Laboratory May 2019

The document provides laboratory and field test results for a road project in Bole, Ethiopia. It summarizes test results for road bed compaction between stations 10+100-10+140 and 10+380-10+420 in April, meeting the minimum 95% compaction standard. It also summarizes embankment layer testing between stations 9+000-9+320 and 10+260-10+420 in May, mostly meeting the minimum 97% compaction standard except for one section. Sub-base testing at station 15+240-15+500 in May failed to meet the 97% standard.

Uploaded by

Solomon Mehari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
77 views16 pages

Laboratory May 2019

The document provides laboratory and field test results for a road project in Bole, Ethiopia. It summarizes test results for road bed compaction between stations 10+100-10+140 and 10+380-10+420 in April, meeting the minimum 95% compaction standard. It also summarizes embankment layer testing between stations 9+000-9+320 and 10+260-10+420 in May, mostly meeting the minimum 97% compaction standard except for one section. Sub-base testing at station 15+240-15+500 in May failed to meet the 97% standard.

Uploaded by

Solomon Mehari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 16

Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project

Employer Contractor Consultant


Eshetu Lema Road SG Consulting
Ethiopian Road Authority
Contractor Engineers PLC

Summary of FDT Road bed


Reporting Month: April 2019
Laboratory Results Field Results
% of
Compaction
Station Section of the Road Test Pit Side OMC Remarks
MDD OMC MDD
OMC ± 2% Min.95%

10+110 CL 1.769 13.5 1.85 12.7 93


10+100-10+140 Bole Weterdino
10+130 LHS 1.769 13.5 1.87 12.9 94

10+390 LHS 1.769 13.5 1.89 12.3 95


10+380-10+420 Bole Weterdino
10+410 RHS 1.769 13.5 1.88 12.6 94

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant
Eshetu Lema Road SG Consulting
Ethiopian Road Authority
Contractor Engineers PLC

Summary of FDT Embankment


Reporting Month: May 2019
Laboratory Results Field Results % of
Station Section of the Road Test Pit Side Layer Compaction Remarks
OMC
MDD OMC MDD
OMC ± 2% Min.95%
10+000 LHS 1.808 14.8 2.00 13.0 98
9+980-10+100 Bole Weterdino 5th
10+060 RHS 1.808 14.8 1.98 13.6 96
10+110 LHS 1.808 14.8 1.99 12.9 97
10+100-10+140 Bole Weterdino 1st
10+130 CL 1.808 14.8 2.00 13.6 97
10+270 RHS 1.808 14.8 1.96 12.9 96
10+260-10+380 Bole Weterdino 4th
10+370 LHS 1.808 14.8 1.98 12.8 97
10+390 RHS 1.808 14.8 1.98 13.0 97
10+380-10+420 Bole Weterdino 2nd
10+410 LHS 1.808 14.8 1.96 13.2 96
9+110 RHS 1.808 14.8 1.99 13.4 97
9+080-9+240 Bole Weterdino 5th
9+230 CL 1.808 14.8 2.00 13.0 98
9+250 LHS 1.808 14.8 2.03 13.8 99
9+240-9+320 Bole Weterdino 4th
9+300 CL 1.808 14.8 1.99 13.7 97
9+020 RHS 1.808 14.8 1.73 9.4 87
9+000-9+080 Bole Weterdino 5th FDT Fail
9+070 LHS 1.808 14.8 1.87 13.4 91

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Contractor Contractor Consultant
Ethiopian Road SG Consulting Engineers
Eshetu Lema Road Contractor
Authority PLC

Summary of FDT Sub base


Reporting Month: May 2019
Laboratory Results Field Results % of
Station Section of the Road Test Pit Side Compaction Remarks
OMC
MDD OMC MDD
OMC ± 2% Min.97%
15+280 RHS 1.82 11.8 1.93 12.3 94
15+240-15+500 Bole Abomsa FDT is Fail
15+320 LHS 1.82 11.8 1.91 12.1 94

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant

Ethiopian Road Eshetu Lema Road


SG Consulting Engineers PLC
Authority Contractor

Summary of Existing Sub grade Laboratory test Results


Reporting Month: May 2019

MDD OMC CBR Swell LL PI 2 0.425 0.075


No. Station Depth (M) Section of the Road Soil Classification GI Type of Soil Remarks

Specification Requirments Min.3 Max.3 Max.60 Max.30 _ _ _

1 0+000-0+500 0.3-0.8 Bole Abomsa 1.487 21.8 0.92 7.42 70.80 34.2 97.9 89.3 84.7 A-7-5 30 Dark Brown Clay Soil Unsuitable

Light Gray Gravely Silty


2 0+500-1+000 0.3-0.8 Bole Abomsa 1.579 17.9 1.06 7.93 56.0 21.3 98 94.9 87.5 A-7-6 22 Soil
Unsuitable

3 1+000-1+500 0.3-1.0 Bole Abomsa 1.755 14.28 3.11 3.56 41.3 14.6 95.8 83.99 67.6 A-7-6 9 Dark Brown Clay Soil Unsuitable

