Instrumentation Question Bank

1. This document contains a question bank with 35 multiple choice questions related to industrial processes, instrumentation, and control systems. The questions cover topics like gas turbine operation, distributed control systems, boiler controls, and transmitter technologies. 2. Each question lists 5 possible answers labeled A through E. The correct answer for each question is provided in the "Answer" column. 3. The questions assess knowledge across different domains including thermodynamics, instrumentation components, control logic and sequences, process variables, and industrial automation systems.

Uploaded by

kb4u_2002
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views3 pages

Instrumentation Question Bank

1. This document contains a question bank with 35 multiple choice questions related to industrial processes, instrumentation, and control systems. The questions cover topics like gas turbine operation, distributed control systems, boiler controls, and transmitter technologies. 2. Each question lists 5 possible answers labeled A through E. The correct answer for each question is provided in the "Answer" column. 3. The questions assess knowledge across different domains including thermodynamics, instrumentation components, control logic and sequences, process variables, and industrial automation systems.

Uploaded by

kb4u_2002
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

Question Bank

Sr. Question Answer A Answer B Answer C Answer D Answer E Answ


No. er

1. Quality of the Inst. Air dryer is measured with Pressure gauge Temperature Hydro meter Hygrometer Anemometer C
gauge
2. Regeneration air controller in Phase-2&3 air dryer is Direct Acting Reverse Acting Stay put Step controller B
3. IGV closed position in main air compressor means 90 Deg. 120 Deg 12 Deg. 180 Deg 60Deg C
4. Main air compressor Vibration gap voltage 10VDC 5VDC 10VAC 7.5VAC 9VDC A
5. Regeneration of Hygrometer sensor is done by Clean with Kept in dry ice High purity High purity Kept in oven C
Isopropile alcohol Nitrogen purging Hydrogen at 200 DegC
purging for 24Hrs.
6. Smart family Rosemount transmitter model is recognized as 3051 1151 3099 3144 1199 A
7. What is the DCN address of the Phase 2 ES ? FF OA O2 1 D
8. Redundancy in Phase 4 DCS (HRSG 7) is 1:1 2:1 3:1 4:1 No A
redundancy
9. In DCS DCN means Data control Distributed Dual None of these All of these C
network communication communication
network network
10. DCN rings used in CPP are redundant share the total Equally None of these All of these A
load distributed
11. In HRSG 1, when GT separation starts, MOV009 closes MOV008 closes MOV 009 closes MOV008 opens No action D
first first and MOV first and then
008 opens MOV 009
closes
12. In GT 1/2 if GT separation fails, GT will trip GT will come to GT will come to none of these No action C
FSNL spinning reserve taken
13. Power rating of solenoid valve in air dryer is 110VDC 120VDC 24VDC 220VDC 110VAC E
14. In GT 3/4/5/6, -------- no of switches are used to trip GT on 1 2 3 4 None C
high GT back pressure
15. In gas turbine for overspeed protection we have electrical mechanical both None C
16. During calibration of SRV, LVDT voltage is set at -------- 1 1.2 0.7 1.2 7 C
volts at zero position
17. GD can be opened only if GFD is open GFD is closed GT is running GT not running None B
18. GFD can be opened only if GD is open GT is running GD is open & GT GD is closed None C
not running
19. Gas turbine works on one of the thermodynamic cycle auto cycle Carnat cycle brayton cycle none All C
20. Compressor in gas turbine has _____ stages 10 15 17 14 Single stage B
21. Gas turbine is vibration measured for protection is non contact type sesmic type Both None B
22. Controller in HRSG#7 is c-controller AC460 sc-controller single loop B
controller
23. Purge permissive for coen make burners requires Both main gas main gas vent pilot gas vent Both pilot and None of the A

