Assessment title : Health and Safety Risk Assessment -Sub structrual activity
Risk Assessment Unmitigated RRN Existing Control Measure Recommended Control Measure
Final RRN Interim Control Measure
Activity (Job/Task Hazard Description (Add Unmitigated risk
S Area
Description)
Hazard
photo)
General Comments Probability (P) Severity (S) Frequency (F) NP (No Persons)
score
Risk Level Describe Control Measure Effective Independent Auditable Valid or Not Valid Control Initial (Mitigated) RRN Risk Level Recommended Control Measure Due dates Responsible Status Control
4.
Machinery / Vehicles(JCB) to be checked
Insect Bites, Heard in Cut (laceration), Once a Engineering control plus
Mass Making Excavation Work before use.
2
AREA (Layout the work area)
Slips & Trips Hit by protruding steel industry OR at 2 mild (usual 0.5 year 0.5 3 – 7 Persons 2 1 (D) Low
5. Provide signalman
1 1 1 Valid training and PPE as 0.2 0 (D) Low Not Required Open Substitution 0
risk disease) required
for controlling the vehicle movements.
6. Provide
barricading or marking for all identified
working areas.
7. Provide close
supervision for all work activities at the
workplace.
8. PTW has to be taken.
9. PPE’S
to be provided to the all worker’s.
Electrical Shock Fall of 11. Appropriate method should be done if the soil
Excavation Work condition is very loose. 12.
Mass Making moving objectives person/Material Heard in industry OR Temporary disability Engineering control plus training
6 (Loading of excavated 2 1 Once a year 0.5 3 – 7 Persons 2 2 (D) Low Appropriate ladder shall place or steps shall be made for access. 1 1 1 Valid 0.2 0 (D) Low FALSE
AREA Poor illumination, at risk (Body portion <9%) 13, Ensure provide proper vehicle access. Avoid overload of material in and PPE as required
soil in vehicle) vehicle . 14. Work area should be barricading.
Machinery /Vehicle slip, Hit by Awareness should be created among the workmen to ensure no one
excavator etc. should cross/run across the moving vehicles.
15.No person shall be allowed near
by the levelling area by deputing a separate flag man for this activity
while marching or reversing the machines.
16. Provide proper access
and exit to the vehicle movement.
6. Vehicle parking
only at designated place.
7.
1. Operator should be valid license &
authorised to drive vehicle.
2. Prohibited man
movement at way of machine at place.
3.
Provide signalman at working.
6. Provided
proper guarding for all rotating parts.
7.
Provided ear plug.
HSE Risk Assessment Number:
Assessment title : Health and Safety Risk Assessment -Sub structrual activity
Risk Assessment Unmitigated RRN Existing Control Measure Recommended Control Measure
Final RRN Interim Control Measure
Activity (Job/Task Hazard Description (Add Unmitigated risk
S Area
Description)
Hazard
photo)
General Comments Probability (P) Severity (S) Frequency (F) NP (No Persons)
score
Risk Level Describe Control Measure Effective Independent Auditable Valid or Not Valid Control Initial (Mitigated) RRN Risk Level Recommended Control Measure Due dates Responsible Status Control
1. Water should never be pumped directly into
slopes.
2. Discontinue dewatering if the area shows signs
of instability or erosion.
3. Channels used for dewatering need to be steady
and protected by grass and vegetation.
4. ever dewater during heavy rains. The water and
infiltration rate will be slower during the
dewatering process or it will not function entirely.
5. Never discharge water that contains oil, grease,
or chemical products.
6. Inspect pumps and cords for defects,
Personnel being hit by heavy and repair or replace as necessary prior to
equipment,Falling or tripping , use
Mass Making Excavation Work Heard in industry OR Temporary disability Engineering control plus training
9 Falling objects (slips, trips and falls), 2 1 Once a year 0.5 1 – 2 Persons 1 1 (D) Low 7. Trained electrician should be handle these types 1 1 1 Valid 0.2 0 (D) Low FALSE
AREA (Dewatering work) at risk (Body portion <9%)
of work
and PPE as required
Electrical shock from
pumps/cords 8. Only trained electricians may repair cords
9. Do not lift electric pumps by cords
12
Mass Making Civil-Rainforcement Slips & Trips Cut slip, Injury Impact
Heard in industry OR
2
Cut (laceration), mild
0.5 Daily 2.5 16 – 50 Persons 8 20
(C ) Medium, 4. Working area should be barricades to 1 1 1 Valid
Engineering control plus training
0.2 4 (D) Low FALSE
AREA at risk (usual disease) Acceptable prevent unauthorised entry. and PPE as required
Assessment title : Health and Safety Risk Assessment -Sub structrual activity
Risk Assessment Unmitigated RRN Existing Control Measure Recommended Control Measure
Final RRN Interim Control Measure
Activity (Job/Task Hazard Description (Add Unmitigated risk
S Area
Description)
Hazard
photo)
General Comments Probability (P) Severity (S) Frequency (F) NP (No Persons)
score
Risk Level Describe Control Measure Effective Independent Auditable Valid or Not Valid Control Initial (Mitigated) RRN Risk Level Recommended Control Measure Due dates Responsible Status Control
1. Conduct tool box talk to be given before start of
work.
