QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP
FORM
Field Instrument Installation Final
C2.5B ICF-039A WC W/R (2)
Inspection
FIELD INSTALLATION OF
C3
COMMUNICATION APPARATUSES
GENERAL NOTES
1 THE ENCLOSED ITP’S ARE INDICATIVE AND SHALL BE FOLLOWED FOR DEVELOPING THE JOB SPECIFIC ITP’S FOR
THE WORKS TO BE PERFORMED BY THE CONTRACTOR. THE PROVISIONS INDICATED FOR STAGE WISE INSPECTION BY
TECHNIP AND OWNER (FOR SPECIFIC ACTIVITIES) ARE THE MINIMUM AND THE ENGINEER-IN- CHARGE MAY DECIDE TO
INCREASE HOLD POINTS/ WITNESS POINTS, WHILE APPROVING THE JOB SPECIFIC ITP’S. ACTIVITIES FOR WHICH ITP’S ARE
NOT PROVIDED IN THIS SPECIFICATION. CONTRACTOR TO DEVELOP AND GET THE SAME APPROVED BY TECHNIP/OWNER
BEFORE START OF THE WORK. IN GENERAL ROLE OF TECHNIP HAS BEEN SPECIFIED IN THE DOCUMENT THE ROLE OF
OWNER TO BE SPECIFIED DURING PREPARATION OF SITE SPECIFIC ITP’S.
2 CONTRACTOR TO SUBMIT JOB SPECIFIC REPORTING FORMATS AND JOB PROCEDURES FOR THE JOBS FOR EACH
ACTIVITY LISTED IN THE ITP’S AND SUBMIT TO TECHNIP/OWNER FOR APPROVAL. BEFORE COMMENCEMENT OF THE
ACTIVITY. IF THE CONTRACTOR HAS TO DEVIATE FROM THE GIVEN ITP FOR A VALID REASON, HE SHALL OBTAIN PRIOR
WRITTEN APPROVAL OF TECHNIP/OWNER. CONTRACTOR TO CARRY OUT 100% EXAMINATION OF ALL ACTIVITIES.
NOTES: (1) A COPY OF THE DOCUMENT WILL BE DELIVERED TO COMPANY FOR INFORMATION
(2) TO BE FILED AS PART OF LOOP CHECK FOLDERS
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
Notes: (1) Unpacking shall be verified against individual project data sheet.
REMARKS:
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
QUALITY CONTROL FORM ICF 017A CLIENT INDIAN OIL CORPORATION LIMITED
COMMUNICATION SYSTEM PROJ. No. 080557C001 REV. 0 SH. _1_ OF _3_
CCTV SYSTEM, INTERCOM/PUBLIC ADDRESS SYSTEM
AND TELEPHONE & DATA NETWORK INSTALLATION CONTRACTOR: ICF 017A N° ______
SUMMARY REPORT
GENERAL DATA
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional
Tanks IOCL Paradip Refinery
QUALITY CONTROL FORM ICF 017A CLIENT INDIAN OIL CORPORATION LIMITED
COMMUNICATION SYSTEM PROJ. No. 080557C001 REV. 0 SH. _2_ OF _3_
CCTV SYSTEM, INTERCOM/PUBLIC ADDRESS SYSTEM
AND TELEPHONE & DATA NETWORK INSTALLATION CONTRACTOR: ICF 017A N° ______
SUMMARY REPORT
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC.
(Ref. to QCP 1570.001) Reference CONTR. TECHNIP
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT
Standby SRU & Additional
Tanks IOCL Paradip Refinery
QUALITY CONTROL FORM ICF 017A CLIENT INDIAN OIL CORPORATION LIMITED
COMMUNICATION SYSTEM PROJ. No. 080557C001 REV. 0 SH. _3_ OF _3_
CCTV SYSTEM, INTERCOM/PUBLIC ADDRESS SYSTEM
AND TELEPHONE & DATA NETWORK INSTALLATION CONTRACTOR: ICF 017A N° ______
SUMMARY REPORT
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC.
(Ref. to QCP 1570.001) Reference CONTR. TECHNIP
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional
Tanks IOCL Paradip Refinery
QUALITY CONTROL FORM ICF 038A CLIENT INDIAN OIL CORPORATION LIMITED
INSTRUMENT AIR SUBHEADERS PRESSURE TEST PROJ. No. 080557C001 REV. 0 SH. __1_ OF _1__
INSPECTION REPORT CONTRACTOR: ICF 038A N° ______
GENERAL DATA
INSTRUMENT
SUBHEADER ID.
OR AIR TAP N.
Instruments supplied:
Accepted
INSTALLATION INSPECTION
N.A. ACC.
A- Installation
A1. Support
A2. Installation
B - Connection / wiring
B1. Main air header commissioned
B2. Secondary air header connected
B3. Air distribution to instrument connected
C - Check
C1. Pressure service test with air at 7Kg/Cm2g
C2. Blowing/Tightness
C3. Labelling
D - Final inspection
D1. Final visual inspection
D2. As-built marked up copy updated and available
REMARKS:
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional
Tanks IOCL Paradip Refinery
QUALITY CONTROL FORM ICF 039A CLIENT INDIAN OIL CORPORATION LIMITED
FIELD INSTRUMENT INSTALLATION FINAL PROJ. No. 080557C001 REV. 0 SH. ___1 OF ___1
INSPECTION REPORT CONTRACTOR: ICF 039A N° ______
GENERAL DATA
Instrument TAG:
Serial:
Model:
MR:
P.O.:
P&ID:
Rev:
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC.