4 1+500-2+000 0.3-0.8 Bole Abomsa 1.893 11.45 47.02 0.59 63.9 31.6 49.6 45.1 33.8 A-7-6 4 Dark Brown Clay Soil Unsuitable

5 2+000-2+500 0.3-0.8 Bole Abomsa 1.522 24.5 1.88 6.81 60.9 27.7 89.9 86.9 81.5 A-7-5 25 Dark Brown Clay Soil Unsuitable

6 2+500-3+000 0.3-0.8 Bole Abomsa 1.683 17.82 22.14 0.87 34.5 10.8 83.2 69.1 64.8 A-6-5 5 Dark Brown with Gravel Suitable

7 3+000-3+500 0.25-0.75 Bole Abomsa 1.7 18.9 8.0 1.6 42 20.54 81.9 72.8 54.8 A-7-6 8 Clayey Soil Suitable

8 3+500-4+000 0.25-0.75 Bole Abomsa 1.78 14.3 25 0.713 36.95 17.84 59.2 45.7 30.9 A-2-6 0 Silty Gravel and Sand Suitable

9 4+000-4+500 0.30-0.80 Bole Abomsa 1.66 20.1 6.4 0.535 46.7 25.12 47.8 32.7 21.1 A-2-7 0 Silty Gravel and Sand Suitable

10 4+500-5+000 0.30-0.81 Bole Abomsa 1.65 20.8 9.15 1.469 35.7 16.13 80.6 59.6 44.6 A-6-6 Light Brown Silty Clay Suitable

11 5+000-5+500 0.3-0.70 Bole Abomsa 1.86 15.4 26 0.616 34.1 12.06 74.4 60.3 50.2 A-6 3 Clayey Soil Suitable

12 5+500-6+000 0.3-0.8 Bole Abomsa 1.45 19.8 42 0.461 - NP 50.8 39.2 28.7 A-2-4 0 Clayey Gravel and Sand Suitable

13 6+000-6+500 0.3-0.75 Bole Abomsa 1.6 10.8 31 0.567 35.7 16.13 40.5 31.9 22.4 A-2-6 0 Silty Gravel and Sand Suitable

14 6+500-7+000 0.3-0.76 Bole Abomsa 1.86 14.2 29 0.756 38.6 21.97 50.2 44.5 41.2 Light Brown Silty Clay Suitable

7+000-7+500

15 7+500-8+000 0.4-0.85 Bole Abomsa 1.95 12 50 0.401 35.5 16.3 54.4 42.1 30.7 A-2-6 0 Silty Gravel and Sand Suitable

16 8+000-8+500 0.3-0.8 Bole Abomsa 1.61 23.8 8 1.787 51.99 28.77 97.7 90.3 79 A-7-6 23 Dark Brown Clay Soil Suitable

17 8+500-9+000 0.2-1 Bole Abomsa 1.93 13.45 56 0.501 34.6 16.69 52.8 37.6 25.4 A-2-6 0 Silty Gravel and Sand Suitable

18 9+000-9+280 _ Bole Abomsa _ _ _ _ _ _ _ _ _ _ _ Rock _

19 9+280-9+500 0.25-0.80 Bole Abomsa 1.84 13.67 30 0.707 36 13.29 60.1 44.6 33.3 A-2-6 0 Silty Gravel and Sand Suitable

20 9+500-9+940 0.25-0.85 Bole Abomsa 1.47 18.03 57 0.919 48 14.67 52.7 37 20.9 A-2-7 0 Silty Gravel and Sand Suitable

21 9+940-11+600 _ Bole Abomsa _ _ _ _ _ _ _ _ _ _ _ Rock _

Light Brown Silty Gravel


22 11+600-11+680 0.3-0.8 Bole Abomsa 1.826 12.6 61.89 0.87 36.6 12 50 43 35 A-2-6 0 and Sand
Suitable

Light Brown Silty Gravel


23 11+680-11+900 0.3-0.8 Bole Abomsa 1.77 14.3 38.04 1.14 47.3 16.7 44 33 26 A-2-7 0 and Sand
Suitable

24 11+900-12+000 0.3-0.8 Bole Abomsa 1.53 19.40 3.41 7.70 63.9 26.3 72.0 68.0 62.0 A-7-5 16 Brown Silty Clay Soil Unsuitable

25 12+000-12+500 0.20-0.75 Bole Abomsa 1.64 19.4 13 1.217 55.8 19.7 54.5 50.4 44.4 A-7-5 5 Clayey Soil Suitable

26 12+500-13+000 0.2-75 Bole Abomsa 1.62 19.4 2.53 3.837 65.6 33.2 60.4 57.1 52 A-7-5 14 Clayey Soil Not sutable,need under cut

27 13+000-13+100 0.2-0.68 Bole Abomsa 1.69 20.4 2.36 3.585 50 29.21 78.8 75.1 70 A-7-6 14 Clayey Soil Not sutable,need under cut

