DETAILS OF TENDERS AWARDED (more than Rs. 1 crore value) upto 21.06.

2023
Whether
No. & name of the Value of the
Mode of Date of Type of bidding No. of contract
Last date of parties not Contract No. and Name of contract (In Schedule date of
S.No. Tender No Item/Nature of work tender publication of Single/Two bid tender awarded to
tender receipt qualified after date contractor crore) completion
enquiry NIT system received lowest
tech. evaluation (Rs.)
tenderer

Engagement of Contractor for


M/s P. C. S.
Outsourcing of Secretarial and
E-tender GEMC- FINTEC
MUM/South/HR/ Support Manpower Services at
1 (through Gem 05/11/2022 Two Bid System 26/11/2022 117 97 Yes 511687779710742 CONSULTAN 4.45 30/04/2025
MPP-OS/630 Offices in the Jurisdiction of
Portal) dated 13-04-2023 CY PRIVATE
CGM/South/Mumbai Unit of
LIMITED
DFCCIL

M/s R R Gupta
GEMC- & Sons
DFCC/Noida
E-tender 511687718096252
Unit/Tender/ Manpower outsourcing services for Rs.
2 (through Gem 12/01/2022 Two Packet 22/01/2022 128 122 Yes 23/21-C, Back 31/03/2024
hiring of DFCCIL Noida Unit 33266666.16
Portal) Gen Date - side East
Manpower/2022
30.03.2022 Patel Nagar,
New Delhi-08

M/s ANJ
Turnkey
Projects
Private Limited
Complete Interior Fitout works
- Mumbai
such as Flooring, Wall & Celling Letter No: WDFC
02
finishes, Partioning, Wood work,, FIELD UNIT- NOIDA-
CGM-DFC- E-tender 112/D, Rs.
Plumbng, Electrical, HVAC, Low CIVIL/CGM-DFC- 12 months from date
3 NOIDA-INT-2022- (through 18/02/2022 Two Packet 05/04/2022 4 i) M/s DEE-VEE Yes Kandivali Govt. 97,62,10,594.7/-
Voltage & other anciliary works for NOIDA-INT-2022- of issue of LOA
01 IREPS) Projects Ltd Industrial (incl 18% GST)
under construction DFCCIL CO 01/10494320055482
ii) M/s LABOTEK Estate,
Building complex at Sec- 145, dated 03.06.2022
Hindustan
Noida
Naka,
Kandivali
West, Mumbai-
400067

M/s Krishna
Refrigeration-
Lucknow

Sandhyapuri
Supply , erection, testing and LOA no: WDFC
Colony,
commissioning of 33KV Field Unit: Noida-
DFCC-NOIDA- Krishna Tower, Rs.
Substation, DG Set and related Electrical/DFC-Noida- 9 months from date of
4 ELECT-SUBSTN- E-tender 22.02.2022 Two Packet 21.03.2022 2 Nill Yes Plot no 5, 17,06,08,872.27
works for DFCCIL Integrated office Elect-Substn- start
02 Khsra No (incl 18% GST)
cum Residential Complex at Sec 02/01183020054427
1151, Opposite
145, Noida dated 13.05.2022
New High
Court Gate No -
4 , ISM,
Lucknow, UP
226016

08 nos.

1. Lisha Engg Pvt Ltd M/s Himalaya


Supply, erection, testing and
2. Umesh traders Generators
Commissioning of 33KV D/C LOA No.
3. GEPDEC Infratech Rs.
DFCCIL-NOIDA- Underground Electric Line from DFCC/Noida
4. K.V. Prateak D-248, Sector- 40437343.10
5 LINE-02 on UPPTCL 400 KV Substation, Sec- E-tender 22.02.2021 2 Packet 30.03.2021 17 nos. Yes Unit/Electrical/Line/2 9 months
Enterprise 10, Noida (incl GST @
IREPS Portal 148, Noida to DFCCIL Integrated 021/02/4922 dtd
5. M Tec. 201301. 18%)
Office cum Residential Complex at 23.07.2021
6. K3 Construction Mob.
Sec-145, Noida
Company 9213113324
7. MMJ Construction
8. Bhagat Engg.

04 Nos.

1. M/s Tuaman Engg


M/s Anubhavi
Ltd
Supply, erecting, testing and LOA No. Constructions
2. Ms Ravinder
DFCC-Noida- commissioning 33KV substation, DFCC/Noida Rs.
Kumar Contractor
6 Elect-Substation- DG set and related work for DFCIL E-tender 04.01.2021 2 Packet 11.02.2021 18 nos. Yes unit/Elect/Substation 171, Abulane, 107828028.12/- 9 months
3. M/s K3
01 integrated office cum residential /2021/01/Pt-II 4728 Phuwara (incl GST)
Construction
complex at sector- 145, Noida dated 09.06.2021 Chowk, Merrut -
Company
250001 (UP)
4. M/s MMJ
Constructions

CPM/DFCCIL/N M/s Himcon


03 nos.
OIDA Engineers Pvt.
Construction of Heavy Haul LOA No.:
UNIT/TENDER/ Ltd.
Research Institute (HHRI) 1. MASTER CAD DFCC/Noida
CONSTRUCTIO Rs. 29-04-2021 (18
comprising of Administrative & 02-08-2019 SOLUTIONS Unit/Contract/Constr
7 N OF HEAVY E-tender 01.07.2019 Two Packet system 7 nos. Yes B-115, Sector- 29,00,95,827.78 months from date of
Hostel Block and General Lab upto 15:00 hrs 2. LISHA uction of HHRI
HAUL 67, Noida - /- + GST extra LOA)
including related Allied Facilities at ENGINEERS PVT. Complex/ 2933
RESEARCH 201307.
sector - 145, Noida LTD dated 30.10.2019.
INSTITUTE Ph: 0120-
3. KJP Projects (JV)
(HHRI)/2019/03 2484494

M/S Krishna
Refigeration &
CGM/DFCCIL/N Interior Fitout works such as False LOA No. DFCC/
Sakshi
oida Unit/ interior ceiling, Partitioning, ood work, Noida Unit/ Tender/
1 no. Builders (JV), 9 months
Fitout Works/ Electrical, HVAC, IT, Furniture & Interior Fitout Rs
from date of issuance
8 HHRI & CTP 14 other allied works for under E-tender 15.11.2021 Two Packet 14.12.2021 5 nos. Yes works/HHRI & 2nd 147203776.66/-
M/s Sanmul 3rd floor, of
Office Building/ construction DFCCIL, HHRI floor of CTP-14 Off./ (incl 18% GST)
Construction Pvt Ltd Krishna Tower, LOA
Sec-145/ Noida/ Building Complex and 2nd floor of 5665 dated
Faizabad Rd,
2021/05 CTP-14 office at sector-145, Noida 20.01.2022
Lucknow -
226016

M/s BEE PEE


Supply, Erection, Testing and REW
LOA No. DFCC/
Commissioning of 33Kv Sub- Consortium
DFC-NOIDA- Noida Unit/ Elect/ Rs.
station, DG Set and related works After 9 months from
9 ELECT-SUBSTN- E-tender 06.09.2021 Two Packet 30.09.2021 5 nos. Nil Yes Substation/2021/255 145646177.38/-
for DFCCIL Integrated Office cum D-5, Site A, date of start
05 /5626 dated (incl 18% GST)
Residential Complex at Sec-145, Industrial Area,
05.01.2022
Noida Mathura-
281004
Balance portion of work for “Supply
of towers & line materials and
erection, testing & commissioning
work for diversion of two numbers
of 220 KV double circuit
WDFC FIELD UNIT-
transmission lines (owned by M/s
MUMBAI-SOUTH-
AEML), to facilitate the passage of AARVANSS
ELECTRICAL/MUM-
MUM/S/EL/239/ rail track being constructed by the BUILDWELL
Two Packet Bid S-EL-239-UTILITY-
10 Utility/77/AEML-L- Dedicated Freight Corridor IREPS 11.09.2021 04.10.2021 5 2 Yes AND 16.07 Cr. 21.03.2022
(Open E-Tender) 77-AEML-L-
1/2021 Corporation of India Limited INFRACON
I/10606520043618/1
(DFCCIL) at four different crossing LLP-
0/2021 dated
locations near Village Aagvan GHAZIABAD
08/02/2022
(Dahanu Taluka), Village Shirgaon
(Vasai Taluka); near Village
Bilalpada (Vasai Taluka) & near
Village Gokhivare (Vasai Taluka) in
Maharashtra”.

MUM/N/EN/Servi
ce Road of M/s Niyati
Two packet open E
11 ROBs/ LC- Service road of ROB E Tender 24.02.2021 25.03.2021 8 2 Yes To be signed Construction 8.26 cr 22.01.2022
Tender
66&68, dated: Company
24.02.2021
LC
MUM/N/EN/ROB
/LC-104 / Two packet open E M/s R C Patel
12 ROB E Tender 03.02.2021 09.03.2021 10 1 Yes Signed 36.84 cr 31.12.2022
0091765003818 Tender Unjha
1 dated
10/07/2021
LC
MUM/N/EN/ROB
M/s Ansari
/LC-96 / Two packet open E
13 ROB E Tender 03.02.2021 09.03.2021 12 3 Yes Signed Erectors 37.33 cr 31.12.2022
0083594003818 Tender
Ahmedabad
2 dated
10/07/2021
LC
Two packet open E M/s Rachna
14 MUM/N/EN/ROB ROB E Tender 17.03.2020 24.07.2020 6 1 Yes To be signed 39.05 cr 25.03.2022
Tender Costruction
/LC-100 / 698

LC M/s. RKM-
Two packet open E
15 MUM/N/EN/ROB ROB E Tender 11.04.2020 25.06.2020 6 1 Yes To be signed Maheshwari 41.05 cr 25.03.2022
Tender
/LC-49 (JV), Mumbai

LC
Two packet open E M/s Meher-
16 MUM/N/EN/ROB ROB E Tender 18.09.2019 23.10.2119 3 1 Yes To be signed 34.55 cr 08.12.2021
Tender SSG (JV)
/LC-99 / 698

LC M/s. Apex
Two packet open E
17 MUM/N/EN/ROB ROB E Tender 26.09.2019 14.11.2019 3 0 Yes Signed Tarmac – Guru 45.83 Cr 21.11.2021
Tender
/LC-70 / 698 (JV)

LC M/s. Ranjit
Two packet open E
18 MUM/N/EN/ROB ROB E Tender 26.09.2019 14.11.2019 3 0 Yes Signed Buildcon Ltd., 44.26 Cr 12.09.2021
Tender
/ LC-67 /697 ADI

MUM/N/HR/Outs M/s A & S


Single packet open
19 ource/571 Dtd. Outsourcing Staff E Tender 30.04.2019 22.05.2019 4 3 Yes Signed Outsourcing 3.10 Cr.. 30.06.2021
E Tender
30.04.2019 Mumbai

MUM/N/EN/Majo
r/Important M/s. Royal
Two packet open E
20 Bridges/Package- PKG-IV for SOMA E Tender 22.07.2019 04.09.2019 2 1 Yes Signed Infraconstru 84.99 Cr. 31.12.2021
Tender
IV, dated Limited,
18.07.2019

MUM/N/EN/Majo
r/Important M/s. Rajasthan
Two packet open E
21 Bridges/Package- PKG- VI (A) for SOMA E Tender 23.07.2019 05.09.2019 1 0 Yes Signed Construction 11.24 Cr. 30.06.2021
Tender
VI(A), dated Pvt. Ltd.,
20.07.2019
MUM/N/EN/Majo
r/Important M/s. Landmark
Two packet open E
22 Bridges/Package- PKG-VI for SOMA E Tender 23.07.2019 05.09.2019 1 0 Yes Signed Corporation 14.88 Cr. 30.06.2021
Tender
VI, dated Pvt. Ltd.,
20.07.2019
MUM/N/EN/Majo
r/Important
Two packet open E M/s. Meher
23 Bridges/Package- PKG-II for SOMA E Tender 24.04.2019 24.06.2019 4 1 Yes Signed 53.01 Cr. 30.06.2021
Tender Foundation
II, dated
23.04.2019
MUM/N/EN/Majo
r/Important
Two packet open E M/s. Relcon-
24 Bridges/Package- PKG-V for SOMA E Tender 24.04.2019 25.06.2019 1 0 Yes Signed 75.16 Cr. 30.06.2021
Tender Vitrag (JV)
V, dated
23.04.2019

MUM/N/EN/Majo
r/Important
Two packet open E M/s. MMC,
25 Bridges/Package- PKG-III for SOMA E Tender 24.04.2019 24.06.2019 1 0 Yes Signed 61.60 Cr. 31.05.2021
Tender Gandhidham
III, dated
23.04.2019
MUM/N/EN/Majo
r/Important
Two packet open E M/s. MMC,
26 Bridges/Package- PKG-I for SOMA E Tender 02.04.2019 11.05.2019 1 0 Yes Signed 48.15 Cr. 31.05.2021
Tender Gandhidham
I, dated
29.03.2019
LC
M/s. Manglam
MUM/N/EN/ROB Two packet open E
27 ROB E Tender 04.12.18 04.01.19 3 0 Yes Signed Buildcon, 75.14 21.09.2021
/LC-66/ Vol.- Tender
Ankleshwar
I/542
LC
M/s. Manglam
MUM/N/EN/ROB Two packet open E
28 ROB E Tender 04.12.18 04.01.19 3 0 Yes Signed Buildcon, 50.49 21.09.2021
/LC-68/ Vol.- Tender
Ankleshwar
I/541

LC M/s Rakesh
Two packet open E
29 MUM/N/ROB/LC- ROB E Tender 30.11.17 15.05.18 1 0 Yes Signed Construction 39.03 31.07.2021
Tender
106 / Vol.-I/355 Company

LC M/s. Manglam
Two packet open E
30 MUM/N/ROB/LC- ROB E Tender 14.11.17 01.01.18 1 0 Yes Signed Buildcon, 37.33 31.12.2021
Tender
97 / Vol.-I/354 Ankleshwar

M/s.
MUM/N/ROB/LC Two packet open E
31 ROB E Tender 14.11.17 02.01.18 1 0 Yes Signed ManglamBuildc 32.84 31.07.2021
– 92 / Vol.-I/352 Tender
on, Ankleshwar

MUM/N/EN/ROB
MUM/N/EN/ROB/LC-
/LC-42, 48 & Two packet open E Sai project Pvt
32 ROB E Tender 13.10.17 16.11.17 2 1 Yes 42, 48 & 52 Dtd. 35.18 30.06.2021
52/438 Dtd. Tender Ltd
13.12.2017
29.01.18
MUM/N/EN/ROB MUM/N/EN/ROB/LC- M/s Meher
Two packet open E
33 /LC-114 -115 ROB E Tender 28.11.17 08.01.18 1 0 Yes 114&115/Vol.I/398 –SSG (JV) – 38.10 Cr. 31.12.2021
Tender
Dtd. 16.11.17 Dt. 12.03.18 Mumbai

MUM/N/EN/ROB MUM/N/EN/ROB/LC- M/s Meher


Two packet open E
34 /LC-111 Dtd. ROB E Tender 04.11.17 19.12.17 1 0 Yes 111/Vol.I/384 Dt. –SSG (JV) – 39.55 Cr. 31.03.2022
Tender
30.10.17 12.03.2018 Mumbai
Rakesh
MUM/N/EN/ROB
Two packet open E Contract agreement construction
35 /LC-118 Dtd. ROB E Tender 08.06.17 23.10.17 2 0 Yes 32.94 Cr. 31.07.2021
Tender signed company
22.01.18
Mehsana

MUM/N/EN/ROB M/s Meher


Two packet open E Contract agreement
36 /LC-130 Dtd. ROB E Tender 23.03.17 08.05.17 2 0 Yes –SSG (JV) – 26.20 Cr. 30.04.2021
Tender Signed
09.03.17 Mumbai
MUM/N/EN/ROB AB
Two packet open E Contract agreement
37 /LC-46A & ROB E Tender 01.02.17 08.03.17 1 0 Yes infrastructure 25.31 Cr 31.12.2021
Tender to be signed
61/351 Pvt. Ltd.
Rakesh
MUM/N/EN/ROB Two packet open E Contract agreement construction
38 ROB E Tender 25.10.16 09.12.16 2 0 Yes 31.49 Cr. 31.05.2021
/LC-124 /266 Tender Signed company
Mehsana
Rakesh
MUM/N/EN/ROB Two packet open E Contract agreement construction
39 ROB E Tender 26.10.16 02.12.16 3 0 Yes 33.72 Cr 30-06-2021
/LC-137 /282 Tender Signed company
Mehsana

MUM/N/EN/ROB MUM/N/EN/ROB/LC-
Through E AB
/LC-55, 60 & Two packet open E 55, 60 &
40 ROB E Tender 27.07.16 30.08.16 tender-2 1 Yes infrastructure 27.50 Cr 30.06.2021
64/OT/417/AB/1 Tender 64/OT/417dt.
Physical -3 Pvt. Ltd.
dt.02.12.16 13.01.17

1. Lead
Partner: SKN
Haryana City
Gas
Distribution
Pvt. Ltd. Joint
Venture with
(Second
Partner):
ARSS
Development of Logistic
Infrastructure License for
Parks/Freight Terminals/ LOA no. N/A
Projects 30 Years +
HQ-OPBD0BD Parcel Terminals and Open HQOPBD0BD( (Rail
41 30/11/2020 Single bid 15/02/2021 Three Nil N/A Limited 3 years
(PR OC)/7/2020 their connectivity with Tender PR Connectivity
2. International gestation
DFC stations through OC)/7/2020 to PFT)
Cargo period
private investment
Terminals
and
Infrastructures
of India
(Private)
Limited
3. Adani Ports
and Special
Economic
Zone Limited