(Ref. to QCP 1570.001) Reference CONTR. TECHNIP
1A- Inspection / Check Point
A1. Instrument calibration ICF (*)
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional
Tanks IOCL Paradip Refinery
TYPE OF QUALITY
CERTIFICATION EXTENT
CONTROL REPORT
ICF-016A; ICF-038A “A” Installation
ICF-039A Final Inspection Report
REFERENCE DOCUMENTS:
LEGENDS
H = HOLD (Work Stop for Inspection- RFI required)
W = WITNESS (RFI required)
WC = 100% SUPERVISION AND EXAMINATION BY CONTRACTOR
S = SURVEILLANCE (NO RFI)
R = REVIEW of QC REPORTS
N/A = NOT APPLICABLE
P = PREPARATION
A = DOCUMENT APPROVAL
IFA = ISSUED FOR APPROVAL / AUTHORIZATION
! = WARNING (Control of document revision status)
INFO = FOR INFORMATION
N.A. = NOT ACCEPTED
ACC. = ACCEPTED
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP
FORM
A PRELIMINARY ACTIVITIES
C INSTALLATION
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
NOTES: (1) A COPY OF THE DOCUMENT WILL BE DELIVERED TO COMPANY FOR INFORMATION
(2) TO BE FILED AS PART OF LOOP CHECK FOLDERS
GENERAL NOTES
1 THE ENCLOSED ITP’S ARE INDICATIVE AND SHALL BE FOLLOWED FOR DEVELOPING THE JOB SPECIFIC ITP’S FOR
THE WORKS TO BE PERFORMED BY THE CONTRACTOR. THE PROVISIONS INDICATED FOR STAGE WISE INSPECTION BY
TECHNIP AND OWNER (FOR SPECIFIC ACTIVITIES) ARE THE MINIMUM AND THE ENGINEER-IN- CHARGE MAY DECIDE TO
INCREASE HOLD POINTS/ WITNESS POINTS, WHILE APPROVING THE JOB SPECIFIC ITP’S. ACTIVITIES FOR WHICH ITP’S ARE
NOT PROVIDED IN THIS SPECIFICATION. CONTRACTOR TO DEVELOP AND GET THE SAME APPROVED BY TECHNIP/OWNER
BEFORE START OF THE WORK. IN GENERAL ROLE OF TECHNIP HAS BEEN SPECIFIED IN THE DOCUMENT THE ROLE OF
OWNER TO BE SPECIFIED DURING PREPARATION OF SITE SPECIFIC ITP’S.
2 CONTRACTOR TO SUBMIT JOB SPECIFIC REPORTING FORMATS AND JOB PROCEDURES FOR THE JOBS FOR EACH
ACTIVITY LISTED IN THE ITP’S AND SUBMIT TO TECHNIP/OWNER FOR APPROVAL. BEFORE COMMENCEMENT OF THE
ACTIVITY. IF THE CONTRACTOR HAS TO DEVIATE FROM THE GIVEN ITP FOR A VALID REASON, HE SHALL OBTAIN PRIOR
WRITTEN APPROVAL OF TECHNIP/OWNER. CONTRACTOR TO CARRY OUT 100% EXAMINATION OF ALL ACTIVITIES.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
QUALITY CONTROL FORM ICF 016A CLIENT INDIAN OIL CORPORATION LIMITED
PACKAGE EQUIPMENT INSTRUMENTATION PROJ. No. 080557C001 REV. 0 SH. _1__ OF _1__
SUMMARY REPORT CONTRACTOR: ICF 016A N° ______
GENERAL DATA
TAG: MR: P.O.:
Reference Drawing: Rev.:
Prefabrication status: Loose item Skid mounted
Serial: Model: P&ID:
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC. Reference
(Ref. to QCP 1590.001) CONTR. TECHNIP
1A - Instrument Hook-up Installation
A1. Installation
A2. Material and Rating
A3. Labelling
A4. Support
A5. Air supply
A6. Signal tubing
A7. Power supply
1B - Cables and wiring
B1. Conduits / trays installation
B2. Fastening
B3. Trays painted
B4. Cables installation and connection
B5. Wiring identification and labelling
B6. Shield / armouring grounding check
B7. Spares and spacing
B8. Electrical execution
1C - Junction box / Local Panel
C1. Junction box / Local panel installation
C2. Cables entry
C3. Accessories installed
C4. Sealing
1D – Range and Calibration Check
D1. Ranges and calibration of skid instrumentation (1)
1E - Final inspection
E1. Final visual inspection
E2. As-built marked up copy updated and available
Notes: 1) Unless otherwise required, the field calibrations shall be performed and recorded on the forms relevant to bench test
calibration report
REMARKS :
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
QUALITY CONTROL FORM ICF 038A CLIENT INDIAN OIL CORPORATION LIMITED
INSTRUMENT AIR SUBHEADERS PRESSURE TEST PROJ. No. 080557C001 REV. 0 SH. _1__ OF __1_
INSPECTION REPORT CONTRACTOR: ICF 038A N° ______
GENERAL DATA
INSTRUMENT
SUBHEADER ID.
OR AIR TAP N.
Instruments supplied:
Accepted
INSTALLATION INSPECTION
N.A. ACC.
A- Installation
A1. Support
A2. Installation
B - Connection / wiring
B1. Main air header commissioned
B2. Secondary air header connected
B3. Air distribution to instrument connected
C - Check
C1. Pressure service test with air at 7Kg/Cm2g
C2. Blowing/Tightness
C3. Labelling
D - Final inspection
D1. Final visual inspection
D2. As-built marked up copy updated and available
REMARKS :
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
QUALITY CONTROL FORM ICF 039A CLIENT INDIAN OIL CORPORATION LIMITED
FIELD INSTRUMENT INSTALLATION FINAL PROJ. No. 080557C001 REV. 0 SH. _1__ OF __1_
INSPECTION REPORT CONTRACTOR: ICF 039A N° ______
GENERAL DATA
Instrument TAG:
Serial:
Model:
MR:
P.O.:
P&ID:
Rev:
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC.
