EXT 230913 0850 MS30 V001 BMW15.10 SYN QA MS 0030 01-Screed
EXT 230913 0850 MS30 V001 BMW15.10 SYN QA MS 0030 01-Screed
EXT 230913 0850 MS30 V001 BMW15.10 SYN QA MS 0030 01-Screed
ID:
Revision: 01 Page 1 of 12
2023.09.13 EXT_230913_0850_MS31_V001_BMW15.10_SYN_QA_MS_0031_01
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
METHOD STATEMENT
Screed Works
Revision history
Acceptance/Approvals
Sign.
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
Location: Debrecen, HRSZ: 0260/1, BMW Plant W15.10, 085.0 – NSM Building
TABLE OF CONTENTS
Date: Doc. ID:
Revision: 01 Page 3 of 12
2023.09.13 EXT_230913_0850_MS31_V001_BMW15.10_SYN_QA_MS_0031_01
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
1. Scope.....................................................................................................................................4
2. References.............................................................................................................................4
4. Competence, responsibility.................................................................................................5
5. Safety Precautions...............................................................................................................6
6.1. Materials:................................................................................................................................................................ 6
6.2. Equipment:............................................................................................................................................................. 6
7. Preparation works:...............................................................................................................7
9. Finishing................................................................................................................................9
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
1. SCOPE
This method statement provides detailed instructions for the execution of screed in the BMW Project. The
screed will be used to create a level and smooth surface for the installation of the flooring.
2. REFERENCES
► Approved drawings;
► Approved materials
► Project Quality Plan;
► Project HSE Plan;
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
4. COMPETENCE, RESPONSIBILITY
Project Manager Responsible for the management of the site activities including the effective
application of the safety and quality system;
The Project Manager shall ensure that the key personnel are well aware of the
specifications and method statement.
Liaisons and corresponding with the Client’s Representative, Engineers, Local
Authorities, Sub-subcontractor and Supplier to ensure that the works are
carried out as per contractual requirement;
Monitoring and ensuring the Project is progressively positively in aspects of
cash flow, cost quality and timely completion.
Site Manager Responsible for overall construction activities and management of the project
construction team ensuring that all method statement, quality and safety
procedures are implemented and required approval permits are obtained.
Control of the daily operation of the construction activities on site.
HSE Personnel Exercise overall responsibility for HSE protection;
Manage the overall safety, health and environment activities in the
organization;
Responsible for planning, formulating and enforcing safety policies and
regulations; To identify variances and take correction actions to protect
personnel and property against accidents; To advise management on all
Occupation Safety & Health (OSH) matters.
Will be closely monitoring the site strict implementation of the MS and Risk
Assessment, the use of proper tools and equipment to maintain safety,
certifications of equipment and their adherence to safety regulations, reporting
of any unsafe work or stopping work that does not comply with HSE
procedures.
QA/ QC Personnel Implement, monitor and verify that all construction operations are being
conducting in accordance with the established quality procedure;
Monitor and review non-conformance and corrective actions, maintain records
and ensure the corrective actions are followed and complied;
Responsible to conduct qualified and competent person in quality field in order
to deliver project successfully;
Carry out inspection on site activities to ensure accordance with the execution
drawings and project specification;
Managing and witnessing material sampling, performance tests and
inspections if required;
Ensure inspection and test measurements are submitted based on quality
control requirements.
Date: Doc. ID:
Revision: 01 Page 6 of 12
2023.09.13 EXT_230913_0850_MS31_V001_BMW15.10_SYN_QA_MS_0031_01
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
5. SAFETY PRECAUTIONS
Before commencing any work, ensure that all safety measures are in place. This includes the use of personal
protective equipment (PPE) such as helmets, gloves, safety boots, and high-visibility vests. Adequate barricades
and signage should be used to prevent unauthorized access to the work area. A trained first-aid responder and a
fire extinguisher should be readily available.
Before starting the screed pouring, inspect all materials and equipment to ensure they are in good condition and
meet the required specifications.
6.1. Materials:
Sand
Cement 42.5R
Qualimeter (screed additive)
Retanol Xtreme Pro 1 (fast drying and high early strength additive)
Water
Rockwool insulation
PE foil 0.4 (for covering Rockwool)
6.2. Equipment:
Date: Doc. ID:
Revision: 01 Page 7 of 12
2023.09.13 EXT_230913_0850_MS31_V001_BMW15.10_SYN_QA_MS_0031_01
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
Screed pump
Concrete helicopter
Buckets
Trowels
Straightedges
Spirit levels
Safety equipment (gloves, goggles, masks, etc.)
Cleaning tools (broom, brushes).
7. PREPARATION WORKS:
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
For a screed area of 10 square meters, you would need the following quantities of materials:
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
9. FINISHING
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
Verification of the Quality documents/Performance Certificate, Technical data sheet received from the Manufacturer
shall be done.
All works shall be executed as per relevant drawings and technical specifications.
#. Equipment Quantity
1. Screed Pump 1 pcs.
2. Concrete Helicopter (Power Float) 1 pcs.
Date: Doc. ID:
Revision: 01 Page 11 of 12
2023.09.13 EXT_230913_0850_MS31_V001_BMW15.10_SYN_QA_MS_0031_01
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
* The quantity / number of the above-mentioned tools and equipment may vary depending on site conditions,
requirements, and availability at the time of execution.
If the natural light required for safe work is not sufficient, artificial general light of 50-100 lux must be
provided.
Tools and equipment must be used in accordance with their intended purpose. Before starting work, hand
tools must be inspected.
Wrong or defective tools must be replaced. None of the works are allowed to be performed with faulty tools.
Number of personnel
HSE section of this document is to identify the standard proactive processes of planning HSE for the site
mobilization and demobilization work, to ensure that foreseeable hazards are identified and mitigation measures
are implemented in a standard manner.
All necessary HSE measures will be taken according to the approved risk assessment and HSE Plan.
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1
Protective helmet Vis clothes Protective boots Eye Protection Harness Safety gloves
All activities All activities All activities All activities Work at height Manual handling
The equipment operators shall possess the required licenses and certificates.
The project safety officer is responsible along with the site engineer for ensuring that all operations are
carried out with due regard to the safety of all project personnel and property.
Tools and equipment shall be inspected by authorized person before carried out to work.
Barricades and sign posts for warning shall be provided on site.
Smoking at construction site is not absolutely allowed.
Ensure every worker to wear safety harness when working at height.
Extension wires shall be hanged to right position to prevent short circuit and electric shock.
EMERGENCY PROCEDURES
• Emergency Response materials are readily available and attended when hazardous atmospheric condition
exists or may develop, with all workers trained and aware of the hazard and safe work process.
METHOD STATEMENT
Site: Debrecen,
Project: BMW Plant W15.10
HRSZ: 0260/1