Consultancy & related Services for the


preparation of Detailed Project
Report(DPR), inclusive of Preliminary
alignment development, optimization Aarvee
of Alignment, Final location survey Associates,
NIT no- (FLS) including Geo Technical survey, Date of Award-04-12-
Architects,
2020/HQ/EN/PW Geological mapping & Hydrological 2020
Engineers &
C/Future Survey, preparation of Land Plans on LOA No-
Revenue Maps and also, inclusive of
Consultant Pvt
Corridor/RFP/DP HQ/EN/WC/PWC(D
study for 2X25 KV Electrification, Ltd
R dated 16-03- Consultancy PR)/1/2020
study for Signaling catering to ETCS- Yes, #8-2-5,
2020 Contract [Computer no-216]
2, Study for Communication, all Consultancy Ravula
QCBS System dated 04-12-2020 15 months from the
discipline [e.g. Civil, Electric & S&T] Contract Residency,
42 Open 04/05/2020 E Tender [Tender 07/10/2020 7 Nil 379351153.7 date of
Quantity and Cost estimation, awarded to Srinagar
RFP No.- Environmental and Social impact Wizard] Contract Agreement commencement
best ranked Colony Main
2020/HQ/EN/PW Study , Maintenance study & Traffic Single Stage Two No. HQ/EN/PWC
Consultant Road,
C/Future study-FIRR & EIRR, Market demand Pacaket system (DPR)/2020/6105/1
Hyderbad-
Corridor/RFP/DP survey, Cost Benefit analysis, Study Package-1-East
500082,
R/Package-1 regarding intermodal Transport Coast/Aarvee dated
Telengana,
dated 04-05- Integration for New Dedicated Freight 04-02-2021
Corridor; India;
2020

(i) East-Coast Corridor comprised of


Section- Kharagpur to Vijayawada
(1115 RKM*)’-[Package-1]
*-Length indicative
Consultancy & related Services for the
preparation of Detailed Project
Report(DPR), inclusive of Preliminary
alignment development, optimization
of Alignment, Final location survey
(FLS) including Geo Technical survey, Aarvee
Geological mapping & Hydrological Associates,
NIT no- Date of Award-04-12-
Survey, preparation of Land Plans on Architects,
2020/HQ/EN/PW 2020
Revenue Maps and also, inclusive of Engineers &
C/Future LOA No-
study for 2X25 KV Electrification, Consultant Pvt
Corridor/RFP/DP study for Signaling catering to ETCS- HQ/EN/WC/PWC(D
Ltd
R dated 16-03- 2, Study for Communication, all Consultancy PR)/1/2020
Yes, #8-2-5,
2020 discipline [e.g. Civil, Electric & S&T] Contract [Computer no-216]
Consultancy Ravula
Quantity and Cost estimation, QCBS System dated 04-12-2020 18 months from the
Contract Residency,
43 Environmental and Social impact Open 04/05/2020 E Tender [Tender 07/10/2020 5 Nil 604718303.3 date of
Study , Maintenance study & Traffic
awarded to Srinagar
RFP No.- Wizard] Contract Agreement commencement
study-FIRR & EIRR, Market demand best ranked Colony Main
2020/HQ/EN/PW Single Stage Two No. HQ/EN/PWC
survey, Cost Benefit analysis, Study Consultant Road,
C/Future Pacaket system (DPR)/2020/6105/2
regarding intermodal Transport Hyderbad-
Corridor/RFP/DP Package-2-East
Integration for New Dedicated Freight 500082,
R/Package-2 West/Aarvee dated
Corridor; Telengana,
dated 04-05- 04-02-2021
India;
2020 (i) East-West Sub Corridor comprised
of sub Corridors-Bhusaval-Nagpur-
Kharagpur- Dankuni (1673 RKM*)
and sub Corridor -Rajkharswan-
Kalipahari-Andal-(195 RKM*)’-
[Package-2]

Consultancy & related Services for the


preparation of Detailed Project
Report(DPR), inclusive of Preliminary
alignment development, optimization
of Alignment, Final location survey Aarvee
(FLS) including Geo Technical survey, Associates,
NIT no- Geological mapping & Hydrological
Date of Award-04-12- Architects,
2020/HQ/EN/PW Survey, preparation of Land Plans on
2020 Engineers &
C/Future Revenue Maps and also, inclusive of
study for 2X25 KV Electrification,
LOA No- Consultant Pvt
Corridor/RFP/DP
study for Signaling catering to ETCS- HQ/EN/WC/PWC(D Ltd
R dated 16-03- Consultancy
2, Study for Communication, all Yes, PR)/1/2020 #8-2-5,
2020 Contract
discipline [e.g. Civil, Electric & S&T] Consultancy [Computer no-216] Ravula
QCBS System 15 months from the
Quantity and Cost estimation, Contract dated 04-12-2020 Residency,
44 Open 04/05/2020 E Tender [Tender 07/10/2020 6 Nil 336681638.7 date of
Environmental and Social impact awarded to Srinagar
RFP No.- Study , Maintenance study & Traffic Wizard] commencement
best ranked Contract Agreement Colony Main
2020/HQ/EN/PW study-FIRR & EIRR, Market demand Single Stage Two
Consultant No. HQ/EN/PWC Road,
C/Future survey, Cost Benefit analysis, Study Pacaket system
(DPR)/2020/6105/3 Hyderbad-
Corridor/RFP/DP regarding intermodal Transport
Package-3-North 500082,
R/Package-3 Integration for New Dedicated Freight
South/Aarvee dated Telengana,
dated 04-05- Corridor;
04-02-2021 India;
2020
(i) North-South sub Corridor
comprised of Section- Vijayawada-
Nagpur - Itarsi (975 RKM*)’[Package-
3]
*-Length indicative
M/s Isha
Protectional
Security Guard
Pvt.Ltd F.No. S-
Yes
Bid No. Human Resource GEMC- 3, Plot No.275,
(Randomly Rs.
45 GEM/2020/B/667 Outsourcing/Technical Manpower GeM 13.06.2020 Single Bid system 04.07.2020 18 Nil 511687793867938 Subhag Home, 16.08.2022
selected by 2,59,02,305.40
115 Service Date: 17.08.2020 Sarvadharam
GeM)
Colony, A-
Sector, Kolar,
Bhopal-
462042.

Balance works of Design, Supply,


Construction, Testing and
Commissioning of Signalling,
IFB No.: Telecommunication and LOA No.: Consortium of
Open Tender DFCCIL Website: Single Stage Two 600 Days from the
HQ/S&T/EC/D- Associated Works of Double Track HQ/S&T/EC/CP- Siemens Ltd.
(National 21.08.2020 Packet System INR date of
46 B/DDU-BPUN, Railway Lines under Construction 29.10.2020 3 Nil Yes 203R/Bid and KEC
Competitive Newspapers: without pre- 4949800000/- Commencement of
dated: on a Design-Build Lump Sum Eval./62(2), dated International
Bidding) 25.08.2020 qualification Works
21.08.2020 Basis for Deen Dayal Upadhyay – 23.11.2020 Ltd.
New Bhaupur Section of Eastern
Dedicated Freight Corridor
(Contract Package 203R)

Engagement of Contractor for


MUM/S/HR/Man
Outsourcing of Secretarial and MUM/S/HR/Manpow M/s.A&S
p ower 1 & M/s.CIS Bureuos 24 months from the
Support Manpower Services at E-Open er OS/Secretarial Outsourcing Rs.
47 OS/Secretarial 08.01.2020 Single 06.02.2020 5 Facilities Services Yes date of
Offices in the Jurisdiction of Tender Support Solutions, 3,22,46,065.00
Support Pvt.Ltd commencement
CGM/South/Mumbai Unit of Services/560 Mumbai
Services/560
DFCCIL

Design, Supply, Construction,


installation, Testing and
02 Nos.
Commissioning of 2x25 KV AC First Stage Bid:
ICB No: Electrification ,Signalling & 08.06.2017 LOA No:
Open Tender First Stage Bid: First Stage: 06 1.Consortium of 900 Days from the
HQ/SYS/EC/D- telecommunication, E&M and Pre-Qualification HQ/SYS/EL/EC/Sec
(International 12.06.2018 Bids. Second Siemens Ltd., India L&T-KYOSAN INR date of
48 B/Sahnewal- Associated Works on Design Build Second Stage followed by Two Yae o nd stage bid CP-
Competitive Second Stage Stage: Siemens S.A, Spain Consortium 738,10,00,000/- Commencement of
Pilkhani dated Lump Sum basis for Sahnewal- Bid: Letter of Stage Bidding 304 dated
Bidding) Bid: 24.12.2019 02 Bids. and Siemens AG, Works
08.06.2017 Pilkhani Section(approximately 175 Invitation issued 23.04.2020
Germany
route KM of Single Line) of Eastern on 14.11.2019
2.KPTL-STS JV
Dedicated Freight Corridor (
Contract Package-304)

Design, Supply, Construction,


installation, Testing and
First Stage Bid: 02Nos.
Commissioning of 2x25 KV AC
14.05.2018
ICB No: Electrification ,Signalling & LOA No:
Open tender First Stage Bid: First Stage: 06 1.Consortium of 900 days from the
HQ/SYS/EC/D- telecommunication, E&M and Pre- Qualification HQ/SYS/EL/EC/Sec
(International Second Stage 30.11.2018 Bids. Second Siemens Ltd, India, L&T-KYOSAN INR date of
49 B/Khurja-Pilkhani Associated Works on Design Build Followed by Two Yes o nd stage bid CP-
Competitive Bid Second Stage Stage: Siemens SA, Spain, Consortium 790,75,00,000/- commencement of
dated Lump Sum basis for Khurja- Stage Bidding 305 dated
bidding) : Letter of Bid: 24.12.2019 02 Bids. and Siemens AG, works
14.05.2018 Pilkhani Section(approximately 220 23.04.2020
Invitation issued Germany
route KM of Single Line) of Eastern
on 14.11.2019 2. KPTL-STS JV.
Dedicated Freight Corridor (
Contract Package-305)

Design, Manufacturing, Supply,


Testing, Commissioning and Date of Award-04-11-
Bid invitation
Training of Plant and Equipment 2019
notification no- Open, in terms Single Stage Two
for Railway Track and Electric Over to be executed by
50 2017/HQ/EN/PW of JICA 01/12/2017 Envelope Bidding 17/12/2018 Two Nil Yes Mitsui & Co. 1158.61 -
Head Equipment (OHE) on Dadri- the
C/ PE P-6 dated Guidelines (Post PQ)
Rewari-JNPT Network of Western Parties up to 31-07-
01-12-2017)
Dedicated Freight Corridor-Plant 2020
And Equipment WorksPackage – 6

Design, Supply, Construction,


Installation, Testing and
02 Nos.
Commissioning of 2 x 25 kV AC
First Stage Bid:
ICB No.: Electrification, Signalling &
Open Tender 14.06.2017 First Stage: 06 1. Consortium of LOA No.: 640 Days from the
HQ/SYS/EC/D- Telecommunication, E&M and Pre-Qualification
(International Second Stage First Stage Bid: Bids. Second Siemens Ltd., India HQ/S&T/EC/DER- L&T-Kyosan INR date of
51 B/Dadri-Khurja, Associated Works on Design-Build followed by Two Yes
Competitive Bid: Letter of 15.03.2018 Stage: Siemens S.A, Spain KRJ/Eval./91/Part V, Consortium 2699400000/- Commencement of
dated: Lump Sum Basis for Dadri-Khurja Stage Bidding
Bidding) Invitation issued 01 Bid and Siemens AG, dated 23.04.2020 Works
14.06.2017 Section (approximately 47 route
on 14.11.2019 Germany
km of Double Line) of Eastern
2. KPTL-STS JV
Dedicated Freight Corridor
(Contract Package 105)

Complete interior and services


CGM/DFCCIL/N
work flooring partitioning, false
OIDA UNIT/ LOA No.- DFCC/ M/S Intermarc
celling, plumbing, electrical, HVAC,
Interior and NOIDA Unit/ Rs.
Communication cabling etc for Single Stage 01
Services/ Development of 1191-A, Arjun 3,95,34,026/-
52 Ground floor and renovation of E tender 20/12/2019 Two- packet 21/01/2020 6 nos Yes 06 months
Renovation/DFC additional space/ Nagar, Kotla (including GST
common and executive toilets at system M/s Agni Ltd
CIL HQ Building/ File- II/ 3341 dated Timber Market, @ 18% )
3rd, 4th and 5th floor of DFCCIL
Pragati maidan/ 19.02.2020. New Delhi-03.
HQ Building at Pragati Maidan ,
2019/04
New Delhi

Date of Award-04-11-
Design , Manufacturing, Supply,
2019
Testing, Commissioning and
LOA No-
Training of Plant and Equipment
2017/HQ/EN/PW Open, in terms 2019/HQ/EN/PWC/T 54 months from the
for Railway Track and Electric Bidding with post Mitsui & Co.
53 C/ PE P-6 dated of JICA 01/12/2017 17/12/2018 2 Nil Yes echnical 1158.61 date of
Overhead Equipment (OHE) on qualification Ltd
01-12-2017 Guidelines Evaluation/PE P- commencement
Dadri-Rewari-JNPT Network of
6/Pt-I(FMTS-
Western Dedicated Freight
201901212) dated:
Corridor
04-11-2019
No. 3
1. B.S.N. Infotech
Pvt. Ltd.
HQ/HR/5/ Engagement of Manpower 2. Capital M/s G.A.
HQ/HR/5/
Tender/CO/Hirin Service Provider for outsourcing of E-Open Outsourcing and Digital and
54 16.01.2019 Single 05.2.2019 8 YES Tender/CO/Hiring of Rs. 5,49,35,400/- 31.03.2021
g of Secretarial and Support Services Tender MGT Services Pvt. Web World
Manpower/2018
Manpower/2018 in DFCCIL, New Delhi. Ltd. Pvt. Ltd.
3. Firstman
Management
Services Pvt. Ltd.

M/s
No. 2
ASHIRBAD
1. M/s Avia Xpert (P) HQ/Admin/Tender/H
HQ/Admin/Tend Engagement of Housekeeping HOUSEKEEPI
E-Open Ltd., New Delhi. ousekeeping Rs.
55 er/Housekeeping Services for DFCCIL's Corporate 19.03.2018 Single 12.04.2018 5 YES NG 31.07.2020
Tender 2. M/s Das Services/17 dtd. 3,13,97,750.60/-
Services/17 Office, New Delhi. SERVICES
Restaurant, Jaipur, 02.07.2018
PVT. LTD.,
Rajasthan.
NEW DELHI.

M/S VIVEK
HQ/AD/VEHICLE
HQ/AD/VEHICL Hiring of Vehicles for DFCCIL E-Open No. 1 (M/s S. A. TRAVELS Rs.
56 15.06.2018 Single 23.07.2018 5 YES TENDER-2018 dtd. 14.10.2020
E TENDER-2018 Corporate Office, New Delhi. Tender Travels) PVT. LTD., 7,42,05,896.66/-
08.10.2018
NEW DELHI.
E-Limited M/s 3097/Rang
Security & Allied Services for the Tender HQ/AD/Security Nath Rai
HQ/AD/Security YES (As per Rs.
57 DFCCIL Corporate Office, New *(from DGR 17.11.2016 Single 01.12.2016 1 Nil Services/2, dtd. Security 31.12.2020
Services/2 DGR Norms) 7,01,75,039.00/-
Delhi. sponsered 29.12.2016 Agency, New
Agencies) Delhi.

M/s Price
Waterhouse
Coopers Pvt.
Ltd. in Joint
Venture with
M/s PWC
Strategy & (I)
EOI Publication in
RFP issued to Pvt. Ltd., M/s
HQ/OP&BD/HEA Consultancy Services for New Papers - EOI followed by HQ/OP &
Short listed Hamburg Port
VY Development of Marketing and 24.08.2014 & Selection of BD/HEAVYHAUL/D
58 Consultants in 20.01.2015 4 NIL YES Consulting Rs. 9,61,01,189/- 15.12.2019
HAUL/DMCSD/R Commercial Strategies for DFCCIL 26.08.2014. On Consultants on MCSD/RFP/2014,
response to GmbH,
EP/2014 and its Catchment Areas (DMCSD) Website - QCBS System dtd. 06.10.2015
EOI Germany and
28.08.2014
M/s
UNICONSULT
Universal
Transport
Consulting
GmbH,
Germany

M/s CPCS
Transcom
International
Ltd.
RFP No. HQ/OP (Barbados) in
RFP issued to EOI Publication in
& EOI followed by HQ/OP & Joint Venture
Consultancy Services for Short listed New Papers -
BD/HEAVYHAU Selection of BD/HEAVYHAUL/IS with CPCS Rs. Extension is
59 Institutional Stregthening Module of Consultants in 17.08.2014. On 16.04.2015 2 NIL YES
L/ISMD/RFP/201 Consultants on MD/RFP/2014 (2), Transcom Ltd. 6,96,82,371.56/- under process
DFCCIL (ISMD) response to Website -
4 (2)/ QCBS System dtd. 22.09.2015 (Canada) Suit
EOI 19.08.2014
(201500742) G6, Welches
Plaza,
Welches, St.
Michael,
Barbodos

SAP-ERP System Upgrade,


HQ/IT/OEM/SAP_01
HQ/IT/OEM/SAP Stabilization, Application Managed M/s SAP India Pvt. M/s SAP India
60 Single Tender 15/05/2019 Single bid system 29/05/2019 1 Yes /29052019 dated 20.53 Cr. 30/09/2024
_01/29052019 Services & Cloud Delivery on Ltd. Pvt. Ltd.
26/09/2019
HANA Enterprise Cloud.

