06 - Tata Power Earth Leakage Circuit Breaker (ELCB) Testing Procedure
06 - Tata Power Earth Leakage Circuit Breaker (ELCB) Testing Procedure
06 - Tata Power Earth Leakage Circuit Breaker (ELCB) Testing Procedure
Rev
Reason for Revision Revised By Checked By Approval by
No.
On the basis of incident Navendra
R0 Ravindra Panchal V K Chourey
Investigation report Singh
Ravindra Panchal
To add SOP of ELCB (Lead Engineer – Corp Navendra Singh Vijay Chourey
R1 (Chief – Corp Safety)
Testing safety) (Group Head – P &
CB; Corp Safety.)
Navendra Singh Rajesh Sharma Suresh Khetwani
Head- Safety (T&D) Corp Head- Safety Chief - Corporate
R2 Periodic revision safety (Generation) Corp Safety & Environment
safety
Content
1. OBJECTIVE:
The objective of this procedure is to define the minimum requirements for testing of
Earth Leakage Circuit Breaker (ELCB).
2. SCOPE:
This procedure applies to all operating & Project sites of TATA Power Group
Companies including JVs/Subsidiaries.
3. EXPECTED RESULTS:
3.1. Manage activities/jobs associated with ELCB safely.
6.1. Any power supply provided for the use of portable electrical tools shall be given
through portable power supply board fitted with ELCB of 30 miliAmp rating.
6.2. If tripping timing exceeds more than 50 Miliseconds at 30 MiliAmp then ELCB
shall be replaced immediately.
6.3. The power supply cable shall be free of any joints.
6.4. Testing Schedule: Following testing schedule shall be followed for ELCBs.-
6.4.1. All fixed type ELCBs installed on switchboards shall be tested Half yearly
with the help of ELCB tester as per attached SOP (Appendix C) by the
licensed Electrician & record shall be maintained as per attached
Appendix A.
6.4.2. All ELCBs installed on portable switchboards, switchboard installed at
Temporary sheds, and outside areas (outside buildings) shall be tested
quarterly with the help of ELCB tester as per attached SOP (Appendix C)
by the licensed Electrician.
6.4.3. Before starting any work ELCB provided / installed for that Electrical
Circuit to be tested by pressing Push Button provided on ELCB to confirm
ELCB is tripping mechanically.
7. RECORDS :
7.1 ELCB Testing record (TPSMS/GSP/ELCB/016/FORM/01) - Retention period
three (3) years
7.2 ELCB failure record (TPSMS/GSP/ELCB/016/FORM/02) - Retention period three
(3) years
8. TRAINING & COMMUNICATION
8.1. Training of ELCB procedure shall be covered along with Electrical safety
Training.
8.2. Initial Communication to be done through Corporate Communication, Email
and subsequently this procedure shall be made available at safety portal at
Sangam.
9. VERIFICATION
9.1. Verification of implementation of ELCB Testing shall be done during Safety
Audit, Field Safety visit and inspections.
10. EXCEPTION :
Any Exception to this procedure shall only be done as per section 6.3 of Document
Control .Procedure (TPSMS/GSP/DC/014/REV01).
11. REFERENCES
11.1. Tata Power Electrical Safety procedure (TPSMS/CSP/ELEC/010).
11.2. Indian Electricity act and Rules
11.3. IS : 12640: 2008
12. REVIEW
12.1. Review of this procedure shall be done as and when but not later than once in every
three (03) years. Typical Factors like Changes in legislation, Review of Incident
Reports, Inspection & Audit findings, Feedback from users, Recommendations in
13. ATTACHMENTS/APPENDIX :
Appendix-A - Format for ELCB Testing (TPSMS/GSP/ELCB/016/FORM/01)
Appendix-B - Format for ELCB Failure record (TPSMS/GSP/ELCB/016/FORM/02)
Appendix-C- SOP For Testing ELCB
Appendix-D- Photographs of ELCB Tester.
Date Sr. No. Location Type & Rating Trip Remarks Name &
of ELCB Make in mA Time in Sign.
of Seconds
ELCB
Appendix-B
TPSMS/GSP/ELCB/016/FORM/02
Format for ELCB Failure record
Date Sr. No. Location Type & Rating Defect Remarks Name &
of Make in mA ( Mechanical Sign.
ELCB of / Electrical)
ELCB
Fig. 1 Fig 2
Fig. 3 Fig. 4
Fig. 5 Fig 6