Activity Inventory Cost Flow and LCNRV
Activity Inventory Cost Flow and LCNRV
Activity Inventory Cost Flow and LCNRV
6. During the current year, an entity purchased a tract of land for P12,000,000. The entity incurred
additional cost of P3,000,000 in preparing the land for sale. Of the tract of land, 70 % was
subdivided into residential lots and 30 % was for road and a park. The tract of land was
subdivided into residential lots as 100 Class A lots with sale price of P240,000 per lot. 100 Class
B lots with sale price of P160,000 per lot, and 200 Class C lots with sale price of P100,000 per
lot. What amount of the costs should be allocated to Class A lots?
a. 3,000,000
b. 3,750,000
c. 6,000,000
d. 4,200,000