Rs. 2,47,55,688/-
CGM / DFCCIL / LOA No: (Rupees Two
Noida Unit / Open E- DFCC/Noida Crore Forty
Hiring of Commercial Vehicles for
Hiring of Tender, ‘“Two Two Packet Unit/Hiring of M/s Vivek Seven Lakh Fifty
61 official use of CGM/DFCCIL/Noida 08/05/2019 07/06/2019 4 1, M/s Amrita Travels Yes 31/08/2021
Commercial Packet System Commercial Travels Pvt Ltd Five Thousand
Unit for a period of two years.
Vehicle/ 2019/ System”. Vehicles/2019/01 Six Hundred
01 dated 16.08.2019 Eighty Eight
Only)

The tender is
Gian P Mathur
Project Management Consultancy for LOA No.
& Associates
CGM/DFCCIL/N (PMC) Services for constructio of a 2 Nos. consultancy DFCC/Noida Unit/
Pvt. Ltd. Rs. 4.752
oida Corporate Office Building Complex Single Stage Two services and Revised/PMC 36 Months (extended
62 E-Tender 25/02/2019 09/04/2019 9 Crores + GST
Unit/PMC/CO and Heavy Haul Institute (HHRI) Packet System 1. UPRNN is based on Tender/ CO Building by 6 months)
C-55, East of applicable
Building/2019/01 with GRIHA 5 Star Rating at Sector 2. RINA India Pvt Ltd CQCCBS & HHRI/ 2649 dated
Kailash, New
-145, Noida. System 29.07.2019
Delhi - 110065
(70:30)

CPM/ DFCCIL/
NOIDA UNIT/ LOA No: M/S KCC-HRC-
CONSTRUCTIO Construction of DFCCIL Corporate DFCC/Noida Unit/ GPPL (JV), E-
Open E-Tender
N OF DFCCIL Office Building including Related Contract/ 6o, Sector-51,
63 Online 30/06/2018 (Single Stage Two 07/08/2018 5 Nill Yes 368560676.8 30/04/2020
CORPORATE Allied Facilities at Noida under Construction of CO Noida, Uttar
Packet system)
OFFICE CPM/Noida. Complex/1805 Pradesh-
BUILDING/2018/ Dated 01/10/2018 201301
01

M/S BC-VGS
Infra JV (M/S
Shifting and Commissioning of Binod
Three Phase Double Circuit 132 construction
KV NCR Transmission line in 01 LOA NO Industrial
CPM/MTC/DFCC
connection with proposed DFCCIL M/s MAN Structural CPM/MTC/DFCCIL/ estate Kokar
IL/132KV NCR
64 ALIGNMENT at BORAKI, WEIR, Open Tender 10/12/2015 Double Bid System 13/01/2016 2 Pvt. Ltd. P.B.No. Yes 132KV NCR Tr. Ranchi-834001 7.19 Crore 43830
Tr. Line/OT/2015-
DANKAUR, AND KHURJA in 189, Near Loco, Line/OT/2015-16 & VGS
16
Khurja-Dadri section in the Jaipur (Rajasthan) dated 26.04.2016 Infrastructure
Jurisdiction of Chief Project Pvt. Ltd 140-B,
Manager/DFCCIL/Meerut unit Pocket-F, GTB
Enclave Delhi-
110093).

"Rendering Services of
Housekeeping including
M/s G.A.
Stenographer/PA, Auto-Cad
Digital Web
Operator, Office Assistants,
LOA NO Word Pvt. Ltd.
CPM/MTC/Manp Attendants/Peons, Dak
CPM/MTC/Manpowe No. 1
65 ower Office/2017- Courier/Dafaiwala, field men, round Open Tender 05/11/2017 Single bid system 07/12/2017 1 Nill Yes 1.32 Cr. 43861
r Office/2017-18/OT Hargobind
18/OT the clock office safety/security
dated 30.01.2018 Enclave, Vikas
watch & Ward service, in the office
Mark Extn.,
under jurisdiction of CPM/Meerut,
Delhi-110092
Dedicated Freight Corridor
Corporation of India Limited."

Aarvee
Associates
EOI Publication:
Architects
DFCCIL website- EURO 154,664/-
Engineers &
05.03.2018 (exclusive of
Engineering Consultancy Services Consultants
RFP No.: News Papers- 01 local indirect
for Train Protection and Warning RFP issued to Pvt. Ltd.-India
HQ/S&T/EC/Pro 10.03.2018 Single Stage Rina Consulting HQ/S&T/EC/Proc./T taxes)
System Works in Dadri-Khurja- shortlisted (Lead
c./TPWS/GC/DE UNDB website: Bidding from S.p.A., Italy in Joint PWS/GC/DER-KRJ- & 18 months after the
66 Bhaupur-Allahabad-Mughalsarai- consultants in 15.11.2018 3 Yes Member) in
R-KRJ-SEB & 06.03.2018 shortlisted Venture with Barsyl, SEB & KRJ-SNL INR 18,283,300/- Commencement Date
Sonnagar and Sahnewal-Pilkhani- response to Joint Venture
KRJ-SNL dated RFP Publication: consultants India. Dated 29.03.2019 (exclusive of
Khurja Sections of Eastern EOI. with Ingenieria
28.08.2018 28.08.2018 (sent local indirect
Dedicated Freight Corridor y Economia del
to shortlisted taxes)
Transporte
consultants)
S.M.E.M.P.,
S.A.-Spain
(INECO)
2. M/s- Max vigil
security expert Pvt.
Ltd. Ahmedabad
3. M/s- A.B.
enterprise.
4. M/s- G.A. digital
DFC/ADI/ web world Pvt. Ltd. DFCC/ ADI/
M/s-Komal
Manpower 5. M/s- Vital Facilities Manpower Hiring/
67 Engagement of manpower service Open tender 21.06.2018 Single bid 26.07.2018 8 Yes Enterprise. - 16,385,002 19.12.2020
hiring/01/ 2018- Pvt. Ltd. 01/ 2018-19 dtd.
Mehsana.
19 6. M/s- Prolific Infra 20.12.2018
Pvt. Ltd.
7. M/s- Gujarat
Enterprise.
8. M/s- Gujarat
Infotech Ltd.
MGS/3/2017- MGS/3/2017-2018/4-
Construction of 04 ROBs (41, 46, E-Tender Single Stage-Two M/s Woodhill-
68 2018/4- 20.09.2017 23.10.2017 2 M/s REW-GIPL (JV) Yes ROB/Bihar/205 50.54 17.10.2019
49, 50) (Open Tender) Packed Rahee (JV)
ROB/Bihar/205 dated 18.04.2018

MGS/08/2018- MGS/08/2018-
M/s Lion
19/ROB- E-Tender Single Stage-Two M/s PEMS & M/s 19/ROB-PMC/SEB-
69 PMC for Construction of ROB 01.06.2018 04.07.2018 8 Yes Engineering 8.61 07.03.2020
PMC/SEB- (Open Tender) Packed RINA Consultant MGS/209 dated
Consultants
MGS/209 08.09.2018
MGS/07/2018-
MGS/07/2018- Construction of 04 ROBs E-Tender Single Stage-Two M/s Woodhill-HMM M/s REW-JCL
70 01.06.2018 03.07.2018 2 Yes 2019/4-ROB/02 66.35 9.03.2020
2019/4-ROB/02 (36,74,76, 83) (Open Tender) Packed (JV) (JV),
dated 10.09.2018
MGS/EN/11/2018-
MGS/EN/11/201 M/s M.G.
Construction of 03 ROBs E-Tender Single Stage-Two NIL 19/LC/3-
71 8-19/LC/3- 09.07.2018 30.08.2018 3 Yes Contractor Pvt. 97.37 31.03.2020
(38,39,40) (Open Tender) Packed All 3 Bidders qualified ROB/Bihar/275
ROB/Bihar/275 Ltd.
dated 01.10.2018
MGS/EN/09/2018-
MGS/EN/09/201 M/s Jhajhariya-
Construction of 04 ROBs (41, 46, E-Tender Single Stage-Two Royal Infraconstru 19/LC/41-46-49-
72 8-19/LC/41-46- 09.06.2018 10.07.2018 2 Yes Shresthabhish 101.53 04.04.2020
49, 50) - Approach portion (Open Tender) Packed Ltd. 50/Bihar/273 dated
49-50/Bihar/273 ek (JV)
05.10.2018

MGS/EN/10/2018-
MGS/EN/10/201 M/s Jhajhariya-
E-Tender Single Stage-Two Royal Infraconstru 19/LC/52-II &
73 8-19/LC/52-II & Construction of 02 ROBs (52/II, 55) 18.06.2018 20.07.2018 2 Yes Shresthabhish 79.52 04.04.2020
(Open Tender) Packed Ltd. 55/Bihar/274 dated
55/Bihar/274 ek(JV)
05.10.2018

MGS/EN/12/2018-
MGS/EN/12/201
E-Tender Single Stage-Two NIL 19/LC-42 & M/s Jhajhariya-
74 8-19/LC-42 & Construction of 02 ROBs (42, 45) 24.07.2018 28.08.2018 1 Yes 76.01 10.04.2020
(Open Tender) Packed 1 Bidders qualified 45/Bihar/276 dated Galvano (JV)
45/Bihar/276
11.10.2018

MGS/EN/18/2018-
MGS/EN/18/201 M/s Lakho
Construction of 03 ROBs (52, 54, E-Tender Single Stage-Two 19/LC-52-54- M/s Jhajhariya-
75 8-19/LC-52-54- 14.09.2018 15.10.2018 3 Sathyendra-SP Malik Yes 101.81 29.04.2020
57) (Open Tender) Packed 57/Bihar/282 dated Galvano (JV)
57/Bihar/282 (JV)
30.10.2018

MGS/EN/16/2018-
MGS/EN/16/201
Construction of 03 ROBs (35, 37, E-Tender Single Stage-Two 19/LC-35-37- M/s Jhajhariya-
76 8-19/LC-35-37- 31.08.2018 05.10.2018 2 Nil Yes 90.5 30.04.2020
48) (Open Tender) Packed 48/Bihar/280 dated Galvano (JV)
48/Bihar/280
31.10.2018
MGS/EN/15/2018-
MGS/EN/15/201
Construction of 02 ROBs (61, E-Tender Single Stage-Two 19/LC-61-62- M/s Jhajhariya-
77 8-19/LC-61-62- 24.08.2018 24.09.2018 2 Nil Yes 67.66 30.04.2020
62/63) (Open Tender) Packed 63/Bihar/279 dated Galvano (JV)
63/Bihar/279
31.10.2018

MGS/EN/17/201 MGS/EN/17/2018- UP State


8-19/LC-70, 71, Construction of 05 ROBs E-Tender Single Stage-Two M/s Jhajharia- 19/LC-70, 71, 75, 76 Bridge
78 08.09.2018 10.10.2018 3 Yes 51.08 14.05.2020
75, 76 & (70,71,75,78,81) (Open Tender) Packed Galvano(JV) & 81/UP/281 dated Corporation
81/UP/281 15.11.2018 Ltd.

MGS/EN/19/2018-
MGS/EN/19/201 M/s M.G.
Construction of 03 ROBs (64, 66, E-Tender Single Stage-Two 19/LC-64-66-
79 8-19/LC-64-66- 01.10.2018 31.10.2018 2 Nil Yes Contractor Pvt. 108.19 15.05.2020
67) (Open Tender) Packed 67/Bihar/283 dated
67/Bihar/283 Ltd.
16.11.2018

MGS/EN/13/2018-
MGS/EN/13/201
E-Tender Single Stage-Two 19/LC-47 M/s Woodhill-
80 8-19/LC-47 Construction of 02 ROBs (47, 53) 24.07.2018 27.08.2018 2 Nil Yes 70.8 25.05.2020
(Open Tender) Packed &53/Bihar/277 dated Rahee (JV)
&53/Bihar/277
26.11.2018
MGS/EN/19/2018-
MGS/EN/19/201
19/GAQ RFO &
8-19/GAQ RFO E-Tender Single Stage-Two NIL M/s C&C-ESM
81 Construction of RFO 01.11.2018 11.12.2018 3 Yes Balance SEB- 124.16 30.06.2020
& Balance SEB- (Open Tender) Packed All 3 Bidders qualified (JV)
MGS/288 dtd
MGS/288
01.01.2019
Construction of DFC side
MGS/EN/RUB/A HQ/EN/RUB/BBU/17
approaches of RUB/LHS at LC No. E-Tender Single Stage-Two M/s HV
82 pproaches/172/3 28.12.2016 27.01.2017 2 M/s Sushil Kumar Yes 2/1 dated 14.03 25.04.2019
35, 37, 44, 48, 51, 52, 54, 57, 58, (Open Tender) Packed Infratex Ltd.
/2016 08.06.2017
64, 65, 66, 67, 77 & 79
M/s Riya
MGS/EN/RUB/BBU/
MGS/EN/RUB/B Construction of RUB/LHS at BBU Tender (Open Single Stage-Two Builders and
83 06.06.2016 20.07.2016 1 NIL Yes 172/1 dated 4.99 31.12.2018
BU/172/1 yard between SEB-MGS section Tender) Packed Developers
15.05.2017
Pvt. Ltd
MGS/02/2017-
MGS/02/2017- Consultancy services for M/s Park
E-Tender Single Stage-Two NIL 2018/ROB/DRG-
84 2018/ROB/DRG- Development and Preparation of 28.09.2017 10.11.2017 5 Yes Project 4.07 05.07.2019
(Open Tender) Packed All 5 Bidders qualified Design/204 dated
Design/204 GAD of 14 nos. ROBs Consultancy
05.01.2018

DFCC/MGS/Hiring of
DFCC/MGS/Hirin Providing of manpower services for M/s RAW One
E-Tender Single Stage- NIL Manpower
85 g of Manpower the office of CPM/Mughalsarai at 10.11.2017 12.12.2017 6 Yes Security 1.37 25.02.2020
(Open Tender) Single Packed All 6 Bidders qualified Services/6/2017
Services/6/2017 Varanasi Services
dated 22.02.2018

MGS/EN/Track- MGS/EN/Track- M/s Anadi


Maintenance of track between E-Tender Single Stage- NIL
86 Maint/1/2017 09.03.2017 10.04.2017 2 Yes Maint/1/2017 (R3) Kishore 2.61 19.12.2019
SSM - DGO (Open Tender) Single Packed All 2 Bidders qualified
(R3) dated 19.12.2017 Pranami

Design, Supply, Construction,


Installation of 2x25 kV
Nil
Electrification, Signalling &
(All three bidders
Telecommunication and
HQ/SYS/EC/D- qualified
Associated Works Including
B/MGS- Prequalificatio 1. M/s TATA Projects-
Testing and Commissioning for single stage-two HQ/EL/SYS/D-
DGO&KWDN- n followed by Texmaco (JV)
Double Track Electrified Railway packets bidding B/MGS-SEBN (EX. M/s Larsen &
87 CPBH-SEBN single stage- 29.12.2017 20.04.2018 3 2. M/s Siemens Yes INR 481.00 Crs 19.11.2020
Line on Design Build Lump Sum from Pre-qualified DGON-KWDN)/2018 Toubro Limited
dated: two packets Limited
Basis from Mughalsarai to New bidders dated 14.12.2018
29.12.2017 bidding 3. M/s Larsen &
Sonnagar and Chirailapathu
Toubro Limited)
Station (Excluding New
Karwandiya –New Durgauti
Section) of Eastern Dedicated
Freight Corridor

Design and Construction of Rail


Flyover and approaches on
IFP No: Viaducts, Formation in
HQ/EN/EDFC- Embankments/Cuttings including
1/PQ/RFO/BRK blanketing, Supply and Spreading
N-DERdated of Ballast and related works for M/s M.G.
Issued PQ on LOA
06.03.2018, single track electrified railway line Contractors
07.03.2018, PQ followed by PQ 03.05.2018, PQ-4, PQ-Nil, No.HQ/EN/EDFC-
& on Design Build Lump Sum Basis Pvt. Ltd.,
88 Open PQ Bid on bidding single Bid 20.09.2018 Bid-3. Bid-Nil. Yes 1/BID/RFO/BRKN- Rs.172.80 Cr. 600 days
IFB No: connecting New Boraki DFC yard Panchkula,
27.06.2018. stage two packet. DER dated
HQ/EN/EDFC- to Dadri yard approx. length 4.54 Haryana.
12.11.2018
1/BID/RFO/BRK Kms from Ch. 0.00 m (Rly Km
N-DER dated 1410.436) to Ch. 4540 m (Rly Km
27.06.2018 1414.955) and related Diversion
works in connection with Eastern
Dedicated Freight Corridor in the
state of Uttar Pradesh in India

M/s
No.- 2
HQ/Admin/ HQ/Admin/ ASHIRBAD
1. M/s Avia Xpert (P)
Tender/Houseke Engagement of housekeeping Tender/Housekeepi HOUSEKEEPI
Ltd.,New Delhi Rs.
89 eping services for DFCCIL’s Corporate E-open tender 19.03.2018 Single 12.04.2018 5 Yes ng NG 31.07.2020
2.M/s Das 3,13,97,750.60/-
services /17 office ,New Delhi services /17 SERVICES
Restaurant, Jaipur,
dtd .02.07.2018 PVT. LTD
Rajasthan
,NEW DELHI
No.4
1. M/s Ecos (I)
Mobibility &
Hospitality Pvt. Ltd.
New Delhi HQ/AD/VEHICLE M/s Vivek
HQ/AD/VEHICL Hiring of Vehicles for DFCCIL Rs.
90 E-open tender 15.6.2018 Single 23.7.2018 5 2. M/s Kuldip Tourist Yes TENDER-2018 travels Pvt. 14.10.2020
E TENDER-2018 Corporate Office, new Delhi 7,42,05,896.66/-
Taxi , New Delhi dtd. 08.10.2018 Ltd.New Delhi
3. Avtar Travels ,New
Delhi
4 S.A.Travels, New
Delhi

No.-2
1. M/s Rahul Bose M/s 3097/
Security & Allied Services for the Security Agency, HQ/AD/Security Rang Nath Rai
HQ/AD/Security
91 DFCCIL Corporate Office, New E-open tender 17.11.2016 Single 01.12.2016 3 new Delhi Yes Services/2, Security Rs. 2,22,53,339/- 31.12.2018
Services/2
Delhi 2. M/s Mohit Bawa dtd. 29.12.2016 Agency, New
Security Agency, Delhi
New Delhi

M/s Price
watre house
Coopers
Private Limited
in Joint
Venture with
M/s PWC
Strategy &
EOI Publication in
RFP No.HQ/OP RFP issued to (India) Pvt.
Consultancy Services for New papers - EOI followed by HQ/OP &
& Short listed Ltd., M/s
Development of Marketing and 24/08/2014& Selection of BD/HEAVYHAUL/D
92 BD/HEAVYHAU consultants in 20.01.2015 4 Nil Yes Hamburg Port Rs. 9,61,01189/- 15.12.2018
Commercial Strategies for DFCCIL 26/08/2014 Consultants on MCSD/RFP/2014,
L/DMCSD/RFP/2 response to Consulting
and its Catchment Areas (DMCSD) On website – QCBS System 06/10/2015
014 EOI GmbH,
28/08/2014
Germany and
M/s
UNICONSULT
Universal
Transport
Consulting
GmbH,
Germany

M/s CPCS
Transcom
International
Limited
(Barbados) in
RFP issued to EOI Publication in Joint Venture
RFP No. HQ/OP EOI followed by No. HQ/OP &
Consultancy Services for Short listed New papers - with CPCS
& BD/HEAVY Selection of BD/HEAVY Rs.6,96,82,371. 11.11.2018 extension
93 Institutional Strengthening Module consultants in 17/08/2014 16.04.2015 2 Nil Yes Transcom
HAUL/ISMD/RF Consultants on HAUL/ISMD/RFP/20 56/- under process
of DFCCIL (ISMD) response to On website – Limited
P/2014 QCBS System 14 dtd. 22/09/2015
EOI 19/08/2014 (Canada) Suit
G6, Welches
Plaza,
Welches,
St.Michael,
Barbodos

Engagement of Manpower service


M/s
provider for outsourcing of
HQ/HR/Tender/C Newspapers HQ/HR/Tender/CO/6 M.J.Solanki,
94 Secretarial and Support Manpower 03.12.2015 Single 22.12.2015 9 Nill Yes Rs. 7,43,01,491/- 28.02.2019
O/6 Open Tender dtd. 29.01.2016 Bhavnagar,
services in DFCCIL Corporate
Gujrat
Office.

