Villa Project Report
Villa Project Report
WBS
Activity ID Activity Name Activity BL Total Cost Actual Total Remaining Total
Status Cost Cost
NEWEPS Samir
V-5 Villa project single floor_Rev04
V-5.1 Preliminary Works
A1000 Project Start Not Started 0.00 LE 0.00 LE 0.00 LE
A1010 Intiial Prepatory works Not Started 0.00 LE 0.00 LE 0.00 LE
Variance - Total
Cost
0.00 LE
0.00 LE
0.00 LE
0.00 LE
-1,200.00 LE
-1,200.00 LE
6,000.00 LE
43,200.00 LE
0.00 LE
0.00 LE
6,000.00 LE
0.00 LE
0.00 LE
0.00 LE
WBS
Activity ID Activity Name Activity BL Total Cost Actual Total Remaining Total
Status Cost Cost
Variance - Total
Cost
55,200.00 LE
0.00 LE
0.00 LE
0.00 LE
0.00 LE
0.00 LE
55,200.00 LE
0.00 LE
0.00 LE
0.00 LE
0.00 LE
54,000.00 LE
WBS
Activity ID Activity Name Activity BL Total Cost Actual Total Remaining Total
Status Cost Cost
Variance - Total
Cost
54,000.00 LE
54,000.00 LE