(Ref. to QCP 1590.001) Reference CONTR. TECHNIP
1A- Inspection / Check Point
A1. Instrument calibration ICF (*)
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
REFERENCE DOCUMENTS:
LEGENDS
H = HOLD (Work Stop for Inspection- RFI required)
W = WITNESS (RFI required)
WC = 100% SUPERVISION AND EXAMINATION BY CONTRACTOR
S = SURVEILLANCE (NO RFI)
R = REVIEW of QC REPORTS
N/A = NOT APPLICABLE
P = PREPARATION
A = DOCUMENT APPROVAL
IFA = ISSUED FOR APPROVAL
INFO = FOR INFORMATION
! = WARNING (Control of document revision status)
N.A. = NOT ACCEPTED
ACC. = ACCEPTED
Shyamsundar
Govindaraj Subramanian- Kanthalurajan
External Sriram Sankaranarayanan Morischristopher Jesumarian
2019.10.18 10:56:59 2019.10.21 16:02:18 +05'30'
2019.10.18 10:55:26 +05'30' +05'30' 2019.11.01 13:18:02 +05'30'
B LOOP CHECK
1 LOOPS CHECK REPORT 1500.P55 WC W/R
(1): Split of site inspection responsibilities depends from the type of the inspection performed and the Contract requirements
GENERAL NOTES
1 THE ENCLOSED ITP’S ARE INDICATIVE AND SHALL BE FOLLOWED FOR DEVELOPING THE JOB SPECIFIC ITP’S FOR
THE WORKS TO BE PERFORMED BY THE CONTRACTOR. THE PROVISIONS INDICATED FOR STAGE WISE INSPECTION BY TECHNIP
AND OWNER (FOR SPECIFIC ACTIVITIES) ARE THE MINIMUM AND THE ENGINEER-IN- CHARGE MAY DECIDE TO INCREASE HOLD
POINTS/ WITNESS POINTS, WHILE APPROVING THE JOB SPECIFIC ITP’S. ACTIVITIES FOR WHICH ITP’S ARE NOT PROVIDED IN
THIS SPECIFICATION. CONTRACTOR TO DEVELOP AND GET THE SAME APPROVED BY TECHNIP/OWNER BEFORE START OF THE
WORK. IN GENERAL ROLE OF TECHNIP HAS BEEN SPECIFIED IN THE DOCUMENT THE ROLE OF OWNER TO BE SPECIFIED DURING
PREPARATION OF SITE SPECIFIC ITP’S.
2 CONTRACTOR TO SUBMIT JOB SPECIFIC REPORTING FORMATS AND JOB PROCEDURES FOR THE JOBS FOR
EACH ACTIVITY LISTED IN THE ITP’S AND SUBMIT TO TECHNIP/OWNER FOR APPROVAL. BEFORE COMMENCEMENT OF
THE ACTIVITY. IF THE CONTRACTOR HAS TO DEVIATE FROM THE GIVEN ITP FOR A VALID REASON, HE SHALL OBTAIN
PRIOR WRITTEN APPROVAL OF TECHNIP/OWNER. CONTRACTOR TO CARRY OUT 100% EXAMINATION OF ALL ACTIVITIES.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
INSTRUMENTATION &AUTOMATION
FIELD INSTRUMENTS
VISUAL INSPECTION
CONNECTING
CALIBRATION
VENT / DRAIN
LABELING &
DIRECTION
EARTHING
TAGGING
WITNESSING
STAMP
SLOPE
FLOW
SITE
LINE
CONTR. TECHNIP
NOTE
QCR ACCEPTANCE
INSPECTORS CONTRACTOR TECHNIP OWNER
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
NOTE
QCR ACCEPTANCE
INSPECTORS CONTRACTOR TECHNIP OWNER
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
ITEM:_________________ MR/PO:__________________________________________________
OPERATING CONDITION
WITNESSING
REQUIRED CHECKS REMARKS DATE
CONTR. TECHNIP
OPERATING PRESSURE
RESET PRESSURE
BUBBLE TEST
NOTE:
QCR ACCEPTANCE
INSPECTORS CONTRACTOR TECHNIP OWNER
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
DATA SHEET
CONFORMITY WITNESSING
POS. ITEM LINE N° (1) DATE NOTES
YES NO CONTR. TECHNIP
NOTE
(1) Verify as minimum:
a) Tag
b) Stamp for flow direction
c) Material
d) Geometrical dimensions (Internal & external diameter; thickness; )
e) Face-to-Face dimensions (as applicable, e.g., Integral Orifice)
f) Vent / Drain hole (as applicable
QCR ACCEPTANCE
INSPECTORS CONTRACTOR TECHNIP OWNER
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
PRECOMMISSIONING ACTIVITIES:
FIELD INSTRUMENTS – LOOP CHECK CONTRACTOR: 1500.P55 N° ______
REPORT
GENERAL DATA
Unit: System: LOOP No:
Instrument TAG No Instrument Range REMARK
N.A
N.A
REMARKS : CHECK THE TAG HART IN ACCORDANCE WITH THE PROJECT DOCUMENTS AND POSITION OF INSTRUMENT
QCR ACCEPTANCE
INSPECTORS CONTRACTOR TECHNIP OWNER
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
INSPECTION REPORT
TEST
3. TYPE OF INSPECTION ____________________________________ EXAMINATION
CHECK
NOT CONFORMING
WITH REMARKS
5. REMARKS _______________________________________________________________________________
_______________________________________________________________________________
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
TYPE OF QUALITY
CERTIFICATION EXTENT
CONTROL REPORT
ICF-001U “U” Unpacking
ICF-006B “B” Before Installation
ICF-001A; ICF-002A; ICF-006A; “A” Installation
ICF-007A; ICF-010A; ICF-013A
Final Inspection Report
REFERENCE DOCUMENTS:
• 080557C-000-STC-1590-001 Installation Standards
• 080557C-000-JSS-1590-001 Job Specification for Instrumentation Installation Works
• 080557C-000-PP-805 Site Co-ordination
LEGENDS
H = HOLD (Work Stop for Inspection- RFI required)
W = WITNESS (RFI required)
WC = 100% SUPERVISION AND EXAMINATION BY CONTRACTOR
S = SURVEILLANCE (NO RFI)
R = REVIEW of QC REPORTS
N/A = NOT APPLICABLE
P = PREPARATION
A = DOCUMENT APPROVAL
IFA = ISSUED FOR APPROVAL / AUTHORIZATION
! = WARNING (Control of document revision status)
INFO = FOR INFORMATION
N.A. = NOT ACCEPTED
ACC. = ACCEPTED
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP.
