08 Transformer
08 Transformer
8/9/2018 IKM 1
APA ITU TRANSFORMER
Sebuah alat elektrik yang boleh menaikkan
atau menurunkan voltan arus ulangalik atau
memindahkan kuasa dari satu litar ke satu
litar lain tanpa ada perubahan kepada
frekuensi
8/9/2018 2
PRINSIP ASAS
Energy can be efficiently transferred by
magnetic induction from one set of coils to
another set of coils by means of a varying
magnetic flux produced by an alternating
current
IKM JASIN
8/9/2018 3
CORE
P S
8/9/2018 4
HOW IT WORKS
Coil P is primary winding connected to the
supply. Coil S is secondary winding and is
connected to the load. The AC voltage
applied to P circulate an alternating current
through the winding, and this current
produces an alternating flux in the core. If
the whole of the flux passes through S, the
emf induced in each turn is the same for P
and S
8/9/2018 5
8/9/2018 6
Input = Output
V1 x I1 = V2 x I2
I2 = V1 I1 V2
TRANSFORMER LOSS
• No Load Loss – histerisis loss and eddy
current loss, constant loss once voltage is
applied irrespective of load
8/9/2018 7
• Load loss – copper loss or I²R loss (heat
loss), the amount of loss depend on the load
of the transformer
TRANSFORMER EFFICIENCY
• It is expressed in percentage and equal to (output
in watts x 100) x (output in watts + total losses in
watts)
• Total losses consist of a fixed loss in the iron and
the copper loss which is proportional to I²
• The maximum efficiency is obtained when the
copper and iron losses are equal
8/9/2018 8
• As copper loss at full load is typically equal to
four times the iron loss, then the maximum
efficiency is usually obtained at half load
EFFICIENCY TABLE
kVA 1000 750 500 1000 750 500
P.F 1.0 1.0 1.0 0.8 0.8 0.8
Load (kW) 1000 750 500 800 600 400
Iron Loss 3.515 3.515 3.515 3.515 3.515 3.515
Cu Loss 11.6 6.52 2.9 11.6 6.52 2.9
8/9/2018 9
Tot. Loss 15.11 10.03 6.415 15.11 10.03 6.415
Eff (%) 98.51 98.68 98.73 98.14 98.36 98.42
KVA RATING
The power capacity of the Power
Transformer e.g 300kVA, 1000kVA,
2MVA etc.
8/9/2018 10
RATED VOLTAGE
Voltage between line terminals at the high
voltage side or the low voltage side such as
11,000/433 volt
RATED CURRENT
Current flowing through a line terminal of a
winding, derived by dividing the rated power
of the winding and by an appropriate
power factor
8/9/2018 11
FREQUENCY
50Hz
60Hz
TYPES OF COOLING
• AN (air natural) – dry type transformer
• ONAN (Oil Natural Air Natural)
8/9/2018 12
• ONAF (Oil Natural Air Forced)
• OFAF (Oil Forced Air Forced)
IMPEDANCE VOLT %
The difference between the rated voltage of a
winding and the voltage developed at a
specified load and power factor, the voltage
supplied to the other winding being at its
rated value
8/9/2018 13
WINDING
8/9/2018 14
8/9/2018 15
VECTOR GROUP
• Dyn 11 (lagging by 30 degrees)
• Dyn 1 (leading by 30 degrees)
8/9/2018 16
CORE AND WINDING
WEIGHT
In kg or metric ton
ITiDi
8/9/2018 17
TRANSFORMER OIL
• Act as an insulant and thermal transfer agent
• Mineral hydrocarbon oil to BS 148 •
Sometimes synthetic liquids, called askarels
(pyroclor) are used instead of oil as they are
non-inflammable and non-explosive but
very expensive
OIL WEIGHT
8/9/2018 18
In kg
OIL CAPACITY
