0% found this document useful (0 votes)
58 views9 pages

Job Analysis Assignment

This document provides a job analysis for the role of R&D lab manager. The role involves managing research and development projects from initiation through closing. Key responsibilities include studying proposals, planning projects, executing pilot productions, closing projects, and updating documentation. The role requires a bachelor's degree in science, 8 years of experience, and skills in areas such as computer systems, communication, and teamwork. Performance is evaluated based on metrics like time to review proposals and achieving cost savings.

Uploaded by

Hazem Amin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views9 pages

Job Analysis Assignment

This document provides a job analysis for the role of R&D lab manager. The role involves managing research and development projects from initiation through closing. Key responsibilities include studying proposals, planning projects, executing pilot productions, closing projects, and updating documentation. The role requires a bachelor's degree in science, 8 years of experience, and skills in areas such as computer systems, communication, and teamwork. Performance is evaluated based on metrics like time to review proposals and achieving cost savings.

Uploaded by

Hazem Amin
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Human Resources Management

Job Analysis Assignment

Introduced to:

DR. Hanady Ragaii

Prepared By:

Hazem Amin Ibrahim Mahmoud (ID: 22221035152)


Job Analysis & Requirement Form

1- Job Identification
 Job Title: R&D lab manager (Senior Researcher).
 Department: Research and Development
 Preparation Date: 04/01/2022
 Prepared By: Human Resources Department.

2- The Purpose of job

Managing research and development projects and/or technical support requests,


once initiated till closed through formal documentation to serve company in
alignment with corporate strategy and satisfying all project/technical support
stakeholders.

3- Relationships and work contact

 Reports to: Research and Development General Manager.


 The kind of supervision Received by your manager: Review of all project
phases’ statuses, projects / technical support statuses and documentation,
and professional code of conduct and ethics with all organization
departments.
 Work with: Sales, production, quality control, procurement, financial and
planning departments.
 Highest level contacted: Team leaders only in other departments, not
department managers.
 Purpose of contact: giving technical support required through official and
formal communication only, verbal communication in few limits and not
accountable.
 Contact outside the Company: Not allowed without department general
manager supervision.

[1]
4- Task, Duties and Responsibilities:

Tas
Tasks Performed %
k
Studying study proposals or technical support required, and
giving opinion for project Approval/Rejection:
- Studying the project scope. N/A
1
- Identify requirements for each functional department Once Recived
including R&D.
- Giving final opinion.

Project Planning:
- Determine project development approach & methodology
with documentation.
- Put theoretical formulation framework and starting formula
with documentation. N/A
2 - Producing small size prototype and inspection with According to
documentation. project nature.
- Receiving official and formal feedback and documenting in
project status report.
- Start creating creation /modification required on BOM “Bill
of Material” /WI “Work Instructions” on SAP.

Project Execution on production scale


- Leading of any external departments “Production, and QC”
for pilot batch production of first product delivery / product
N/A
after modification.
3 - Verifying product scope regarding WI “Work Instructions” According to
& QC “Quality Control” methods to get them trained on project nature.
verified deliverables.
- Validating product scope with coordination with sales team to
be formally accepted deliverables.

[2]
Closing Project:
- Receiving final product acceptance by end user after
complete selling of all pilot batch quantity.
- Transferring ownership of product to both: Sales, QC,
Production, Procurement, Stores, and Financial Departments N/A
4 by delivery the formal products documents through official According to
communication channels and proper escalation procedure project nature.
through R&D GM.
- Documenting project report.
- Documenting lesson learned to OPA “Organizational Process
Assets” repository

Updating Reports, Project, and Products documents: N/A


- On daily basis for all projects and products once required and According
5 changes/creation happened. to
- project
nature

Total 100%

5- Authorities

 Decision Making:

 Unlimited:

- to select raw suitable materials, equipments and instruments required


for projects success.

- During pilot batch to modify formula to meet planed specifications


values.

 Limited:

- Give only recommended list of suppliers and vendors. “Final Decision


for procurement department”.

 Supervision type: Direct

 Highest Level Supervised: Divisions leaders during projects execution.

 Number Supervised: as per project size.

[3]
 Budgetary Limitations: Opened after project approval.

6- Working Condition

 Working Days: Saturday to Thursday

 Working Hours: From 8 a.m. to 5 p.m. “with 1 hour rest time from

01:00pm to 02:00pm”

 Location:

 Mainly in R&D Center,

 “Production Plant and QC Lab during production scale execution or

technical support”.

 External customers “end users” workshops if requested or needed.

 Other production plants within Al-Arifi group of companies in Riyadh

or Dammam if requested for Internal Technical Support.

 Hazards:

 Fumes, Dusts, Odors, Organic solvents, Flammable and Explosive

chemicals.

[4]
 Work Aids:

 As per new project requires.

7- Standards of Performance

No
Task KPI / Description
.
Achieving Know How in lowest time for new
Product Formulation proposals:
1
- Time between submitting proposal and
final opinion submission.
Knowledge of industry trends and emerging
practices:
2 New Products Initiation
- Number of new ideas introduced to
R&D GM.
Achieving objective goals for change requests:
3 Products Improvements - Percentages (%) of change requests
succeeded.
Lowering costs of finished products:
- Percentage of cost reduction of
processed proposals by himself (By
4 Monetary Savings alternating raw materials or by
production processes value stream
mapping).

Achieving projects objectives without any


5 Team Leading complaint due to unethical non-professional
conduct with his team.

[5]
8- Human Requirement to fill this Job
A) Knowledge:
Level of Education Bachelor degree of Science,
Training Courses PMP / ACP / RMP / Lean 6 Sigma Green Belt
Minimum Years of
8 Years Minimum in same field
Experience
B) Skills:
Computer Skills MS Office / MS Project / SAP
Language Skills Upper Intermediate
Negotiation / Presentation /Team Work / Time
Soft Skills
Management / Emotional Intelligence
C) Abilities (Talents):
Mental Abilities Analytical mind / Multitasking
Physical Abilities Little

[6]
9- Behavioral Competency Matrix
Level- Level- Level- Level- Level-
Job Competencies
1 2 3 4 5
A Core Competencies
1 Effective Communication 
2 Planning & Organization 
3 Team Work 
4 Ability to take responsibility 
5 Customer Focus 
6 Goal Achievement 
7 Professionally 
B Functional Competencies
8 Analytical Thinking 
9 Functional Awareness 
1 Adaptation & Flexibility
0 
1 Creativity & Innovation
1 
C Leadership Competencies
1 Leading & Influencing Others
2 
1 Problem Solving & Decision
3 Making 
1 Developing Others
4 

[7]
1 Strategic Thinking
5 
1 Resource Management
6 

[8]

You might also like