Engagement of Manpower
CPM/DFCCIL/N DFCCIL/Noida
Services Provider for Outsourcing
OIDA Unit/ Hiring Unit/Hiring of M/s Rakshak
of Support Services in DFCCIL
95 of E-Tendering 17.07.2018 Single Packet 10.08.2018 5 Nill Yes Manpower/Rakshak/ Securitas 2,95,69,452/- 16.09.2020
under CPM/Noida Unit for a period
Manpower/2018/ 2018/02 dated Pvt.Ltd
of Two year (extendable by
02 30.10.2018
additional one year)

Consultancy Services for Social &


EOI:- 22.11.2017
Environmental Safeguard
in newspaper &
Monitoring and Review Consultant Contract
RFP issued to 01.12.2017 in No.
No: (SESMRC) for EDFC-3 project: Single stage 01; M/s EPTISA Awarded to M/s LEA
Short listed UNDB website HQ/SEMU/SESMRC
HQ/SEMU/SES Sahnewal-Pilkhani section, 175 bidding from Servicios de Highest Associates INR 45 Months from date
96 consultants in RFP:- 05.02.2018 5 /EDFC-3/2017
MRC/EDFC- Kms, Khurja-Dadri section, 46 Kms Shortlisted Ingenieria, S.L., Combined South Asia 3,31,98,000/- of Commencement
response to 02.01.2018 (sent Dated 28.03.2018
3/2017 and Pilkhani-Khurja section, 221 Consultants Madrid, Spain Score Pvt. Ltd.
EOI to shortlisted
Kms and Balance 3 QPRs of Consultant
consultant)
EDFC-1 project: Khurja-Bhaupur
section, 343 Kms.

Contract
RFP issued to EOI: 29.09.2017
Balance General Consultancy Single stage Awarded to No.
No: Short listed & 26.10.2017
Services for Khurja-Sahnewal and bidding from Highest HQ/EN/Proc./GC-III Egis Rail S.A- INR 8 Months from date of
97 HQ/EN/Proc./GC- consultants in RFP: 27.03.2018 2 Nill
Khurja-Dadri Section of Eastern Shortlisted Combined Dated 09.05.2018 Egis India JV 2,72,17,210/- Commencement
III/RFP response to 12.02.2018
Dedicated Freight Corridor. Consultants Score
EOI
Consultant

EOI Publication:
DFCCIL website-
25.01.2017
News Papers-
RFP No.: Consultancy Services for RFP issued to 02.02.2017
Single Stage Euro 149,859
HQ/S&T/EC/ISA/ Independent Safety Assessment of shortlisted UNDB website: HQ/S&T/EC/ISA/MG
Bidding from Italcertifer (exclusive of 15 months after the
98 MGS-BPUN Signalling Works of Mughalsarai – consultants in 02.02.2017 19.01.2018 3 Nil Yes S-BPUN dated
shortlisted S.p.A, Italy local indirect Effective Date
dated New Bhaupur section of Eastern response to RFP 23.03.2018
consultants taxes)
11.12.2017 DFC Project-2. EOI. Publication:
11.12.2017 (sent
to shortlisted
consultants)

Contract Systra MVA


RFP No: Project Management Consultancy RFP issued to
EOI: 20.05.2016 Single stage Awarded to Consulting EURO:
HQ/EN/Procure Services for Khurja - Pilkhani Short listed HQ/EN/Procurement
RFP: bidding from Highest (India)Pvt. Ltd 23,92,390/- and 68 Months from date
99 ment/PMC/KRJ- Section (Approx. 222 Route Kms) consultants in 30.01.2017 4 NIL /PMC/KRJ-PKY,
25.10.2016 Shortlisted Combined and Systra INR of Commencement
PKY Dated of Eastern Dedicated Freight response to Dated 20.02.2018
Consultants Score S.A. France 49,07,66,000/-
25.10.2016 corridor Project-3 EOI
Consultant ‘JV’

First stage Bid


Design and Construction of civil, (Technical bid):
Structures and Track Works, 08.11.2016
involving Formation in Extended up to
Embankment/ Cuttings, Ballast on SPN issued on 22.11.2016
Formation, Track Works, Bridges, 30.04.2015and and 24th June, 2021
ICB No. 8 for Technical
Structures, Buildings, yards & Prequalificatio first stage Bid Second Stage HQ/EN/EC/D-B/ (i.e 1200 days from
HQ/EN/EC/D-B/ Two stage bidding bid (1st stage) INR
Integration with Indian Railway’s n followed by invitation issued Bid (Financial Khurja - Pilkhani Larsen & Date of
100 Khurja - Pilkhani from Pre-qualified and 6 for NIL YES 28,63,81,13,280
Existing Railway system and two stage on 22.11.2016. Bid from section/CP-303, Toubro Ltd. Commencement of
section, dated bidders Financial bid .00
Testing & Commissioning on bidding Second stage bid technically dated 15.03.2018 work on 12.03.2018)
19.08.2016 (2nd stage)
Design-Build Lump-Sum Basis of invitation issued qualified
Khurja - Pilkhani Section (approx. on 22.06.2017. bidders):
222 route Km of Single Line) of 12.06.2017 and
Eastern Dedicated freight Corrdor it was extended
(Contract Package-303) up to 22.06.2017
Independent Safety Assessment
Limited tender LOA No.
Services for Signalling System of M/s Bureau
HQ/S&T/WC- to firms on Single Stage Two HQ/S&T/ISA/WDFC- 3 Years from date of
101 Phase-II (Rewari -Dadri and JNPT- 28/07/2017 05/10/2017 3 Nill Yes veritas Italia 2.7264699
II/ISA RDSO's list of Envelop Bidding II/Bid Evaluation issue of LOA
Vadodara section) of the Western S.p.A
ISA dated: 01/01/2018
Dedicated Freight Corridor

Selection of Architechtural &


Design Consultancy Firm, for
Providing comprehensive
Architecural & Design Consultancy
Services for the Following Work:

Detailed Master Planning of


"DFCCIL Inegrated Office Cum Awarded
CPM/DFCCIL/N Residential Complex" with Pre- Using
LOA No. DFCC/
OIDA Certified GRIHA 5 Star Rating (on CQCCBS
Stage -I Noida Unit/ Arch-
UNIT/Architectur the land measuring approx. (Combined Space
E-tendering 28/08/2016 Two Bid System 05/10/2016 11 (i) KliMart Pvt. Ltd. Tender/ 17,136,000 13/12/2019
al 16.8491 Hect. At Noida-Greater Quality Cum Combine
102 (ii) Mecon Limited Contract/370 dtd
Consultancy/201 Noida Expresswat in Village Jhatta, Cost Based
29/11/2016
6/3 Noida) System)
System
&
Complete Design, Drawing &
Development of a Corporate Office
Building with GRIHA 5 Star Green
Building rating (of built up area
19200 sqm) to be constructed in
Phase-I of the Project.

Note:- For Stage-II Tech. Evaluation concept Presentation were given by bidders to nomiated Jury (Approved by Corporate Office) Out of 9, Only 2 bidders qualified Stage-II technical Evaluation, therefore, Financial offers of only these 2 bidders (C.P. Kukreja
& Space Combine) were opened.
2 LOA No.
CPM/DFCCIL/No
M/s Indraprastha DFCC/Noida M/s Amrita
ida Unit/ Hiring of Hiring of Commercial Vehicles for
Services, Lado Sarai Unit/Hiring of travels, Mohan
103 Commercial official use of CPM/DFCCIL/Noida E-tendering 08/02/2017 Two Bid 03/03/2017 3 Yes Rs 1,65,97,584/- 07/04/2019
Commercial Nagar ,
Vehicles/ Unit for a period of two years.
M/s Vivek Travels, Vehicles/2017/01/57 Gaziabad
2017/01
Pitampura 2 dtd 23/03/2017

Engagement of Manpower M/s Crux


CPM/DFCCIL/No
Services Provider for Outsourcing LOA No. DFCC/ Management
ida Unit/Hiring of
of support services in DFCCIL Noida Unit/Hiring of Services Pvt.
104 Manpower Open tender 20/05/2017 Single Bid system 13/06/2017 4 NIL Yes 1.15 crs 30/06/2018
under CPM/Noida Unit for a period Manpower/2017/02 Ltd.,
Services/2017/0
of ine year (extandable by dtd 28/06/2017 Begumpet,
2 dtd 16/05/2017
additional 1 year) Hyderabad.

LOA No:-
DFC/ADI/ENGG/
ADI/ENGG/ADI- Rachana
ADI-PNU/ROB/ Ranjit Construction
105 Construction of ROB Open Tender 05.01.2017 Two bid system 18.02.2017 2 Yes PNU/ROB/LC No. Construction 63.83 05.01.2019
LC No. 211 & Company
211 & 216 Dated:- Co.
216
06.05.2017

Independent Safety Assessment


Services for Signalling System Limited tender 4.2961
HQ/S&T/WC- including TPWS of Phase-I (Rewari to firms on Single Stage Two HQ/S&T/WC-I/ISA-R ITALCERTIFE (excluding local 4 Years from date of
106 26/10/2016 28/11/2016 3 NILL Yes
I/ISA-R - Makarpura) of the Western RDSO's list of Envelope Bidding Dated 31-01-2017 R S.p.A. service tax issue of LOA.
Dedicated Freight Corridor and ISA component)
Signalling Generic Products

LOA No:-
DFC/ADI/ENGG/
ADI/ENGG/ADI- Rachana
ADI-PNU/ROB/ Open Tender,
107 Construction of ROB 08.12.2016 Two bid system 10.01.2017 3 NA Yes PNU/ROB/LC No. Construction 76.87 21.11.2018
LC No. 199 & E-Tender
199 & 201 Dated:- Co.
201
22.03.2017
Expression Of
Interest:
05.11.2015
EOI invited on Expression Of Joint Venture
and
ICB No: Short listing 05.10.2015 and Interest: 18 Contract of ITALFERR
Quality and Safety Audit EURO
HQ/EN/Procure followed by Request for Single stage Awarded to HQ/EN/Procurement S.p.A –
Consultancy Services for Sahnewl- Request for 14,04,000.00 45 (Forty Five) Months
ment/QSAC/SNL- Single Stage Proposal invited bidding from Request for Highest /QSAC/SNL-KRJ & VOGUE
108 Khurja Section with Khurja-Dadri Proposal NIL and INR from date of
KRJ-DER, and Two (Technical + Shortlisted Proposal Combined KRJ-DER Dated: Construction &
Link of Eastern Dedicated Freight (Technical + 18,81,50,000.00 Commencement
Dated: Packet Financial Consultants (Technical + Score 20.03.2017 Consultancy
Corridor. Financial): /-
18.05.2016 System Proposal) on Financial): 3 Consultant Services Pvt.
28.06.2016
18.05.2016 Ltd.
Extended up to
12.07.2016

EOI invited Expression Of


on Interest:
Expression of
Consultancy Services for 28.6.2016 17.08.2016 Contract
Interest: Monash
ICB No: study on the Special Short listing and and Awarded
10 University’s
HQ/EN/Proc./IR/ Railway Establishment for followed by 02.08.2016 Single stage two Request for to AUD
Request HQ/EN/Proc/IR/ Institute of 4 (Four) Months from
SRESTHA, Strategic Technology & Single Stage and Request packet bidding Proposal Highest 635,160/-
109 for NIL SRESTHA Railway date of
Dated Holistic Advancement and Two for Proposal from Shortlisted (Technical + Combined excluding
Proposal Dated 16.03.2017 Technology, Commencement
16.03.2017 (SRESTHA) in Indian Packet invited Consultants Financial): Score service tax
(Technical + Australia
Railways System (Technical + 27.10.2016 Consultant
Financial ): 4
Financial Extended up to
Proposal) on 21.11.2016
21.09.2016
Expression Of
Interest:02.08.20 Expression Of
EOI invited on
16 Interest: 13
Consultancy Services for study on Short listing 12.07.2016 and Contract
ICB No: and KPMG
the Railway Planning & Investment followed by Request for Single stage Awarded to
HQ/EN/Proc./IR/ Request for HQ/EN/Proc/IR/RPI Advisory 4 (Four) Months from
Organization (RPIO) and Special Single Stage Proposal invited bidding from Highest
110 SUTRA & RPIO, Proposal Nill O & SUTRA Dated Services INR 2,36,28,250 date of
Unit for Transportation Research and Two (Technical + Shortlisted Combined
Dated (Technical + Request for 15.02.2017 Private Commencement
and Analysis ( SUTRA ) in Indian Packet Financial Consultants Score
30.08.2016 Financial): Proposal(Tech Limited, India
Railways System Proposal) on Consultant
05.10.2016 nical +
30.08.2016
Extended up to Financial):4
17.11.2016
IFP No:
HQ/EN/EC/PQ/T
rack/MGS-
DGO&KWDN- Design, Supply and Construction
CPBH-SEBN of Track & Track related works
dated including Testing & Commissioning LOA No.
Issued PQ on M/s Kalindee
14/01/2016, for double track electrified railway HQ/EN/EC/Bal.Trac
14.01.2016, PQ followed by PQ 17.03.2016, PQ-5, PQ-Nil, Rail Nirman
& line on Design Build Lump Sum k/MGS-
111 Open PQ Bid on bidding single Bid 27.09.2016 Bid-2. Bid-Nil. Yes (Engineers) Rs.196.90 Cr. 730 days
IFB No: Basis from Mughalsarai to New DGO&KWDN-CPBH-
11.07.2016. stage two packet. Limited, New
HQ/EN/EC/Track Sonnagar and Chirailapathu SEBN/Bid Doc dated
Delhi.
/MGS- (excluding New Karwandiya – New 25.01.2017
DGO&KWDN- Durgauti Section) of Eastern
CPBH-SEBN Dedicated Freight Corridor.
dated
11.07.2016

Social and Environmental


Safeguards Monitoring and Review
HQ/SEMU/EC/SES
HQ/SEMU/EC/S Consultancy (SESMRC) for M/s Operation
Two Packet MRC/APL-3/2016 1.10.2020
112 ESMRC/APL- Sahnewal-Pilkhani (175 Kms) and Open Tender 09.03.2016 01.07.2016 3 All qualified Yes Research 1.67
System Dated: (45 months)
3/2016 Khurja- Dadri (46 Kms) Sec. (APL- Group Pvt.Ltd.
16.12.2016
3) of EDFC Project.
Total 221 Kms
Date of Award-12-05-
EOI followed by 29 months from date
Engg service Consultancy (Rewari- Open, in terms 2010
Selection of N.K. of commencement i.e.
113 Hq/EN/WC/E&S Vadodara section, WDFC, Ph- of JICA 30/10/2009 21/12/2009 1 Nill Sole tenderer CA No- 127.46
Consultants on Consortium from 13-06-2010; up
1)ES-1 Guidelines Hq/EN/WC/E&S
QCBS System to 30-10-2012
dated 12-05-2010
21 months from the
Date of Award-31-10-
Engg service Consultancy (JNPT- EOI followed by date of issue of
Open, in terms 2011
Hq/EN/WC/Ph- Vadodara & Rewari-Dadri sections, Selection of N.K. Client’s Notice to
114 of JICA 09/07/2010 18/10/2010 1 Nill Sole tenderer CA No- 99.25
II/ECS WDFC, Ph-2) Consultants on Consortium-2 Proceed i.e.
Guidelines Hq/EN/WC/E&S
ES-2 QCBS System From 30-12-2011
dated 30-11-2011
Up to 30-09-2013
Date of Award-07-06-
2013
Prequalification
Civil, Building Track Contract CA No- 208 weeks from date
Open, in terms followed by Single
2011/WC/Ph.I/P Package (Rewari- Iqbalgarh, HQ/EN/PWC/Phase- Sojitz-L&T of commencement i.e.
115 of JICA 18/11/2011 Stage Two 27/09/2012 2 Nill Yes 6,699.50
Q WDFC-Ph-1) I Pkg- Consortium 30-08-2013 up to 25-
Guidelines Envelope Bidding
CTP-1&2 1&2/D&B/1/Sojitz- 08-2018
System
L&T dated 06-08-
2013
Date of Award-26-08-
2014
Prequalification
CA No- 208 weeks from date
Electrical Package (Rewari- Open, in terms followed by Single
2013/WC/Ph.I/P HQ/EN/PWC/PHAS JFE-Gammon of commencement i.e.
116 Makarpura-WDFC-Ph-1) of JICA 01/07/2013 Stage Two 07/03/2014 2 Nill Yes 328.00
Q-3A(R ) E-I PKG- Consortium 20-11-2014 up to 15-
EMP-4 Guidelines Envelope Bidding
3A(R)/D&B/2/JFE- 11-2018
System
Gammon Dated 15-
10-2014

Date of Award-18-11-
2014
200 weeks from date
Electrical Package (Rewari- Open, in terms Single Stage Two CA no-
2013/WC/EMP- Sojitz-L&T of commencement i.e.
117 Makarpura-WDFC-Ph-1) of JICA 28/03/2013 Envelope Bidding 26/02/2014 Nill Yes Hq/EL/WC/Phase- 3097.00
4/Ph-1/Bid Consortium 15-05-2015 up to 15-
EMP-4 Guidelines (Post PQ) 1/Pkg-EMP-
03-2019
4/D&B/3/Sojitz-L&T
dated 04-03-2015

Date of Award-22-06-
2015
338 weeks from date
Signalling & Telecom Package Open, in terms Single Stage Two CA no-
2013/WC/STP- S.A.F.E. of commencement i.e.
118 (Rewari-Makarpura-WDFC-Ph-1) of JICA 15/04/2013 Envelope Bidding 21/11/2014 2 Nill Yes Hq/S&T/WC/Phase- 1780.2
5/Ph-1/Bid Consortium 11-01-2016 up to 04-
STP-5 Guidelines (Post PQ) 1/Pkg ST P-
07-2022
5/D&B/4/S.A.F.E.
dated 10-12-2015

442 weeks from date


2014/WC/STP- Train Protection & warning System Open, in terms Single Stage Two
I-N Signal of commencement i.e.
119 5A/Phase- (TPWS) Package of JICA 14/08/2014 Envelope Bidding 28/11/2014 2 Nill yes 28/11/2014 608.99
Cosnortium 01-06-2016 up to 20-
I&II/Bid STP-5A Guidelines (Post PQ)
11-2024

06 years from date of


Date of Award-26-02- commencement i.e.
EOI followed by
Project Management Consultancy Open, in terms 2014 11-04-2014 up to 09-
Hq/EN/WC/Ph.I/ Selection of
120 (Rewari-Makarpura-WDFC-Ph-1) of JICA 08/04/2013 28/06/2013 1 Nill Sole tenderer CA no- NKC 653 04-2020; for Loco
PMC Consultants on
PMC-1 Guidelines Hq/EN/WC/PMC-1 related activities, 96
QCBS System
dated 27-03-2014 months i.e. up to 28-
02-2022

Date of Award-25-02-
2016
Civil, Building Track Contract CA No- 208 weeks from date
Open, in terms Single Stage Two Sojitz-L&T-
HQ/EN/WC/Ph.I/ Package ( Iqbalgarh-Vadodara, HQ/EN/PWC/PHAS of commencement i.e.
121 of JICA 01/06/2015 Envelope Bidding 11/09/2015 2 Nill Yes Gayatri 4743.9
CTP-3R WDFC-Ph-1) E – I PKG – 3( R)/ 06-06-2016 up to 01-
Guidelines (Post PQ) Consortium
CTP-3R D&B/8/Sojitz-L&T- 06-2020
Gayatri dated 17-
05-2016.