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant

Ethiopian Road Eshetu Lema Road


SG Consulting Engineers PLC
Authority Contractor

Summary of Existing Sub grade Laboratory test Results


Reporting Month: May 2019
28 13+100-13+280 0.2-0.65 Bole Abomsa 1.68 19.3 27 0.303 55.3 29.54 33.1 29.2 24.9 A-2-7 0 Silty Gravel and Sand Suitable

29 13+280-14+000 0.2-0.75 Bole Abomsa 1.63 17.6 3 6.081 52.2 21.17 67.8 62.6 55.3 A-7-5 10 Clayey Soil Not sutable,need under cut

30 14+000-14+500 0.2-0.75 Bole Abomsa 1.63 17.6 2.27 8.034 58.8 32.01 89.9 85.7 79.2 A-7-5 47 Black Cotton Not sutable,need under cut

31 14+500-15+000 0.2-0.80 Bole Abomsa 1.68 17.2 2 7.473 45.7 22.63 81.3 73.6 63.5 A-7-6 13 Clayey Soil Not sutable,need under cut

32 15+000-15+500 0.2-0.75 Bole Abomsa 1.58 22.2 1.5 5.125 60.5 34.09 92.8 89.7 83.3 A-7-6 20 Clayey Soil Not sutable,need under cut

33 15+500-16+000 0.25-0.75 Bole Abomsa 1.59 19.6 3 4.856 82.9 42.04 92.8 90 85.6 A-7-5 20 Clayey Soil Not sutable,need under cut

16+000 - 16+500 0.22-.75 Bole Abomsa 1.54 24.2 1.74 4.656 59.8 33.88 94.8 91.2 81.9 A-7-5 30 Clayey Soil Not sutable,need under cut

16+500 - 17+000 0.25-.85 Bole Abomsa 1.48 24.2 2.16 4.868 68.7 28.29 97.7 96.2 93.4 A-7-6 34 Clayey soil Not sutable,need under cut

34 17+000-17+500 0.30-0.85 Bole Abomsa 1.56 23.04 2 5.308 82 42.5 98.5 95.6 90.7 A-7-5 20 Clayey Soil Not sutable,need under cut

35 17+500-18+000 0.30-0.90 Bole Abomsa 1.54 23.5 3 4.655 64 34 98.8 96 91 A-7-5 20 Clayey Soil Not sutable,need under cut

36 18+000-18+500 0.30-0.90 Bole Abomsa 1.55 26.8 2 4.575 69.8 34.23 98.3 96.7 92.2 A-7-5 20 Clayey Soil Not sutable,need under cut

37 18+500-19+000 0.30-0.90 Bole Abomsa 1.44 22.9 2 6.353 65.7 31.38 90 83.2 79.8 A-7-5 20 Clayey Soil Not sutable,need under cut

Not sutable,need under cut;


38 19+000-19+400 0.30-0.90 Bole Abomsa 1.52 21.84 7.0 3.547 58.4 29.54 65.7 58.3 50.2 A-7-6 11 Clayey Soil
due to swell
Light Gray Gravley Silty
39 0+000-0+500 0.3-0.80 Bole Weterdino 1.667 18.27 3.2 6.09 45.8 16.07 85.3 80.3 67.2 A-2-7 0 Clay
Unsuitable

Light Gray Gravley Silty


40 0+500-1+000 0.3-0.8 Bole Weterdino 1.953 12.86 36.37 0.89 42.81 12.41 45.0 36.0 25.0 A-2-7 0 Clay
Suitable

41 1+000-1+500 0.3-0.8 Bole Weterdino 1.618 16.60 2.72 7.15 69.70 35.1 99.0 96.0 88.0 A-7-5 36 Black Cotton Not sutable,need under cut

42 1+500-2+000 0.3-0.8 Bole Weterdino 1.565 18.40 4.81 5.90 69.20 34.4 99.0 97.0 91.0 A-7-5 37 Black Cotton Not sutable,need under cut

43 2+000-2+500 0.3-0.8 Bole Weterdino 1.535 18.60 2.27 8.25 62.00 30.6 98.0 90.0 86.0 A-7-5 30 Dark Brown Clay Soil Not sutable,need under cut

44 2+500-3+000 0.3-0.8 Bole Weterdino 1.68 17.82 4.62 4.47 58.00 21.3 52.0 48.0 45.0 A-6 5 Dark brown with Gravel Not sutable,need under cut

45 3+000-3+500 0.3-0.8 Bole Weterdino 1.652 19.54 4.13 3.38 43.20 13.9 92.0 85.0 74.0 A-7-5 7 black cotton Not sutable,need under cut

46 3+500-4+000 0.3-0.8 Bole Weterdino 1.646 15.96 1.08 6.3 56.9 20.6 96.0 89.0 80.0 A-7-5 19 black cotton Not sutable,need under cut

