Shop Drawings Project Name: Toilet Type 1 Kitchen G003
Shop Drawings Project Name: Toilet Type 1 Kitchen G003
Shop Drawings Project Name: Toilet Type 1 Kitchen G003
00 M
21 20 19 18 17 16 15 14 13 12 11 10' 10 9 8 7 6 5 4 3 2 1
SHOP DRAWINGS
BALADIA NETWORK
Slope 1 cm/m
I.C
1.10
0.60 IL= - 0.07 58.30 B07 Project Name
0.30
0.30
3.65 3.10 2.90 3.20 1.85 2.00 B07 8.48 4.20 4.20 4.50 3.90 4.20 3.25 2.55 2.75
0.60
0.60
0.65 IL=-0.10 Madinah, Saudi Arabia
Sewage -Soil
P 0.60 0.60 P
PVC 110
Slope 1 cm/m
0.10
PVC 110
Sewage -Soil
PVC 110
Sewage -Soil
PVC 50
Vent Pipe
1.40
FD
IL=0.15
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m IL=0.15 IL=0.15 IL=0.15
IL=-0.06
1.00
IL=0.00 IL=0.00 IL=0.00 IL=0.00 IL=0.00 IL=0.30 SN-Waste
IL=0.30
0.20
0.10
PVC 50 SN-Waste
Sewage -Soil
Sewage -Soil
Sewage -Soil
Sewage -Soil
IL=0.00 F.C.O PVC 110 PVC 50
PVC 110
PVC 110
4.00 4.00 3.30 8.22SS PVC 110 3.98 4.00 4.00 4.00 4.00 4.00 4.00 5.60 2.55
PVC 110
PVC 110
Slope 1 cm/m IL=0.15
SN-Waste SN-Waste
IL=0.30 PVC 50 PVC 50
Slope 1 cm/m
Slope 1 cm/m
Sewage -Soil
0.20 SN-Waste
0.20
5.34
5.34
SN-Waste SN-Waste
0.10
PVC 110
PVC 50 PVC 50
1.40
PVC 50
7.10
IL=0.00 IL=0.00 IL=0.00 IL=0.00 Vent pip PVC 50
Sewage -Soil
Sewage -Soil
Slope 1 cm/m
Vent Pipe
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
above the false ceiling
Slope 1 cm/m
PVC 110
PVC 110
PVC 50
SN-Waste
PVC 50 IL=0.15
IL=0.30
IL=0.15 IL=0.15 IL=0.15 IL=0.15 GREASE TRAP
Slope 1 cm/m
Slope 1 cm/m
PVC 50
SN-Waste sewage1
PVC 50
PVC 50
PVC 50
PVC 50
SN-Waste
SN-Waste
SN-Waste
SN-Waste
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
SN-Waste
PVC 50
N IL=0.06
C.O
PVC 110
IL=-0.05
N
PVC 110
IL=0.30
3.00
IL=0.00 sewage1
Slope 1 cm/m Slope 1 cm/m Slope 1 cm/m
sewage1
PVC 110
0.20
IL=0.00
PVC 75
0.20
sewage1
PVC 75
sewage1
1.41
1.41
IL=0.30
F.C.O PVC 110
IL= +3.0
KITCHEN G003
IL=0.10
Rain water
M IL= + 3.0 PVC
IL=0.10 110 I.C M
TOILET TYPE 1
Vent pip PVC 50
0.20
IL=0.30
IL=0.10
IL=0.30
IL=0.10
IL=0.30
IL=0.10
0.68
0.20
0.68
1.50
1.50
1.50
underground Vent pip PVC 50 BALADIA NETWORK
above the false ceiling Vent pip PVC 50
17.35
1.02
1.02
above the false ceiling Vent pip PVC 50
Vent pip PVC 50
Vent pip PVC 50
above the false ceiling 49.50 above the false ceiling
above the false ceiling
Slope 1 cm/m
