
11.00 0.090 corporal)

Squad 1
(1 Pawn + 0.05
corporal)
8.70 0.115