Date of Award-15-07-
2016
Prequalification CA no-
Civil, Building Track Contract
Open, in terms followed by Single HQ/EN/PWC/Phase- Express freight
2014/HQ/EN/PW Package (JNPT-Vaiterana, WDFC- 208 weeks from date
122 of JICA 18/06/2014 Stage Two 15/03/2016 2 Nill Yes II/Pkg CTP- Railway 2949
C/CTP-11 Ph-2) of commencement
Guidelines Envelope Bidding 11/D&B/9/Express Consortium
CTP-11
System Freight Railway
Consortium dated
10-11-2016

Date of Award-22-05-
2015
Prequalification
Civil, Building Track Contract CA no- 208 weeks from date
Open, in terms followed by Single Express
Hq/En/WC/Ph.II/ Package (Vaiterana-Sachin, Hq/EN/PWC/Phase- of commencement i.e.
123 of JICA 12/11/2012 Stage Two 10/11/2014 2 Nill Yes Freight 2170.6
PQ-12 & 13 WDFC-Ph-2) II Pkg- 15-10-2015 up to 10-
Guidelines Envelope Bidding Consortium
CTP-12 12/D&B/3/Express 10-2019
System
Freight Consortium
dated 18-08-2015

Date of Award-22-05-
2015
Prequalification
Civil, Building Track Contract CA no- 208 weeks from date
Open, in terms followed by Single Express
Hq/En/WC/Ph.II/ Package (Sachin - Hq/EN/PWC/Phase- of commencement i.e.
124 of JICA 12/11/2012 Stage Two 10/11/2014 2 Nill Yes Freight 2157.6
PQ-12 & 13 Makarpura(Vadodara) section, II Pkg- 15-10-2015 up to 10-
Guidelines Envelope Bidding Consortium
WDFC-Ph-2)CTP-13 13/D&B/4/Express 10-2019
System
Freight Consortium
dated 18-08-2015

Date of Award-03-06-
2015
Prequalification
Spl Bridge Package Civil, Building CA no- 208 weeks from date
Hq/ENWC/Ph.II/ Open, in terms followed by Single 01
Track Contract Package (JNPT- Hq/EN/PWC/Phase- IIS-L&T of commencement i.e.
125 PQ-15A,15B & of JICA 23/11/2012 Stage Two 03/02/2014 2 JFE-Gammon yes 518.1
Vadodara section, WDFC-Ph- II Pkg- Consortium 15-10-2015 up to 10-
15C Guidelines Envelope Bidding Consortium
2)CTP-15A 15A/D&B/5/IIS-L&T 10-2019
System
Consortium dated
06-08-2015
Date of Award-03-06-
2015
Prequalification CA no-
Spl Bridge Package Civil, Building 208 weeks from date
Hq/ENWC/Ph.II/ Open, in terms followed by Single Hq/EN/PWC/Phase-
Track Contract Package (JNPT- IIS-L&T of commencement i.e.
126 PQ-15A,15B & of JICA 23/11/2012 Stage Two 03/02/2014 2 Nill Yes II Pkg- 330.7
Vadodara section, WDFC-Ph-2) Consortium 15-10-2015 up to 10-
15C Guidelines Envelope Bidding 15B/D&B/6/IIS-L&T
CTP-15B 10-2019
System Consortium dated
06-08-2015 dated
06-08-2015

Date of Award-03-06-
2015
Prequalification
Spl Bridge Package Civil, Building CA no- 208 weeks from date
Hq/ENWC/Ph.II/ Open, in terms followed by Single
Track Contract Package (Rewari- Hq/EN/PWC/Phase- IIS-L&T of commencement i.e.
127 PQ-15A,15B & of JICA 23/11/2012 Stage Two 03/02/2014 2 Nill Yes 214.11
Dadri section, WDFC-Ph-2)CTP- II Pkg- Consortium 15-10-2015 up to 10-
15C Guidelines Envelope Bidding
15C 15C/D&B/7/IIS-L&T 10-2019
System
Consortium dated
06-08-2015

Date of Award-
30 months of issue of
26/12/2008
Single stage two Acceptance letter no-
Hq/EN/WC/BRID Spl. Bridge Package (Vaiterana- CA No- Soma
128 Open 11/07/2008 envelope bidding 04/09/2008 5 Nill Yes 605.15 Hq/EN/WC/Bridges/D
GES/D&B/1 Utran, 54 Bridges) Hq/EN/WC/Bridges/ Enterprises Ltd
system &B/1 dated 26-12-
D&B/1/Soma dated
2008
17-03-2009

Date of Award-21-01-
Prequalification 2016
182 weeks from date
Electrical Package (JNPT- Open, in terms followed by Single CA no-
2013/WC/EM/Ph Sojitz-L&T of commencement i.e.
129 Vadodara section, WDFC,Ph-2) of JICA 26/09/2014 Stage Two 09/10/2015 2 Nill Yes 2015/Hq/EL/PH- 1213
.II/PQ Consortium 02-05-2016 up to 28-
EMP-16 Guidelines Envelope Bidding II/EMP-16/8/Sojitz-
10-2019
System L&T dated 31-03-
2016

Date of Award-13-05-
Prequalification
2016CA No- 208 weeks from date
(JNPT-Vadodara section, Open, in terms followed by Single
2014/WC/S&T/P HQ/S&T/WC/Ph- Sojitz-L&T of commencement i.e.
130 WDFC,Ph-2) of JICA 25/09/2014 Stage Two 26/11/2015 2 Nill Yes 631
h.II/PQ 2/Pkg STP-17/ Consortium 29-08-2016 up to 24-
STP-17 Guidelines Envelope Bidding
D&B/9/Sojitz-L&T 08-2020
System
dated 10-08-2016
Date of Award-15-02-
Part-A- 4+2 Years
Project Management Consultancy EOI followed by 2016
Open, in terms Part-B-6+2 Years
Hq/EN/WC/Ph- (JNPT-Vadodara & Rewari-Dadri Selection of CA no- OCG
131 of JICA 04/06/2015 06/07/2015 1 Nill Sole tenderer 555 from Commencement
2/PMC(2R) sections, WDFC, Ph-2) Consultants on HQ/EN/PWC/PMC- Consortium
Guidelines date i.e. on 31-03-
PMC-2R QCBS System 2R dated 21-03-
2016
2016

Date of Award-14-10-
2016
LOA No-
Integrated Contract Package of 2016/HQ/EN/PWC/
Design and Construction of Civil, Prequalification CTP-14/Price Bid
Building and Track Works, Open, in terms followed by Single Evaluation dated:
Hq/EN/WC Sojitz-L&T 208 weeks from date
132 Electrical and Mechanical Works of JICA 25/05/2014 Stage Two 07/04/2016 2 Nill Yes 14-10-2016 3798.99
Ph.II/PQ-14 Consortium of commencement-
and Signal and Telecom Works Guidelines Envelope Bidding CA no-
(CTP-14) from Dadri to Rewari System HQ/EN/PWC/Phase-
(WDFC-Ph-2) II/Pkg CTP-
14/D&B/10/Sojitz-
L&T Consortium
dated 09-01-2017
LOA No:-
DFC/ADI/ENGG/
ADI/ENGG/ADI- Rachana
ADI- M/s. R.C.Patel
133 Construction of ROB Open Tender 21.07.2016 Two bid system 26.08.2016 4 Yes PNU/ROB/LC.No. Construction 34.92 27.06.2018
PNU/ROB/LC.N Co.(JV)
227 Dated:- Co.
O. 227
28.12.2016

LOA No:-
DFC/ADI/ENGG/
ADI/ENGG/ADI- Rachana
ADI-
134 Construction of ROB Open Tender 19.07.2016 Two bid system 24.08.2016 3 NA Yes PNU/ROB/LC.No. Construction 58.45 27.08.2018
PNU/ROB/LC.N
208 & 208B Co
O. 208 & 208B
Dated:28.12.2016

Expression Of
Interest:
Project Management Consultancy 15.05.2015
EOI invited on Expression Of
Services for construction of double and
Short listing 27.03.2015 and Interest: 16 Contract
ICB No: line electrified (2x25 KV) Railway
followed by Request for Single stage Awarded to
HQ/EN/Procure Track complete with Signaling & Request for HQ/EN/Procurement EURO: 1698000
Single Stage Proposal invited bidding from Request for Highest TYPSA-ICT- 60 Months from date
135 ment/PMC/KRJ- Telecommunication System and Proposal NIL /PMC/ KRJ-DER and INR
and Two (Technical + Shortlisted Proposal Combined BARSYL (JV) of Commencement
DER, Dated related infrastructure for Khurjal - (Technical + Dated 20.10.2016 21,39,69,500
Packet Financial Consultants (Technical + Score
30.10.2015 Dadri Section (Approx. 46 Kms) of Financial):
System Proposal) on Financial):3 Consultant
Eastern Dedicated Freight corridor 04.12.2015
30.10.2015
Project Extended up to
18.04.2016

LOA No:-
DFC/ADI/ENGG/
ADI/ENGG/ADI- Rachana
ADI- M/s. Rakesh
136 Construction of ROB Open Tender 14.06.2016 Two bid system 18.07.2016 2 Yes PNU/ROB/LC.No.21 Construction 68.84 05.06.2018
PNU/ROB/LC.N Construction Co.
4 & 220/R1 Dated:- Co.
O.214 & 220/R1
05.10.2016
Integrated Contract Package of Date of Award-14-10-
Design and Construction of Civil, Prequalification 2016
Building and Track Works, Open, in terms followed by Single LOA No-
Sojitz-L&T 208 weeks from date
137 CTP-14 Electrical and Mechanical Works of JICA 25/05/2014 Stage Two 07/04/2016 2 Yes 2016/HQ/EN/PWC/ 3798.99
Consortium of commencement
and Signal and Telecom Works Guidelines Envelope Bidding CTP-14/Price Bid
(CTP-14) from Dadri to Rewari System Evaluation dated:
(WDFC-Ph-2) 14-10-2016
LOA No.
M/s Lall
ALD(E)/EN/ROB/ ALD(E)/EN/ROB/20
138 ROB Work Open Tender 04/06/2016 Two Bid System 04/07/2016 3 NILL Yes Contruction 13.49 30/11/2017
2016/OT-2/177 16/OT-2/177, dated
Co.
30/08/2016

EOI followed by Date of Award-12-05- 29 months from date


Engg service Consultancy (Rewari- Open, in terms
Selection of 2010 N.K. of commencement i.e.
139 ES-1 Vadodara section, WDFC, Ph- of JICA 21/12/2009 1 Sole tenderer 127.46
Consultants on No-Hq/EN/WC/E&S Consortium from 13-06-2010; up
1)ES-1 Guidelines
QCBS System dated 12-05-2010 to 30-10-2012

21 months from the


Engg service Consultancy (JNPT- EOI followed by Date of Award-31-10- date of issue of
Open, in terms
Vadodara & Rewari-Dadri sections, Selection of 2011 N.K. Client’s Notice to
140 ES-2 of JICA 09/07/2010 18/10/2010 1 Sole tenderer 99.25
WDFC, Ph-2) Consultants on No-Hq/EN/WC/E&S Consortium-2 Proceed i.e.
Guidelines
ES-2 QCBS System dated 30-11-2011 From 30-12-2011
Up to 30-09-2013

Date of Award-07-06-
2013
Prequalification
Civil, Building Track Contract No- 208 weeks from date
Open, in terms followed by Single
Package (Rewari- Iqbalgarh, HQ/EN/PWC/Phase- Sojitz-L&T of commencement i.e.
141 CTP-1 &2 of JICA 18/11/2011 Stage Two 27/09/2012 2 Yes 6699.5
WDFC-Ph-1) I Pkg- Consortium 30-08-2013 up to 25-
Guidelines Envelope Bidding
CTP-1&2 1&2/D&B/1/Sojitz- 08-2018
System
L&T dated 06-08-
2013

Date of Award-26-08-
2014
Prequalification
No- 208 weeks from date
Open, in terms followed by Single
Spl Bridge Package HQ/EN/PWC/PHAS JFE-Gammon of commencement i.e.
142 CTP-3AR of JICA 01/07/2013 Stage Two 07/03/2014 2 Yes 328
CTP-3AR E-I PKG- Consortium 20-11-2014 up to 15-
Guidelines Envelope Bidding
3A(R)/D&B/2/JFE- 11-2018
System
Gammon Dated 15-
10-2014

Date of Award-18-11-
2014
200 weeks from date
Electrical Package (Rewari- Open, in terms Single Stage Two CA no-
Sojitz-L&T of commencement i.e.
143 EMP-4 Makarpura-WDFC-Ph-1) of JICA 28/03/2013 Envelope Bidding 26/02/2014 Yes Hq/EL/WC/Phase- 3097
Consortium 15-05-2015 up to 15-
EMP-4 Guidelines (Post PQ) 1/Pkg-EMP-
03-2019
4/D&B/3/Sojitz-L&T
dated 04-03-2015

Date of Award-22-06-
2015
338 weeks from date
Signalling & Telecom Package Open, in terms Single Stage Two CA no-
S.A.F.E. of commencement i.e.
144 STP-5 (Rewari-Makarpura-WDFC-Ph-1) of JICA 15/04/2013 Envelope Bidding 21/11/2014 2 Yes Hq/S&T/WC/Phase- 1780.2
Consortium 11-01-2016 up to 04-
STP-5 Guidelines (Post PQ) 1/Pkg ST P-
07-2022
5/D&B/4/S.A.F.E.
dated 10-12-2015

Date of Award-12-08-
2015
442 weeks from date
Train Protection & warning System Open, in terms Single Stage Two CA no-
I-N Signal of commencement i.e.
145 STP-5A (TPWS) Package of JICA 14/08/2014 Envelope Bidding 28/11/2014 2 Yes Hq/S&T/WC/Ph- 608.99
Cosnortium 01-06-2016 up to 20-
STP-5A Guidelines (Post PQ) 1&2/Pkg-STP-
11-2024
5A/D&B/5/I-N dated
10-12-2015

06 years from date of


Date of Award-26-02- commencement i.e.
EOI followed by
Project Management Consultancy Open, in terms 2014 11-04-2014 up to 09-
Selection of
146 PMC-1 (Rewari-Makarpura-WDFC-Ph-1) of JICA 08/04/2013 28/06/2013 1 Sole tenderer CA no- NKC 653 04-2020; for Loco
Consultants on
PMC-1 Guidelines Hq/EN/WC/PMC-1 related activities, 96
QCBS System
dated 27-03-2014 months i.e. up to 28-
02-2022

Date of Award-25-02-
2016
Civil, Building Track Contract CA No- 208 weeks from date
Open, in terms Single Stage Two Sojitz-L&T-
Package ( Iqbalgarh-Vadodara, HQ/EN/PWC/PHAS of commencement i.e.
147 CTP-3R of JICA 01/06/2015 Envelope Bidding 11/09/2015 2 Yes Gayatri 4743.9
WDFC-Ph-1) E – I PKG – 3( R)/ 06-06-2016 up to 01-
Guidelines (Post PQ) Consortium
CTP-3R D&B/8/Sojitz-L&T- 06-2020
Gayatri dated 17-
05-2016.
Prequalification
Civil, Building Track Contract
Open, in terms followed by Single Express freight
Package (JNPT-Vaiterana, WDFC- Date of Award-15-07- 208 weeks from date
148 CTP-11 of JICA 18/06/2014 Stage Two 15/03/2016 2 Yes Railway 2949
Ph-2) 2016 of commencement
Guidelines Envelope Bidding Consortium
CTP-11
System

Date of Award-22-05-
2015
Prequalification
Civil, Building Track Contract CA no- 208 weeks from date
Open, in terms followed by Single Express
Package (Vaiterana-Sachin, Hq/EN/PWC/Phase- of commencement i.e.
149 CTP-12 of JICA 12/11/2012 Stage Two 10/11/2014 2 Yes Freight 2170.6
WDFC-Ph-2) II Pkg- 15-10-2015 up to 10-
Guidelines Envelope Bidding Consortium
CTP-12 12/D&B/3/Express 10-2019
System
Freight Consortium
dated 18-08-2015

