1 Bridge Manoeuvring System
1 Bridge Manoeuvring System
1 Bridge Manoeuvring System
xls
Date:2008-09-02
PROJECT INFORMATION :
CLASS : DNV
10-Nov-09 1. Prepared the final drawing for H1013 EJJ JHJ KWL
SAMJIN H1013-16/1021-26
KM Korea Ltd.
Kongsberg Maritime AS
AO-20221- / 22-Jan-08
DOCUMENT STATUS
CHANGES IN DOCUMENT
5. Slave ID numbers: 1
* NOTE : These signals are included for VDR interface through AMS.
DOCUMENT STATUS
CHANGES IN DOCUMENT
If OPU is Required
2 5 1200065
Paper Termic
OPU AC C20
Rolls of 16m