Imin & Imax Adjustments
Imin & Imax Adjustments
GMK 4075
Instructions for Adjusting Current Signals
1. General Description....................................................................................................................... 1
2. Necessary Preparations for the Adjustments............................................................................. 1
3. Main Hoist....................................................................................................................................... 2
3.1. Main Hoist – Adjust Imin – Raise Function .......................................................................... 2
3.2. Main Hoist – Adjust Imin – Lower Function ......................................................................... 4
3.3. Main Hoist – Adjust Imax – Raise Function.......................................................................... 5
3.4. Lower Main Hoist – Checking and Correcting the Starting Time & Starting Value
Parameters...................................................................................................................................... 7
4. Telescoping Gear........................................................................................................................... 8
4.1. Telescoping Gear – Adjust Imin – Retract Telescope Function......................................... 8
4.2. Telescoping Gear – Adjust Imin – Extend Telescope Function ....................................... 10
4.3. Telescoping Gear – Adjust Imax – Extend Telescope Function ...................................... 12
5. Derricking Gear ............................................................................................................................ 13
5.1. Derricking Gear – Adjust Imin – Derrick Out Function ..................................................... 13
5.2. Derricking Gear – Adjust Imin – Derrick In Function ........................................................ 15
5.3. Derricking Gear – Adjust Imax – Derrick Out Function..................................................... 15
5.4. Derricking Gear – Adjust Imax – Derrick In Function........................................................ 17
6. Slewing Gear ................................................................................................................................ 18
6.1. Slewing Gear – Adjust Imin – Slew Right Function........................................................... 18
6.2. Slewing Gear – Adjust Imin – Slew Left Function ............................................................. 20
6.3. Slewing Gear – Adjust Imax – Slew Right Function .......................................................... 20
6.4. Slewing Gear – Adjust Imax – Slew Left Function ............................................................ 20
6.5. Slewing Gear Brake – Adjust Imin & Imax.......................................................................... 21
7. Tilt Cab Control System, Adjust Imin & Imax ........................................................................... 22
8. Counterweight Control System.................................................................................................. 23
1. General Description
The ECOS controls the proportional valves with the relevant current signals:
The window is to be closed (“Close”) each time the parameters are adjusted using “Set”.
The activated valves control the control pressure for the appropriate direction valves at the
superstructure control block proportional to the current signal. See hydraulics circuit diagram OW
03057302.
Note: The adjustments must only be carried out by trained specialist staff!!
GMK 4075 Imin & Imax Training Information. April 02. Page 1
Deutsche GROVE GmbH
3. Main Hoist
Note: The adjustment should be carried out with reeving of up to a maximum of 4 parts of line.
Activate
GMK 4075 Imin & Imax Training Information. April 02. Page 2
Deutsche GROVE GmbH
b) Start GMK 4075 service program & click on Main Hoist Drive Unit
Open the throttle, move the joystick as far as it will go towards “Raise” (without high-speed!).
then move back to set value of 0.5% and hold.
Left click on
GMK 4075 Imin & Imax Training Information. April 02. Page 3
Deutsche GROVE GmbH
Left click on
c) Set offset such that the hoist lowers quite slowly. The speed must be slow enough that the HDRI
can be heard “ticking” every 4 - 5 seconds. The offset value can be between –5 and +12.
GMK 4075 Imin & Imax Training Information. April 02. Page 4
Deutsche GROVE GmbH
a) Set speed on the active display (see Imin, raise function) to 100%.
b) Connect pressure gauge (manometer) to the control block (right side of superstructure) at
measuring point MC.
Click on
d) Open the throttle, operate joystick to maximum position, and activate high-speed.
GMK 4075 Imin & Imax Training Information. April 02. Page 5
Deutsche GROVE GmbH
ATTENTION:
The control pressure must also be checked for the Lower function. It must not fall below 20 bar. If
necessary, adjust Imax – even if the pressure for the Raise function is rather higher.
GMK 4075 Imin & Imax Training Information. April 02. Page 6
Deutsche GROVE GmbH
3.4. Lower Main Hoist – Checking and Correcting the Starting Time & Starting
Value Parameters
Parameters
Click on
Main hoist
Adjust if necessary
Empirical values: 700 – 900 ms
3–5%
b) Move joystick as in normal operation towards Lower (without high-speed at average speed)
c) Following the adjustment, the Lower function must start without any undue delay and without any
jerky movements. If necessary, correct the starting time and starting value.
Note:
This adjustment is reminiscent of the setting of the throttle on the safety lowering valve.
The auxiliary hoist is adjusted in the same way as the main hoist
GMK 4075 Imin & Imax Training Information. April 02. Page 7
Deutsche GROVE GmbH
4. Telescoping Gear
4.1. Telescoping Gear – Adjust Imin – Retract Telescope Function
b) Unlock the telescoping cylinder and partially retract it to 2000 – 3500 mm.
The adjustment should be carried out in mid range at a length of approx. 2000 – 3500mm to avoid
the braking ranges of the ECOS program.
c) Open the throttle. Move joystick as far as it will go (retract) then move back to a set value of 0.5%
and hold.
GMK 4075 Imin & Imax Training Information. April 02. Page 8
Deutsche GROVE GmbH
d) Observe the length of the telescoping cylinder on the ECOS display (on the instrument panel).
Measure a change in length of 10mm (e.g. from 2270 to 2280) with a stopwatch.
Set value to
0.5% and
hold
Left click on
e) Adjust Imin such that a change in length of 10mm occurs every 3 seconds. This corresponds to a
telescoping cylinder speed of 10mm/3 secs. (= 3.3mm/sec.).