FORM
A PRELIMINARY ACTIVITIES
B BEFORE INSTALLATION
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP.
FORM
C INSTALLATION
C2.1C Installation of trays (False Floor and inside Control Room) ICF-007A WC W/R
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP.
FORM
ICF-006B /
C3.1A Instrument Cables Drum Check WC W/R
ICF-006A
C3.1B Cables Installation (False Floor and inside Control Room) ICF-006A WC W/R
C5.1A Support installation (False Floor and inside Control Room) ICF-001A WC W/R
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP.
FORM
C5.2C Battery Check ICF-001A WC W/R
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP.
FORM
C5F.4B Capacitance measurement at Marshalling Cabinet ICF-002A WC W/R
C5F.4D Signal and noise level measurement at Marshalling Cabinet ICF-002A WC W/R
C5F.4E Field end measurement for each device (after download) ICF-002A WC W/R
GENERAL NOTES
1 THE ENCLOSED ITP’S ARE INDICATIVE AND SHALL BE FOLLOWED FOR DEVELOPING THE JOB SPECIFIC ITP’S FOR
THE WORKS TO BE PERFORMED BY THE CONTRACTOR. THE PROVISIONS INDICATED FOR STAGE WISE INSPECTION BY
TECHNIP AND OWNER (FOR SPECIFIC ACTIVITIES) ARE THE MINIMUM AND THE ENGINEER-IN- CHARGE MAY DECIDE TO
INCREASE HOLD POINTS/ WITNESS POINTS, WHILE APPROVING THE JOB SPECIFIC ITP’S. ACTIVITIES FOR WHICH ITP’S ARE
NOT PROVIDED IN THIS SPECIFICATION. CONTRACTOR TO DEVELOP AND GET THE SAME APPROVED BY TECHNIP/OWNER
BEFORE START OF THE WORK. IN GENERAL ROLE OF TECHNIP HAS BEEN SPECIFIED IN THE DOCUMENT THE ROLE OF
OWNER TO BE SPECIFIED DURING PREPARATION OF SITE SPECIFIC ITP’S.
2 CONTRACTOR TO SUBMIT JOB SPECIFIC REPORTING FORMATS AND JOB PROCEDURES FOR THE JOBS FOR EACH
ACTIVITY LISTED IN THE ITP’S AND SUBMIT TO TECHNIP/OWNER FOR APPROVAL. BEFORE COMMENCEMENT OF THE
ACTIVITY. IF THE CONTRACTOR HAS TO DEVIATE FROM THE GIVEN ITP FOR A VALID REASON, HE SHALL OBTAIN PRIOR
WRITTEN APPROVAL OF TECHNIP/OWNER. CONTRACTOR TO CARRY OUT 100% EXAMINATION OF ALL ACTIVITIES.
NOTES: (1) A COPY OF THE DOCUMENT WILL BE DELIVERED TO COMPANY FOR INFORMATION
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
1A - Support Installation
A1. Support installation
A2. Equipment layout alignment and fixing
1B – Internal Connection
B1. Internal wiring done
B2. Internal grounding done
1C – Labelling & internal components Check
C1. Labelling
C2. Internal components identification
1D - Final inspection
D1. Final visual inspection
D2. As-built marked up copy updated and available
2A - IP Installation
A1. Check Ingress Protection (IP) means
2B - Power & Grounding Connection
B1. System cable connected (if any)
B2. Power supply cable connected.
B3. Common grounding connected
B4. Safety grounding connected
2C - Battery Check
C1. Back-up battery check
C2. Readiness for power-on witnessed by vendor specialist
2D - Final inspection
D1. Final visual inspection
D2. As-built marked up copy updated and available
Equipment Types: Traditional Panels and Racks; DCS, PLC, AC (auxiliary cabinets), MC (marshalling cabinets), SIC (special instrument cabinets), EIC
(Electrical/instrument interface cabinets), PS (power supply cabinets), PMC (package manufactured cabinets), Etc…..
REMARKS :
CONTRACTOR
5A - FINAL DOC.
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
Notes: (1) Unpacking shall be verified against individual project data sheet.
REMARKS:
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
1A - Support Installation
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
(+)to(-) signal
B1. Actual=
Expected => 1µF (+/-20%)
(+)to shield
B2. Actual=
Expected <= 300 nF
(-to shield
B3. Actual=
Expected <=300 nF
(+)to ground bar
B4. Actual=
Expected <= 300 nF
(-)to ground bar
B5. Actual=
Expected <= 300 nF
Shield to ground bar
B6. Actual=
Expected <= 300 nF
4C- DC voltage measurement at Marshalling Cabinet (power supply
connected)
C1. (+)to(-) signal Actual=
(+)to(-) signal
D1. Actual las=
Expected = 300÷700 mV
(+)to(-) signal Actual peak noise FF
D2.
Expected <= 75 mV frequencies =
(+)to(-) signal Actual peak
D3.
Expected <= 150 mV noise HF =
(+)to(-) signal Actual peak
D4.
Expected <= 150 mV noise LF =
(+)to(-) signal Actual noise average FF
D5.
Expected <= 75 mV frequencies =
(+)to(-) signal Actual noise
D6.
Expected <= 150 mV average HF =
(+)to(-) signal Actual noise
D7.
Expected <= 150 mV average LF =
REMARKS:
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
REMARKS:
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
(2) C/C, C/G, C/S, C/A, S/A not applicable to FO cables. C/C, C/G, C/S, C/A, A/G in Mega Ohm; S/A in Ohm. A minimum of 2
Mega Ohm insulation resistance is to be guaranteed between conductors/armour and ground.