Page 1 of 3
Question Bank
Sr. Question Answer A Answer B Answer C Answer D Answer E Answ
No. er

vent valve and valve open ,pilot valve open , main main gas vent above
pilot gas vent gas vent valve gas vent valve valve close
valve open close close
24. For HRSG 3 TO 6 , if burner no 1 trips on flame failure All RHS burners All LHS burners All burners will Only no 1 will None of the D
will trip will trip trip trip above
25. EWLG works on principle of Inductance Capacitance Resistence Conductance Photo sensor D
26. The boiler will trip on which of the following conditions Burners trip Both scanner Both augment air Both seal air Main steam B
fan ac/dc trips fan ac/dc trips fan ac/dc trips temp goes
very high.
27. For single element control , in boiler the controlling Feed water flow Drum level Steam flow Drum temp Drum B
paramater is pressure
28. SIFT technology is implemented with AC 460 SC Controller C controller Modicon plc August PLC E
29. Pilot sensing for phase 1 burners uses IR effect UV effect Ionization effect Temp effect None C
30. For soot blower if the running PLC fails Boiler will trip Burner will trip Secondary will Soot blower will A,B,D D
take over tirp
31. If the drum pressure goes above 123kg /cm2 the boiler will True False B
trip.
32. Oxygen Measurement analyser is of which type Paramagnetic Dimagnetic Zirconia Probe Magnesium Chromatograp C
Dioxide Probe h
33. Smart transmitter sensing element is of the type Capacitance Reluctance Piezoelectric Inductance Conductance C
34. Rosemount Micromotion flowmtr can also measure Turbidity Viscosity Specific Gravity Suspended Lubricity C
Particulate
35. Which of the options will give more reliable LVDT 110 VAC 50 hz 230 VAC 50 hz 110 VDC 110 VAC , 1 230 VDC D
measurement Khz
36. Proximity probes work on which principle Capacitance Eddy Current Reluctance Static None of the B
change change generation options
37. Torque tripping in Rotork IQ type MOVs is sensed by Reduction Gears Spring loaded Motor current Motor current Magnetic Flux D
worm action only and magnetic
flux
38. In Gas Turbines ratcheting can be stopped once 300 degC 100degC 200 degC 150 degC 250 degC B
Wheelspace temperature goes below…….
39. Which Model of Rosemount make pH sensor is suitable 381PH 399PH 320HP None of the All of the C
for pH measurement of Mixed Bed Outlet in DM plants? above above
40. The MMI ( Man Machine Interface ) software in DM plant 3 Wonderware Controlview Panorama 2000 Itellusion RS view C
is -
41. The Cooling Tower 3 Data Comes to DCS through DM1 PLC DM2 PLC DM3 PLC Directly to Doesn’t C
CSS#5 of DCS comes at all
42. The Shutoff Valve of Chlorinator will close if The Chlorine The Chlorine Chlorine leakage The Power Power Water E

Page 2 of 3
Question Bank
Sr. Question Answer A Answer B Answer C Answer D Answer E Answ
No. er

Pressure goes flow stops Water pressure Pressrue Low


high goes high
43. The Chlorine Leak Detector works on the principle of Oxidation Reduction Capacitance Electrolysis None of the D
change options
44. The rate of Flow meter installed for Sand Bed Filter Flow in Resistance Inductance Capacitance Bernoulli’s Pascals Law C
RW works in the principle of Princple
45. The sand bed Filter condition is indicated by Loss of Head DP transmitter Variable area Vortex meter Hygrometer A
meter meter
46. If fire water pressure goes low the main pumps starts All at a time Depending upon Depending upon None of the All the above B
individual switch running hours of above
settings first pump
47. The DM2 Digital input voltage is 110VAC 24VDC 125VDC 5VDC 24VAC A
48. The Rotameter Works in the Principle of Variable area & Turbulence Flow Reynolds number Vortex flow None of the A
gravity above
49. In DM plant 2 the Sequence Control of Silica Analyzer is A dedicated PLC DM Plant PLC By the analyzer A sequencer No Sequence B
done from in the Analyzer itself attached to the Control
Panel solenoid House Required
50. For which two PLC the I/O cards are Interchangeable DM1 & DM2 DM1& DM3 DM3 & DM2 DM3 and SLC None of the B
500 options

Page 3 of 3