We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3
PRE-PRODUCTION MEETING REQUIREMENTS PPM R
SERIAL NO :
01. Gold Seal Sample (GSS) / Red Tag 4
Sample (RTS) 5
02. PO Sheets 6
03. Tech Pack 7
04. Fabric Approval & Test Report With Composition Report 8
05. 4 Point Inspection Report With Shade 9
Band Report 10
06. Risk Assessment Report, Sample
Guideline From Sample Section 07. Trim Card Approval 08. Size Set Garments With Measurement Report Guideline From Sample Section 07. Trim Card Approval 08. Size Set Garments With Measurement Report 09. Print Measurement (If Any)
PRE-PRODUCTION MEETING REQUIREMENTS
01. GOLD SEAL SAMPLE (GSS) / RED TAG
SAMPLE (RTS) 02. PO SHEETS 03. TECH PACK PPM REQUIREMENTS CHECKLIST SERIAL NO : DESCRIPTION STATUS
1 Gold Seal Sample (GSS) / Red Tag Sample (RTS)
2 PO SHEETS
3 TECH PACK
4 FABRIC APPROVAL & TEST REPORT WITH COMPOSITION REPORT
5 4 POINT INSPECTION REPORT WITH SHADE BAND REPORT