IL=0.30
IL=0.00
sewage1
SN-Waste
PVC 50
IL=0.30
IL= +3.0
IL=0.10
Rain water L
IL=0.15
PVC 75 C.O
PVC 110
sewage1
FD IC-IL= - 1.00 M
SN-Waste PVC 75 PVC 110 sewage1 sewage1
IL=0.30 sewage1
PVC 50 IL=0.15 PVC 110 PVC 110 PVC 110
IL=0.15 FD IL=0.30 SN-Waste IL=0.08 IL= - 0.08
K K
IL= - 0.05
4.00
Slope 1 cm/m
IL=0.00 IL=0.30 WastePipe
F.C.O PVC 50 sewage1
4.66
PVC 75
IL=0.30 PVC 110 PVC 110 WastePipe
IL=0.00 PVC 75
IL=0.15 SN-Waste IL=0.15
FD Sewage -Soil
PVC 50 sewage1 Vent pip PVC 50
PVC 75 PVC 110 Vent pip PVC 50 underground
6.10
6.10
SN-Waste Slope 1 cm/m SN-Waste
IL=0.15
underground PVC 50 PVC 50 WastePipe WastePipe SN-Waste
SN-Waste IL=0.15
0.20
Slope 1 cm/m
PVC 50
IL=0.30 IL=0.00 Slope 1 cm/m WastePipe
Slope 1 cm/m Slope 1 cm/m Slope 1 cm/m Slope 1 cm/m
0.20
Slope 1 cm/m
SN-Waste Slope 1 cm/m SN-Waste PVC 75
IL=0.15
IL=0.15 PVC 50 PVC 50
sewage1 IL=0.15 IL=0.15
8.08
SN-Waste PVC 110 FD
J J
Slope 1 cm/m
FD
PVC 50 Sewage -Soil
IL=0.30 PVC 110
Slope 1 cm/m Slope 1 cm/m
FD FD FD FD
Slope 1 cm/m
IL=0.00 IL=0.15 IL=0.15
IL=0.15 SN-Waste
Vent pip PVC 50
0.20 0.20 PVC 50
IL=0.30
Slope 1 cm/m Slope 1 cm/m Slope 1 cm/m
IL=0.15 SN-Waste Slope 1 cm/m above the false ceiling SN-Waste SN-Waste
PVC 50 IL=0.15 PVC 50 PVC 50 IL=0.15
0.10 Sewage -Soil
IL=0.00 WastePipe
0.20
IL=0.15
PVC 110 PVC 75
2.50
Slope 1 cm/m
WastePipe
13.30 2.55 I
0.70
SN-Waste
2.74
IL= - 0.05 Slope 1 cm/m PVC 75
3.88
0.93 0.70
IL=- 0.06 PVC 110 underground SN-Waste
SN-WasteSlope 1 cm/m PVC 50
Vent pip PVC 50 PVC 50
PVC 75
C.O
above the false ceiling IL=0.13
H 0.30 0.20 0.20 0.20 0.18 0.20 0.20 0.20 0.20 0.20 C.O
IL=0.15
PVC 75 IL=0.15
IL=0.30
0.32
0.32
0.55
0.55
IL= - 0.10
0.93
IL=- 0.30
G' G'
0.02
0.02
8.48 4.20 4.20 4.50 3.90 4.20 3.25 2.55 2.75
Slope 1 cm/m
I.C
38.03
G Sewage -Soil
PVC 110
Sewage -Soil
PVC 110
IL= - 1.00 M
BALADIA NETWORK G
Sewage -Soil
PVC 110
IL= - 0.05 IL=0.30
B07 IL= 0.05
IL=0.30 IL= - 0.05
Sewage -Soil
PVC 110
B07
IC-IL= - 1.00 M SN-Waste Vent pip PVC 50 SN-Waste IC-IL= - 1.00 M
PVC 50 to the roof PVC 50
IL= - 0.15 Sewage -Soil IL= - 0.15
I.C FD FD Sewage -Soil
I.C
9 8 7 6 5 3
Vent PVC 50 Vent PVC 50
BALADIA NETWORK
PVC 110
IL= - 0.20
sewage1
PVC 110 50 mm pipe inside
the wall to the shaft
IL= - 0.05
IL=0.30
50 mm pipe inside
the wall to the shaft
