SCRUM Test Results
SCRUM Test Results
Seite 1 von 16
Points: 24 out of 30
Percentage: 80%
Duration: 00:18:23
Feedback
Thank you for taking the Open assessment of Scrum. Please review The Scrum Guide on Scrum.org and
take this assessment again to improve your score.
Ken Schwaber
Statistics by Category
Question 1 of 30
Who has the final say on the order of the Product Backlog?
Correct answer: D)
You chose: B)
Note: This question displayed answer options in random order when taking this Test.
A) The Stakeholders
E) The CEO
Points: 0 out of 1
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 2 von 16
Feedback
The Product Owner is the sole person responsible for managing the Product Backlog.
Question 2 of 30
Correct answer: A)
You chose: A)
Note: This question displayed answer options in random order when taking this Test.
Points: 1 out of 1
Feedback
The Development Team uses the Daily Scrum to inspect progress toward the Sprint Goal and to inspect
how progress is trending toward completing the work in the Sprint Backlog.
Question 3 of 30
Correct answer: C)
You chose: C)
Note: This question displayed answer options in random order when taking this Test.
Points: 1 out of 1
Feedback
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 3 von 16
Scrum is not a process or a technique for building products; rather, it is a framework within which you
can employ various processes and techniques.
Question 4 of 30
What is the recommended size for a Development Team (within the Scrum Team)?
Correct answer: B)
You chose: B)
Note: This question displayed answer options in random order when taking this Test.
A) Minimal 7
B) 3 to 9
C) 7 plus or minus 2
D) 9
Points: 1 out of 1
Feedback
Optimal Development Team size is small enough to remain nimble and large enough to complete
significant work. Fewer than three Development Team members decreases interaction and results in
smaller productivity gains. More than nine members simply requires too much coordination.
Question 5 of 30
Correct answer: D)
You chose: E)
Note: This question displayed answer options in random order when taking this Test.
C) Manage the meeting in a way that each team member has a chance to speak.
D) Teach the Development Team to keep the Daily Scrum within the 15 minute time-box.
Points: 0 out of 1
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 4 von 16
Feedback
The Scrum Master ensures that the Development Team has the meeting, but the Development Team is
responsible for conducting the Daily Scrum. The Scrum Master teaches the Development Team to keep
the Daily Scrum within the 15-minute time-box. The Scrum Master enforces the rule that only
Development Team members participate in the Daily Scrum.
Question 6 of 30
Correct answer: C)
You chose: C)
Note: This question displayed answer options in random order when taking this Test.
C) Support the Product Owner with insights and information into high value product and
system capabilities. Support the Scrum Master to cause organizational change that
fosters empiricism, self-organization, bottom-up intelligence, and intelligent release of
software.
Points: 1 out of 1
Feedback
Management has no active role in the actual product development through Scrum. However,
management external to the Scrum team is incredibly important in setting the vision and strategy to
guide the overall direction of the organization.
Question 7 of 30
Correct answer: B)
You chose: A)
Note: This question displayed answer options in random order when taking this Test.
A) 4 hours.
C) Whenever it is done.
D) Monthly.
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 5 von 16
Points: 0 out of 1
Feedback
Sprint Planning is time-boxed to a maximum of eight hours for a one-month Sprint. For shorter Sprints,
the event is usually shorter.
Question 8 of 30
Correct answer: A) B) C)
You chose: A) B) C)
Points: 1 out of 1
Feedback
The Scrum Team consists of the Scrum Master (manages the process), the Product Owner (decides
what to do) and the Development Team (does the work).
Question 9 of 30
Correct answer: A)
You chose: A)
A) True
B) False
Points: 1 out of 1
Feedback
The heart of Scrum is a Sprint, a time-box of one month or less during which a "Done", usable, and
potentially releasable product Increment is created.
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 6 von 16
Question 10 of 30
Correct answer: E)
You chose: E)
Note: This question displayed answer options in random order when taking this Test.
A) Size, where small items are at the top and large items are at the bottom.
B) Risk, where safer items are at the top, and riskier items are at the bottom.
Points: 1 out of 1
Feedback
The Product Owner decides what makes the most sense to optimize the value of the work being done by
the Development Team.
