Design 2 1
Design 2 1
Design 2 1
D.E.P.W.
OFFICE OF THE BUILDING OFFICIAL
CITY OF CEBU
SCOPE OF WORK
RECOMMENDING APPROVAL:
A ARCHITECTURAL
27.55
2.15 4.70 4.70 4.70 3.60 4.70 3.00
HEAD DATE
CIVIL/STRUCTURAL
B
PROP. 2"X2" ANGLE BAR
LADDER TYPE (SEE DETAIL) HEAD DATE
2.95
STORAGE
R S
DRY WALL
DRY WALL
ROOM
WALL
T E
SANITARY
N
5.10
BALCONY
A
D4
P L
FIRE
1.08
FEMALE D2 D3 D3
A
HEAD DATE
MECHANICAL
1 2 3 4 5 6 7 ELECTRONICS
RECOMMENDING APPROVAL
A
ROOF DECK PLAN
SCALE : 1:80 MTS. LOWELL M. CORMINAL
OIC-ASST. CITY ENGINEER HEAD DATE
FROM THE OFFICE OF: PREPARED: CHECKED & RECOMMENDED BY: PROJECT TITLE: SOURCE OF FUND: AIP 2015 APPROVED AS TO PLANS: APPROVED: SHEET NO.
A1 - A4
E
O F F IC
IN
TY
U
C EB 3RD FLR. YUTIVO BLDG. JAKOSALEM ST. CEBU CITY ENGINEER, DEPW
OF ENGINEERING ASSISTANT, DEPW ARCHITECT IV - HEAD, PLANNING & DESIGN DIVISION LOCATION: BRGY. PASIL, CEBU CITY CEBU CITY MAYOR
CITY APPROVED: