Ecube 7 Power Supply Check
Ecube 7 Power Supply Check
Ecube 7 Power Supply Check
(E-CUBE 7)
HIGHLY CONFIDENTIAL 82 /
1st AC power FUSE, LED Check
1-2 1-1
1-1 Check fuse when AC power is off, fuse is whether good or not < Necessary Equipment>
1) Fuse short : ok Move 1-2. step
2) Fuse open : fail AC PSU defect 1. Multi meter or voltage meter
1-2 Check switch when LED AC power is on, if fuse is ok, LED will be turned on.
1) LED on (Green) : ok Move 2. step
2) LED off : fail AC PSU defect
2nd [D5VP STB] voltage check
2
2. If AC power is turned on(green switch), you can measure 5V on D5VP STB pin.
1) 5V : ok Move 3. step
2) 0V : fail AC PSU defect
CP S/W
3. After AC power is connected to DC power with 12pins cable and is < Necessary Equipment>
turned on,
turn on the CP switch, you can check 0V on PS_ON pin 1. Multi meter or voltage meter
(this is hard to check the voltage, you should measure voltage with AC
power and DC power are connected)
1) 0V : ok (fan operation)
2) 3.3V : fail System Defect
5th OUTPUT CHECK (by voltage meter)
D3.3VP 3.3V
A4.2VP 4.2V
D5.0Vsb 5.0V
D5.0VP 5.0V
A5.0VN -5.0V
A7.0VP 7.0V
A12.0VP 12.0V
D12.0VP 12.0V
D12VP_AMP 12.0V
A12.0VN -12.0V
D12.0VN -12.0V