(6) Multimode: Max attenuation @850nm shall be < 3,50 dB/km each fiber, Max attenuation @1300nm shall be < 1,5 dB/km
each fiber
Single mode: Max attenuation @1310nm and 1550nm shall be < 0,4 dB/km each fiber
(7) OTDR Test printout shall be attached by Subcontractor to this quality form and the Test Data shall be provided Contractor
with electronic media as well
WARNING: Never look directly into the end of an optical fiber. If laser light is present, it can seriously damage
the eye.
REMARKS:
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
1D - Installation of Instrument
D1. Hook up installation complete and sealed
D2. Drains / vents
D3. Cable glands installed and tight
TC / RTD fully inserted with gasket bolts and nuts
D4.
tight
D5. Signal cable and cable tray install.
D6. Wiring and Grounding connection
1E - Check
Instrument installation and maintenance space
E1.
check
HP & LP connections check (including Impulse line
E2.
and slope)
E3. Flow direction check
E4. Cable identification
E5. Wiring identification & connection
E6. Labeling
1F - Final inspection
F1. Final visual inspection (including material & rating)
F2. As-built marked up copy updated and available
REMARKS:
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be used
for any purpose other than that for which it is supplied.
TYPE OF QUALITY
CERTIFICATION EXTENT
CONTROL REPORT
ICF-001U “U” Unpacking
ICF-006B “B” Before Installation
ICF-003A; ICF-004A; ICF-006A; ICF-007A; ICF-008A; “A” Installation
ICF-010A; ICF-014A; ICF-026A; ICF-027A
Final Inspection Report
REFERENCE DOCUMENTS:
LEGENDS
H = HOLD (Work Stop for Inspection- RFI required)
W = WITNESS (RFI required)
WC = 100% SUPERVISION AND EXAMINATION BY CONTRACTOR
S = SURVEILLANCE (NO RFI)
R = REVIEW of QC REPORTS
N/A = NOT APPLICABLE
P = PREPARATION
A = DOCUMENT APPROVAL
IFA = ISSUED FOR APPROVAL / AUTHORIZATION
! = WARNING (Control of document revision status)
INFO = FOR INFORMATION
N.A. = NOT ACCEPTED
ACC. = ACCETPED
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP
FORM
A PRELIMINARY ACTIVITIES
B BEFORE INSTALLATION
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP
FORM
C INSTALLATION
C3 INSTALLATION OF STUB-UP
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP
FORM
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP
FORM
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP
FORM
ICF-006B /
C11.1A Instrument Cables Drum Check WC W/R
ICF-006A
1520-12
C12 INTERMEDIATE SPLICING OF FIBER OPTIC
CABLES
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
QUALITY ACTION
CHECK AND
Nr. CONTROL NOTES
INSPECTION ITEM CONTR. TECHNIP
FORM
GENERAL NOTES
1 THE ENCLOSED ITP’S ARE INDICATIVE AND SHALL BE FOLLOWED FOR DEVELOPING THE JOB SPECIFIC ITP’S FOR
THE WORKS TO BE PERFORMED BY THE CONTRACTOR. THE PROVISIONS INDICATED FOR STAGE WISE INSPECTION BY
TECHNIP AND OWNER (FOR SPECIFIC ACTIVITIES) ARE THE MINIMUM AND THE ENGINEER-IN- CHARGE MAY DECIDE TO
INCREASE HOLD POINTS/ WITNESS POINTS, WHILE APPROVING THE JOB SPECIFIC ITP’S. ACTIVITIES FOR WHICH ITP’S ARE
NOT PROVIDED IN THIS SPECIFICATION. CONTRACTOR TO DEVELOP AND GET THE SAME APPROVED BY TECHNIP/OWNER
BEFORE START OF THE WORK. IN GENERAL ROLE OF TECHNIP HAS BEEN SPECIFIED IN THE DOCUMENT THE ROLE OF
OWNER TO BE SPECIFIED DURING PREPARATION OF SITE SPECIFIC ITP’S.
2 CONTRACTOR TO SUBMIT JOB SPECIFIC REPORTING FORMATS AND JOB PROCEDURES FOR THE JOBS FOR EACH
ACTIVITY LISTED IN THE ITP’S AND SUBMIT TO TECHNIP/OWNER FOR APPROVAL. BEFORE COMMENCEMENT OF THE
ACTIVITY. IF THE CONTRACTOR HAS TO DEVIATE FROM THE GIVEN ITP FOR A VALID REASON, HE SHALL OBTAIN PRIOR
WRITTEN APPROVAL OF TECHNIP/OWNER. CONTRACTOR TO CARRY OUT 100% EXAMINATION OF ALL ACTIVITIES.
NOTES: (1) A COPY OF THE DOCUMENT WILL BE DELIVERED TO COMPANY FOR INFORMATION
(2) TO BE FILED AS PART OF LOOP CHECK FOLDERS
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
Notes: (1) Unpacking shall be verified against individual project data sheet.
REMARKS:
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
1A- Installation
A1. Support installation
A2. JB/LP position & location
A3. Cable glands installed and tight
A4. Spare holes plugged
A5. Protection of LP (Canopy, weather shed)
1B – Connection / wiring
B1. Internal wiring and markers done
B2. Screen connection
B3. Ground connection
1C - Check
C1. Labelling
C2. Cable end identification (single cables and multicables)
C3. Terminal wiring Identification
C4. Components identification
1D - Final inspection
D1. Final visual inspection
D2. As-built marked up copy updated and available
2A - IP Installation
A1. Check Ingress Protection (IP) means
2B - Power & Grounding Connection
B1. System cable connected (if any)
B2. Power supply cable connected.
B3. Common grounding connected
B4. Safety grounding connected
2C – Battery Check
C1. Back-up battery check
C2. Readiness for power-on witnessed by vendor specialist
2D - Final inspection
D1. Final visual inspection
D2. As-built marked up copy updated and available
Equipement Types: Traditional Panels and Racks; DCS, PLC, AC (auxiliary cabinets), MC (marshalling cabinets), SIC (special instrument cabinets),EIC
(Electrical/instrument interface cabinets), PS (power supply cabinets), PMC (package manufactured cabinets), Etc…..
