MemInspection Process 01.06
MemInspection Process 01.06
MemInspection Process 01.06
INSPECTION OF MEMORIALS.
3. PERSONS AT RISK
To be completed by ________________________________________________(date)
Following comprehensive training in this discipline, inspection work should be carried out
in conjunction with make safe work.
LB Havering Memorial Safety Policy and ICCM memorial safety guidance is available to
inspection staff
All work shall be carried out in accordance with training and policy documents received
Ensure no-one stands where the memorial may fall
Inspection shall consist of visual, then hand test and confirmed by a mechanical force test
(only if the memorial is less than 1.5m tall)
Carry out visual assessment of all memorials to assess potential risks
Ensure the inspection area is clear before proceeding with physical tests
Where memorial is 2.5m or less, carry out hand test to assess stability, ensuring a stable
stance is taken to the side of the memorial and a force, approximating 350 Newtons
(35kg), is gradually exerted in one direction. Test in both directions if required.
Where memorial is 1.5m or lower, on completion of a hand test, carry out force test using
a mechanical measuring device. Follow manufacturer’s directions ensuring a stable
stance is taken to the side of the memorial and a force is gradually exerted in one
direction. Test in both directions if required.
Complete inspection records as required
If working independently mobile ‘phones will be provided and instruction received on a
regular contact patterns with the main office. If working with a partner good
communication is essential and care taken to remain outside the fall of any memorials as
they are inspected.
Where two work together inspection tasks should be rotated on a regular basis where
possible