Empirical value:
Imin 310 – 340 mA
GMK 4075 Imin & Imax Training Information. April 02. Page 9
Deutsche GROVE GmbH
b) Unlock the telescoping cylinder and partially retract it to 2000 – 3500mm and then extend slightly.
The adjustment should be carried out in mid range at a length of approx. 2000 – 3500mm to avoid
the braking ranges of the ECOS program.
Activate
Set speed to 1%
Check length
here on ECOS
display
c) Open the throttle. Move the joystick as far as it will go (extend) then move back to a set value of
0.5% and hold.
GMK 4075 Imin & Imax Training Information. April 02. Page 10
Deutsche GROVE GmbH
d) Observe the length of the telescoping cylinder on the ECOS display (on the instrument panel).
Measure a change in length of 10mm (e.g. from 2270 to 2280) with a stopwatch.
Set value to
0.5% and
hold
Click on
e) Adjust Imin offset such that a change in length of 10mm occurs every 3 seconds. This
corresponds to a telescoping cylinder speed of 10mm/3 secs. (= 3.3mm/sec.).
GMK 4075 Imin & Imax Training Information. April 02. Page 11
Deutsche GROVE GmbH
a) Connect pressure gauge (manometer) to the control block (right side of superstructure) at
measuring point MB.
b) Set telescoping gear speed on the display to 100%. Left click on PWM parameter ‘Speed control
telescoping’
Push joystick right forward, open the throttle and activate fast speed. Adjust Imax such that the
control pressure is 20 bar.
Empirical values:
Imax 600 – 700 mA
GMK 4075 Imin & Imax Training Information. April 02. Page 12
Deutsche GROVE GmbH
5. Derricking Gear
5.1. Derricking Gear – Adjust Imin – Derrick Out Function
The adjustments should be carried out with just base section or maximum of 1x telescope and with a
boom angle of approx. 700 .
a) Set speed to 1%
Activate
Set speed to 1%
b) Left click on speed control derricking down for PWM parameter window.
Move set
value to 0.5%
and hold
Click on
GMK 4075 Imin & Imax Training Information. April 02. Page 13
Deutsche GROVE GmbH
c) Open the throttle. Move the joystick as far as it will go (derrick down) then pull back to set value of
0.5% and hold. Adjust Imin such that the boom derricks out very, very slowly. At 0.3% it must stop.
Imin adjustment
Note: this is a very precise adjustment and boom movement must be closely observed!
GMK 4075 Imin & Imax Training Information. April 02. Page 14
Deutsche GROVE GmbH
Imin Adjustment
c) Open the throttle. Move the joystick as far as it will go, then pull back to set value of 0.5% and
hold. Adjust Imin such that the boom derricks in very, very slowly. At 0.3% it must stop.
b) Connect pressure gauge (manometer) at measuring point MX to the derricking cylinder holding
valve.
GMK 4075 Imin & Imax Training Information. April 02. Page 15
Deutsche GROVE GmbH
c) Left click on ‘Speed control derrick down’ for PWM parameter window
d) Push joystick right forward, open the throttle. Adjust Imax such that the control pressure is max.
21.5 bar.
GMK 4075 Imin & Imax Training Information. April 02. Page 16
Deutsche GROVE GmbH
b) Connect pressure gauge to the control block (right side of superstructure) at measuring point MA.
d) Move joystick to max position for Derrick in, open the throttle and activate high-speed. Adjust Imax
such that the control pressure is 20 bar.
GMK 4075 Imin & Imax Training Information. April 02. Page 17
Deutsche GROVE GmbH
6. Slewing Gear
a) The turntable must be adjusted so that it is not affected by wind and it is not carrying any load.
Activate and
set to 1%
GMK 4075 Imin & Imax Training Information. April 02. Page 18
Deutsche GROVE GmbH
Increase set
value to
0.5% and
hold
Left click on
d) Open the throttle. Move joystick to right as far as it will go, then pull back to set value of 0.5% and
hold. Adjust Imin such that the slewing gear slews very slowly to the right. At 0.3% it must stop.
GMK 4075 Imin & Imax Training Information. April 02. Page 19
Deutsche GROVE GmbH
Here again the turntable has to be adjusted so that it is not affected by wind and it is not carrying any
load.
The adjustments for the Slew left function are identical to those for the Slew right function.
Exception:
Left click on ‘Slewing left’ for PWM parameter window (instead of Slew right).
Move joystick hard right, open the throttle and measure the slewing speed. Move Imax continually
upwards in 10mA stages until the crane has reached a slewing speed of 26-28 seconds for 1
revolution. Reduce Imax by 10mA and then close the window.
The adjustments for the Slew Left function are identical to those for the Slew Right function.
Exception:
GMK 4075 Imin & Imax Training Information. April 02. Page 20
Deutsche GROVE GmbH
b) Left click on ‘slewing brake control pressure’ for PWM parameter window.
Adjust Imax
(see description
below)
C) Description:
- Engine idling
- Release slewing brake (deadman must be set via joystick or seat switch)
- Press slewing gear foot brake pedal right down and then fully release brake pedal
- Adjust Imax such that the control pressure is 28 bar
- Complete the adjustment using “set” and “close”
GMK 4075 Imin & Imax Training Information. April 02. Page 21
Deutsche GROVE GmbH
c) Tilt cab with the button (lower), adjust Imin such that the
cab lowers very slowly (start of movement).
GMK 4075 Imin & Imax Training Information. April 02. Page 22
Deutsche GROVE GmbH
Imin & Imax values are input as standard values and should not be changed. Any changes are only
permitted by arrangement with GROVE.
GMK 4075 Imin & Imax Training Information. April 02. Page 23