REMARKS :
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
1A- Installation
A1. Support installation
A2. JB/LP position & location
A3. Cable glands installed and tight
A4. Spare holes plugged
A5. Protection of JB (Canopy, weather shed)
1B – Connection / wiring
B1. Internal wiring and markers done
B2. Screen connection
B3. Ground connection
Spur Junction Box Terminator
B4.
Connection
1C - Check
C1. Labelling
Cable end identification (single cables
C2.
and multicables)
C3. Terminal wiring Identification
C4. Components identification
C5. FF Marking
C6. Voltage level at FF JB end
C7. Signal level at FF JB end
1D - Final inspection
D1. Final visual inspection
As-built marked up copy updated and
D2.
available
REMARKS :
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
REMARKS:
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
(2) C/C, C/G, C/S, C/A, S/A not applicable to FO cables. C/C, C/G, C/S, C/A, A/G in Mega Ohm; S/A in Ohm. A minimum of 2
Mega Ohm insulation resistance is to be guaranteed between conductors/armour and ground.
(6) Multimode: Max attenuation @850nm shall be < 3,50 dB/km each fiber, Max attenuation @1300nm shall be < 1,5 dB/km
each fiber
Single mode: Max attenuation @1310nm and 1550nm shall be < 0,4 dB/km each fiber
(7) OTDR Test printout shall be attached by Subcontractor to this quality form and the Test Data shall be provided Contractor
with electronic media as well
WARNING: Never look directly into the end of an optical fiber. If laser light is present, it can seriously damage
the eye.
REMARKS:
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
GENERAL DATA
TAG / identification
Type (see bottom)
Ref. Drawing & rev
Location
MR
INSTALLATION INSPECTION
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC. Reference
(Ref. to QCP 1520.001) CONTR. TECHNIP
1A - Support Installation
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
GENERAL DATA
AREA: ZONE:
SECTION (TRUNK) : DRAWING REF.:
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC. Reference
(Ref. to QCP 1520.001) CONTR. TECHNIP
1A - Stub-up/Conduit concrete base and trench
inspection
A1 Preliminary trench survey inspection for stub-
. up/conduit bed preparation
1B - Stub-up/Conduit installation
B1. Stub-up bending
B2. Stub-up/Conduits installation and cleaning
B3. Stub-up/Conduit fixing and bushings installation
1C – Stub-up/Conduit installation check
C1. Stub-up/Conduits size
C2. Labeling
C3. Ready for backfilling
1D - Final inspection
D1. Final visual inspection
D2. As-built marked up copy updated and available
Note: A key plan showing the location of the cable tray route shall be attached to this form.
REMARKS :
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
(1) Cable installation shall be carried out in accordance with Manufacturer’s instructions
(3) A/G in Mega Ohm. A minimum of 2 Mega Ohm insulation resistance is to be guaranteed between armour and ground.
(6) Multimode: Max attenuation @850nm shall be < 3,50 dB/km each fiber, Max attenuation @1300nm shall be < 1,5 dB/km
each fiber
Single mode: Max attenuation @1310nm and 1550nm shall be < 0,4 dB/km each fiber
(7) OTDR Test printout shall be attached by Subcontractor to this quality form and the Test Data shall be provided Contractor
with electronic media as well
(*) THE QC REPORT N° SHALL BE INDICATED IN THE RELEVANT HERE BELOW SPACES :
WARNING: Never look directly into the end of an optical fiber. If laser light is present, it can seriously damage
the eye.
REMARKS:
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
1A - Installation Results
Preliminary trench survey
inspection for U/G Fiber Optic
A1.
cables splicing on site; bed
preparation check
A2. F.O. Cables marking
A3. F.O. Fibers identification & splicing
A4. Grounding
A5. Bonding
Insulation (Megger) 500
A6. VDC values A/G
see notes (1) (2)
1B - Check Results
B1. Fibers splicing executed
F.O. Termination and connection
B2.
on patch panel
1C - Test Results
C1. Fiber optic cables @850nm
attenuation value MM
C2. @1300nm
in dB/km
C3. @1310nm
See notes (4) (5) SM
C4. (6) (7) @1550nm
Optical length
C5.
See notes (4) (5) (7)
Attenuation point discontinuity
C6.
See notes (4) (5) (7) (8)
Splice attenuation
C7.
See notes (4) (5) (7) (9)
Connector loss (per pair)
C8.
See notes (4) (5) (7) (10)
Connector return loss
C9.
See notes (4) (5) (7) (11)
Total attenuation
C10.
See note (3)
Continuity check
C11.
See note (3)
Polarity check
C12.
See note (3)
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
(2) A/G in Mega Ohm. A minimum of 2 Mega Ohm insulation resistance is to be guaranteed between armour and ground.
(3) Measures with Attenuation Test Set (Source + Optical power meter)
(6) Multimode: Max attenuation @850nm shall be < 3,50 dB/km each fiber, Max attenuation @1300nm shall be < 1,5 dB/km
each fiber
Single mode: Max attenuation @1310nm and 1550nm shall be < 0,4 dB/km each fiber
(7) OTDR Test printout shall be attached by Subcontractor to this quality form and the Test Data shall be provided Contractor
with electronic media as well
(10) Connectors loss (per pair) shall be <0,75 dB on 100% and <0,5dB on 95%
WARNING: Never look directly into the end of an optical fiber. If laser light is present, it can seriously damage
the eye.