In litre or gallon
MAX TEMPERATURE RISE
8/9/2018 20
SEALED TYPE TRANSFORMER
8/9/2018 ITiDi 21
SEALED TYPE TRANSFORMER
8/9/2018 ITiDi 22
TEMPERATURE
INDICATOR
8/9/2018 ITiDi 23
8/9/2018 ITiDi 24
OIL IMMERSED
TRANSFORMER
8/9/2018 ITiDi 25
8/9/2018 ITiDi 26
FEEDER PILLAR OF COMPACT SUBSTATION
8/9/2018 ITiDi 27
TOP VIEW
8/9/2018 28
FEEDER PILLAR
8/9/2018 ITiDi 29
HERMETICALLY SEALED TRANSFORMER
ITiDi
8/9/2018 30
SEALED TYPE TRANSFORMER
8/9/2018 ITiDi 31
8/9/2018 32
TECHNICAL DATA 11/0.433kV Dyn 11
8/9/2018 ITiDi 33
8/9/2018 ITiDi 34
TECHNICAL DATA 22/0.433kV Dyn 11
8/9/2018 ITiDi 35
8/9/2018 36
TECHNICAL DATA 33/0.433kv Dyn 11
8/9/2018 ITiDi 37
TECHNICAL DATA 33/11KV
8/9/2018 38
TECHNICAL DATA 132/11KV
8/9/2018 39
TECHNICAL DATA OF EARTHING TRANSFORMER
8/9/2018 ITiDi 40
LARGE
8/9/2018 TRANSF
41
ORMER
8/9/2018 ITiDi 42
8/9/2018 43
8/9/2018 ITiDi 44
EARTHING TRANSFORMER
8/9/2018 45
8/9/2018 ITiDi 46
33/11KV TRANSFORMER
8/9/2018 47
8/9/2018 48
33/11KV TRANSFORMER
8/9/2018 49
8/9/2018 50
132/11KV TRANSFORMER
8/9/2018 51
8/9/2018 52
132/11KV TRANSFORMER
8/9/2018 53
8/9/2018 ITiDi 54
WINDING
8/9/2018 ITiDi 55
DRY TYPE TRANSFORMER
8/9/2018 ITiDi 56
DRY TYPE TRANSFORMER WITH
HOUSING
8/9/2018 ITiDi 57
8/9/2018 ITiDi 58
RING MAIN UNIT
TRANSFORMER
8/9/2018 ITiDi 59
COMPACT SUBSTATION
8/9/2018 ITiDi 60
COMPACT SUB-STATION
8/9/2018 ITiDi 61
8/9/2018 ITiDi 62
FEEDER PILLAR &
DISTRIBUTION BOARD
• 1600A, 10 fuseways
• 800A, 6 fuseways
• 400A outdoor mini feeder pillar, 6 nos
outgoing
• Transformer from 300 kVA to 1000 kVA
8/9/2018 63
STREET LIGHTING FEEDER
PILLAR
• 100A up to 6 ways 60A outgoing
• 50A single phase panel box/Meter
8/9/2018 64
NAME PLATE
8/9/2018 65
8/9/2018 ITiDi 66
NAME
PLATE
8/9/2018 67
NAME PLATE
• kVA rating – 1000kVA
• Rated voltage, Rated current – 11/.433kV, 1600A
• Frequency – 50Hz
• Phase – 3 phase
• Winding – star or delta connected
• Type of cooling – ONAN
• Impedance volt (%) – 4%
• Vector group – Dyn 11
• Oil capacity – in liters
• Oil weight – in kilogram
8/9/2018 ITiDi 68
• Max temperature rise – 40 degrees
• Tap changer – 5 taps or more
8/9/2018 69
8/9/2018 ITiDi 70
8/9/2018 ITiDi 71
RELIEVE
VALVE
8/9/2018 ITiDi 72
MAIN TANK
8/9/2018 ITiDi 73
CONSERVATOR TANK
Smaller tank on top of the transformer
partially filled with transformer oil and the
rest filled with air. It is as an expansion area
for the oil when it is hot and also as a place
where oil level indicator and temperature
8/9/2018 74
indicators are located – Hermetically sealed
transformers are without conservator tank
8/9/2018 ITiDi 75
CONSERVATOR TANK
8/9/2018
COOLING FIN 76
RADIATORS/COOLING FIN
8/9/2018 ITiDi 77
Part of the
transformer
tank with a
number of
small tubes
where hot oil
is passed
through for
8/9/2018 78
heat dissipation to the surrounding air
COOLING
FIN
8/9/2018 ITiDi 79
CABLE TERMINATION/BOX
Where H.T and L.V cable are terminated
and closed for the purpose of safety and to
avoid enviromental disturbants, however
thesedays for indoor transformer some of
them are without cable box instead cable
termination are used
8/9/2018 80
8/9/2018 ITiDi 81
8/9/2018 ITiDi 82
LV & HV BUSHING
8/9/2018 83
HV BUSHING
8/9/2018 84
LV BUSHING
8/9/2018 85