47 4+000-4+500 0.25-0.8 Bole Weterdino 1.62 19.1 2.9 7.88 63 28.7 96.9 88.6 69 A-7-5 20 Clayey Soil Not sutable,need under cut

Light Brown With Few


48 4+500-5+000 0.25-0.8 Bole Weterdino 1.62 18.4 2.0 8.1 58.9 32.2 94.7 82.9 51.3 A-7-6 13 Gravel Clay Soil
Unsuitable

49 5+000-5+500 0.3-0.8 Bole Weterdino 1.57 18 5.6 2.74 43.3 18.7 92 75.9 57 A-7-6 8 Brown Clay Soil Suitable

50 5+500-6+200 0.3-0.8 Bole Weterdino 1.69 15.1 4.3 8.43 82.3 45.6 97.8 91.7 82 A-7-5 43 Dark Brown Clay Soil Unsuitable

Light Brown With Few


51 6+200-6+500 0.25-0.8 Bole Weterdino 1.92 13 26.7 0.5 45.5 22.4 34.1 22.1 12 A-2-7 0 Gravel Clay Soil
Suitable

Dark Brown Silty Clay


52 6+500-6+960 0.25-0.8 Bole Weterdino 1.68 20.4 5.3 3.01 45.1 19.8 94.6 80.5 67.5 A-7-6 12 Soil
Unsuitable

Light Brown With


53 6+960-7+540 0.3-0.9 Bole Weterdino 1.83 12.6 44.7 0.53 36.1 17.2 31.2 23 21.1 A-2-7 0 Gravel Silty Clay Soil
Suitable

Dark Brown Silty Clay


54 7+540-7+700 0.3-0.8 Bole Weterdino 1.8 14 9.2 2.3 36.9 15.9 87.6 65.7 49.1 A-6 5 Soil
Suitable

7+700-8+200 0.3-0.9 >> 1.52 22.3 0.96 7.08 83.05 50.65 92.53 84.62 77.69 a-7-5 43 Black Cotton Unsuitable

Dark Brown Silty Clay


55 8+200-8+500 0.3-0.9 Bole Weterdino 1.89 10.9 7.9 1.73 54.4 26.1 47.3 37.4 30.9 A-2-7 1 Soil
Suitable

Brown Gravel Silty Clay


56 8+500-9+000 0.3-0.8 Bole Weterdino 1.75 15 67.5 0.29 36.8 12.7 30.2 19.8 11.8 A-2-6 0 Soil
Suitable

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant

Ethiopian Road Eshetu Lema Road


SG Consulting Engineers PLC
Authority Contractor

Summary of Existing Sub grade Laboratory test Results


Reporting Month: May 2019
57 9+000-9+600 0.3-0.8 Bole Weterdino 1.57 17.2 1.1 6.83 68.1 36.8 97.1 89.1 82.3 A-2-6 0 Black Cotton Unsuitable

Reddish With Gravel


58 9+600-10+000 0.3-0.8 Bole Weterdino 1.77 14.2 36.1 0.39 41.3 19.96 25.7 17.1 9.1 A-2-6 0 Silty Soil
Suitable

Light Gray Gravely Silty


59 10+000-10+645 0.3-0.8 Bole Weterdino 1.769 13.35 66.16 0.54 44.41 15.48 30 24.1 17.8 A-2-7 0 Soil
Suitable

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant

Ethiopian Road Eshetu Lema Road SG Consulting Engineers


Authority Contractor PLC

Summary of Test Result Borrow for Embankment


Reporting Month: May 2019

MDD OMC CBR Swell LL PI 2 0.425 0.075


Soil
No. Station Section of the Road GI Type of Soil Remarks
Classification
Specification
Min.7 Max.2 Max.60 Max.30 _ _ _
Requirments

1 4+200 Offset 300m LHS (Stock1) Bole Abomsa 1.81 13.8 69 3.447 27.60 13.81 23.4 18.5 14.7 A-2-6 0 Silty Gravelly and Sand Swell is Too High

2 4+200 Offset 300m LHS (Stock2) Bole Abomsa 1.92 12.8 49 0.086 39.7 20.01 33.3 25.5 18.1 A-2-6 0 Silty Gravelly and Sand Re -Tested

3 9+280 RHS (Stock1) Bole Abomsa 1.73 16.4 36 0.44 46.7 22.71 26.9 23.2 19 A-2-7 0 Silty Gravelly and Sand Satisfy the Requirements

4 9+280 RHS (Stock2) Bole Abomsa 1.8 13.9 25 1.105 54.4 27.8 38.8 27.9 22.3 A-2-7 1 Silty Gravelly and Sand Re- Checked

5 13+200 Offset 1.2km RHS Bole Abomsa 1.72 13.8 8 1.324 58.3 27.73 61.6 58.4 54.3 A-2-7 13 Clayey Soil Satisfy the Requirements

6 13+100-13+200 FW Bole Abomsa 1.72 16.3 12.4 1.455 50.87 27 45.1 39.9 30 A-2-7 1 Silty Gravelly and Sand Satisfy the Requirements

