09 - Tata Power Safety - Audit - Procedure
09 - Tata Power Safety - Audit - Procedure
09 - Tata Power Safety - Audit - Procedure
Reason for
Rev No. Prepared By Checked By Approval by
Revision
Rev No. Corp Rules & Procedures
First release D R Kamath Vijay Chourey
00 -committee
Contents
1. OBJECTIVE:
Objective of this procedure is provide guidelines for conducting internal and external safety
audit and finding scope of further improvement and guidance on continual improvement of
Safety Management System.
2. SCOPE:
This procedure applies to all operating plants and project sites of Tata Power Group
companies including JVs/Subsidiaries.
3. EXPECTED RESULTS:
3.1. Verification of level of compliance on implementation of Tata Power Safety
Management System.
5. GLOSSARY/ DEFINITIONS:
Audit: Systematic, independent & documented process for obtaining ‘audit evidence ‘&
evaluating it objectively to determine the extent to which ‘audit criteria ‘is fulfilled.
Classification of Audits:
- First Party Audit (Internal Audit): Audit by an organization on itself for their own
purpose
-Third Party Audit (External Audit): Audit by an independent organization typically for
certification
Controls: Methods used to manage safety risks. Controls can be Elimination, Substitution,
Isolation/ separation, Engineering controls, signage/warnings, administrative controls and
/or PPE.
Job: A piece of physical work defined by time or other limits and that has a clear start and
end point
Non Routine Job / Task: Where an SOP / SMP is not available or the conditions of the
SOP / SMP have changed
Shall: Mandatory requirement
Should: Optional requirement
6. PROCEDURES:
6.1. Internal Audit:
6.1.1. Internal Audit shall be carried out by trained Internal auditors in all divisions
6.1.2. Internal audit shall be done as per Term of reference(TOR) which will based
upon either THSMS 13 elements or ISO 45001 or any other system requirements
as the case may be.
6.1.3. The Safety audit procedure addresses:
6.1.3.1.Responsibilities, competencies & requirements for planning & conducting
audits, reporting results & retaining associated records.
6.1.3.2. Audit criteria, scope, frequency & methods.
6.1.4. Audit programmes are based on
6.1.4.1. Results of risk assessments.
6.1.4.2. Results of previous audits.
6.1.5. Selection of auditors & conduct of audits shall ensure objectively & the
Impartiality of the audit process.
6.1.6. Methodology: Audit shall be conducted by adopting following methodology
6.1.7. Site observations:
i. Interviews with concerned site heads
ii. Review of related documents ( standards,procedures,design
codes,operations & maintenance procedures ,records )
6.1.8. Working documents
i. Check lists
ii. Forms
iii. Standard
iv. Guidelines
6.1.9. Scope
i. Locations
ii. Organizational units
iii. Activities & processes covered.
6.2. Scale of Implementation of Safety procedures:
12. REVIEW:
12.1. Review of this procedure shall be done as and when but not later than once in every
three (03) years. Typical Factors like Changes in legislation, Review of Incident
Reports, Inspection & Audit findings, Feedback from users, Recommendations in
Incident investigation reports may be inputs for the review and revision of the
procedure.
12.2. In case release of revised procedure gets delay due to obtaining feedback or any other
reasons, safety advisory may be issued immediately to take precautions for the
proposed changes in the procedure and revised procedure should be released
subsequently.
13. ATTACHMENTS/APPENDIX :
Annexure – 1: Format for measuring Implementation of Safety Procedures
(TPSMS/GSP/AUDT/012/FORM01)
Annexure – 2: Safety Audit Report
(TPSMS/GSP/AUDT/012/FORM02)
TPSMS/GSP/AUDT/012/FORM-01 Annexure – 1
1.
2.
3.
4.
5.
Scoring Criteria
Score Assessment criteria
level
1 Expectation never met. (0% Compliance)
Expectation SELDOM met. There are major non-conformances. Action plan does not
2 exist. (25% Compliance)
Expectation SOMETIMES met. There are few major non-conformances. Action plan
3 exist. No action taken. (50% Compliance)
Expectation USUALLY met. There are few minor non-conformances. Action plan for
4 non-conformances exists. (75% Compliance)
Expectation ALWAYS met. Few minor non-conformances exist. Appropriate action is
5 taken. (100% Compliance)
TPSMS/GSP/AUDT/012/FORM-02 Annexure – 2
SN Evidence Remarks
(Photograph Recommen Severity / SMS
Observations Action by Target Date
/ document dations Referenc
etc.) e
1.
2.
3.
4.
5.