8/9/2018 ITiDi 86
HT
8/9/2018 ITiDi 87
8/9/2018 88
BUSHING AND
SPARK GAP
8/9/2018 ITiDi 89
DEHYDRATING BREATHER
To provide a passage for the flow of air in
and out of the transformer when the process
of expansion and contraction of transformer
oil and also to contain silica gel that absorb
8/9/2018 90
moisture
8/9/2018 ITiDi 91
BREATHER
8/9/2018 92
CABLE BOX
BREATHER
OUTLET
8/9/2018 ITiDi 93
8/9/2018
BREATHER
ITiDi 94
TAP CHANGER
To increase and decrease output voltage. It is
on the high voltage side. Standard tap
changer consists of 5 tapping positions
(+5%, +2.5%, 0, -2.5%, -5% ) and can
be more than 5 tappings Off
load tap changer
On load tap changer (>33kV)
8/9/2018 ITiDi 95
TAP
CHANGER
8/9/2018 ITiDi 96
8/9/2018 ITiDi 97
8/9/2018 98
TAP CHANGER
8/9/2018 ITiDi 99
8/9/2018 ITiDi 100
WINDINGS
• Primary winding (inner side)
• Secondary winding (outer side)
• LV winding is in the form of copper plate
• Voltage/turn
• Ampere/turn
8/9/2018 102
OIL LEVEL
GAUGE
8/9/2018 104
TEMPERATURE
INDICATOR
ITiDi
8/9/2018 106
THERMOMETER
8/9/2018 107
PRESSURE RELIEF VALVE
Safety pressure relief valve, the valve will
open when the pressure inside the
transformer tank exceed certain limit
8/9/2018 108
8/9/2018 109
BUCHHOLZ RELAY
A mechanical relay connected through pipe
and situated between main tank and
conservator tank of a transformer. Only
certain kVA transformer need to be installed
with one, normally above 1MVA. It will be
connected to the trip coil of the circuit
breaker controlling the transformer or the
installation
8/9/2018 110
BUCHHOLZ RELAY
8/9/2018 114
TRANSFORMER EARTHING
• Body/frame earth
• Star point earth
• Neutral earth
8/9/2018 115
8/9/2018 ITiDi 116
HIGH
8/9/2018 136
OIL
• General physical check for any sign of oil
leakage at gasket, radiator, tank,
conservator, pipes and valves
• If minor leakage, tighten bolts and nuts • If
leakage persist, have the leakage part of the
gasket replaced
• Oil in conservator tank should always be
kept at its maximum level indicated
8/9/2018 137
OIL TEST
• Dielectric test, should exceed 30kV average
• Acidity in oil is 0.5mg of KOH per gram
of oil, exceeding 1.00mg of KOH oil should
be changed immediately, 0.5 – 1.00mg is to
test again after a period of 3 months
• Or when chloroform – soluble sludge is
produced
8/9/2018 138
TEMPERATURE
• Normally a receptacle located at the
transformer main tank top is provided for a
thermometer to be placed into it. A period of
5 to 10 minutes should be allowed to
elapsed before reading is taken
• The maximum normal operating
temperature of the winding is 90 degrees C
8/9/2018 139
BUSHING
ITiDi
8/9/2018 140
BREATHER
• Check the colour of the silica gel,
dehydrated silica gel is blue in colour, it
turns pink when hydrated, change new one
or heat it in an oven to dehydrated it
• Clean the breather if necessary
• Check the rubber of cork sheet gasket of the
breather
• Check the oil seal is kept at the correct level
8/9/2018 141
CONSERVATOR TANK
8/9/2018 143
• Insulation test (HT and LV)
• Polarity test
• Open circuit test
• Short circuit test
8/9/2018 144
8/9/2018 ITiDi 145
8/9/2018 ITiDi 146
8/9/2018 ITiDi 147
8/9/2018 ITiDi 148
8/9/2018 ITiDi 149
TEST