The document is a proposal for a perimeter fence and gate for a two-storey residential house in Cavite. It includes a bill of materials and cost estimate with items such as concrete, rebar, hollow blocks, tubular steel for gates and railings, paint and labor. The total proposed cost is 662,728.50 pesos, which covers materials, labor, overhead, contingencies and profit for the structural works including columns, beams, block wall construction and gates/railings.
The document is a proposal for a perimeter fence and gate for a two-storey residential house in Cavite. It includes a bill of materials and cost estimate with items such as concrete, rebar, hollow blocks, tubular steel for gates and railings, paint and labor. The total proposed cost is 662,728.50 pesos, which covers materials, labor, overhead, contingencies and profit for the structural works including columns, beams, block wall construction and gates/railings.
The document is a proposal for a perimeter fence and gate for a two-storey residential house in Cavite. It includes a bill of materials and cost estimate with items such as concrete, rebar, hollow blocks, tubular steel for gates and railings, paint and labor. The total proposed cost is 662,728.50 pesos, which covers materials, labor, overhead, contingencies and profit for the structural works including columns, beams, block wall construction and gates/railings.
The document is a proposal for a perimeter fence and gate for a two-storey residential house in Cavite. It includes a bill of materials and cost estimate with items such as concrete, rebar, hollow blocks, tubular steel for gates and railings, paint and labor. The total proposed cost is 662,728.50 pesos, which covers materials, labor, overhead, contingencies and profit for the structural works including columns, beams, block wall construction and gates/railings.
100mm x 50mm x 2mm thk Tubular B.I 6.00 pcs 1,500.00 9,000.00 800.00 4,800.00 13,800.00 50mm x 50mm x 2mm thk Tubular B.I 13.00 pcs 1,000.00 13,000.00 800.00 10,400.00 23,400.00 Spray Paint Finish 1.00 lot 15,000.00 15,000.00 10,000.00 10,000.00 25,000.00 Mechanisms for Gates 1.00 lot 15,000.00
Subtotal 631,170.00
Note: TOTAL AMOUNT 631,170.00
Existing Footing and Wall Footing to be Re-used Overhead, Contingency, Profit, Misc. 31,558.50 New CHB Fence will be installated in existing (approximately 1.5m ht.) GRANDTOTAL 662,728.50