MN State Bonding Tour Booklet Final

Download as pdf or txt
Download as pdf or txt
You are on page 1of 4

MINNESOTA

STATE BONDING TOUR


DOWNTOWN ST. CLOUD F
A
D
B
I
I PP
CENTRA CARE SS
HEALTH N SI
IS ER
ST. CLOUD HOSPITAL
t St M IV
R
1 s

3
5t

y2
hA

Hw
ve

E
7th

S
10

Av
th

eS
Av
eN

C St
S
3 rd
ST. CLOUD
STATE UNIVERSITY
14
th
Av
eS

PUBLIC IMPROVEMENTS
Lake
George A. Mississippi Riverwalk Connection
B. East St. Germain Walkability and Veterans Bridge
C. Lake George/Downtown Connectivity
D. St. Cloud Hospital Gateway Corridor Connectivity
E. SCSU Gateway Corridor Connectivity
F. Rail Corridor Pedestrian Safety Improvements

REDEVELOPMENT OPPORTUNITIES

COMMUNITY BENEFITS Lady Slipper Lot


Swan Lot
Best Western Kelly Inn
Riverside Apartments
Northwest Corner East End Infill
Regional Impact Pedestrian Safety/Walkability Tech High School Site East End TOD
Courthouse Building Cooper Avenue
Economic Development Social Equity North Downtown Riverfront Division Street

Housing Environmental Enhancement


PUBLIC IMPROVEMENTS PHASE ONE & TWO
2024 i $20 million
2025 i $15 million

A. MISSISSIPPI RIVERWALK CONNECTION


The Riverwalk project further strengthens these Statewide assets by intentionally engaging the Mississippi River with active and passive
recreation amenities for all. Creation of a unique water’s edge asset within steps of St. Cloud Hospital and downtown St. Cloud will
generate eco-tourism, economic investment, and environmental education and awareness.

PRE-DESIGN &
CONSTRUCTION DRAWINGS $650,000 CONSTRUCTION FUNDING $8 MILLION

B. EAST ST. GERMAIN AND VETERANS BRIDGE WALKABILITY


The east side of downtown is well positioned to flourish due to its framing by the Mississippi River and Future Transit Oriented
Development at the Northstar connection. Creation of a walkable urban environment through streetscape and infrastructure
investments on East St. Germain Street and the Veterans Bridge will result in housing, cultural amenities, and economic opportunity for
all area residents in a unique regional destination.

PRE-DESIGN &
CONSTRUCTION DRAWINGS $730,000 CONSTRUCTION FUNDING $9 MILLION

C. LAKE GEORGE/DOWNTOWN CONNECTIVITY


Division Street, Trunk Highway 23, is one of St. Cloud’s primary east-west roadways and a regional economic engine. Strategic crossing
improvements and beautification enhancements are necessary to safely balance regional traffic volumes with the walkable urban
environment necessary for downtown and the adjacent regional assets to thrive.

PRE-DESIGN &
CONSTRUCTION DRAWINGS $245,000 CONSTRUCTION FUNDING $3 MILLION

D. ST. CLOUD HOSPITAL GATEWAY CORRIDOR CONNECTIVITY


Creation of an identifiable connection between St. Cloud Hospital, Central Minnesota’s largest employer, and Downtown is vital to the
regional economy. Wayfinding, streetscape, and safety amenities can strengthen car and walking connections from CentraCare to
downtown and presence within downtown housing, employment, and services.

PRE-DESIGN &
CONSTRUCTION DRAWINGS $400,000 CONSTRUCTION FUNDING $5 MILLION

E. SCSU GATEWAY CORRIDOR CONNECTIVITY


Enhancing the presence of St. Cloud State University and the pedestrian connection to downtown is essential to capturing the
educational, cultural, and economic returns generated by the campus. Wayfinding and walkability improvements will increase the
presence of the University and foster surrounding developments within downtown and adjacent spaces connecting these regional
assets.

PRE-DESIGN &
CONSTRUCTION DRAWINGS $400,000 CONSTRUCTION FUNDING $5 MILLION

F. RAIL CORRIDOR PEDESTRIAN SAFETY IMPROVEMENTS


Creating a safe, walkable, pedestrian environment is essential to the fostering construction of new urban housing within downtown St.
Cloud. Rail corridor barriers and crossing improvements are necessary to address aesthetics, safety, and train whistles that fosters
1,000 new units of downtown housing.

PRE-DESIGN &
CONSTRUCTION DRAWINGS $400,000 CONSTRUCTION FUNDING $5 MILLION

MINNESOTA STATE BONDING TOUR


PUBLIC IMPROVEMENTS PHASE THREE
2026 - 2027 i $65 million

S I T E ACQ U I S I T I O N A N D PU B L I C UT I L I T I E S S I T E ACQ U I S I T I O N F O R
S I T E PR E PA R AT I O N PU B L I C R E D EVE LO PM E N T CA PAC I TY M I S S I S S I PPI R I VE R F R O N T
HOUSING I M PR OVE M E N T S D OWN TOWN PU B L I C PL A Z A

$11 MILLION $8 MILLION $8 MILLION

PA R A M O U N T PA R K I N G PU B L I C S KYWAY SYST E M D OWN TOWN CO R E


R A M P E XPA N S I O N WA L KA B I L I TY U P G R A D E S

$9 MILLION $8 MILLION $7 MILLION

PUBLIC
E A ST ST G E R M A I N PU B L I C C E N T R E S Q UA R E PA R K I N G FOSTER
PA R K I N G ACQ U I S I T I O N A N D R A M P E XPA N S I O N
CO N ST R U C T I O N

$6 MILLION $8 MILLION

DOWNTOWN ST. CLOUD


SEPTEMBER 13, 2023
COMMUNITY VISION
PUBLIC ENGAGEMENT &

EAST END VISION SMALL AREA PLAN ST. CLOUD COMPREHENSIVE PLAN

PLACEMAKING DESIGN MANUAL ST. CLOUD RIVERWALK MASTER PLAN

A ROAD MAP
FOR COLLECTIVE
EFFORTS TO ACHIEVE
A SHARED VISION

Mayor Dave Kleis www.ci.stcloud.mn.us 1201 7th Street South


320-255-7201 [email protected] St. Cloud, MN 56301