7 14+920 Offset 3.5km LHS Bole Abomsa 2 9.1 70 1.324 43 18.78 12.6 8.4 5.5 A-2-7 0 Silty Gravelly and Sand Satisfy the Requirements

8 14+700 Offset 1.5km RHS Bole Abomsa 1.35 26.1 16 0.919 52.1 19.26 71 47.5 31.5 A-2-7 1 Silty Gravelly and Sand Satisfy the Requirements

Quality Tests Satisfy the


9 18+900 Offset 100m LHS Bole Abomsa 1.52 18.8 26 0.51 58.5 25.7 50 40.7 33.9 A-2-7 3 Silty Gravelly and Sand
Requirements
Satisfy the Requirements (3:1
10 14+700 Blended with 13+200 Bole Abomsa 1.63 15.7 22 0.885 58.13 25.57 56.2 43.9 33.4 A-2-7 1 Silty Gravelly and Sand
Blended Ratio)
Satisfy the Requirements (3:1
11 14+700 Blended with 18+900 Bole Abomsa 1.48 19.3 27 0.475 54.65 21.27 54.9 41.7 30.1 A-2-7 0 Silty Gravelly and Sand
Blended Ratio)
Satisfy the Requirements (3:1
12 14+700 Blended with 11+500 Bole Abomsa 1.69 16.5 58 0.421 51.35 23.75 34.8 26 17.4 A-2-7 0 Silty Gravelly and Sand
Blended Ratio)

13 4+200 Offset 300m LHS Bole Abomsa 1.8 12.2 85.3 0.31 41.8 13.8 22 14 10 A-2-7 0 Light Brown silty Gravlly Re- Tested

Redish Brown Silty Ciay Indicative Satisfy the


14 2+400 Offset 1.7km Bole Abomsa 1.84 12.5 60.6 0.17 41.5 15.8 19 14 10 A-2-7 0 With Gravel Requirements
Light Brown Silty
15 10+800 Offset 100m RHS Bole Abomsa 1.825 11.6 76.76 0.09 40.5 13.4 28 22 13 A-2-7(0) 0 Gravel and sand

Light Brown Silty Clay


16 8+800 Offset 100m RHS Stock 2 Bole Abomsa 1.857 10.7 3.26 2.6 53.5 27.4 26 18 14 A-2-6(0) 0 With Some Gravel
CBR is Fail

Brown Silty gravelly and


17 7+640 Offset 100m RHS Bole Weterdino 1.808 14.8 _ _ _ _ _ _ _ _ _ sand
Only MDD Test Checked

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant

Ethiopian Road Eshetu Lema Road SG Consulting Engineers


Authority Contractor PLC

Summary of Test Result For Material Obtained From (Road Way)


Reporting Month: May 2019

MDD OMC CBR Swell LL PI 2 0.425 0.075


Soil
No. Station Section of the Road GI Type of Soil Remarks
Classification
Specification
Min.7 Max.2 Max.60 Max.30 _ _ _
Requirments

1 7+660-7+900 FW Bole Abomsa 1.93 12.3 57 0.584 43.50 24.1 29.1 22.5 14.7 A-2-7 0 Silty Gravelly and Sand Satisfy the Requirements

5+650 Blended with 6+000


2 Bole Abomsa 1.74 14.07 36.2 0.346 35.6 17.6 57.2 38.8 25.2 A-2-6 0 Silty Gravelly and Sand Satisfy the Requirements
(1:1 Ratio)

3 9+160-9+300 Bole Abomsa 1.9 12.7 45 0.215 38.7 18.73 13.1 9.7 8.3 A-2-6 0 Silty Gravelly and Sand Satisfy the Requirements

4 10+100-10+400 LHS Bole Abomsa 1.62 19 17 0.18 55 28.12 40.9 35 26.4 A-2-7 0 Silty Gravelly and Sand Satisfy the Requirements

5 13+100-13+200 RHS (Stock) Bole Abomsa 1.72 16.3 12.4 1.46 50.87 27 45.1 39.9 30 A-2-7 1 Silty Gravelly and Sand Satisfy the Requirements

Light Brown Gravel Silty


6 10+000-10+080 FW Bole Abomsa 1.58 18.9 71.5 0.22 44.7 15.3 43.3 30.3 18.7 A-2-7 0 Satisfy the Requirements
Soil

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant

Ethiopian Road Eshetu Lema Road SG Consulting Engineers


Authority Contractor PLC
Summary of Test Result For Capping Material
Reporting Month: May 2019

MDD OMC CBR Swell LL PI 2 0.425 0.075


Soil
No. Station Section of the Road GI Type of Soil Remarks
Classification
Specification
Min.15 Max.2 Max.50 Max.25 _ _ _
Requirments

1 18+900 Offset 100m LHS Bole Abomsa 1.51 21.8 40.6 0.4 48.60 18.7 22 15 11 A-2-7 0 Silty Gravelly and Sand Satisfy the Requirements

