0% found this document useful (0 votes)
42 views1 page

MNT PF 001

The Corrective Maintenance Process Flow document outlines the process for handling corrective maintenance requests. It involves receiving a request, generating a work order, determining the cause of issue, deciding if the item is repairable in the workshop, procuring any needed spare parts, performing repairs, recording the work in a history log, and returning the item to the end user.

Uploaded by

Salu Bahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views1 page

MNT PF 001

The Corrective Maintenance Process Flow document outlines the process for handling corrective maintenance requests. It involves receiving a request, generating a work order, determining the cause of issue, deciding if the item is repairable in the workshop, procuring any needed spare parts, performing repairs, recording the work in a history log, and returning the item to the end user.

Uploaded by

Salu Bahi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

CORRECTIVE MAINTENANCE PROCESS FLOW

Issue Date: 01-Jun-


MNT-PF-001 Revision 00
2023
PREPARED BY: REVIEWED & APPROVED BY:
MANAGEMENT REPRESENTATIVE MANAGING DIRECTOR

Receive the Request from the


requestor for Corrective Maintenance

schedule

Generate the Work Order & Get the actual Work Order
details /information / history of the MNT-FRM-002
requested work

Check the condition & determine the


possible cause(s) of the problem

No
Arrange specialist for
Is it repairable in
repair
the workshop?

Yes

Arrange the Spare Parts Does it need to


and repair accordingly procure Spare
parts?
No
Yes

Prepare Purchase
Requisition

PUR-FRM-001

History Log Fill up the Work order and keep record in


MNT-FRM-004 Equipment History Log

Turn Over to the end user

Page 1 of 1 Issued date: 01-Jun-2023 Rev: 00 MNT-PF-001

You might also like