RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
Page 1 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
Page 2 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
14. Details of trial pit/bore log- Nature of the soil as Para 906-
determined from trial pit & bore log details, the a(xii) of
details of location with chainage, reduced level at IRWM
top of trial pit/bore log, SBC value for each stratum
to be shown in tabular form and pictorial form.
Page 3 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
3. Relevant & up to date IRS and IRC Codes, etc. with Various
their order of preference to be decided. Codes,
Manuals,
Specificati
ons, etc.
4. L-Section:-
Page 4 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
10. Waterway:-
Page 5 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
11. Whether vertical clearance and free board have Clause 4.8
been provided as per the Sub-structure Code? If and 4.9 of
not, a note should be added that condonation IRS Sub-
should be taken from the competent authority before structure
starting the work. Code
12. Whether maximum scour depth below HFL at pier Clause 4.6
and abutment has been considered as per the Sub- of IRS
structure Code? Sub-
structure
Code
13. Foundation:-
Page 6 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
15. Super-structure:-
Page 7 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
Page 8 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
18. Whether bridge is located in seismic zone III, IV & Clause 5.3
V? If yes, ductile detailing is mandatory for of IRS
piers/portals as per the IRS Seismic Code. Seismic
Code First
Revision -
2020
20. RUB/Subways:-
b. Railway
Board
Page 9 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
Letter
No.2017
/CE-
IV/LX/Mi
sc/244(L
C) dated
15.10.20
20
adequately? of IRS
Sub-
structure
Code
Page 11 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
(iii) Any known bench mark with the datum from Para 906-
which its value has been reckoned. a(vi) of
IRWM
31. The drawings for a bridge should include the site Para 906-
plan, plan and longitudinal section of the river or c) of IRWM
nala above and below the proposed site in the case
of large bridges being rebuilt on account of
insufficient waterway or being built at a new site and
a sufficient number of cross sections showing
highest flood level, ground plan of foundations,
sections through the bridge in such directions as are
necessary to show the intended form and
dimensions of the various parts, front and side
elevation of abutments and piers, and drawings of
such details as have not been standardised.
The standard of loading for which the bridge is
designed should be recorded in the plan and
reference to the type drawing of the particular girder
should also be recorded.
Page 12 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
Note: Latest version of Codes & Manuals, Special Publications and RDSO BS Reports
should be referred to. The present versions of the referred resources are tabulated for ready
reference.
Page 13 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
Page 14 of 14
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
GOVERNMENT OF INDIA
MINISTRY OF RAILTVAYS
(RATLWAY BOARDI
Many a times, it is noticed that the existing bridge is also very old and
due
for replacement in near future. In such case-s, the railway should provide
temporary diversion (frt for 75 Kmph) for the existing bridge. Tirereafter,a
existing single line bridge should be dismantled and nJ* aor-Ule line
bridge
should be constructed on existing alignment for latest loading standard. It
give the
will
following benefits:
i' Cost of new double line bridge is lesq than two single line bridges, thus
there will be substantial cost saving, in cases where existing Uiiage is
old
and require maj or rehabilitation/ rebuilding.
ii' Reverse curye on the approach of bridge *IU b" completely avoided,
thus
increasing the speed potential of line.
iii. Existing single line will also be re-constructed for 25 ton axle load.
The matter has been considered and it has been decided that wherever
doubling is planned, railway shall consider the condition of existing single
line
bridge also for replacement in the near future. It has also been decided
existing major (not important) bridges which have outlived their life
that few
may
selected for re-construction with doubling projects to implement be
methodologr under advice to Board. this
(O.N. Sharmhf
Director (B&S)
Copy to: Chief Commissioner of Railway Safet5r, New Delhi for kind
information.
o\O
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
File No.RDSO-BnS0ESTR(BnF)/3/2021-O/o ED/STRUCTURES/RDSO
GOVERNMENT OF INDIA
MINISTRY OF RAILWAYS
(RAILWAY BOARD)
Vide above reference, instructions were issued for construction of RCC boxes
for railway bridges on the zonal railways. Recently, some issues have been raised by
the project executing agencies in this regard. Accordingly, in supersession of existing
instructions, following has been decided:
(i) RCC boxes shall not be constructed for major bridges on new lines/gauge
conversion/ doubling works. In exceptional cases on feasibility
consideration (like insufficient vertical clearance, restricted land
availability, to avoid damage to existing wing wall etc), RCC box may be
constructed for major bridges with adequate cushion (on replaceability
consideration to accommodate suitable temporary girder) duly considering
the strata underneath the bridge with approval of CAO(C)/CBE on case to
case basis.
(ii) RCC boxes may be constructed for minor bridges on new lines/ gauge
conversion/ doubling works up to a span of 3 m with provision of adequate
cushion (on replaceability consideration to accommodate suitable
temporary girder) duly considering the strata underneath the bridge with
approval of CE(C). In case it is not found feasible to provide desired cushion
and/ or RCC box of span more than 3 m is to be provided, approval of
CAO(C)/CBE shall be taken.
(iii) Use of multiple RCC boxes shall not be permitted. However, standard
RDSO design/ specially designed multi-cell RCC boxes may be permitted
on feasibility consideration with approval of CAO(C) / CBE.
(vi) For building/ rebuilding of bridges on existing lines, efforts should be made
to provide girder/ slab bridges as far as possible and RCC boxes shall be
provided only as last resort with approval of CBE.
(vii) In all cases where RCC boxes have been constructed or planned to be
constructed, properly designed protection works such as drop wall, curtain
wall, flooring etc duly considering the scour criteria and approved by CBE
or CE/ C shall be provided. The provisions shall also be incorporated in the
GAD and approved by competent authority.
(viii) Only standard ROSO design RCC boxes shall be constructed at all
locations. In exceptional cases where it is not feasible to adopt ROSO
designs, specially designed RCC boxes may be constructed with the
approval of PCE or CAO/ C. It shall be ensured that provisions of para
13.4.1 of "Concrete Bridge Code - Reprint 2014" are duly complied while
designing the non-ROSO standards RCC boxes.
~1-
(0. N.'shJ~~,
Director CE (B&S)