2 4+200 Offset 300m RHS Bole Abomsa 1.79 12.2 85.29 0.31 41.8 13.8 22 14 10 A-2-7 0 Silty Gravelly and Sand Satisfy the Requirements

3 9+500 Offset 300m RHS Bole Weterdino 1.673 17.2 40.3 0.35 42.73 13.9 41 27.4 16.7 A-2-7 0 Brown Gravel and Sand Satisfy the Requirements

Light Brown Gravel Silty Clay


4 7+640 Offset 300m RHS Bole Weterdino 1.817 14 85.28 0.19 40.75 11.92 17 8 0 A-2-4 0 Indicative test ok
Soil

Light Brown Silty Clay with


5 10+800 Offset 100m RHS Bole Weterdino 1.805 13 66.8 0.88 39 13.1 32 23 13 A-2-6 0 Satisfy the Requirements
Some Gravel

Light Brown Silty Clay with


6 11+680 Offset 300m RHS Bole Abomsa 1.77 13.5 59.12 0.64 42.8 13.3 31 22 16 A-2-7 0 Satisfy the Requirements
Some Gravel

Light Brown Silty Clay with


7 10+800 Offset 100m RHS Bole Abomsa 1.825 11.6 76.76 0.09 40.5 13.4 28 22 13 A-2-7 0 Satisfy the Requirements
Some Gravel

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant

Ethiopian Road Authority Eshetu Lema Road Contractor SG Consulting Engineers PLC

Summary of Test Result for Sub Base


Reporting Month: May 2019

Linear
MDD OMC CBR Swell LL PI 63 37.5 20 4.75 1 0.425 0.075
shrinkage%
No. Material Source Station Section of the Road Soil Classification Type of Soil Remarks
Specification Requirments Min.30 Max.1.5 Max. 45 Max.12 100-100 70-100 50-100 30-100 17-75 11--56 5--25 Max.6

1 5+900 Offset 200m LHS _ Bole Abomsa 1.866 11.8 41 0.33 37.39 10.3 100 84 64.5 33 23.3 20.1 15.4 _ A-2-6(0) Dark browngravely silty soil Indicative Test is Ok

2 10+800 Offset 200m RHS _ Bole Abomsa 1.883 12.3 71 0.73 39.0 10.5 100 83.6 62.4 35.3 25.4 19.6 12.4 _ A-2-7(0) Dark browngravely silty soil Indicative Test is Ok

3 14+920 Offset 6+7km LHS _ Bole Abomsa 1.989 11.2 59 0.07 43.0 17.6 100 84 65 28.3 16.1 13.1 10.6 _ A-2-7(0) Dark browngravely silty soil Indicative Test is Ok (PI Our Limit)

Light Brown Sandy Silty With


4 4+200 Offset 300m RHS Stock 4 _ Bole Abomsa 1.76 13.39 69 0.33 31.7 11.8 100 84 64 30.4 19.7 15.4 12.6 4.3 A-2-6(0) Gravel
From the Stock Results ok

5+420-5+580 ( Sub base Trial Light Brown Sandy Silty With


5 4+200 Offset 300m RHS Stock 5 Bole Abomsa 1.76 13.39 69 0.33 27.6 9.5 100 89.2 74.4 50.3 35.3 25 15.5 4.3 A-2-6(0) Sampled After Compaction the Results Ok
Section)RHS Gravel

5+420-5+580 ( Sub base Trial Light Brown Sandy Silty With


6 4+200 Offset 300m RHS Stock 6 Bole Abomsa 1.76 13.39 69 0.33 26.4 7.98 100 90.7 73.7 46.6 30.7 21.5 12.7 4.3 A-2-6(0) Sampled After Compaction the Results Ok
Section)CL Gravel

Light Brown Sandy Silty With


7 4+200 Offset 300m RHS Stock 7 6+020-6+200 Bole Abomsa 1.76 13.39 69 0.33 26.36 8.02 100 93.8 81.6 50.9 35.1 24.7 14.1 4.3 A-2-6(0) Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With


8 4+200 Offset 300m RHS Stock 7 6+020-6+200 Bole Abomsa 1.76 13.39 69 0.33 34.72 10.37 100 96.5 85.8 54 36.3 26.7 18.2 4.3 A-2-4(0) Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With


9 6+000 Offset 300m RHS Stock 1 _ Bole Abomsa 1.71 14.55 74.8 0.15 37.9 9.48 100 90 75 41 26 21 17 4.3 A-2-4(0) Gravel
From the Stock Results ok

Light Brown Sandy Silty With


10 4+200 Offset 300m RHS Stock 7 6+460-6+720 Bole Abomsa 1.76 13.39 69 0.33 31.7 10.38 100 89 68 34 22 16 11 4.3 A-2-4(0) Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With


11 4+200 Offset 300m RHS Stock 7 7+300-7+480 Bole Abomsa 1.76 13.39 69 0.33 28.1 7.9 100 89 76 48 32 23 15 4.3 A-2-4(0) Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With


