1 Service Information
1 Service Information
Documentation Available
Optimus RAD X-ray generator
Bucky Diagnost TH Subsystem
Bucky Diagnost TH2 Subsystem
Bucky Diagnost TH System Manual Installation
Bucky Diagnost TH2 System Manual Installation
Bucky Diagnost TH System Manual Corrective Maintenance
Bucky Diagnost TH2 System Manual Corrective Maintenance
Bucky Diagnost CS2/4 Subsystem
Bucky Diagnost VE/VT Unit
Bucky Diagnost VE2/VT2 Subsystem
Tools available
Inalfa test tool
The tool is a simple unit to measure the cassette sizes and to test the cassette present
switch. The bit pattern that is received from the optocouplers is made visible. Check
with the help of a table if the data is correct.
Tomography phantom
To check the tomo layer height and tomo movement.
Firmware
Unit SW Release date Remarks
nr
Optimus 0.2 09-94 First version (Beta)
0.3 01-95 Improved version
1.1 11-95 Vario focus added
2.1 02-96 NEW FUNCTIONS:
TDC, AEC with fixed current, Prepared for Thoravision, Area
dose calculation, second Bucky TH, Brightness displays
programmable.
SMALL EXTENSIONS AND CHANGES (LIST OF MOST IMPORTANT
CHANGES):
Programming of max kV value per tube, Anode speed in tube
data, Configuration key contents, SW and HW version
displayable, Use Vario focus information of tube data, CAN FU
config list to be displayed, Release and level number in prom
header, max exposure time is programmable, Changeable
sensitivity of measurement chamber.
PROBLEM ELIMINATION (LIST OF MOST IMPORTANT
CHANGES):
Adap problems due to previous exp. solved, APR’s per RgDv
increased to 400, Adaptation possible with connected SIGNAL-
BUS, Reliability boosting increased, No ready in case of missing
display, All filters available in predefined APR programs.
2.2 10-96 BASIC BOTTOM LEVEL! New program steps added.
3.2 Summer 97 Optimus divided in RAD and FLUO. Not upgradeable!
3.3 FCO solving several bugs
3.5 04-2002 FCO solving several bugs
3.6 Q3 2004 Especially for the 5 field amplimat, requires AgenT
Service Software
Unit SW number Release date Remarks
APR manager 1.1 last quarter 96 Almost all bugs are out. This version
is supplied with a new Optimus
Also available on BBS
1.3 minor bugs
1.3.1 minor bugs
1.4.1 Buttons added to modify FSC per
APR and per RgDv
Unit SW number Release date Remarks
Optimus
Bucky Hardware
Question Answer
Collimator Software
BTH HW Why is the tightening block Security reasons. When the belt brakes, the cs will be
supposed to be at head-side? pulled away from the patient’s head.
BTH HW What is the function of W1 on This jumper is used for the watch-dog, however it is
PCB UE2? not used in release 1.x
BTH SW LED’s H1, H2, H3 on the Flashing LED’s give information about the status at
Bucky controller are flashing start-up. The red led lit for about 20 seconds. Than the
during start-up. What is green &yellow led will lit. After some time the yellow
happening? led starts flashing. This is an indication that
communication on the bus is active. A steady yellow
led is mostly an indication that something is wrong!
BTH SW When I have pulled the battery That’s right! The instructions:
of the Bucky controller, the ‘set service output_errors_to_vt100 1’ and
logging functions of VT100 ‘set service error_logging_mask 1’ are erased after
don’t work anymore. pulling the battery. Type ‘superuser’ and the two
instruction-lines, push the reset button the get the
logging function back.
The same phenomena can also occur when: Placing a
new Bucky controller PCB, a software crash or mains
failure during SW upgrade.
Release 2.1 and higher: When the BTH is restarted
(cold or warm) the mask is set back to level 2.
BTH SW What to do if the layer height Use the tomography phantom to visualise the real layer
is wrong? height on a film. If the measured layer height on the
film is not the selected layer height then change in
Xscope the Table Image Distance (tid) Table config.
BTH SW The measuring field have Rel <1.1: set service small_field_size x=0 [return] set
wrong switch-off sizes. Can I service small_field_size y=0 [return]. The Optimus will
correct this? take care of the side field switching.
REL 1.1: set service small_field_size [value] switch-
off size is set to [value]
REL 2.1: Xscope programming
BTH SW Bucky controller and VT100 We have noticed that not all VT100 emulator work
well with the Bucky controller. Use the version that is
supplied on the Xscope diskette to avoid problems
BTH SW Resetting after entering VT100 A long time we’ve been thinking that each
instructions programming in VT100 mode requires resetting.
Depending on instruction and SW version this is true
and not true. Unfortunately we have no overview of
instruction and/or SW version. Known is that the tomo
drivers always require a reset after programming
changes.