Date of Award-22-05-
2015
Prequalification
Civil, Building Track Contract CA no- 208 weeks from date
Open, in terms followed by Single Express
Package (Sachin - Hq/EN/PWC/Phase- of commencement i.e.
150 CTP-13 of JICA 12/11/2012 Stage Two 10/11/2014 2 Yes Freight 2157.6
Makarpura(Vadodara) section, II Pkg- 15-10-2015 up to 10-
Guidelines Envelope Bidding Consortium
WDFC-Ph-2)CTP-13 13/D&B/4/Express 10-2019
System
Freight Consortium
dated 18-08-2015

Date of Award-03-06-
2015
Prequalification
Spl Bridge Package Civil, Building CA no- 208 weeks from date
Open, in terms followed by Single 01
Track Contract Package (JNPT- Hq/EN/PWC/Phase- IIS-L&T of commencement i.e.
151 CTP-15A of JICA 23/11/2012 Stage Two 03/02/2014 2 JFE-Gammon Yes 518.1
Vadodara section, WDFC-Ph- II Pkg- Consortium 15-10-2015 up to 10-
Guidelines Envelope Bidding Consortium
2)CTP-15A 15A/D&B/5/IIS-L&T 10-2019
System
Consortium dated
06-08-2015

Date of Award-03-06-
2015
Prequalification CA no-
Spl Bridge Package Civil, Building 208 weeks from date
Open, in terms followed by Single Hq/EN/PWC/Phase-
Track Contract Package (JNPT- IIS-L&T of commencement i.e.
152 CTP-15B of JICA 23/11/2012 Stage Two 03/02/2014 2 Yes II Pkg- 330.7
Vadodara section, WDFC-Ph-2) Consortium 15-10-2015 up to 10-
Guidelines Envelope Bidding 15B/D&B/6/IIS-L&T
CTP-15B 10-2019
System Consortium dated
06-08-2015 dated
06-08-2015

Date of Award-03-06-
2015
Prequalification
Spl Bridge Package Civil, Building CA no- 208 weeks from date
Open, in terms followed by Single
Track Contract Package (Rewari- Hq/EN/PWC/Phase- IIS-L&T of commencement i.e.
153 CTP-15C of JICA 23/11/2012 Stage Two 03/02/2014 2 Yes 214.11
Dadri section, WDFC-Ph-2)CTP- II Pkg- Consortium 15-10-2015 up to 10-
Guidelines Envelope Bidding
15C 15C/D&B/7/IIS-L&T 10-2019
System
Consortium dated
06-08-2015

Date of Award-
30 months of issue of
26/12/2008
Acceptance letter no-
Spl. Bridge Package (Vaiterana- CA No- Soma
154 open 605.15 Hq/EN/WC/Bridges/D
Utran, 54 Bridges) Hq/EN/WC/Bridges/ Enterprises Ltd
&B/1 dated 26-12-
D&B/1/Soma dated
2008
17-03-2009

Date of Award-21-01-
Prequalification 2016
182 weeks from date
Electrical Package (JNPT- Open, in terms followed by Single CA no-
Sojitz-L&T of commencement i.e.
155 EMP-16 Vadodara section, WDFC,Ph-2) of JICA 26/09/2014 Stage Two 09/10/2015 2 yes 2015/Hq/EL/PH- 1213
Consortium 02-05-2016 up to 28-
EMP-16 Guidelines Envelope Bidding II/EMP-16/8/Sojitz-
10-2019
System L&T dated 31-03-
2016

Track Side Works -


Date of Award-13-05- 208 weeks from date
Prequalification
2016CA No- of Commencement i.e.
(JNPT-Vadodara section, Open, in terms followed by Single
HQ/S&T/WC/Ph- Sojitz-L&T 29-08-2016 up to 24-
156 STP-17 WDFC,Ph-2) of JICA 25/09/2014 Stage Two 26/11/2015 2 Yes 631
2/Pkg STP-17/ Consortium 08-2020 ; On Board
STP-17 Guidelines Envelope Bidding
D&B/9/Sojitz-L&T Radio Works -416
System
dated 10-08-2016 weeks i.e. up to 19-08-
2024

Date of Award-15-02-
Part-A- 4+2 Years
Project Management Consultancy EOI followed by 2016
Open, in terms Part-B-6+2 Years
(JNPT-Vadodara & Rewari-Dadri Selection of no- OCG
157 PMC-2R of JICA 04/06/2015 06/07/2015 1 Sole tenderer 555 from Commencement
sections, WDFC, Ph-2) Consultants on HQ/EN/PWC/PMC- Consortium
Guidelines date i.e. on 31-03-
PMC-2R QCBS System 2R dated 21-03-
2016
2016

First stage Bid


(Technical bid):
Design and Construction of civil, 26.08.2015
Sructures and Track Works for Extended up to
Railway, involving Formation in 16.09.2015
Embankment/Cuttings, Ballast on SPN issued on
ICB No:
Formation, Track Works, Bridges, 05.03.2014 and and
HQ/EN/EC/D- 9 for Technical
Structures, Buildings, yards, Prequalificatio first stage Bid HQ/EN/EC/D-
B/sahnewal- Two stage bidding bid (1st stage)
Integration with Indian Rialway’s n followed by invitation issued Second Stage 01 (Jaiprakash B/Sahnewal – INR 1769.40
158 Pilkhani and from Pre-qualified and 6 for Yes GIL-TPL JV 25th Mach, 2020
existing Railway system and two stage on 26.06.2015. Bid (Financial Associates Ltd) Pilkhani/CP-301, Crores
Dadri-Khurja bidders Financial bid
Testing & Commissioning on bidding Second stage bid Bid from Dated 29.08.2016
sections , dated (2nd stage)
Design-Build Lump-Sum Basis for invitation issued technically
26.06.2015
Sahnewal-Pilkhani (approx.. 175 on 25.02.2016. qualified
route Km of Single Line) of Eastern bidders):
Dedicated freight Corrdor (Contract 29.03.2016 and
Package-301) it was extended
up to 19.04.2016

First stage Bid


(Technical bid):
Design and Construction of civil, 26.08.2015
Sructures and Track Works for Extended up to
Railway, involving Formation in 16.09.2015
Embankment/Cuttings, Ballast on SPN issued on
ICB No:
Formation, Track Works, Bridges, 05.03.2014 and and 10 for
HQ/EN/EC/D-
Structures, Buildings, yards, Prequalificatio first stage Bid Technical bid HQ/EN/EC/D-
B/sahnewal- Two stage bidding
Integration with Indian Rialway’s n followed by invitation issued Second Stage (1st stage) 01 (Jaiprakash B/Dadri - Khurja/CP- INR 511.30
159 Pilkhani and from Pre-qualified Yes GIL-TPL JV 19th July, 2019
existing Railway system and two stage on 26.06.2015. Bid (Financial and 6 for associates Ltd) 302, Dated Crores
Dadri-Khurja bidders
Testing & Commissioning on bidding Second stage bid Bid from Financial bid 29.08.2016
sections , dated
Design-Build Lump-Sum Basis for invitation issued technically (2nd stage)
26.06.2015
Dadri-Khurja section (approx.. 46 on 25.02.2016. qualified
route Km of double Line) of bidders):
Eastern Dedicated freight Corrdor 29.03.2016 and
(Contract Package-302 it was extended
up to 19.04.2016

M/S Vivek
Travels
21-5-2013 on LOA No: NOIDA
NOIDA (Regd), SD 1.85 19/07/2013
Hiring of Vehicles for DFCCIL website and 28- 5- Unit/DFCC/Vehicle
160 Unit/DFCC/ Open tender Single 25/06/2013 2 Under TC Under TC Block, Main revised to extended to
under CPM/ NOIDA 2013 in /13/01/197 Dt. 19-07-
Vehicle/13/0 1 Road, 2.72 31/01/2017
newspapers 2013
Pitampura,
Delhi
Expression Of
Interest:
Project Management Consultancy 15.05.2015
EOI invited on Expression Of
Services for construction of single and
ICB No: Short listing 27.03.2015and Interest: 17 Contract
line electrified (2x25 KV) Railway DB
HQ/EN/Procure followed by Request for Single stage Awarded to
Track complete with Signaling & Request for HQ/EN/Procurement Engineering EURO: 1674538
ment/PMC/SNL- Single Stage Proposal invited bidding from Request for Highest 68 Months from date
161 Telecommunication System and Proposal NIL /PMC SNL-PKY, and Consulting and INR
PKY, and Two (Technical + Shortlisted Proposal Combined of Commencement
related infrastructure for Sahnewal - (Technical + Dated 09.09.2016 GmbH, 53,34,40,133/-
Dated Packet Financial Consultants (Technical + Score
Pilkhani Section of Eastern Financial): Germany
30.10.2015 System Proposal) on Financial):3 Consultant
Dedicated Freight corridor Project- 17.12.2015
30.10.2015
3 Extended up to
18.04.

Engagement of Manpower Service


Noida/ Hiring of Noida/Hiring of M/s JMD
Provider agency for providing M/s Security Solution 1.07 31/08/2016
Manpower Single packet Manpower Consultants,
162 various categories of outsourced Open tender 02/07/2015 24/07/2015 6 and Manpower Yes revised to extended to
Services/01/ system Services/01/2015 Shakarpur,
staff for Chief Project Manager/ Services, Noida, UP 1.51 30/06/2017
2015 dated 26.08.2015 Delhi-92
DFCCIL, Noida Unit

23/02/2010
M/s VKS
HQ/EN/BB/ Preliminary works and detail engg HQ/EN/BB/Rewari- 1.83 extended to
Infratech &
163 RewariDadri/15 survey Rewari-Dadri dection & land Open tender 24/02/2009 Single bid system 25/03/2009 7 N/A Yes Dadri/15 & 16 dated revised to 25/07/2015
Management
& 16 facilitation work 12.05.2009 2.19 (Work Completed,
Pvt Ltd
final payment done)
08 Nos 1) M/s -
Chansma taluka
sarvoday mazoor
kamdar sahakari
mandli ltd.- Mehsana.
2) M/s - Prime one
work force Pvt.Ltd. -
Bhopal. 3) M/s -
Jagdamba services
solutions Pvt. Ltd.-
DFCC/ ADI/ West Mumbai. No. DFCC/ ADI/
4 )M/s - M.S. Services M/s-Komal
Manpower Manpower Hiring/ 08 Rs. 1.006
164 Hiring of manpower Open tender 26.02.2016 Single 05.04.2016 9 Pvt. Ltd. - Solan (H.P). Yes Enterprise. - 19.05.2018
Hiring/ 08 (R1)/ 2015 Cr.
5) M/s - Minesh Mehsana
(R1)/ 2015 Date: 20.05.2018
security agency -
Gandhinagar. 6) M/s -
Kiran security services -
Ahmedabad. 7) M/s -
Bhakti management
services Pvt. Ltd. -
Gandhinagar. 8) M/s
- Orion security
solutions Pvt. Ltd. -
Mumbai.

PROJECT MANAGEMENT
CONSULTANCY for
Design and Construction of
Formation in
Embankments/Cuttings including
blanketing, Viaducts, Rail Flyover,
6,
Bridges (Major, Minor & RUBs),
M/s CEG Ltd, M/s
Supply and Spreading of Ballast
IFB No. RBP I&E Works, M/s Rodic
and other related infrastructural
HQ/EN/EC/ SEB M/s SOWiL Ltd, Consultants
works for double track electrified 07.12.2015, single stage two 900 days + DLP 24
165 JN/CS/PMC Open 08.03.2016 8 M/s SN Bhobe&A P Yes Date: 20.05.2018 Pvt. 8.6
railway line on Design Build Lump 10.12.2015 packet months
dated Ltd JV DIMMTS Ltd, Ltd., Gurgaon,
Sum Basis from Howrah end
07.12.2015 M/s Feedback Infra P Haryana.
approach of DFC Sone bridge to
Ltd, M/s SM
Chirailapathu station of IR towards
Consultants.
Howrah & to New Sonnagar station
towards Garhwa and at Dehri-on-
Sone yard from Km. 3.16 to Km.
5.38 in connection with Eastern
Dedicated Freight Corridor in the
state of Bihar in India.

M/S BC-VGS
Infra JV (M/S
Shifting and Commissioning of Binod
Three Phase Double Circuit 132 construction,
CPM/MTC/ KV NCR Transmission line in 01 M/s MAN LOA NO Industrial
DFCCIL/ 132KV connection with proposed DFCCIL Structural Pvt. Ltd. CPM/MTC/DFCCI estate Kokar
INR
166 NCR ALIGNMENT at BORAKI, WEIR, Open Tender 10.12.2015 Double Bid System 13.01.2016 2 P.B. No. 189, Near Yes L/132KV NCR Tr. Ranchi- 25.04.2018
7.18 Crore
Tr. Line/OT/ DANKAUR, and Loco, Line/OT/2015-16 834001 & VGS
2015-16 KHURJA in Khurja- Dadri section Jaipur (Rajasthan) dated 26.04.2016 Infrastructure
in the Jurisdiction of Chief Project Pvt. Ltd 140-B,
Manager/DFCCIL/Meer ut unit. Pocket- F,
GTB Enclave
Delhi-110093)

Engagement of Manpower Service LOA No.


Noida/ Hiring of M/s JMD
Provider agency for providing M/s Security Solution DFCC/Noida Unit/
Manpower Single packet Consultants,
167 various categories of outsourced Open Tender 02/07/2015 24/07/2015 6 and Manpower Yes Tender/Hiring of 1.07 31/08/2016
Services/01/ system Shakarpur,
staff for Chief Project Manager/ Services, Noida, UP Manpower dtd. 22-
2015 Delhi-92
DFCCIL, Noida Unit 08-15

M/S Vivek
Travels
21-5-2013 on LOA No: NOIDA
NOIDA (Regd), SD
Hiring of Vehicles for DFCCIL website and 28- Unit/DFCC/Vehicle 3 years after issue of
168 Unit/DFCC/ Open Tender Single 25/06/2013 Two Under TC Under TC Block, Main 1.85
under CPM/ NOIDA 5-2013 in /13/01 Dt. 19-07- Letter Of Acceptance
Vehicle/13/0 1 Road,
newspapers 2013
Pitampura,
Delhi
Design and Construction of
Formation in
Embankments/Cuttings including
blanketing, Viaducts, Rail
Flyover,Bridges (Major, Minor &
IFP No:
RUBs),Supply and Spreading of
HQ/EN/EC/
Ballast and other related
PQ/SEB- BCJ-
infrastructural works for double M/s ATEPL-
CPBH LOA No.
track electrified railway line on Issued PQ on PQ followed by MGCPL
dated PQ 23.07.2015, PQ-3, PQ-Nil, HQ/EN/EC/SEB
169 Design Build Lump Sum Basis Open PQ 01.06.2015, Bid bidding single Yes Joint 365.22 900 days
01/06/2015 Bid 29.12.2015 Bid-2. Bid-Nil. Jn.Works/Bid Doc
from Howrah end approach of DFC on 09.10.2015 stage two packet. Venture,New
& IFB No: dated 26.04.2016
Sone bridge to Chirailapathu Delhi.
HQ/EN/EC/ SEB
station of IR towards Howrah & to
JN.Works dated
New Sonnagar station towards
09.10.2015
Garhwa and at Dehri-on- Sone
yard from Km. 3.16 to Km. 5.38 in
connection with Eastern Dedicated
Freight Corridor in the state of
Bihar in India.

Social and Environmental


Safeguards Monitoring and Review M/s Haskoning
HQ/SEMU/ 1, M/s SAI HQ/SEMU/SESM
Consultancy (SESMRC)for Two Packet DHV
170 SESMRC/E EOI 05.05.2013 29.04.14 4 Consulting Engineers Yes RC/02/13 Dated: 1.97 1.12.2018
Bhaupur System Consulting
OI/APL-2/13 Pvt. Ltd. 2.12.2014
– Mughalsarai Sec. Pvt.Ltd.
(APL-2) of EDFC
Design, Construction, Supply,
Installation, Testing and
SPN PQ issued
Commissioning of 2x25 AC 50 Hz
on 16.07.2012 08.08.2014 (First
Electrification, Signalling and JV of Alstom
HQ/SYS/ EC/D- Pre and first stage bid stage bid)
Telecommunication and 3 during first HQ/SYS/EC/D-B/ India Limited
B/ Qualification invitation issued Two stage Bidding 27.04.2015
associated works of Double Track stage and 3 Bhaupura Khurja/ (AIL) and 1100 days from
171 Bhaupur- Khurja followed by on 31.01.2014 from Pre-qualified (Second stage Nil Yes 1497.11
Railways Lines Under construction during second CP-104 dated Alstom commencement date
Dated two stage and bidders bid from
on A Design Buid Lump Sum Basis stage 21.07.2015 Transport
31.01.2014 bidding second stage bid technically
for Bhaupur- Khurja Section of S.A. (ATSA)
invitation issued qualified bidders)
Eastern Dedicated Freight Corridor
on 21.02.2015
(System Works Contract Package-
104)

M/s
Siddhivinayak
Engagement of Manpower service LOA No.
Sushikshit
MUM/HR/ provider for outsourcing of support MUM/HR/Manpow
Berojgar Seva Rs. 1.22
172 Manpower/ OA, services at offices in the Open Tender 31.02.2015 Single Bid System 09.03.2015 10 NA Yes er/OA, EA & 31/05/2017
Sarkari Crore
EA & ACO/303 Jurisdiction of ACO/303 dtd :
Sanstha
CPM/DFCCIL/Mumbai 02/05/15
Maryadit
Mumbai
Design and Construction of Civil,
Structures and Track Works for
Double Line Railway involving
Formation in
Embankments/Cuttings, Ballast on SPN for PQ
Formation, Track Works, Bridges, issued on
29.05.2014 (First
Structures, Buildings, Yards, 11.04.2013 and
HQ/EN/EC/ D-B/ Pre stage bid) , HQ/EN/EC/D-
Integration with IR Existing Railway first stage bid 7 during first
Mughalsarai Qualificaiton Two stage bidding 24.11.2014 B/Mughalsarai - New
System and Testing & invitation issued stage and 5 Rs. 2664.09
173 - New Bhaupur followed by from pre qualified (Second stage Nil Yes Bhaupur /CP - 202 GIL - SIL JV 20.01.2019
Commissioning on Design-Build on 12.02.2014 during second Crores
Dated two stage bidders. bid from Dated
Lump Sum Basis for New and second stage
12.02.2014 bidding technically 27.05.2015
Karchana Station (excluding) – stage bid
qualified bidders)
New Bhaupur station (excluding) invitation issued
(Approx. on 01.10.2014.
236 Route Km out of which 229.5
Km is double line and 6.7 km is
single line) of Eastern Dedicated
Freight Corridor.

