Eas Oostl
Eas Oostl
Eas Oostl
G Slack
1 2 3
8 4
G
7 6 5
G
9 10 11
G
Data Saluran:
Saluran R X Y/2
Bus to Bus per-unit per-unit per-uit
1–2 0.0080 0.0370 0.0050
1–6 0.0235 0.0741 0.0015
1–8 0.0123 0.0518 0.0005
2 -3 0.0325 0.0133 0.0012
3–4 0.0723 0.0105 0.0020
4–5 0.0082 0.0240 0.0008
5–6 0.0118 0.0529 0.0003
5 – 10 0.0080 0.0235 0.0008
6–7 0.0588 0.0300 0.0001
5 – 11 0.0213 0.0518 0.0005
6 – 10 0.0068 0.0196 0.0006
7–8 0.0085 0.0242 0.0013
7–9 0.0068 0.0196 0.0006
9 – 10 0.0118 0.0529 0.0003
10 – 11 0.0078 0.0237 0.0011
Data Bus :
Bus Generator Beban V Keterangan
P(MW) Q(MVar) P(MW) Q(MVar per-unit
1 1.02 0 Slack Bus
2 27.5 16.5 1.00 0 Load Bus
3 15.0 9.0 1.00 0 Load Bus
4 50 1.03 0 Generator Bus
5 25.0 15.5 1.00 0 Load Bus
6 30 1.03 0 Generator Bus
7 20.0 10.5 1.00 0 Load Bus
8 31.0 18.2 1.00 0 Load Bus
9 45 1.02 0 Generator Bus
10 15 9.7 1.00 0 Load Bus
11 5.5 2.8 1.00 0 Load Bus
Pola Beban
Jam 1 2 3 4
(1 jam) (1 jam) (1 jam) (1 jam)
Beban (MW) 450.3 359.6 240.4 410
Sebelum jam ke 1, hanya unit 1 dan 3 ON dan telah ON selama 4 jam. Sedangkan
unit-unit lain Abaikan losses, spinning reserve dll, persyaratan yang harus dipenuhi
hanya daya yang dibangkitkan bisa men-supply beban. Harga bahan bakar untuk
semua unit : 1.0 R/Mbtu. Gunakan PowerGen untuk menentukan Unit Commitment
dengan asumsi karakteristik input-output semua unit linear.
a. Bila Minimum Up/Down Time setiap unit sama (1 jam), tentukan Unit
Commitment dan total biaya operasinya berdasarkan “Priority List Schedule”.
b. Bila Minimum Up/Down Time setiap unit sama (1 jam), tentukan Unit
Commitment dan total biaya operasinya berdasarkan “complete enumeration”.
Jelaskan perbedaan dengan (a).
c. Dengan menggunakan data yang diketahui diatas, tentukan Unit Commitment
dan total biaya operasinya berdasarkan “complete enumeration”.
d. Gunakan software matlab. Bandingkan (PLOT) Unit Commitment yang
diperoleh dari (a), (b) dan (c).