BTH SW Very often the tomo The acceleration time for tomo movements can be
longitudinal fuse gets blown. adjusted. If the time is bigger, than the motor current is
What can I do? lower. Type set service tomo_t_accel 250 (range
200..300) (every unit corresponds with 5mS)
BTH SW After making a tomo exp. the The force to move back into the centre catch can be
cs goes back to the centre programmed. Xscope: Tomography Configuration –
position. However is doesn’t Tomo Overshoot.
click into the centre catch.
What to do?
COLL HW In the collimator diagrams a The function of the mentioned jumper is to have an
jumper W3 is drawn. What is end-node for the CAN bus. However the end-node is
the function? already placed somewhere else and therefore the
jumper should not be present
COLL SW When changing the maximum No, the Xscope display is ‘updated’ after leaving the
collimator opening (with procedure and recalling it.
Xscope) it seems that nothing
has been changed. Is this a SW
bug?
COLL SW The green led on the control When the collimator is resetting, the ready indicator is
handle indicates system ready, not switched off. However making an exposure is not
even when I press the reset possible! Giving a next exposure request causes no
button on the collimator. Do I exposure although the control handle display will give
have a ready state? the information that the cassette is already exposed.
Note: Resetting the generator is also not displayed via
the control handle led, exposures cannot be made
OM HW Is there a phase check in the No, there is no phase check. If the phases are wrongly
Optimus? connected, than the maximum power can not be
achieved
OM HW What is ADAP_A (B, C, D) ADAP_X is an interface to connect decade plugs.
Adap A & B for Bucky use, C & D (future) for scopo
use.
OM HW What is the difference between ADAP_A = Universal I/O interface
ADAP_A and FU_CIE FU_CIE = Computer interface extended, basic I/O
interface (Module EZ150).
OM HW How to connect more tubes if Since July 96 a rotor controller is available that can
they differ from type, RO / handle different tubes at the same board. If your system
SRO is equipped with an earlier controller different tube is
not possible.
OM HW How to connect an amplimat. The ‘old’ amplimat uses different working voltages
There are more types of than the new amplimat. Therefore and adapter is
amplimats and also the plugs available that can convert to the correct voltage.
do not always match. A new amplimat can directly be connected to the
Basic-I/O. If the generator has a new basic interface
than there is a possibility to set a solder jumper for
selection of amplimat type!
OM HW Is it possible to transform a No, the HT induction makes transformation
65/80KW generator into a impossible.
50KW version (temporarily)
when one of the converters is
defect?
OM HW Which tubes can handle In general tubes that have their foci in line. Meaning
Vario-focus? the filaments are positioned parallel next to each other.
The beams will overleap on the anode! As an example
the following tubes can handle Vario-focus: RO 17/50,
SRO 09/50, 25/50, 33/100
OM SW Film/Screen combinations are All working methods are based on an APR. If you want
selected via APR’s. But what to use different settings, than select them! This will be
if I do not work with APR’s indicated with a star in the end of the current APR
name field.
OM SW At the end of an exposure The generator calculates when to switch-off to have
there is a discharge of the after the discharge exactly the correct dose Because
cables. It also means there is you’ve programmed the cable capacity calculation is
radiation that is unwanted possible.
OM SW In some systems it is possible In an older SW release there was a bug that didn’t
to radiate while the door is notice ‘door open’ when closing and directly opening
open the door.
OM SW What happens during During adaptation nomograms are calculated (relation
adaptation emission-current / filament-current). The offsets are
stored in FU_mA.
OM SW What to do if the measured HT No, there is no adjustment! If the error is more than
doesn’t match the selected HT. (4%+1KV), error 02HA appears. When the error arises
Can I adjust this? during prep, probably something is wrong with the
FU_KV. If there is no error during prep than the
problem is in the converter or tank
OM SW Is it possible to put the No, the current SW version does not support this
generator in simulation mode? option.
(like in the mcp/scp)
OM SW Is it possible to do an No.
amplimat test
OM HW After trying to make an This is mostly an indication that there is a heavy short
exposure, the hospital fuse is circuit. Experience learned that probably something is
blown. What is happening? wrong with the tube.
When the automatic fuse ENF1 blows, mostly this
implies that the converter is defect.
OM SW I cannot activate the converter That’s is possible in SW 3.2, there is a bug in this SW
test. What’s wrong level. You can select the converter test, but the test
doesn’t start!
OM SW When I have loaded APR’s via No, that is another bug in SW 3.2. The only thing that
APRmanager, add (or modify) you can do is to upload a new APR data set to your
an APR with Xrgscope, than I generator! Hopefully you have a backup (on diskette or
cannot do a download the harddisk) with the customer APR’s!!
APR’s anymore. Do I make a
mistake?