sewage1
PVC 110
PVC 110
IL= - 0.20
BALADIA NETWORK 4 2 1
8.50
8.50
8.20
8.20
IL= 0.00
sewage1 sewage1
PVC 110 sewage1 PVC 110
PVC 75
IL= - 0.15
sewage1
PVC 110
Sewage -Soil
Vent PVC 50
50 mm pipe inside
the wall to the shaft FD
IL=0.30
IL=0.30
FD
Vent PVC 50
50 mm pipe inside sewage1
the wall to the shaft Sewage -Soil PVC 110 IL= - 0.15
IL= - 0.12
HANDWASH G006
47.00
0.20
F F
DISH WASHING 004
4.20
4.00
4.20
IL= 0.00
sewage1 sewage1
sewage1
E PVC 110
PVC 75
PVC 110
E
TOILETS
IC-IL= - 1.00 M IC-IL= - 1.00 M
IL= - 0.12 Vent PVC 50 IL=0.30 Vent PVC 50 IL= - 0.12
sewage1 50 mm pipe inside 50 mm pipe inside sewage1
PVC 110 the wall to the shaft IL=0.30 the wall to the shaft Sewage -Soil PVC 110
IL= - 0.15 Sewage -Soil FD FD IL= - 0.15
SN-Waste Vent pip PVC 50 SN-Waste
PVC 110 PVC 110
PVC 50 to the roof PVC 50
4.20
4.00
4.20
D D
N
4.20
4.00
4.00
4.20
0.20
0.20
C C
4.20
4.00
4.20
Sewage -Soil
PVC 110
IL= - 0.05 IL=0.30
IL= 0.05
IL=0.30 IL= - 0.05
Sewage -Soil
PVC 110
DRAINAGE
IC-IL= - 1.00 M SN-Waste Vent pip PVC 50 SN-Waste IC-IL= - 1.00 M
0.20
IL= 0.00
sewage1 sewage1
sewage1
B PVC 110
PVC 75
PVC 110
B
IC-IL= - 1.00 M
IL= - 0.12
sewage1
PVC 110
Vent PVC 50
50 mm pipe inside
IL=0.30
IL=0.30
Vent PVC 50
50 mm pipe inside sewage1
IL= - 0.12
IC-IL= - 1.00 M
GROUND FLOOR
IL= - 0.15 Sewage -Soil
the wall to the shaft FD FD the wall to the shaft Sewage -Soil PVC 110 IL= - 0.15
SN-Waste Vent pip PVC 50 SN-Waste
PVC 110 PVC 110
PVC 50 to the roof PVC 50
4.05
IL= 0.05
4.35
4.35
SN-Waste SN-Waste
4.30 2.10
Rain water
1.50 2.10
Rain water
4.30
PVC 110 PVC 110
A 0.10 A 31/7/2023
0.60 1.10 0.60
0.20 0.65 0.02
0.30
0 0 0
21 20 19 18 17 16 15 14 13 12 11 10' 10
A - B0 7 - 0 0 1
IL= - 1.00 M
SHOP DRAWINGS
Project Name
18 17 16 15 14 13 12 11 10' BALADIA NETWORK
10 Madinah, Saudi Arabia
Slope 1 cm/m
I.C
0.60
1.10 IL= - 0.07
Sewage -Soil
0.60
PVC 110
Slope 1 cm/m
0.10
PVC 110
Sewage -Soil
PVC 110
Sewage -Soil
PVC 50
Vent Pipe
1.40
FD
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m IL=0.15
IL=-0.06
1.00
IL=0.30
IL=0.00 IL=0.00 IL=0.00 IL=0.00 IL=0.00 IL=0.30 SN-Waste
0.10
PVC 50
F.C.O PVC 110 Slope 1 cm/m Slope 1 cm/m Slope 1 cm/m
IL=0.30 SN-Waste
Sewage -Soil
Sewage -Soil
Sewage -Soil
Sewage -Soil
IL=0.00 F.C.O PVC 110 PVC 50
PVC 110
PVC 110