Design and Construction of Civil,


Structures and Track Works for
Double Line Railway involving
Formation in
SPN for PQ
Embankments/Cuttings, Ballast on
issued on
Formation, Track Works, Bridges, 29.05.2014 (First
HQ/EN/EC 11.04.2013 and
Structures, Buildings, Yards, Pre stage bid) , HQ/EN/EC/D-
/D-B/ first stage bid 8 during first
Integration with IR existing Railway Qualificaiton Two stage bidding 24.11.2014 B/Mughalsarai - New
Mughalsarai invitation issued stage and 5 Rs.2416.68
174 System and Testing & followed by from pre qualified (Second stage Nil Yes Bhaupur /CP - 201 GIL - SIL JV 20.01.2019
- New Bhaupur on 12.02.2014 during second Crores
Commissioning on Design-Build two stage bidders. bid from Dated
Dated and second stage
Lump Sum Basis for Mughalsarai – bidding technically 27.05.2015
12.02.2014 stage bid
New Karchana Station (including) qualified bidders)
invitation issued
(Approx. 181 Route Km out of
on 01.10.2014.
which
158.6 Km is double line and 22.43
is single line) of Eastern Dedicated
Freight Corridor

One Sanjeev Bahl M/s Durga Co-


Construction of Station Buildings,
(Contractor), Marble LOA No. operative L&C
CPM/UMB/ S&T- Relay Rooms and Gate Goomties
House, Punjabi CPM/UMB/S&T- Society Ltd.,
175 Utility/2015/ PB- in connection with shifting of S&T Open Tender 24.01.2015 Single 16.02.2015 2 Yes 1.03 08.09.2015
Mohalla, Utlity/2015/PB-01 #16, Jawahar
01 Utilities in the Punjab State under
Ambala Cantt- dated 09.03.2015 Nagar, Ambala
the jurisdiction of CPM/Ambala
133001 City.

HQ/EN/PW Project management Consultancy HQ/EN/PWC/RFP/ M/s


JYP-294.45 INR-
176 C/RFP/PMC for Rewari to Vododara Section of Single Bid System PMC/PHASE-I N.K.Constortiu 06 Years
474.25
/PHASE-I Phase-I of WDFC Dated 21.02.2014 m

Design and construction of


Civil,Building<trackwork s for
HQ/EN/PW double line Railway involving
HQ/EN/PWC/PRE-
C/PRE- embankments/cutting,st
WORKS/PHASE-
WORKS/PH ructure,building,ballast on Single Bid SOJITZ-L&T
177 I/PKG1&2/D&B/1/ 6699.5 208 WEEKS
ASE- formation,track works,including System CONSORTIUM
SOJITZ-L&T
I/PKG1&2/ testing,abnd commissioning on
06.08.2013
D&B/1 designbuild lump-sum price basis
for Rewari- Iqbalgarh Section of
WDFC-PH-I

Contract
awarded to
the firm who Joint Venture
scored of Mott
RFP issued to Quality and Cost
HQ/EN/PR Quality and Safety Audit EOI published on Last date of highest HQ/EN/PROCURE MacDonald
shortlisted base GBP 920056/- +
OCUREME Consultancy services for Bhaupur- 11/10/12, RFP submission of combined MENT/QSAC/BAU- Limited ,UK
178 consultants in selection(QCBS) 2 0 INR 177,670,06 42 months
NT/QSAC/ BAU- Khurja issued on date RFP was technical and KRJ dated and Mott
response to with 2 packet 6
KRJ section of EDFC Project- I 25/04/2013 27/08/2013 financial 06.05.2014 MacDonald
published EOI system
score based Private Limited
on QCBS India
selection
process

Construction of Boundary wall,


The Durga Co-
supplying & fixing of boundary
None (It was a single LOA No. op L&C
CPM/UMB/ posts along newly acquired land by 6 Months from the
packet bid & work CPM/UMB/BW/2/ Society Ltd.,
179 BW/2/Const DFCCIL from Kalanaur to Ambala Open Tender 25.10.2013 Single 25.11.2013 3(Three) Yes 1.16 date of Start
was awarded to L1 Const. dated 16 Jawahar
. city in Haryana within the i.e.22.08.2014
tenderer) 22.02.2014 Nagar, Ambala
Jurisdiction of
City
CPM/DFCCIL/Ambala.

M/s Kardam
Constructions Pvt. M/s S.G.
CPM/ Ltd., C-8, Road No.- CPM/ Constructions,
6 Months after issue of
180 UMB/BW/3/ Civil Work Open Tender 25.10.2013 Single Bid 25.11.2013 Two 11, Nitya Nand Yes UMB/BW/3/Const. 951,Urban 1.35
LOA.
Const. Nagar, Gandhi Path, dated: 25.04.2014 Estate Phase,
Vaishali Nagar, Jalandhar.
Jaipur- 302021.

Prepartion of GAD for proposed


ROBs in Lieu of LC gates JNPT-
BSR on WDFC and ROBs of
Central Railway comprising of
Engineering Survey, Geo-
technological investigation;
prepartion
& approval of GADs from Mum/EN/LT/
MUM/EN/LT M/s. SOWIL
181 concerned Railway authorities etc. Limited Tender 03.10.2012 Single BID 05.11.2012 2 NA Yes ROB/254 1.42 20.11.2014
/ROB/254 Ltd
including temporary diversions, dt.19/12/2012
temporary LCs, prepartion of
detailed design & drawings of
ROBs (Railway portion including
FOBs/Subways wherever
required), and prepartion of BOQ
,Estimate, Schedule if quantites for
construction of ROBs etc
M/s Vivek
Travels(regd.),
Hiring of Vehicles for DFCCIL at ROB/254 SD Block, main
182 NA NA NA NA NA NA NA 1.84 19.07.2016
Corporate office dt.19/12/2012 Road,
Pitampura
Delhi

PMC for Design and Construction


of Important Bridge across river
Sone(approx. lengh 3.06.km), its
approaches (on both sides) and
other miscellaneous works for
double track electrified railway line
on Design Build Lump Sum Basis
between Sonnagar(Rly.km
NCB No. M/s
549) and Dehri-on- Sone(Rly. km.
HQ/EN/EC/ LOA No. Intercontinental
554) Railway Stations on
NKWD- HQ/GGM/CO/EC/ Consultants
Mughalsarai-Sonnagar Section of
183 NGAQ/Sone Open 06.09.2013 Two Packet 19.11.2013 5 2 Yes PM-SEB- and 13.9 1216 days
Eastern DFC & Design and
RFO/PMC GAQN/73/2013 Technocrats
Construction of Rail Flyover near
dated dated 02-01-2014 Pvt. Ltd, New
Ganjkhwaja, Formation in
06.09.2013 Delhi
Embankments/Cuttings including
blanketing, Bridge(Major, Minor &
RUBs), Supply and Spreading of
Ballast and oher related
infrastructural works for double
track electrified railway line on
Design Build Lump Sum
Basis in different stretches

Design and Construction of Rail


Flyover near Ganjkhwaja,
Formation in
Embankments/Cuttings including
blanketing, Bridges (Major, Minor &
RUBs), Supply and Spreading of
IFB No. LOA No.
Ballast and other related
HQ/EN/EC/ DOS- Issued PQ on PQ followed by HQ/EN/EC/DOS- M/s ILF&S
infrastructural works for double PQ 19.03.2013 PQ-10
184 MGS/RFO& Open PQ 31.10.2013 Bid bidding, Single PQ-2 Bid-Nil Yes MGS/Bid/RFO & Bal. Engg- GPT(JV) 144.65 900 days
track electrified railway line on Bid 08.08.2013 Bid-3
Bal.Works Date 14.06.2013 stage two packet Works dated hyderabad
Design Build Lump Sum Basis in
14.06.2013 12.11.2013
different stretches between Dehri-
on-Sone
& Mughalsarai of Eastern
Dedicated Freight Corridor in the
states of Bihar and Uttar Pradesh
in India

RFP No. RFP issued to


HQ/EN/proc Project Management Consultancy short listed HQ/EN/Procureme
Joint Venture
185 urement/PM Services for Bhaupur-Khurja consultants in 31.10.2013 Bidding 19.03.2013 6 nil yes nt/PMC/BAU-KRJ 80.98 72 months
SAI- TYPSA
C/BAU-KRJ Section of Eastern DFC Project-1 response to dated 31.01.13
dated 11.01.13 EOI

Design and Construction of


important Bridge across river
Sone(approximate length 3.06
Kms),its approaches(on both
IFB No. sides) and other miscellaneous LOA No. M/s ATEPL-
HQ/EN/EC/ works for double track electrified PQ-14, HQ/EN/EC/Bid/So MGCPL
186 Open PQ id Single Stage Bid PQ-Nil Bid-1 Yes 249.84 1216 Days
DB/Sone Bridge railway line on Design build Lump Bid-7 ne Bridge/Pt.II Dated Joint Venture,
Date 23.04.2013 Sum Basis between Sonnagar(Rly. 24.10.2013 New Delhi
Km. 549) and Dehri-on- Sone(Rly.
Km. 554) railway Station on
Mughalsarai-Sonnagar Section of
Eastern Dedicated Freight Corridor

No. M/s Operations


HQ/SEMU/
Social & Environmental Safeguard HQ/SEMU/SESM Research
187 SESMRC/E EOI 14.06.2013 Two Packet 30.01.1900 3 Nil Yes 1.08 31.07.2017
Monitoring & Review Consultancy RC/EOI/11-12/2 Group Pvt. Ltd.
OI/11-12/2
Dated:01.08.2013 (ORG)

PMC for Design and construction


of Track, signalling & Telecom
4 Parties:1) EGIS
works, Traction power
India Consulting
HQ/EN/ EC/NK supply,SCADA,OHE and M/s Wilbur
Engineers Pvt. Ltd..
WDNGAQ/ T general Electrical works and its smith
2) SOWIL HQ/EN/EC/NKWD
racksystem s/ testing & commissioning for double associates pvt.
188 Open Tender 15.06.2012 Two Bid System 27.09.2012 5 Limited.3) LEA Yes /DGO/PMC-Track 19.02 07.07.2017
PMC line electrical railway track from Ltd. JV with
Associates South /Adt-d 08.03.2013
dated 22.06.20 New Karwandiya(Rly. Km ardanury
Asia Pvt. Ltd. 4) SAI
12 564) to Durgawati(Km 630) approx. Igeneieria, S.A.
Consulting engineers
66 Kms on Mughalsarai-Sonnagar
Pvt. Ltd.
section of Eastern Dedicated
freight Corridor

Preparation of GAD, & detail


design , modification/rebuilding of
ROB Engineering Survey; M/s Construma
DFC / ADI / NIL DFC / ADI / GAD
Geotechnical investigation; 15.12.2012 Consultancy
189 GAD / 4 / 2012- Open Tender Single 21.01.2013 10 (Awarded to Lowest Yes /4 / 2012-13 3.51 21.04.2017
Preparation of Land Acquisition (Indian Exp.) Pvt.
13 offer) 14.03.2013
Plans; estimate, Schedule of Ltd
quantities and Comprehensive
tender documents.

Dismantling of acquired structures JP/EN/Dismantling


JP/EN/Dism
from Rewari to Madar along DFCC of
antling of Website & M/s Miral
190 alignment in the State of Haryana 04.12.12 Single 07.01.13 6 Nil Yes structures/2012/10 1.05 22.09.13
structures/2 office Infrastructure
and Rajasthan on Western Freight 2/01-R Dated
012/102/01- R
Corridor under CPM/ JAIPUR 23.3.13

LOA No.
HQ/Admin/Tender/
HQ/Admin/T Engagement of manpower service
Housekeeping
ender/Hous provider for outsourcing of GA Digital Web
191 Open Tender 16.10.12 Single Bid 16.11.12 7 Not Applicable Yes services/12 dated 1.12 31.12.2014
ekeeping housekeeping services in word(P) Ltd
20.12.12 Date of
services/12 DFCCIL's Corporate office
start of work-
01.01.13

PQ No.
HQ/EN/EC/
Track/NKW D-
DGO
dated M/s Ferrovia
Issued PQ HQ/EN/EC/NKWD-
18.11.2011 Single stage two PQ 16.01.2012 PQ-22 Transrail
192 Track Works Open PQ 18.11.2011, Bid PQ Nil Bid-9 Yes DGO/Track Bid 147.61 540 days
Bid No. packet after PQ Bid 30.05.2012 Bid-11 Solutions Pvt.
17.04.2012 Dated 20.07.2012
HQ/EN/EC/ Ltd.
Track/NKW D-
DGO
dated
17.04.2012
2 Parties:(1) INECO
S.A. Contract
in JV with Prointec Awarded to
S.A. and LEA the firm who
HQ/EN/Proc
Associate South asia scored
urement/GC RFP issued to Quality and cost HQ/EN/Procureme
Pvt. Ltd. highest
/MGS- BAU(PH- General consultancy Services for short listed base nt/GC/MGS- AECOM Asia
EOI published on (2) SYSTRA combined
193 2), KRJ- LDH(PH- Bhaupur- Mughalsarai and Khurja- consultant in selection(QCBS) 03.05.2012 6 BAU(PH-2), KRJ- Company 18.18 36 months
03.05.2011 S.A. France JV with technical and
3) Ludhiana Section of EDFC response to with 2 packet LDH(PH-3) Dated Limited
CANA RAIL financial
Dated EOI system 09.01.2013
Consultant INC. score based
11.04.2012
CANADA and on QCBS
SYSTRA MVA selection
consulting India Pvt. process
Ltd.

Design and construction of Civil,


Structures and Track works for
double line railway involving SPN for PQ
Formation in issued on
Embankments/Cuttings Ballast on 05.04.2010 and 30.03.2012(First
13
HQ/EN/DB/ Formation, Track Works, Bridges, Prequalificatio first stage Bid Stage Bid),
Two stage Bidding during First HQ/EN/DB/Bhaup ur-
Bhaupur- Khurja Structures, Buildings including n followed by invitation issued 20.12.2012(Seco TATA-
194 from Pre-qualified stage and 9 NIL Yes Khurja Lot 101 1329.5 21.04.2017
Lot 101 dt. Testing and Commisioning on two stage on 24.12.2011 nd stage bid ALDESA(JV)
bidders during second dt. 08.03.2013
24.12.2011 Design-Build Lump- Sum basis for bidding and Second from Technically
stage
bhaupur- khurja section of Eastern stage bid qualified bidders)
Dedicated Freight Corridor Lot invitation issued
101(Bhaupur village to Bhathura on 08.11.2012
village rly.
1040-1170)

Design and construction of Civil,


Structures and Track works for
SPN for PQ
double line railway involving
issued on
Formation in
05.04.2010 and 30.03.2012(First
Embankments/Cuttings Ballast on 13
HQ/EN/DB/ Prequalificatio first stage Bid Stage Bid),
Formation, Track Works, Bridges, Two stage Bidding during First HQ/EN/DB/Bhaup ur-
Bhaupur- Khurja n followed by invitation issued 20.12.2012(Seco TATA-
195 Structures, Buildings including from Pre-qualified stage and 9 NIL Yes Khurja Lot 102 925.9 21.04.2017
Lot 102 dt. two stage on 24.12.2011 nd stage bid ALDESA(JV)
Testing and Commisioning on bidders during second dt. 08.03.2013
24.12.2011 bidding and Second from Technically
Design-Build Lump- Sum basis for stage
stage bid qualified bidders)
bhaupur- khurja section of Eastern
invitation issued
Dedicated Freight Corridor Lot
on 08.11.2012
102(Bhathura village to Birauni
village rly. 1170- 1266)

Design and construction of Civil,


Structures and Track works for
SPN for PQ
double line railway involving
issued on
Formation in
05.04.2010 and 30.03.2012(First
Embankments/Cuttings Ballast on 13
HQ/EN/DB/ Prequalificatio first stage Bid Stage Bid),
Formation, Track Works, Bridges, Two stage Bidding during First HQ/EN/DB/Bhaup ur-
Bhaupur- Khurja n followed by invitation issued 20.12.2012(Seco 1(OHL-PUNJ TATA-
196 Structures, Buildings including from Pre-qualified stage and 9 Yes Khurja Lot 103dt. 1012.14 21.04.2017
Lot 103 dt. two stage on 24.12.2011 nd stage bid LIOYD(JV)) ALDESA(JV)
Testing and Commisioning on bidders during second 08.03.2013
24.12.2011 bidding and Second from Technically
Design-Build Lump- Sum basis for stage
stage bid qualified bidders)
bhaupur- khurja section of Eastern
invitation issued
Dedicated Freight Corridor Lot
on 08.11.2012
103( Birauni village to Khurja rly.
Km. 1266- 1368)

M/s Nippon
Koei Co. Ltd,
Japan Railway
The Project for Construction of JPY 1,069,968,1
HQ/EN/WC/ technical
Freight Corridor: Dadri-Rewarri 01 ( INR
197 E&S dated 05.12.2011 Service, PB
& Vadodara-JNPT Section under 302,702,30
30.11.2011 Japan Co. Ltd
Phase-2. 1)
and Nippon
Koei India Pvt.
Ltd

DFCCIL/HQ
DFCCIL/HQ/AD/TE
/AD/Tender/
Hiring of Vehicles for DFCCIL at NDER-2011- M/s Vivek
198 2011-12-III Open Tende 01.09.2011 Single bid system 30.09.2011 3 Nill yes 4.62 31.10.2014
Corporate office 2012(III) Travels
Dated
Date:15/11/2011
15.11.2011

DFCCIL invites sealed bids from


eligible Bidders for design and
development of package-based
integrated IT Solution, procurement
Original DOC
of hardware and software, testing, 01. Infosys M/s HCL
DFCCIL/IT/ Single stage & two DFCCIL/IT/SI/2011 30.06.2013
199 ensuring security, deployment and Open Tender 04.07.2011 11.11.2011 4 Technologies Yes Technologies 23.98
SI/2011 packet 29.03.2012 Extended up to
commissioning, training to end- Limited Ltd.
30.09.2016
users, post implementation
Warranty and Operation
& Maintenance for a period of three
years, for IT Project at DFCCIL