REMARKS:
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
TYPE OF QUALITY
CERTIFICATION EXTENT
CONTROL REPORT
ICF-001U “U” Unpacking
ICF-005A; ICF-011A; ICF-012A; ICF-013A; “A” Bench Test & Installation
ICF-015A; ICF-020A; ICF-022A; ICF-023A;
ICF-028A; ICF-029A; ICF-034A; ICF-036A;
ICF-037A; ICF-038A
ICF-039A Final Inspection Report
REFERENCE DOCUMENTS:
• 080557C-000-STC-1590-001 Installation Standards
• 080557C-000-JSS-1590-001 Job Specification for Instrumentation Installation Works
• 080557C-000-PP-805 Site Co-ordination
LEGENDS
H = HOLD (Work Stop for Inspection- RFI required)
W = WITNESS (RFI required)
WC = 100% SUPERVISION AND EXAMINATION BY CONTRACTOR
S = SURVEILLANCE (NO RFI)
R = REVIEW of QC REPORTS
N/A = NOT APPLICABLE
P = PREPARATION
A = DOCUMENT APPROVAL
IFA = ISSUED FOR APPROVAL / AUTHORIZATION
! = WARNING (Control of document revision status)
INFO = FOR INFORMATION
N.A. = NOT ACCEPTED
ACC. = ACCEPTED
Sriram
Govindaraj Subramanian-
External
Shyamsundar Kanthalurajan Sankaranarayanan Morischristopher Jesumarian
2019.10.18 10:40:11 +05'30' 2019.10.21 16:06:43
2019.10.14 16:43:46 +05'30' 2019.11.01 13:20:58 +05'30'
+05'30'
A PRELIMINARY ACTIVITIES
B UNPACKING
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
C5 LEVEL GAUGES
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
C8 TANK -GAUGING
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
C9 LEVEL SWITCHES
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
GENERAL NOTES
1 THE ENCLOSED ITP’S ARE INDICATIVE AND SHALL BE FOLLOWED FOR DEVELOPING THE JOB SPECIFIC ITP’S FOR
THE WORKS TO BE PERFORMED BY THE CONTRACTOR. THE PROVISIONS INDICATED FOR STAGE WISE INSPECTION BY TECHNIP
AND OWNER (FOR SPECIFIC ACTIVITIES) ARE THE MINIMUM AND THE ENGINEER-IN- CHARGE MAY DECIDE TO INCREASE HOLD
POINTS/ WITNESS POINTS, WHILE APPROVING THE JOB SPECIFIC ITP’S. ACTIVITIES FOR WHICH ITP’S ARE NOT PROVIDED IN
THIS SPECIFICATION. CONTRACTOR TO DEVELOP AND GET THE SAME APPROVED BY TECHNIP/OWNER BEFORE START OF THE
WORK. IN GENERAL ROLE OF TECHNIP HAS BEEN SPECIFIED IN THE DOCUMENT THE ROLE OF OWNER TO BE SPECIFIED DURING
PREPARATION OF SITE SPECIFIC ITP’S.
2 CONTRACTOR TO SUBMIT JOB SPECIFIC REPORTING FORMATS AND JOB PROCEDURES FOR THE JOBS FOR EACH
ACTIVITY LISTED IN THE ITP’S AND SUBMIT TO TECHNIP/OWNER FOR APPROVAL. BEFORE COMMENCEMENT OF THE ACTIVITY.
IF THE CONTRACTOR HAS TO DEVIATE FROM THE GIVEN ITP FOR A VALID REASON, HE SHALL OBTAIN PRIOR WRITTEN
APPROVAL OF TECHNIP/OWNER. CONTRACTOR TO CARRY OUT 100% EXAMINATION OF ALL ACTIVITIES.
NOTES: (1) A COPY OF THE DOCUMENT WILL BE DELIVERED TO COMPANY FOR INFORMATION
(2) TO BE FILED AS PART OF LOOP CHECK FOLDERS
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
Notes: (1) Unpacking shall be verified against individual project data sheet.
REMARKS:
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall
not be used for any purpose other than that for which it is supplied.
Output signal:
Accuracy:
Mode (Analogue/Digital):
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC. Reference
(Ref. to QCP 1530.001) CONTR. TECHNIP
1A- Check Results
A1. Instrument supply
A2. Overrange protection
A3. Zero suppression
A4. Zero elevation
1B- Signal Calibration Results
B1. 0% Output signal/ Error:
B2. 25% Output signal/ Error:
B3. 50% Output signal/ Error:
Input Signal
2D - Installation of Instrument
Hook up installation including diaphragm seal (as
D1.
applicable) complete and sealed
D2. Drains / vents
D3. Cable glands installed and tight
TC / RTD fully inserted with gasket bolts and nuts
D4.
tight
D5. Signal cable and cable tray install.
D6. Wiring and Grounding connection
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
1A - Mechanical Installation
A1. Diameter and dimensions
A2. Material and rating
A3. Position and location check
A4. Flow direction check
A5. Up- stream and down-stream diameter check
1B - Electrical connection
B1. Cable glands installed and tight
B2. Cable and wiring check
1C - Pneumatic connection
C1. Air supply and signal tubing installation and test
C2. Air supply distribution installation and test
1D - Final inspection
D1. Final visual inspection
D2. As-built marked up copy updated and available
Notes: (1) Valid for all on line flow instruments, such as Vortex, Magnetic Flow Meters, Coriolis, Ultrasonic, Target, Integral Orifices, Transmitter, Rotameter etc.
Including also Orifice Plates, Annubar, Restriction Orifices, Venturi Tubes etc.
REMARKS :
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not
be used for any purpose other than that for which it is supplied.
1D - Installation of Instrument
D1. Hook up installation complete and sealed
D2. Drains / vents
D3. Cable glands installed and tight
D4. Availability of personnel safety equipment (like dosimeter)
D5. Procedure for safe handling of source during installation
D6. Signal cable and cable tray install.
D7. Wiring and Grounding connection
Alignment of flanges, visibility of gauges and orientation of
D8.
instrument
1E - Check
E1. Instrument installation and maintenance space check
E2. HP & LP connections check (including Impulse line and slope)
Flow direction check / Flow requirements of cooling medium (if
E3.
required)
Type of illuminators for Transparent type Level Gauges suitable
E4.
to area classification
E5. Cable identification
E6. Wiring identification & connection
E7. Labeling
1F - Final inspection
F1. Final visual inspection (including material & rating)
F2. As-built marked up copy updated and available
REMARKS :
INSPECTORS CONTRACTOR TECHNIP OWNER
DOC. REVIEW
1G - FINAL
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be used
for any purpose other than that for which it is supplied.
