ACTIVITIES
WEEK 1 WEEK 2 WEEK 3
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
SECURE THE BUILDING PERMIT
CLEARING OF SITE
PURCHASE OF INITIAL MATERIALS
PLOTTING OF BEARINGS
FENCING OF SITE
MOBILIZATION
LAYOUT AND STAKING OF BATTER BOARDS
EXCAVATION OF COLUMN & WALL FOOTING AND SEPTIC VAULT
CUTTING, BENDING AND OVERLAYINGOF REINFORCEMENT BARS
INSTALLING OF REBAR AND FRAMEWORK FOR COLUMN, WALL FOOTINGS AND DOWELS
MIXING OF CEMENT, GRAVEL, SAND AND WATER
CONCRETING AND CURING OF COLUMN AND WALL FOOTINGS
INSTALLING COLUMN REBARS
CUTTING OF PLYWOOD AND WOOD STUDS
INSTALLING OF FORMWORKS OF COLUMNS
MIXING OF CEMENT, GRAVEL, SAND AND WATER
CONCRETING AND CURING OF COLUMNS
MIXING OF CEMENT, SAND AND WATER FOR MORTAR
CHB LAYING FOR GROUND FLOOR WALLS
INTALL ING OF BEAM REBARS
INSTALLING OF FLOOR BEAM FORMWORKS
INSTALL OF SECOND FLOOR SLAB FORMWORKS
INSTALLING OF SECOND FLOOR SLAB REBARS
CONCRETING AND CURING OF BEAMS AND SLABS
ROUGHING - IN - ELECTRICAL
ROUGHING - IN - PLUMBING
REMOVING COLUMN FORMWORKS
MIXING OF CEMENT, SAND AND WATER FOR MORTAR
CHB LAYING FOR SECOND FLOOR WALLS
INSTALLING OF ROOF BEAM REBARS
INSTALLING OF ROOF BEAM FORMWORKS
CONCRETING AND CURING OF ROOF BEAMS
REMOVING SLAB AND FLOOR BEAM FORMWORKS
MIXING OF CEMENT, GRAVEL, SAND AND WATER
GRADING AND GRAVELING FILL ON FIRST FLOOR
INSTALLING OF GROUND FLOOR SLAB REBARS
CONCRETING AND CURING OF GROUND FLOOR SLABS
MIXING OF CEMENT, GRAVEL, SAND AND WATER
INSTALLING OF STAIR REBARS
INSTALLING OF STAIR FORMWORKS
CONCRETING AND CURING OF STAIRS
INSTALL ROOF FRAMING AND ROOF RAFTERS
INSTALL PURLINS AND FACIA BOARD AND RIVET
LAYOUT OF ROOFING G.I. SHEETS
INSTALL GUTTERS, FLASHING, RIDGE ROLLS, AND VALLEYS
INSTALL CEILING BOARDS ON EAVES
REMOVING IF STAIR FORMWORKS
INSTALL WINDOW JAMBS
INSTALL DOOR JAMBS
INSTALL CEILING JOISTS
INSTALL CEILING BOARDS
MIXING OF CEMENT, SAND AND WATER FOR MORTAR
PLASTERING OF ALL CHB WALLS
INSTALL ALL PANELS AND FLUSH DOORS
INSTALL OF STEEL WINDOWS
INSTALL OF GLASS AND SCREENS
MIXING OF CEMENT AND WATER FOR GOUT
WATERPROOFING
TESTING OF WATERPROOFING
LAYINGOUT OF ALL TILING WORKS FOR T&B AND KITCHEN
FABRICATE ALL KITCHEN AND BEDROOM CLOSETS AND CABINETS
MIXING OF CEMENT AND WATER FOR GOUT
FINISHING ALL FLOORINGS VINYL, GRANULITHIC, WASHOUTS
MIXING OF CEMENT, GRAVEL, SAND AND WATER
INSTALLING OF SEPTIC VAULT REBARS
CONCRETING AND CURING OF SEPTIC VAULT
INSTALLING OF WIRINGS OF ELECTRICAL
INSTALLING OF ALL ELECTRICAL FIXTURES
INSTALLING OF ALL PLUMBING FIXTURES
INSTALL ALL OF FINISHING HARDWARES
WAINSCOATING OF INTERIOR
START ALL INTERIOR PAINTING
WAINSCOATING OF EXTERIOR
START ALL EXTERIOR PAINTING INCLUDING ROOF
REMOVE ALL SCAFOLDINGS, DEBRIS, AND CLEAN UP PREMISES
PROJECT TURN OVER
DURATION
NTH 2 MONTHS 3M
WEEK 3 WEEK 4 WEEK 5 WEEK 6 WEEK 7 WEEK 8 WEEK 9 WEEK 10
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66
3 MONTHS 4 MOTNHS
WEEK 10 WEEK 11 WEEK 12 WEEK 13
67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88