4.00 3.30 8.22SS PVC 110 3.98
PVC 110
PVC 110
Slope 1 cm/m IL=0.15
IL=0.30
Slope 1 cm/m
Slope 1 cm/m
Sewage -Soil
0.20 SN-Waste
0.10
PVC 110
PVC 50
1.40
20 0.20 IL=0.00 IL=0.00 IL=0.00 IL=0.00 IL=0.00
0.20 Vent pip PVC 50
Sewage -Soil
Sewage -Soil Slope 1 cm/m
Vent Pipe
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
PVC 110
PVC 110
PVC 50
SN-Waste
PVC 50 IL=0.15
IL=0.30
IL=0.15 IL=0.15 IL=0.15 IL=0.15
Slope 1 cm/m
Slope 1 cm/m
PVC 50
SN-Waste
PVC 50
PVC 50
PVC 50
PVC 50
SN-Waste
SN-Waste
SN-Waste
SN-Waste
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
Slope 1 cm/m
SN-Waste
PVC 50
IL=0.06 N
PVC 110
sewage1
IL=0.30
3.00
IL=0.00
Slope 1 cm/m Slope 1 cm/m Slope 1 cm/m
IL=0.30
C.O PVC 110
Slope 1 cm/m
0.20
PVC 75
sewage1
PVC 75
sewage1
IL=0.30
IL=0.10
IL=0.30
IL=0.10
0.20
1.50
0.60
P
IL=0.15
IL=0.15 IL=0.15
SN-Waste
PVC 50
0.10 O
4.00 5.60 SN-Waste
PVC 50
SN-Waste
PVC 50 2.55
5.34
SN-Waste SN-Waste
PVC 50 PVC 50
GREASE TRAP
C.O
PVC 110
sewage1
IL=-0.05
N N
sewage1
PVC 110 PVC 110
1.41
IL=0.30
DRAINAGE
IL= +3.0 BLOCK 7
IL=0.10
Rain water KITCHEN G003
IL= + 3.0 PVC 110
IL=0.10 I.C M
0.68
BALADIA NETWORK
17.35
1.02
Vent pip PVC 50 31/7/2023
above the false ceiling Vent pip PVC 50 Slope 1 cm/m
above the false ceiling 1/50 3
0 0 0
IL= + 3.0 IL=0.10
A - B0 7 - 0 0 3
IL=0.10
L
SHOP DRAWINGS
Project Name
Madinah, Saudi Arabia
C.O
PVC 110
sewage1
PVC 110
IL=0.08
Slope 1 cm/m
sewage1 IL=0.30
4.66
IL=0.15
PVC 110
IL=0.15
IL=0.15 PVC 50 PVC 50
Slope 1 cm/m
Slope 1 cm/m
0.20
SN-Waste Slope 1 cm/m
SN-Waste
PVC 50 PVC 50
IL=0.15 IL=0.15
FD
Slope 1 cm/m Slope 1 cm/m
FD FD
IL=0.15 IL=0.15
CHECK THE NORTH
0.20
IL=0.30
Slope 1 cm/m Slope 1 cm/m
SN-Waste SN-Waste
IL=0.15 PVC 50 PVC 50 IL=0.15
N
WastePipe
2.00
IL=0.15
2.50
SN-Waste
2.74
PVC 75
PVC 75 Vent pip PVC 50 DRAINAGE
FD underground BLOCK 7
SN-Waste Slope 1 cm/m
HANDWASH G006
PVC 50
IL=0.13
1/25
A - B0 7 - 0 0 4
0 0
3
0
IL=0.10
IL= +3.0
Rain water SHOP DRAWINGS
Project Name
PVC 110 Madinah, Saudi Arabia
sewage1
PVC 110
6.10
SN-Waste
PVC 50
Slope 1 cm/m
Slope 1 cm/m
WastePipe
PVC 75
IL=0.15
FD FD
SN-Waste
CHECK THE NORTH
0.20 PVC 50
WastePipe
0.20
IL=0.15
PVC 75 N
2.55 DRAINAGE
0.70
SN-Waste BLOCK 7
PVC 50 DISHWASHING G004
PVC 75
C.O
IL=0.15
31/7/2023
1/25 3
5
0 0 0
A - B0 7 - 0 0 5
0.