2.Skilled & Trained carpenter will be
deployed.
3. Work Permit to
be taken before start of the work.
Shuttering Activity 1. 4.
AllProper support
Concrete to Shuttering
machinery shall be .checked before
Mass Making Heard in industry OR Cut (laceration), mild use. Engineering control plus training
18 (Shuttering Fixing work manual handling & Sharp edges Personal injury, damage to property 2 0.5 Daily 2.5 3 – 7 Persons 2 5 (D) Low 1 1 1 Valid 0.2 1 (D) Low FALSE
AREA at risk (usual disease) 5.Use of safe Scaffolding
2. Proper – proper
alignment and PPE as required
) base,positioning
and support,bracing,cross bracing,
of Mixer Machine to hand rill, .Safe
be done
platform,
Area access.
barricade to restrict entry.
6. Display Inspection Sticker.
2. Ensure safety
7. Full body safety harness
belt anchor by each workmen.
should be provided.
3.Engaged trained & experienced person8.on PPE’S
the
should be provided.
job.
4.
Maintain good house keeping at work site.
5. Conduct tool box talk
before starting the work.
6. Ensure recommended PPE
should be worn the worker such as safety shoes,
helmet, hand gloves goggles & nose mask.
7.Use of
armored cable with ELCB power connection 1.
Personal Injury, Electrocution ,burn, Cable Should not lay on ground and adequate
Injury, Machinery, Injury,Fall of clearance shall be maintained from ground.
19
Mass Making Concrete Slips & Trips
materials, Personal Injury,Skin contact Heard in industry OR
2
Minor injuries,
0.1 Daily 2.5 8 – 15 Persons 4 2 (D) Low
2. Cable laying 1 1 1 Valid
Engineering control plus training
0.2 0 (D) Low FALSE
AREA with cement material, fall of person / at risk scratch, bruise above 2.mtr.Drop from lowest part of work. and PPE as required
material,Electric shock,Electrical fire due
to short circuit,Trip and fall 3. Work shall be carried out under
supervision.
4. If PVC
insulated body for that single earthing should
provided.
5. If Metal insulated
body for that double earthing should provided.
6. Shall be provided On/ Off
switch.
7. Proper connection through MCB+ELCB with and
ensure plug top shall be provided.
1. Cable Should not lay on ground and adequate8.
Damaged cable
clearance shall
shall be not be used
maintained and
from proper cable
ground.
joints shall be made if necessary.2. Cable laying
above 2.mtr.Drop from lowest part of work.9. Fire
extinguisher & sand bucket should be kept at
working area.3. Work shall be carried out under
supervision. 10. Checklist should be
fill before starting the mixing work. 4. If PVC
insulated body for that single earthing should
11. Proper housekeeping of work place.
provided.
5. If Metal insulated
body for that double earthing should provided.