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
Node Address:
F.F
Output signal:
Accuracy:
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC. Reference
(Ref. to QCP 1530.001) CONTR. TECHNIP
1A-Check Results
A1. Instrument supply
A2. Overrange protection
A3. Zero suppression
A4. Zero elevation
1B- Signal Calibration Results
B1. 0% Output signal/ Error:
B2. 25% Output signal/ Error:
B3. 50% Output signal/ Error:
Input Signal
2D - Installation of Instrument
Hook up installation including prefabricated hook up,
D1.
diaphragm seal (as applicable) complete and sealed
Drains / vents (vent / drain connection on drip ring for
D2.
diaphragm seal type instruments)
D3. Cable glands installed and tight
D4. TC / RTD fully inserted with gasket bolts and nuts tight
D5. Signal cable and cable tray install.
D6. Minimum operating voltage at field transmitter
D7. Wiring and Grounding connection
REMARKS :
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional Tanks
IOCL Paradip Refinery
2E - Check
E1. Instrument installation and maintenance space check
HP & LP connections check (including Impulse line and
E2.
slope)
E3. Flow direction check
Correctness of range, rating, immersion length (U
E4.
length) as per data sheets / P&IDs
E5. Visibility & orientation of gauges
E6. Tightness of studs / nuts
E7. Cable identification
E8. Wiring identification & connection
E9. Labeling
2F - Final inspection
F1. Final visual insp. (including material & rating)
F2. As-built marked up copy updated and available
Notes: (1) Displacer level instrument, transmitters, transducers, pressure gauges, indicators, etc....
REMARKS :
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional Tanks
IOCL Paradip Refinery
REMARKS :
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional Tanks
IOCL Paradip Refinery
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional Tanks
IOCL Paradip Refinery
Output signal:
Accuracy:
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC. Reference
(Ref. to QCP 1530.001) CONTR. TECHNIP
1A-Check Results
A1. Reset (set at):
A2. Derivative (set at):
A3. Prop. band (set at):
A4. Action (DIR / REV)
1B- Signal Calibration Results
B1. 0% Output signal/ Error:
B2. 25% Output signal/ Error:
B3. 50% Output signal/ Error:
Input Signal
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional Tanks
IOCL Paradip Refinery
REMARKS :
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional Tanks
IOCL Paradip Refinery
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional Tanks
IOCL Paradip Refinery
Node Address:
F.F
Output signal:
Accuracy:
INSPECTIONS / CHECK Report / INSPECTOR SIGNATURE & DATE
N.A. ACC. Reference
(Ref. to QCP 1530.001) CONTR. TECHNIP
1A-Check Results
A1. Instrument supply
A2. Overrange protection
A3. Zero suppression
A4. Zero elevation
1B- Signal Calibration Results
B1. 0% Output signal/ Error:
B2. 25% Output signal/ Error:
B3. 50% Output signal/ Error:
Input Signal
2D - Installation of Instrument
D1. Hook up installation complete and sealed
D2. Drains / vents
D3. Cable glands installed and tight
D4. TC / RTD fully inserted with gasket bolts and nuts tight
D5. Signal cable and cable tray install.
D6. Wiring and Grounding connection
REMARKS :
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional Tanks
IOCL Paradip Refinery
REMARKS :
NAME
SIGNATURE
DATE
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional Tanks
IOCL Paradip Refinery
1A - Inspection
A1. Visual witnessing of ball/plug position
A2. Correct supply setting (Pneumatic/Electrical)
A3. Stroking time (On-off valves)
Position action on signal rise
A4.
Increase Decrease
Air failure action or electrical failure action
A5.
Fail open (FO) Fail closed (FC) Fail hold (FH)
A6. Electrical classification
Valve seat leakage test according to ANSI/FC
A7.
70-2
Required seat leakage class according to valve D/S:
Test results values:
A8. Power supply voltage solenoid valve
A9. Output signal position transmitter
Required air supply pressure (Bar) solenoid
A10.1
valve
A10.2 Required air supply pressure (Bar) booster relay
A11.1 Housing protection (IP) position transmitter
A11.2 Housing protection (IP) solenoid valve
A11.3 Housing protection (IP) limit switches
A11.4 Housing protection (IP) booster relay
A12. Solenoid valve type: way or other
A13. Solenoid valve nr. of coils
Solenoid valve de-energized to air fail action:
A14.
Yes No
Limit switch position:
A15.
Open Close
Limit switches contact type:
A16.
SPST SPDT DPDT
REMARKS :
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization
PROJECT Standby SRU & Additional Tanks
IOCL Paradip Refinery
1B - Calibration Results
B1. 0%
B2. 25%
B3. 50%
Input Signal
Positioner
B4. 75%
B5. 100%
B6. 75%
B7. 50%
B8. 25%
B9. 0%
B10. 0%
Valve Stroke Position
B11. 25%
B12. 50%
Input Signal
B13. 75%
B14. 100%
B15. 75%
B16. 50%
B17. 25%
B18. 0%
1C- Final Inspection
C1. Final visual inspection
C2. As-built marked up copy updated and available
2A- Installation
A1. Equipment installed property
A2. Flow direction check
A3. Accessories complete
A4. Remote panel installed
A5. Air receiver tank installed
2B - Connection
B1. Cable glands installed and tight
B2. Cable and wiring checks
B3. Air supply distribution and signal tubing installation
2C - Check
C1. Diameter and dimensions
C2. Material and rating
C3. Leak test
2D - Final inspection
D1. Final visual inspection
D2. As-built marked up copy updated and available
REMARKS :
This document is developed by TECHNIP India Limited and the information it contains is property of Indian Oil Corporation Ltd. It shall not be
used for any purpose other than that for which it is supplied.
CONFIDENTIAL – Not to disclose without Authorization