CV-Modeler 2

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 8

MOBILE : EMAIL :

PIPING SP3D DESIGNER

1
CORE STRENGTHS
OBJECTIVE
 Piping:
 Oil & Gas Seeking a position as a Piping Designer where I can apply my skills and
 Offshore knowledge in the field towards the growth and development of the
 Onshore organization.
 Feed & EPC

 3D Modeling
BACKGROUND
 SP3D
Diploma in Mechanical Engineering – with over 11 years of rich
 PDMS (Plant Design
experience in Years of piping Design and Detail Engineering experience
and Management
in both Upstream and downstream Offshore/Onshore Oil & Gas.
System
Ver.12.1.SP2)
 Aveva E3D MY WORK AS INCLUDED:

EMPLOYMENT HISTORY  Experienced in Upstream & downstream projects (Both


Offshore & Onshore) of Oil & Gas Industry.
 DESIGNER (PIPING &  Development of Plot plan, Equipment layout, Piping
LAYOUT) Layouts for various equipment.
Dec 2019 – Till Date
SAIPEM Contracting  Equipment location plans, Nozzle orientation drawings,
Netherlands BV Tie-in.
(Sharjah)  Process Piping design of CS, AS, SS, Duplex SS, CRA
materials, Cladded, non-ferrous piping like, Inconel 825
 SR. PIPING DESIGNER
(ASTM B423) & Inconel 625 (ASTM B444) material.
May 2019 – Nov 2019
CINQ Technical  Preparation of MTO (30%, 60%, 90%, Final & Reconcile)
Services (Sharjah) list and Valve list.
 Preparation of pipe support MTO.
 PIPING DESIGNER
Apr 2018 – May 2019  Preparation of piping deliverable drawings like Piping GAD,
Dodsal Engineering Piping Layouts & Isometrics.
and Construction
Pte Ltd (Dubai)  Firefighting piping networks like Fire water (FW) and
Foam systems to prevent from accidental fire.
 PIPING DESIGNER  Jacketed pipe routing and utility piping
Mar 2017 – Feb 2018
Penspen Ltd  IDC Check of HSE, Process, Mechanical E&I and Civil
(Bangkok) Drawings.
 Review & Comment on Vendor drawings.
 JUNIOR EXECUTIVE
Jul 2014 - Mar 2017  Ensure quality and consistency in piping design and
Siemens Ltd. drawings by checking IFC Isometrics, piping layouts &
(Coimbatore) GADs...Etc.
 Coordinate and participate in 3D model, safety, and
 JUNIOR ENGINEER constructability Reviews
Aug 2011 – Jun 2014
ISGEC Heavy  Provide input to other departments like Process, E&I,
Engineering Ltd. Mechanical and Civil.
 Preparation of guidelines for 3D modelling, check list for
 DESIGN ASSISTANT
isometric checking.
Apr 2009 – Aug 2011
Cheema Boilers Ltd.  Preliminary pipe support for both Critical & noncritical lines
2
and issue of critical lines for stress analysis.

3
EMPLOYMENT DETAILS
May 2019 – Till Date
Designer (Piping & Layout)
SAIPEM Contracting Netherlands BV (Sharjah)
UMM SHAIF Gas Cap Condensate Development Project Phase-1
Responsibilities

 Coordination & compilation of Dossier & final documentations


 Preparing individual system / sub system mark ups in P&ID
 Preparing model test packs by discipline for compiling in turnover dossiers and obtain client
approval.
 3D CAD modelling of equipment’s and temporary structures using Plant design and management
system (SP3D)
 Prepare pipe support and special support for structural input.
 Prepares piping conceptual design and estimate based on plot plan drawings, piping &
instrument diagram (P&ID) and piping standard drawings in accordance with project standard.
 Prepares equipment layout drawings and other piping related information drawings to coordinate
with other engineering disciplines.
 Communicate & interfaces with other disciplines such as Civil & Structural. Control systems,
Electrical, & Mechanical group during design development phase.
 Preparation of material take off.

PROJECTS:
 UMM SHAIF GAS CAP CONDENSATE DEVELOPMENT PROJECT PHASE-1 – ADNOC OFFSHORE

May 2019 – Till Date


SR. PIPING DESIGNER
CINQ Technical services (Client : Petrofac Emirates L.L.C. (Sharjah))
UMM SHAIF Gas Cap Condensate Development Project Phase-1
Responsibilities

 Conceptual Study, FEED, Plot Plan, Equipment Layout, Piping Study.