20
Mass Making D'Shuttring manual handling & Sharp edges
Fall of material, Nail Piercing, Personnel Heard in industry OR
2
Cut (laceration), mild
0.5 Daily 2.5 3 – 7 Persons 2 5 (D) Low
6. Shall be provided On/ Off 1 1 1 Valid
Engineering control plus training
0.2 1 (D) Low FALSE
AREA injury, cut/penetration, Personal Injury at risk (usual disease) switch. and PPE as required
Engineering Engineering
control plus control plus
0.2 training and 0.2 training and
PPE as PPE as
Temporary disability required required
1 (Body portion <9%) 1 Monthly 4 8 – 15 Persons
Administrative Administrative
control OR control OR
0.6 Eng Controls 0.6 Eng Controls
Temporary disability that require that require
(Body portion >9%) Admin Admin
OR Occupational
2 disease (temporary) 1.5 Weekly 8 16 – 50 Persons
Permanent disability
4 (Body portion <9%) 0.9 PPE 0.9 PPE
OR loss of one eye
OR occupational More than 50
disease (permanent) 2.5 Daily 12 persons
Permanent disability
(Body portion >9%)
8 OR loss of two eyes 1 None 1 None
OR Death causing
occupational disease
4 Hourly
15 Fatality
5 Many times an hour
HSE Risk Assessment Template Number: HSE2-3B
Health and Safety Risk Assessment Template Revision
Issue date: August 2021
Hazard Category Number of people Residual Risk Number (RRN)
Hazard Description of the hazard Probability (P) Frequency (F) Severity (S) Control Measures (C) Example/ Notes
exposed (NP)
Biological hazards Allergies (dust, smells, food) Tetanus (rusted Never heard of in Less than once Minor injuries, scratch or bruise Inert area within 1 1-5. Very low
metals) Leptospirosis (drains, sewers) the industry OR a year (First Aid) boundary of Elimination or
Elimination_ Manual handling of minor
Legionella (cooling towers, air conditioning) highly facility. Or 1-2 substitution
ingredient eliminated with reformulation
handling of infectious agents and blood borne improbable 1 0.2 0.1 people exposed. (Substitution 0 Elimination/ Substitution
replaces ingredient with another already
pathogens) requires a re-
Workplace health handled in bulk system
assessment)
hazard
Chemical (Corrosive) A chemical that, when it comes into contact Heard of in the Cut, laceration or mild ill-effect 3-7 2 5-10 low
with skin, metal, or other materials, damages industry OR at (Medical Treatment)
the materials. Acids and bases are examples risk Controls that Do - Guards with Cat 3 or 4 interlocks, restart by
of corrosives. Not require Admin separate button, (without line of sight) and
2 Once a year 0.5 0.5 intervention, 0.2 Pressure Sensing Devices or Trapped Key
Training, Signage system (if person is able to stay within cage
and PPE as reqd area)
- Physical barriers (fixed guards, cage, wall, Engineering Controls,
Ergonomics isolated aisles, etc.) Admin, PPE
Chemical (Flammable) A chemical that, when exposed to a heat Has happened in Temporary disability (Body 8-15 4 10-50 Medium (acceptable)
ignition source, results in combustion. the organization portion <9%), one limb or eye
Typically, the lower a chemical’s flash point Controls that Do
and boiling point, the more flammable the require Admin - LOTO
chemical. Check MSDS for flammability intervention OR - Guards with Cat 1 or 2 interlocks, 2 points of
information. 5 Monthly 1 1 0.6
Admin controls, inc. control and tool/PPE
training, signage - Guards with Cat 3 or 4 interlocks, with auto-
and PPE as reqd restart, 2 points of control and tools/PPE
Personal Safety - Energy isolation (pneumatic, hydraulic,
Hazards electrical, etc.) Admin, PPE
Chemical (Toxic) A chemical that exposes a person by Occurred more Temporary disability (Body 16-50 8 50-100 Medium (consider
absorption through the skin, inhalation, or than once per portion >9%) OR occupational controls)
through the blood stream that causes illness, year in the disease (temporary), multiple PPE as required to
disease, or death. (Toxic vapors / Toxic Dust organization 8 Weekly 1.5 limbs or both eyes 2 address physical 0.9 Gloves, bump cap, gloves, eyewear, etc.
Exposure ) hazards
Fire and explosion
Hazards PPE
Electrical (Fire) Use of electrical power that results in Has happened in Permanent disability (Body Impact outside 12 100-500 High (consider
electrical overheating or arcing to the point of this location portion <9%) OR loss of one eye the facility stopping task and
combustion or ignition of flammables, or OR occupational disease boundary or implement interim
electrical component damage. (overloaded (permanent) more than 50 controls)
outlets, non-approved equipment, defective people exposed.
or frayed cords, improper placement of cords
or electrical outlets near sinks or other water 10 Daily 2.5 4 No Controls 1
sources, uncontrolled Sources of ignition e.g.,
Static Electricity)
Other emergency
situations. No controls
Electrical (Loss of Power) Safety-critical equipment failure as a result of Has happened Permanent disability (Body 500 Unacceptable (stop
loss of power. (Utility Failures) more than once portion >9%) OR loss of two eyes task and implement
per year at the OR death causing occupational interim controls)
location OR 15 Hourly 4 disease 8
highly probable
Elevated work area hazards · (lack of safety railings, unsafe and untied
ladders and no fall restraint systems)
1
2
3
4
5