Schedule 8A P10 150623
Schedule 8A P10 150623
Schedule 8A P10 150623
Feb 23 13 Feb 23 20 Feb 23 27 Feb 23 6 Mar 23 13 Mar 23 20 Mar 23 27 Mar 23 3 Apr 23 10 Apr 23 17 Apr 23 24 Apr 23 1 May 23 8 May 23 15 May 23 22 May 23 29 May 23 5 Jun 23 12 Jun 23 19 Jun 23 26 Jun 23 3 Jul 23 10 Jul 23 17 Jul 23 24 Jul 23 31 Jul 23 7 Aug 23 14 Aug 23 21 Aug 23 28 Aug 23 4 Sep 23 11 Sep 23 18 Sep 23
Name Start Finish
S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T
1 TIS EPF Rental Services 30/11/22 08:00 26/08/23 17:00
6 Process, Automatic Control System, Instrument and... 30/11/22 08:00 13/12/22 17:00
11 Process Equipment and Device Drawing Design 21/12/22 08:00 14/03/23 17:00
46 Contract Signing with Suppliers (Laike, HBP, Memtech) 21/12/22 08:00 30/12/22 17:00
58 Power System Equipment (GEG and DEG) 20/02/23 08:00 11/05/23 17:00
59 Power System Equipment (GEG and DEG) FAT 15/05/23 08:00 18/05/23 17:00
68 Fire Fighting System and other Local Equipment 26/06/23 08:00 02/07/23 17:00
70 Membrane Separation Skid, API Separator, Flare & I... 10/06/23 08:00 02/07/23 17:00
71 9 Process Skid (including instrument, valves), Conde... 22/06/23 08:00 12/07/23 17:00
72 Automation (cable, auxiliary parts), DEG, PSV 25/06/23 08:00 15/07/23 17:00
75 Place PO with Sub Contractor dan Procurment 14/06/23 08:00 14/06/23 17:00
77 Civil and Foundation Work Including Flowline 07/04/23 08:00 11/08/23 17:00
81 Foundation PE-0401 Membrane Separation Skid 1 ... 07/04/23 08:00 30/06/23 17:00
98 Found of Explosion-Proof Manual Alarm Button 3 unit 27/04/23 08:00 30/06/23 17:00
100 Foundation PE-0701A/B Stabilize Condensate Stor... 27/04/23 08:00 30/06/23 17:00
101 Foundation PE-0702 Stabilize Condensate Loading... 27/04/23 08:00 30/06/23 17:00
109 Foundation PE-01 Produced Water Pump Skid 08/05/23 08:00 30/06/23 17:00
112 Foundation Rooms (Power Distribution, Control ro... 08/05/23 08:00 30/06/23 17:00
114 Foundation Fire Protection Water Tank 08/05/23 08:00 30/06/23 17:00
117 Flowline & Gas sales Pipeline Installation 13/07/23 08:00 19/07/23 17:00
121 Utility and Fire Fighting System 03/07/23 08:00 11/08/23 17:00
122 Install Fire Protection Water Tank 03/07/23 08:00 12/07/23 17:00
125 Install Porta Camp (Power Distribution, Control Ro... 03/07/23 08:00 12/07/23 17:00
130 Install PE-0401 Membrane Separation Skid 03/07/23 08:00 16/07/23 17:00
132 Install PE-0201 Gas-Liquid Separation Skid 16/07/23 08:00 29/07/23 17:00
138 Install PE-0601 Condensate Stabilization Skid 16/07/23 08:00 29/07/23 17:00
139 Install PE-0801 Fuel Gas Skid 16/07/23 08:00 29/07/23 17:00
140 Install PE-0701A/B Stabilize Condensate Storage 16/07/23 08:00 29/07/23 17:00
141 Install PE-0702 Stabilize Condensate Loading Pum... 16/07/23 08:00 29/07/23 17:00
143 Install PE-01 Produced Water Pump Skid 13/07/23 08:00 26/07/23 17:00