HQ/EN/EC/ Original DOC =


TS/EN/PETS/Futu re
PETS/Futur e 11.9.2014
200 PETS Survey for Future Corridors SINGLE DFC Date : M/s RITES Ltd 63.552
DFC Extended upto
14.10.2011
Dated 2.9.2011 29.2.2016

Geotechnical Investigation,
CPM/ADI/E Preparation of GAD of bridges,
N/Pre ( Works) preparation of schedule of Hydropneum
201 20.5.2011 1.17
Wamaj - IGQ ( quantities, Joint measurement Systems,Pune
East)/2 survey, preparation of land plans &
land acquisition

Original DOC
Consultancy Service for Overall IT 01 Vyam
HQ/IT/PPF/1 Dated 16/05/2012
202 HQ/IT/PPF/ 1 Strategy and Program EOI and RFP 30.06.2009 EOI and RFP 20.01.2010 6 Technologies Pvt. No M/S WIPRO 1.08
17.05.2010 Extended upto
Management Ltd.
31.12.2016

M/s Nippon
Koei Co. Ltd,
Japan Railway
Engineering Consulting Services JPY 1,79,603,00
HQ/EN/WC/ technical
for construction of WDFC- RE- 0 ( INR
203 E&S/Pt IV dated 12.5.2010 Service, PB
BRC and procurement of Eectric 396,108,00
12.5.2010 Japan Co. Ltd
locomotives. 0)
and Nippon
Koei India Pvt.
Ltd

Contract
Awarded to
the firm who
scored
RFP issued to Quality and cost M/s Scott
Consultancy Service for Design EOI published on Last date of highest
short listed base Wilson Ltd.,
HQ/Engg./P Review Consultancy for 27.03.09.RFP submission of combined HQ/EN/PPF/DRC/ 12 weeks after
204 consultants in selection(QCBS) 6 0 U.K & Scott 1.2
PL/DRC/1 Khurja_Bhaupur section of issued on RFP was technical and 1 dated 11.02.10 11.02.10
response to with 2 packet Wilson India
Eastern DFC 14.07.09 20.10.2009 financial
published EOI system Pvt. Ltd.
score based
on QCBS
selection
process
23 feb 2010, extended
M/s VKS
HQ/EN/BB/ Preliminary works and detail engg HQ/EN/BB/Rewari- to 23.01.2014,
Infratech &
205 Rewari- Dadri/15 survey Rewari-Dadri dection & land Open tender 24.02.2009 Single bid system 25.03.2009 7 N/A Yes Dadri/15 & 16 2.8 further extension upto
Management
& 16 facilitation work dated 12.05.2009 23-4-2014 is under
Pvt Ltd
process

Design and construction of


formation including blanketing,
major Bridges, Minor Bridges,
RUBs,ROBs, Supply and
spreading of ballast and other
related infrastructural works for
HQ/EN/NK WD- Dedicated fright corridor from HQ/EN/NKWD- 16.12.2011 EOT
206 NGAQ/D&B/ chainage 14.108 Km(Near New NGAQ/D&B/03/20 BSC-C&C 'JV' 660.31 granted upto
03/2009 Karwandiya) to chainage 119.437 09 Dt-17.03.2009 20.02.2014
Km(Near New Ganj Khawaja)
approx
101.089 Kms, on Mughalsarai-Son
nagar Section of eastern corridor in
the state of Bihar and Uttar
Pradesh

M/s Consulting
Limited tender fro staking out Engineer
alignment, detail engineering None (It was a single Group Ltd., E-
LDH/EN/BB.CEG.
construction survey for packet bid & work 12, Moji
207 NA Limited Tender 03.02.09 Single 12.03.2009 3 Yes Agreement dated 1.54 24.07.09
locations)…. etc… from Kesri to was awarded to L1 Colony,
04.06.2009
Sanehwal on Eastern Dedicated tenderer) Malaviya
Freight Corridor Nagar, Jaipur-
302017

M/s Pankaj
Limited tender fro preparation of Patel &
General arrangement drawings for Associates,
proposed Road Over Bridges in 303,
None (It was a single
lieu of level corssing gates LDH/EN/ROB.PPA Chakrawarty
packet bid & work
208 NA (approx.43 Nos.) between Limited Tender 12.06.09 Single 30.06.2009 16 Yes /Agreement dated Complex, Opp. 1.13 9.12.2009
was awarded to L1
Kalanaur to Sanehwal in the State 11.11.2009 Kiran Park
tenderer)
of Haryana & Punjab Circle, Nawa
……. Estimates, Schedule of Vadaj,
quantities etc. Ahmedabad-
380013

Project Management Consultancy


Services for design and
construction of formation including
blanketing, major Bridges, Minor
Bridges, RUBs,ROBs, Supply and
M/s SMEC (
spreading of ballast and other
India ) Pvt.Ltd.,
related infrastructural works for
HQ/EN/EC/ HQ/EN/EC/NKWD- in Association 19.04.2012 EOT
Dedicated fright corridor from
209 NKWD- NGAQ/ NFAQ/PMC/04/20 with M/s Rodic 19.2 granted upto
chainage 14.108 Km(Near New
PMC 1 09 Dt. 10.06.2009 Consultants 20.02.2014
Karwandiya) to chainage 119.437
Pvt Ltd.
Km(Near New Ganj Khawaja)
Gurgaon .
approx
101.089 Kms, on Mughalsarai-Son
nagar Section of eastern corridor in
the state of Bihar and Uttar
Pradesh
Detail Engineering Construction
Survey of the proposed alignment
of the section, preparation of land
Plan and Land Acquisition
Proposal as per Railway 3 nos. As
(Amendment) Act, 2008, under: 1) M/s STUP
identification of utilities & Two bid Consultants Pvt. Ltd M/s Monarch
HQ/EN/EC/ Open tender HQ/EN/Ec/Pre- 25.06.2010
preparation of schedule of system(Technical 2)M/s EMA Unihorn Surveyors &
210 Pre(Works)/ (Two packet 28.05.2009 22.07.2009 8 Yes (Works)/DHN- SEB, 2 (original) extended
quantities for construction of followed by (India) Pvt. Contractors
DHN-SEB/ system) dated 29.09.2009 upto 31.07.2013
Dedicated Freight Corridor from Financial) Ltd 3) Lion Pvt. Ltd
Dhanbad at Km 270.88 to Engineering
Sonnagar at Km 549.04 Consultants
(Approx.route length of 278 Kms)
on Eastern Dedicated Freight
Corridor (KM 00.00 starts from
Howrah).
Detail Engineering Construction
Survey of the proposed alignment
of the section, preparation of land
Plan and Land Acquisition
Proposal as per Railway M/s Aarvee
2 nos.As under:1)
HQ/EN/EC/ (Amendment) Act, 2008, Associates
Open Two bid M/s STUP HQ/EN/EC/Pre-
Pre(Works)/ identification of utilities & Architects 30.04.2010(origi nal)
tender(Two system(Technical Consultants Pvt. Ltd (Works)/DKAE-
211 DKAE-DH, preparation of schedule of 28.05.2009 22.07.2009 8 Yes Engineers & 1.43 extended upto
packet followed by 2) M/s EMA DHN, dated
dated quantities for construction of consultant Pvt. 30.04.2013
system) Financial) Unihorn(India 04.08.2009
28.05.2009 Dedicated Freight Corridor from Ltd.
) Pvt. Ltd
Dankuni at Km 14.81 To Dhanbad , Hyderabad
at Km 270.88 (Approx. route length
of 256 Kms) on Eastern Dedicated
Freight Corridor (KM 00.00 starts
from Howrah).

Providing assistance for the


acquisition of land from the stage
of Sec. 20A onwards up to transfer Rodic
of title in favour of DFCCIL/Rlys. for Consultants
ALD/ EN/
212 construction of Dedicated Freight 14/04/2009 Private 1.01
Tender LA/ 48
Corridor Corporation from Limited,
Sonnagar (Km 549.04) to Ranchi.
Karchana
(Km 807.43).

Limited tender for staking out


alignment, detail engineering
construction survey for location(s)
preparation of Land Plan for
section 4 & 6 notification under
Indian Land Acquisition Act, 1989,
identification
& preparation of Land Acquisition Consulting
LDH/EN/Te Plan for dumping locations for Engineer
213 25/03/2009 1.54
nder.BB ballast/ blanket material etc, Group Ltd.,
Geotechnical investigation, Jaipur
preoaration of G.A.D. for Minor &
Major bridges along with
preparation of schedule of
quantities, estimate and DPR for
construction of Dedicated Frieght
Corridor from Kesri to Sanehwal on
Eastern Frieght Corridor.

Design and Construction of


important and major bridges
(54Nos) for Western Freight
M/s Soma
HQ/EN/WC/ Corridors between Vaitarna and
214 Open Tender 10.07.2008 Two BID System 04.09.2008 5 NIL YES 26/12/2008 Enterprises, 605.15
Bridge/D&B/ 1 Utran on Vaisai - Bharuch Section
Hyderabad
in the states of Maharastra and
Gujrat, India on Lump Sum
Contract.
Design and Construction of
formation including blanketing, M/s B.Seenah
HQ/EN/EC/ Major Bridges, for DFCC on & Co.
215 17/12/2008 781.06
Bridge/DNB/ 1 Mughalsarai-Sone Nagar Section (Projects) Ltd.,
of Eastern Corridor in States of Hyderabad
Bihar and Uttar Pradesh in India.

Prepaaration of GAD for proposed


ROBs etc in lieu of Level Crossing
M/s.Consulting
HQ/EN/EC/ LC Gates (51 Nos) between
216 27/10/2008 Engg Group 2.03
ROB UP Mughalsarai to Kalanaur in the
Ltd., Jaipur
State of Uttar Pradesh on Eastern
Freight Corridor

M/s (IL&FS)
HQ/OP&BD/ Project Consultancy services for
Ltd.
217 Business development of Business Plan of 23-09-2008 6.54
Consortium,
Plan/RFP/ Pt.4 DFC project in India.
New Delhi

Consortium
consisting of
parsons
Brinckerhoff
Contract India private
Awarded to Ltd., New
RFP issued to
the firm who Delhi(lead
short listed
scored partner),
General Consultancy services for consultants in Quality and cost LOA No.
Last date of highest Halcrow
the work of Double line Electrified response to base HQ/EN/GC/1 dt.
RFP issued on submission of combined Consulting
218 HQ/EN/GC/ 1 railway track complete with S&T notice in selection(QCBS) 3 0 22.09.2008 133.86 21.09.2014
date 10.04.08 RFP was technical and India Private
etc. for Bhaupur- Mandrak of newspaper for with 2 packet Agreement dated
08.07.2008 financial Ltd., New delhi,
Kanpur - Khurja section of EFC. short listing of system 04.03.2009
score based Wilbur Smith
detail design
on QCBS Associates
consultants
selection Inc.,
process Bangalore, Lea
Associates
South asia
private Ltd.,
New Delhi

30.03.2010 physically
Interior works Flooring partition,
M/s Godrej & Contract value work completed on
HQ/Adm/Off false ceiling complete Elec work for HQ/Adm./Off./1
219 Open 10.03.2008 - 31.03.2008 6 - yes Boyce Mfg. Co. 7.24 value on 15.11.2009 date of
ice/1 top and middle floor for DFCCIL 5/04/2008
Ltd., New Delhi completion 8.98 completion exetended
office Complex at Pragati Maidan
upto 30.03.2010

Interior works Flooring partition, M/s Space


HQ/Adm/Off false ceiling complete Elec work for HQ/ADM./OFF./1 Furniture 04.08.2008 extended
220 Open 10.03.2008 - 31.03.2008 7 - yes 3.73
ice/2 bottom floor for DFCCIL office 07/04/2008 System, New upto 30.09.2008
Complex at Pragati Maidan Delhi

Stacking out alignment Detailed


M/s Monarch
Engineering Const.Survey for
Surveyors
HQ/EN/Pre- DFCCIL from :Prempur at Km
221 14/03/2008 Contractors 1.9
Works/CNB 991.2 to Bhavpur (KM 1037.6) and
Pvt.
from Ekdil (KM 1146.69 to Kulwa
Ltd. Pune
(Km 1338.40) on EFC.

Stacking out alignment Detail M/s Monarch


Engineering Const. for DFCCIL Surveyors
HQ/EN/Pre-
222 from 12.03.2008 Contractors 2.48
Works/MTC
: Kulwa to Khurja, Khurja to Dadri Pvt.
and Khurja to Talheri Ltd., Pune

Stacking out alignment, Detailed


Engineering Construction Survey M/s Rodic
HQ/EN/Pre. for detour alignment at Dehri-On- Consultants
223 11.03.2008 3.21
(Works)/AL D/E Sone,Sasaram,ROB for Const. Pvt. Ltd.,
from Sonnagar to Karchana on Ranchi
EFC

M/s
Stacking out alignment Detailed
Consultancy
HQ/EN/Pre- Engineering Const. from :Madar to
224 07.03.2008 Engineers 5.31
Works/AII Palanpur Km 290 to Km 648 on
Group Ltd.
WFC
Jaipur

Stacking out alignment, Detailed


Engineering Construction Survey M/s Rodic
HQ/EN/Pre- from Nadiad at Km. Consultants
225 07.03.2008 2.65
Works/ADI 451.6 to Palampur (Km.648.4 ex Pvt.
Rewari) on Western Freight Ltd., Ranchi
Corridor

M/s Monarch
Stacking out alignment, Detailed
Surveyors
HQ/EN/Pre- Engineering Const. Survey from :
226 07.03.2008 Contractors 1.51
Works/ALD( W) Karchana at Km 807.43 to
Pvt.
Prempur at Km 991.2 on EFC.
Ltd., Pune

Stacking out alignment, Detail


engineering construction survey for
detour from Ambala to Doraha on
left side of GT Road and at any M/s Scott
other locations (s) as directed by Wilson India
HQ/EN/Pre-
227 the Engineer in Charge, 07.03.2008 Pvt. Ltd 3.36
Works/LDH
preparation of Land Plan for Mathura Road.
section etc. for construction of New Delhi.
DFCCIL from Talheri at Km 156 to
Ludhiana on Eastern Freight
Corridor.
Stacking out alignment detail
Engineering Const. for DFCCIL M/s Wilbur
HQ/EN/Pre- from Smith
228 07.03.2008 2.5
Works/JP :Khori ( Rewari ) to Madar Km 10 to Associates,
290 WFC and Rewari Area (35 Bangalore
Kms)
M/s
Stacking out alignment, Engg Con
HQ/EN/Pre- Consultancy
Survey work from Sachin at Km.
229 Works/BRC/ 04.03.2008 Engineers 3.19
251.6 to Nadiad at Km.451.6 on
2008 Group Ltd.
Western Freight Corridor
Jaipur

Design, supply installation testing


and commissioning of heating,
HQ/EL/ Tender- M/s Voltas Ltd,
230 ventilation and air conditioning 22.02.2008 3.37
AC/Pt.II New Delhi
(HVAC) system at DFCCIL office
Complex at Pragati Maidan

M/s STUP
HW/Engg/ Pre- Preliminary works of const. of 10.07.2008
Consultants
231 works/ Bridges major and important bridges from Limited Tender 07.01.2008 Two Bid System 23.01.2008 4 NIL YES 11.02.2008 1.24 extended upto
Pvt.
/Surat Vaitrana to Utran on Western DFC 15.10.11
Ltd.Mumbai
No.
2007/GM/E M/s Vivek
2007/GM/Engg.III/Hi
232 ngg III/Hiring Vehicle Hiring Limited Tender 24.08.2007 Single bid system 03.09.2007 5 Nill yes Travel Pvt. Ltd 1.67 31.10.2010
ring/Vehicle, Date:
Vehicle New Delhi
01/11/2007
Dismantling of structures from
JP/EN/Dism JP/EN/ Dismantling
Rewari to Madar along DFCC 30.04.2014
antling Website & of structures/2012/ M/s. Miral
233 alignment in the State of Haryana 04.12.2012 Single Bid System 07.01.2013 6 NIL Yes 1.05 (Contract is
of structures/2 Office 102/01-R dated Infrastructure
and Rajasthan on Western Freight completed)
012/ 102/01- R 23.03.2013
Corridor under CPM/JAIPUR

M/s Skylark
MTC/EN/DF MTC/EN/DFCCIL/
Detail Engg. Construction Survey designer &
CCIL/Detour Detour INR:
234 from Hafizpur to Daurala and Open Tender 23/02/2014 Single Bid System 28.04.2014 6 NA YES enginnering 04/12/2015
Survvey/20 14- Survvey/2014-15 1,49,94,4311
Khatauli to Rohana Kalan Pvt.
15 Dated 26.06.2014
Ltd. Noida

Design Supply, Erection, Testing


and Commissioning of 132 KV 3 HQ/EL/132/KVTR L- M/s Associate
HQ/EL/132k
Phase Double Circuit Transmission single stage/Two XING/EC/02/ 02 Power
235 VTRL- XING/EC- Open Tender 14/05/2013 12/07/2013 one one YES Rs.25.45 Cr. 10.04.2015
Line Xing Modification work for packet system /2013 DTD Structures Pvt.
02dt. 14.5.2013
DFCalignment in Allahabad 11.10.2013 Ltd.
Division of North Centra Railway

HQ/EN/WC/ PMC for Design and Construction HQ/EN/WC/BRID M/S SNC 10.71 25.09.2012
236 BRIDGES/ of 54 Major Bridges in WDFC Open Tender 01.10.2008 Two BID System 06.11.2008 NA YES GES/PMC/1/SPA Lavanin Pvt. revised C>A. extended upto
PMC/1 between Vaitarana and UTRAN N dated 12.06.2009 Ltd. 17.85 29.12.14

Design, Construction, Supply,


installation, testing and
Commissioning of 2x25 KV
electrification, signalling &
telecommunication and
associated works for the double one (Siemens Yes (out of HQ/SYS/DB/NKW D-
HQ/SYS/DB Single stage Two M/s Larsen &
237 track railway line under open Tender 26.10.2012 05.02.2013 Two infrastructure and two, one firm DGO/01/2013 Rs. 315 Cr. 18.08.2015
/NKWD- DGO packet system Toubro Limited
construction on design buid lump cities) disqualified) dated 08.05.2013
sum basis from new- karwandiya
(Rly km
564) approx. 66 kms of route on
mughalsarai section of Eastern
deidcated freight corridor

You might also like