12 4+200 Offset 300m RHS Stock 7 6+720-7+000 Bole Abomsa 1.76 13.39 69 0.33 31.1 8.9 100 89 70 42 27 20 13 4.3 A-2-4(0) Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With


13 4+200 Offset 300m RHS Stock 8 7+480-7+760 Bole Abomsa 1.76 13.39 69 0.33 25.2 9.6 100 89 80 56 41 31 22 4.3 A-2-4(0) Gravel
Sampled After Compaction the Results Ok

14+160-14+280 ( Sub base Trial Light Brown Sandy Silty With


14 6+000 Offset 300m RHS Stock 1 Bole Abomsa 1.71 14.55 74.8 0.15 28.8 9.6 100 91 77 46 30 23 16 4.3 A-2-4(0) Sampled After Compaction the Results Ok
Section)LHS Gravel

14+160-14+280 ( Sub base Trial Light Brown Sandy Silty With


15 6+000 Offset 300m RHS Stock 1 Bole Abomsa 1.71 14.55 74.8 0.15 28 8.6 100 84 67 40 26 18 11 4.3 A-2-4(0) Sampled After Compaction the Results Ok
Section)RHS Gravel

Light Brown Sandy Silty With


16 6+000 Offset 300m RHS Stock 2 _ Bole Abomsa 1.76 13.8 85 0.17 35.7 9 100 90 74 40 24 17 10 4.3 A-2-4(0) Gravel
From the Stock Results ok

Light Brown Sandy Silty With


17 4+200 Offset 300m RHS Stock 7 7+760-8+020 Bole Abomsa 1.76 13.39 69 0.33 23.1 7.6 100 89 71 45 30 21 12 4.3 A-2-4(0) Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With


18 4+200 Offset 300m RHS Stock 7 8+020-8+460 Bole Abomsa 1.76 13.39 69 0.33 29.9 8.4 100 90 74 40 24 17 10 4.3 A-2-4(0) Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With


19 6+000 Offset 300m RHS Stock 2 _ Bole Abomsa 1.764 13.8 85 0.17 35.7 9 100 90 74 40 24 17 10 4.3 A-2-4(0) Gravel
From the Stock Results ok

20 6+000 Offset 300m RHS Stock 2 7+760-8+020 at 7+880 Bole Abomsa 1.764 13.8 85 0.17 23.1 7.6 100 89 71 45 30 21 12 4.3 A-2-4(0) Dark browngravely silty soil Sampled After Compaction the Results Ok

21 6+000 Offset 300m RHS Stock 2 8+020-8+460 at 8+250 Bole Abomsa 1.764 13.8 85 0.17 29.9 8.4 100 90 64 32 20 14 8 4.3 A-2-4(0) Dark browngravely silty soil Sampled After Compaction the Results Ok

22 6+000 Offset 300m RHS Stock 2 _ Bole Abomsa 1.764 13.8 85 0.17 35.7 9 100 90 74 40 24 17 10 4.3 A-2-4(0) Dark browngravely silty soil After Production From Sock Pile

Light Brown Sandy Silty With


23 6+000 Offset 300m RHS Stock 2 13+100-15+100 Bole Abomsa 1.822 11.8 74.8 0.44 _ _ _ _ _ _ _ _ _ _ _ Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With


24 6+000 Offset 300m RHS Stock 2 13+700-13+950 at 13+850 Bole Abomsa _ _ _ _ 28.7 8.2 100 93 82 50 31 23 16 _ A-2-4(0) Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With


25 6+000 Offset 300m RHS Stock 2 14+500-14+750 at 14+650 Bole Abomsa _ _ _ _ 30.9 9.5 100 84 70 41 27 20 14 _ A-2-4(0) Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With


26 6+000 Offset 300m RHS Stock 2 14+750-15+000 at 14+850 Bole Abomsa _ _ _ _ 35 11.8 100 89 76 45 27 20 13 _ A-2-4(0) Gravel
Sampled After Compaction the Results Ok

Light Brown Sandy Silty With Sampled After Compaction the Results
27 6+000 Offset 300m RHS Stock 2 13+950-14+160 at 14+000 Bole Abomsa _ _ _ _ 28.9 11 99 92 73 40 24 18 12 _ A-2-4(0) Gravel Need Appruval.

Light Brown Sandy Silty With Sampled After Compaction the Results
28 6+000 Offset 300m RHS Stock 2 14+260-14+500 at 14+350 Bole Abomsa _ _ _ _ 29.9 9.5 98 90 70 41 26 18 11 _ A-2-6(0) Gravel Need Appruval.