 Piping Design and Equipment Modelling for Exchangers, Separator, Coalescer, Glycol Absorber,
Scrubbers, Injection gas compressor, Inter stage & Discharge coolers Flare System Piping etc.
using with SP3D Piping modelling.
 Performed P & ID Mechanization, walkdowns, tie-in locations, complete system walkdowns,
routing of piping system. Worked together with structural group on equipment pumps and piping
locations.
 Providing input to Structural for location of Equipment’s, ladders, piping supports, cleats &
platforms.
 Attended model review and received comments from client
 Prepared/Comments vendor drawings as per std design.
 Able to predict time required to complete assignments and communicate with engineers and
schedulers to meet required schedules.
 Material Handling Study.
 Handle complex designing assignments under minimal supervision.
 Fixing Equipment nozzle orientations and size. Verify P & ID\'S.

PROJECTS:
 UMM SHAIF GAS CAP CONDENSATE DEVELOPMENT PROJECT PHASE-1 – ADNOC OFFSHORE

4
Apr 2018 – May 2019
PIPING DESIGNER
Dodsal Engineering and Construction Pte Ltd. (Dubai)
HMD South HGA Project

Responsibilities
 SP3D Piping modelling in Design of wellhead piping’s, flow lines, trunk lines and scraper trap
piping’s.
 Development of plot plans for Clusters which includes Oil production, WAG (water Alternate
Gas), WI (Water Injection), water disposal wells.
 Piping design & detail engineering of Central processing plant (CPP) area which covers
Launcher/receivers, Production manifolds, Slug catcher, flare system, flare seal drum,
 FST tanks, tank knock out drums, flare seal drum /tank KO drum/Export and Booster pumps,
 CBD vessel, firefighting, Quality metering skid.
 Piping design & detail engineering of Cluster Area which covers Oil production/WAG/Water wells,
Production & test manifold, Gas/Water injection manifolds, Well head piping, Let-down &Gas lift
station.
 Design of Pig Trap area which covers Oil production, Gas, Water launchers & receivers.
 Design of Underground network piping for closed drain vessel.
 Support modelling using MDS as per stress requirement.
 3D model review (30%, 60% and 90%) with client to meet safety, construction, operation&
maintenance.

CLIENT PROJECTS I HAVE WORKED FOR:


 HMD South HGA Project - EXECUTION OF A SEPARATION AND COMPRESSION CENTRE (CSC) AT
SOUTH HGA ALGERIA.

Mar 2017 – Feb 2018


PIPING DESIGNER
Penspen Ltd. (Bangkok)

Responsibilities
 SP3D Piping modelling in Pipe racks & Incinerator area
 3DModeling of Equipment using SP3D for skimmer, gas floatation unit, recirculation pumps,
nutshell filters, decant tank, effluent water storage tank, disposal pumps, gravity settling tank
and pumps & stripping column.
 Preparation & extraction equipment layout, nozzle orientation, tech. structure load detail
drawing by using SP3D Draft.
 Isometric Extraction using SP3D Iso Draft.
 Review all documentation from vendor and contractor’s requirements for achieving the accuracy
requirements of the project by solving optimal field discrepancies.
 Checking if the equipment as specified, meet the project requirements, standards and rules as
per industry best practice.
 Checking and optimal equipment nozzle orientation drawings.
 Checking and optimal piping layout design on 3D model.
 Checking and review civil IDC drawings.

CLIENT PROJECTS I HAVE WORKED FOR:


 KUWAIT OIL COMPANY -JURASSIC PRODUCTION FACILITY (JPF) – ONSHORE PROJECT

5
Jul 2014 – Mar 2017
JUNIOR EXECUTIVE
Siemens Ltd. (Coimbatore/Gurgaon)
Responsibilities

 Piping quantity estimates, Piping Layout, Piping Material and Stress & Support in following sector
of Onshore and Offshore projects like Water Softening, Waste water & Produced water package,
Power Generation Module, Gas Compressor Module, Fuel Gas Conditioning Skid, Sea water
Injection Module and SRU.
 SP3D Project setup configuration based on client spec & requirement, Standard & Client specific
Piping spec creation, Discipline wise users & team management creation and controlling user
right through Database management.
 Fabrication design co-ordination and Fabrication drawing extraction from 3D detailing software,
3D Client/ Vendor Fabrication model review, Integration & Comments Co-ordination.
 Piping design reviews, Design optimization, Piping Load calculation, Stress Iso’s review &
support selection with respect to client recommendation, Interdisciplinary drawing reviews,
Client/Vendor Interface review & approval.
 Site issue Clarification and onsite technical support.
 Tender quantities (BOQ) estimation, Cost evaluation, Vendor evaluation
 Checking of piping Isometrics, piping GAD’s and stress sketches. Perform, coordinate & review
piping material take offs (MTO) activities and to provide necessary details for further
procurement activities.
 Creating the piping model in SP3D and generating material take-off for the bill of material.
Generating isometric drawing in SP3D Siemens add-ons application and checking with P&ID,
Pipe schedule and valve schedule.
 Design the Pipe Supports and model as per the Pipe Support Standard using MDS support
Module, for Critical lines.

CLIENT PROJECTS I HAVE WORKED FOR:

 BP KHAZZAN – PRODUCED WATER TREATMENT PACKAGE: ONSHORE PROJECT


 SOHAR- WASTE WATER TREATMENT PACKAGE: ONSHORE PROJECT
 PKE JAWORZNO COMBINED CYCLE POWER PLANT -1 X 910 MW. (POLAND)
 BENI SUEF COMBINED CYCLE POWER PLANT. (EGYPT)

Aug 2011 – Jun 2014


JUNIOR ENGINEER
ISGEC Heavy Engineering Ltd.
Responsibilities
 Preparations of Boiler House Piping & HFO, LDO, Diesel & Gas Firing Piping from Knockout Drum.
 SP3D modelling for Flash steam piping from steam oil heater, HP& natural gas piping from
terminal points to Boilers, Natural gas piping from battery limit to fuel gas skid, Natural gas line
from KOD to fuel gas skids, NG-HP gas O\L from fuel oil skids piping in SP3D.
 Preparation of Piping Arrangement Drawings using SP3D DRAFT.
 Fabrication Isometric drawing making & checking.
 Preparation of Strength Calculation for pipe using IBR/ASME.
 Modelling of Supports as per Stress Report and Support Detail Engineering.
 Preparation of Piping & Support BOM.
 Checking of Layout drawings. (Fouling & Interfacing with other Equipment’s & Process wise).
 Preparation of Material Forecasting (MTO’s)
 Piping Elements, Codes and Standards, Pipe Sizing, Valves, Plot Plan Equipment and Piping
Layout, Steam traps and jacketed piping

6
DEPUTATION EXPOSURE:
DEPUTATION TO M/S. SHRI DATTA SAKHAR KARKHANA AS SITE ENGINEER (A UNIT OF
DALMIA BHARAT SUGAR & INDUSTRIES LIMITED) FOR ERECTION OF BOILER HOUSE PIPING
& SUPPORTS (DURATION: 6 MONTHS)

 Plan and supervise the piping equipment layout based on inputs received from process and
project departments.
 Supervise the design of the piping layouts based on P&ID (Piping and Instrument Design layout).
 Coordinate with other engineering disciplines to solicit any inputs or changes in engineering
design with need to be incorporated to finalize piping design layout.
 Prepare the work plan for the piping department to draw up the quantum of work and work out
the schedule/plan for deployment of resources.
 Plan and supervise periodic site surveys for first hand data collection which is used to
incorporate any changes if required in the piping layout.
 Represent piping department in the periodic Engineering Review Meetings to share the work in
progress, problems/issues faced etc.

Apr 2009 – Aug 2011


DESIGNER
Cheema Boilers Ltd.
Responsibilities

 Preparation of General Arrangements for Elevation, Plan, Plot plan, Loading Data, Pressure Parts
Arrangements, and non-Pressure parts Arrangements & piping Drawings per design
requirements and customer requirements.
 Preparations of Pressure Parts & Non-Pressure Parts Drain Piping.
 Preparation of Air Heater, Ducting for all non-pressure parts of Boiler.

EDUCATION

 DIPLOMA IN MECHANICAL ENGINEERING, 2009


SRI RAMAKRISHNA POLYTECHNIC COLLEGE, COIMBATORE, I CLASS

IT SKILLS

 PDMS (Plant Design and Management System Ver.12.1.SP2)


 SP3D
 Aveva E3D
 Navisworks Simulate 2014
 AutoCAD. (2007 to 2018)

LANGUAGES KNOWN

 ENGLISH, HINDI, TAMIL

PERSONAL INFORMATION

Nationality : Indian
Date of Birth :
Address :
7
Marital Status : Married
Passport :

You might also like