Question 11 of 30
Correct answer: C)
You chose: C)
Note: This question displayed answer options in random order when taking this Test.
Points: 1 out of 1
Feedback
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 7 von 16
Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge
comes from experience and making decisions based on what is known.
Three pillars uphold every implementation of empirical process control: transparency, inspection, and
adaptation.
Question 12 of 30
The Development Team should have all the skills needed to:
Correct answer: C)
You chose: C)
Note: This question displayed answer options in random order when taking this Test.
A) Complete the project as estimated when the date and cost are committed to the
Product Owner.
B) Do all of the development work, except for specialized testing that requires additional
tools and environments.
C) Turn the Product Backlog items it selects into an increment of potentially releasable
product functionality.
Points: 1 out of 1
Feedback
The Development Team consists of professionals who do the work of delivering a potentially releasable
Increment of "Done" product at the end of each Sprint. Development Teams are cross-functional, with all
of the skills as a team necessary to create a product Increment.
Question 13 of 30
When do Development Team members become the exclusive owner of a Sprint Backlog
item?
Correct answer: B)
You chose: B)
Note: This question displayed answer options in random order when taking this Test.
B) Never. All Sprint Backlog Items are "owned" by the entire Development Team, even
though each one may be done by an individual development team member.
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 8 von 16
Points: 1 out of 1
Feedback
Sprint Backlog and all of its items are collectively owned by the Development Team. No individual team
member can claim ownership over an item as this would block communication and collaboration.
Question 14 of 30
Correct answer: A)
You chose: A)
Note: This question displayed answer options in random order when taking this Test.
A) Empirical
B) Hybrid
C) Defined
D) Complex
Points: 1 out of 1
Feedback
Scrum is founded on empirical process control theory, or empiricism. Empiricism asserts that knowledge
comes from experience and making decisions based on what is known.
Question 15 of 30
Correct answer: D)
You chose: D)
A) Short enough to keep the business risk acceptable to the Product Owner.
B) Short enough to be able to synchronize the development work with other business
events.
Points: 1 out of 1
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 9 von 16
Feedback
All of these choices are appropriate considerations in determining the length of a Sprint.
Question 16 of 30
An organization has decided to adopt Scrum, but management wants to change the
terminology to fit with terminology already used. What will likely happen if this is done?
Correct answer: D)
You chose: D)
A) Without a new vocabulary as a reminder of the change, very little change may
actually happen.
B) The organization may not understand what has changed with Scrum and the benefits
of Scrum may be lost.
Points: 1 out of 1
Question 17 of 30
Which two (2) things does the Development Team do during the first Sprint?
Correct answer: A) C)
You chose: B) C)
Note: This question displayed answer options in random order when taking this Test.
Points: 0 out of 1
Feedback
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 10 von 16
The heart of Scrum is a Sprint, a time-box of one month or less during which a "Done", useable, and
potentially releasable product Increment is created. This applies to every Sprint
Question 18 of 30
What are the two primary ways a Scrum Master keeps a Development Team working at its
highest level of productivity?
Correct answer: A) B)
You chose: A) B)
Note: This question displayed answer options in random order when taking this Test.
Points: 1 out of 1
Feedback
A Scrum Master is a servant-leader for the Development Team. Facilitation and removing impediments
serves a team in achieving the best productivity possible.
Question 19 of 30
Correct answer: B)
You chose: B)
Note: This question displayed answer options in random order when taking this Test.
A) 2 hours.
C) As long as needed.
D) 1 day.
Points: 1 out of 1
Feedback
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 11 von 16
Sprint Review is a four-hour time-boxed meeting for one-month Sprints. For shorter Sprints, the event is
usually shorter.
Question 20 of 30
When many Development Teams are working on a single product, what best describes the
definition of "done?"
Correct answer: C)
You chose: C)
Note: This question displayed answer options in random order when taking this Test.
A) Each Development Team defines and uses its own. The differences are discussed
and reconciled during a hardening Sprint.
B) Each Development Team uses its own but must make their definition clear to all other
Teams so the differences are known.
C) All Development Teams must have a definition of "done" that makes their combined
work potentially releasable.
D) It depends.