Light Brown Sandy Silty With


29 6+000 Offset 300m RHS Stock 2 15+000-15+240 at 15+160 Bole Abomsa _ _ _ _ 30.8 10.7 100 94 74 40 27 20 14 _ A-2-6(0) Gravel
Sampled After Compaction the Results Ok

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant

Ethiopian Road
Eshetu Lema Road Contractor SG Consulting Engineers PLC
Authority
Summary of Test Result for Crushed Aggregate Base Course
Reporting Month: May 2019

Flakiness
MDD OMC CBR Swell LL PI 50 37.5 20 10 5 2.36 0.425 0.075
Index
No. Station Section of the Road Type of Soil Remarks

Specification Requirments Min.100 Max.1.5 _ Max.6 100-100 95-100 60-80 40-60 25-40 15-30 7--19 5--12 Max.30

9+280 Offset 100M Test Results Satisfy the


1 Bole Abomsa 2.045 11.9 162 0.11 _ NP 100 100 74 45 28 21 13 11 29.6 Light Grey
RHS Requirements

9+280 Offset 100M Re-Test and Test Results


2 Bole Abomsa 2.1 12 109.5 0.1 _ NP 100 100 79 48 30 20 10 8 26.1 Light Grey
RHS Satisfy the Requirements

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant
Ethiopian Road Eshetu Lema Road
SG Consulting Engineers PLC
Authority Contractor

Laboratory Test Result of Concrete


Reporting Month: May 2019

Sampling Date Testing Cube Compressive Strength (Map)


No. Casting Date Slump (mm) Type of Structure Class of Concrete Remarks
Station
7 Days 28 Days 7 Days 28 Days
Project Main Testing to Central
1 27/02/2019 55 6/3/2019 27/03/2019 Drainage Structure C-25 37.3 43.04
Camp Laboratory
Testing to Central
2 Project Main Camp 27/02/2019 70 6/3/2019 27/03/2019 Drainage Structure C-30 34.3 38.82
Laboratory

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant
SG Consulting
Ethiopian Road Authority Eshetu Lema Road Contractor
Engineers PLC

Laboratory Test Result of Water


Reporting Month: May 2019

Specification Requirement(ERA 2013 Technical Spec)

7--9 <4000ppm <5000ppm <2000pmm

Chloride Content (mg/l) TDS (mg/l)


No Station Source Name PH Sulphate Content (mg/l)

1 km 0.0-BA, offset 150m RHS Awash River 7.1 19.1 27.2 212

2 km 19.7-BA Arbadino River 7 9 14.6 142

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project

Employer Contractor Consultant

Ethiopian Road SG Consulting Engineers


Eshetu Lema Road Contractor
Authority PLC

Laboratory Test Result of Sand


Reporting Month: May 2019

No Quality Tests Legeferda River Sand ERA 2013 Specification

1 Soundness Loss by Sodium Sulfate (AASHTO T-104) 16.10% Max 10%

2 Clay lumps and friable particles (AASHTO T-112) 0.60% Max 3%

3 Material finer than 0.075mm sieve (AASHTO T – 11) 1% Max 3%

4 Sand Equivalent (AASHTO T – 176) 89% Min 75%

5 Organic impurities (AASHTO T – 21) Color plate. 1 Color plate. 1 or 2

6 7 days Mortar strength (AASHTO T – 71) 19.1 Min 15MPa

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant
Ethiopian Road SG Consulting
Eshetu Lema Road Contractor
Authority Engineers PLC

Laboratory Test Result of Masonry Stone

Reporting Month: May 2019

No Station Specific Gravity Absorption (%) Com.Strength (Mpa)

9+300 Offset 150m RHS Bole


1 2.7 _ 28
Weterdino

18+500 offset 2km RHS Bole


2 _ _ 28
Abomsa

Prepared by: ___________________ Lab Technician


Bole Junction - Weterdino Horticulture and Bole - Abomsa Design and Build Road Project
Employer Contractor Consultant
SG Consulting
Ethiopian Road Authority Eshetu Lema Road Contractor
Engineers PLC
Weather Report
Location: Bole Site Office Reporting Month: April 2019
Weather Condition Temperature OC
Date Rainfall Intensity (mm) Remark
Sunny Foggy Cloudy Rain Minimum Moderate Maximum
1-Apr-2019 ü
2-Apr-2019 ü
3-Apr-2019 ü
4-Apr-2019 ü
5-Apr-2019 ü
6-Apr-2019 ü
7-Apr-2019 ü
8-Apr-2019 ü
9-Apr-2019 ü
10-Apr-2019 ü
11-Apr-2019 ü
12-Apr-2019 ü
13-Apr-2019 ü
14-Apr-2019 ü
15-Apr-2019 ü
16-Apr-2019 ü
17-Apr-2019 ü
18-Apr-2019 ü
19-Apr-2019 ü
20-Apr-2019 ü
21-Apr-2019 ü
22-Apr-2019 ü
23-Apr-2019 ü
24-Apr-2019 ü
25-Apr-2019

26-Apr-2019

27-Apr-2019

28-Apr-2019

29-Apr-2019

30-Apr-2019

NB :Temperature OC and Rainfall Intensity (mm) Not Recorded Dut to the Contractor Not Supplying the Instruments.