Power Supply Check

(E-CUBE 7)

HIGHLY CONFIDENTIAL 82 /
1st AC power FUSE, LED Check

1-2 1-1

1-1 Check fuse when AC power is off, fuse is whether good or not < Necessary Equipment>
1) Fuse short : ok  Move 1-2. step
2) Fuse open : fail  AC PSU defect 1. Multi meter or voltage meter

1-2 Check switch when LED AC power is on, if fuse is ok, LED will be turned on.
1) LED on (Green) : ok  Move 2. step
2) LED off : fail  AC PSU defect
2nd [D5VP STB] voltage check
2

2. If AC power is turned on(green switch), you can measure 5V on D5VP STB pin.
1) 5V : ok  Move 3. step
2) 0V : fail  AC PSU defect

< Necessary Equipment>

1. Multi meter or voltage meter


3rd [PS_ON] voltage check
3

CP S/W

3. After AC power is connected to DC power with 12pins cable and is < Necessary Equipment>
turned on,
turn on the CP switch, you can check 0V on PS_ON pin 1. Multi meter or voltage meter
(this is hard to check the voltage, you should measure voltage with AC
power and DC power are connected)
1) 0V : ok (fan operation)
2) 3.3V : fail  System Defect
5th OUTPUT CHECK (by voltage meter)

<Output voltage check >


Output Name Voltage

D3.3VP 3.3V

A4.2VP 4.2V

D5.0Vsb 5.0V

D5.0VP 5.0V

A5.0VN -5.0V

A7.0VP 7.0V

A12.0VP 12.0V

D12.0VP 12.0V

D12VP_AMP 12.0V

A12.0VN -12.0V

D12.0VN -12.0V

< Necessary Equipment>

1. Multi meter or voltage meter