G Sewage -Soil
PVC 110
Sewage -Soil
PVC 110
SHOP DRAWINGS
Project Name
IL= - 0.05 IL=0.30 IL=0.30
Sewage -Soil Madinah, Saudi Arabia
PVC 110
IL= 0.05
IC-IL= - 1.00 M SN-Waste Vent pip PVC 50 SN-Waste
PVC 50 to the roof PVC 50
IL= - 0.15 Sewage -Soil FD FD
I.C PVC 110 sewage1 Vent PVC 50 IL= - 0.05
PVC 110 50 mm pipe inside
BALADIA NETWORK the wall to the shaft IL=0.30
IL= - 0.20
8.50
8.20
IL= 0.00
sewage1
PVC 110 sewage1
PVC 75
IC-IL= - 1.00 M
IL= - 0.12 Vent PVC 50 IL=0.30
sewage1 50 mm pipe inside
PVC 110 the wall to the shaft IL=0.30
IL= - 0.15 Sewage -Soil FD FD
47.00
0.20
F
CHECK THE NORTH
4.20
4.00
4.00
IL= 0.05
SN-Waste SN-Waste 1/50 3
PVC 50 PVC 50
IL= - 0.05 IL=0.30 IL=0.30 0 0 0
A - B0 7 - 0 0 6
Sewage -Soil Sewage -Soil
PVC 110 PVC 110
BALADIA NETWORK
IL= - 1.00 M SHOP DRAWINGS
IL=0.30 IL=0.30 IL= - 0.05
Sewage -Soil Project Name
PVC 110 Madinah, Saudi Arabia
IL= 0.05
SN-Waste Vent pip PVC 50 SN-Waste IC-IL= - 1.00 M
PVC 50 to the roof PVC 50
FD FD IL= - 0.15
IL= - 0.05 Vent PVC 50 sewage1
Sewage -Soil
PVC 110
I.C
50 mm pipe inside PVC 110
IL=0.30 the wall to the shaft BALADIA NETWORK
IL= - 0.20
8.50
8.20
IL= 0.00
sewage1
sewage1 PVC 110
PVC 75
IC-IL= - 1.00 M
IL=0.30 Vent PVC 50 IL= - 0.12
50 mm pipe inside sewage1
IL=0.30 the wall to the shaft PVC 110
FD FD Sewage -Soil IL= - 0.15
SN-Waste Vent pip PVC 50 SN-Waste PVC 110
PVC 50 to the roof PVC 50
IL= 0.05
SN-Waste SN-Waste
PVC 50 PVC 50
IL=0.30 IL=0.30 IL= - 0.05
0.20 F
CHECK THE NORTH
4.20
IL=0.30 IL=0.30 IL= - 0.05
Sewage -Soil
PVC 110
IL= 0.05
SN-Waste
PVC 50
Vent pip PVC 50
to the roof
SN-Waste
PVC 50
IC-IL= - 1.00 M N
FD FD IL= - 0.15
IL= - 0.05 Vent PVC 50 sewage1
Sewage -Soil
PVC 110
I.C
50 mm pipe inside PVC 110
IL=0.30 the wall to the shaft BALADIA NETWORK
IL= - 0.20
8.20
IL= 0.00
sewage1
sewage1
PVC 75
PVC 110
E DRAINAGE
BLOCK 7
IC-IL= - 1.00 M
IL=0.30 Vent PVC 50 IL= - 0.12 TOILETS 105 - 112
50 mm pipe inside sewage1
IL=0.30 the wall to the shaft PVC 110
FD FD Sewage -Soil IL= - 0.15
SN-Waste Vent pip PVC 50 SN-Waste PVC 110
PVC 50 to the roof PVC 50
4.20
IL= 0.05
SN-Waste SN-Waste 31/7/2023
PVC 50 PVC 50
IL=0.30 IL=0.30 IL= - 0.05 1/50 3
0 0 0
A - B0 7 - 0 0 7
0