Points: 1 out of 1
Feedback
Scrum requires an Increment to be releasable. This is an Increment of product. Many teams working on
a single product are expected to deliver such an Increment.
Question 21 of 30
Correct answer: C)
You chose: C)
Note: This question displayed answer options in random order when taking this Test.
Points: 1 out of 1
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 12 von 16
Feedback
Teams typically go through some steps before achieving a state of increased performance. Changing
membership typically reduces cohesion, affecting performance and productivity in the short term.
Question 22 of 30
What is the main reason for the Scrum Master to be at the Daily Scrum?
Correct answer: B)
You chose: B)
Note: This question displayed answer options in random order when taking this Test.
B) He or she does not have to be there; he or she only has to ensure the Development
Team has a Daily Scrum.
C) To write down any changes to the Sprint Backlog, including adding new items, and
tracking progress on the burn-down.
Points: 1 out of 1
Feedback
The Scrum Master enforces the rule that only Development Team members participate in the Daily
Scrum.
Question 23 of 30
Correct answer: A)
You chose: A)
Note: This question displayed answer options in random order when taking this Test.
C) Managing the project and ensuring that the work meets the commitments to the
stakeholders.
Points: 1 out of 1
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 13 von 16
Feedback
The Product Owner is responsible for maximizing the value of the product and the work of the
Development Team.
Question 24 of 30
During a Sprint, a Development Team determines that it will not be able to finish the complete
forecast. Who should be present to review and adjust the Sprint work selected?
Correct answer: B)
You chose: B)
Note: This question displayed answer options in random order when taking this Test.
A) The Scrum Master, the project manager and the Development Team.
Points: 1 out of 1
Feedback
During the Sprint, scope may be clarified and re-negotiated between the Product Owner and
Development Team as more is learned.
Question 25 of 30
When multiple teams work together on the same product, each team should maintain a
separate Product Backlog.
Correct answer: B)
You chose: B)
A) True
B) False
Points: 1 out of 1
Feedback
Products have one Product Backlog, regardless of how many teams are used. Any other setup makes it
difficult for the Development Team to determine what it should work on.
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 14 von 16
Question 26 of 30
Correct answer: D)
You chose: C)
Note: This question displayed answer options in random order when taking this Test.
Points: 0 out of 1
Feedback
The duration of a Sprint is fixed and cannot be shortened or lengthened.
Question 27 of 30
Correct answer: D)
You chose: D)
Note: This question displayed answer options in random order when taking this Test.
Points: 1 out of 1
Feedback
Time-boxed events are events that have a maximum duration.
Question 28 of 30
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 15 von 16
Correct answer: D)
You chose: D)
Note: This question displayed answer options in random order when taking this Test.
C) 4 hours.
D) 15 minutes.
Points: 1 out of 1
Feedback
The length of a daily Scrum is time-boxed at 15 minutes, it does not change with the length of a Sprint.
Question 29 of 30
Correct answer: D)
You chose: D)
Note: This question displayed answer options in random order when taking this Test.
A) Next Monday.
Points: 1 out of 1
Feedback
A new Sprint starts immediately after the conclusion of the previous Sprint.
Question 30 of 30
https://www.classmarker.com/online-test/results/ 22.02.2018
Finished. Seite 16 von 16
The Development Team should not be interrupted during the Sprint. The Sprint Goal should
remain intact. These are conditions that foster creativity, quality and productivity. Based on
this, which of the following is FALSE?
Correct answer: B)
You chose: C)
Note: This question displayed answer options in random order when taking this Test.
A) The Product Owner can help clarify or optimize the Sprint when asked by the
Development Team.
B) The Sprint Backlog is fully formulated in the Sprint Planning meeting and does not
change during the Sprint.
D) The Development Team may work with the Product Owner to remove or add work if it
finds it has more or less capacity than it expected.
Points: 0 out of 1
Feedback
The Sprint Backlog makes visible all of the work that the Development Team identifies as necessary to
meet the Sprint Goal. The Development Team modifies the Sprint Backlog throughout the Sprint, and
the Sprint Backlog emerges during the Sprint.
https://www.classmarker.com/online-test/results/ 22.02.2018