Schedule of Rate, Both Civil and Mechanical/Electrical With All Corrigendum and Addendum As On 03-Nov-2021

Download as pdf or txt
Download as pdf or txt
You are on page 1of 159

Schedule of Rate, both Civil and Mechanical/Electrical

with all corrigendum and addendum as on 03-Nov-2021


GOVERNMENT OF WEST BENGAL
DEPARTIVIENT OF PUBLIC HEALTH ENGINEERING
NEW SECRETARIAT BUILDINGS (7"' fl oor), KOLKATA - 7fim01

Memo no: - PHE/M 2583 lW-82/2021 Datez 02.11.2021

ORDER
The undersigned is directed by order of the Govemor to say that, the Governor is pleased to
accept the Schedule of Rates (Civil & Mechanical/Electrical) recommended by the Schedule Committee
formed vide Order No. PHE/IV/201 8/W- l 08/2020 dated 04.12.2020 at its meeting held on 04. 10.202 I .

2. This order issues in tandem with the approval of Secretary of this Department.

3. All concerned are being informed.

By order of the Governor,

\ nooror^iko
to the Government of West Bengal

Memo no: - PIIE/TV/ 25&3 Date:02.11.2021


^N-82n021
Copy forwarded for necessary action to the:-

.
f Principal Accountant General (Audit), West Bengal.
2. Principal Accountant General (A&E), West Bengal (Express Budget Section)
3. Principal Accountant General (R.W & L.B.A), West Bengal.
4. Principal Accountant General (General & Social Sector), West Bengal.
5. Accountant General (Economic & Revenue Sector Audit), West Bengal.
6. Dy. Accountant General (A/Cs & VLC), Express-A.M.-I Section, Treasury Bldgs, Kol-l
7. Director of Treasuries & Accounts, West Bengal.
8. Special Secretary/ Joint Secretary, Finance Department (Group N), Nabanna.
9. Special Secretary/ Joint Secretary, Finance Deparfinent (Group F), Nabanna.
10. Special Secretary/ Joint Secretary, Finance Department (Group T), Nabanna.
I l. Sr. P.S. to Minister-in-Charge, PHE Department.
12. Sr. P.A to the Secretary, PFIE Department
13. P.A. to the Engineer-in-Chief, PHE Department.
14. P.A. to the Additional Secretary, PHE Department.
15. Financial Advisor, PHE. Department.
16. Chief Engineer (H.Qs), PHE Directorate
17. Chief Engineer (Planning & WQM), PHE Directorate
18. Chief Engineer (Western Zone\, PHE Directorate.
19. Chief Engineer (Northern Zone), PHE Directorate.
20. Chief Engineer, Northern Zone (MlE), PHE Directorate.
21. Chief Engineer(Southem Zone), PHE Directorate.
22. Project Director, PMU, Purulia, WBPWSP, PIIE Dte.
23. Chief Engineer & Project Director, WBDWSIP, PHE Dte.
24. File Copy.

o-\ rr\ 2t
Secretary (Technical)
to the Government of West Bengal
INDEX
Sl. No. Subject Page No.
1 Note Sheet I
2 1" Corrigendum & Addenda for Schedule of Rates of PHED Originally 2
Published on July 2019
J Supply, Delivery and Installation of Automatic Plunger Type 3
Chlorinator
4 Annexure-[ 4
Specification for Supply, Delivery and lnstallation of Automatic Plunger
Type Chlorinator having flow rate of 0-100 LPH and maximum pressure
of 10 kg/cm'?(should be included in tender document)
5 Supply, Delivery and Installation of Automatic Plunger Type 5
Chlorinator
6 Annexure-ll 6
Specification for Supply, Delivery and Installation of Automatic Plunger
Type Chlorinator having flow rate of 0-200 LPH and maximum pressure
of 12 kglcm' (should be included in tender document)
7 Repairing of Automatic Chlorinator by Supplying of different Spares 7
and other works at different WS Scheme
8 Annexure-lll 8
Specification for Repairing of Automatic Chlorinator by Supplying of
different Spares and other works at different W/S Scheme (should be
included in tender document
1
FileNo.DPHEll}l2o2l.cEPWoM(DPHE)-DPHE(ComputerNo.tt46754)
:eipt No : 19177 1212021 /O/oCEPWQM(DPHE)

NOTE SHEET

With a viewto prepare a common schedule of Rates (SOR) forfrequently used electro-mechanical works
under pHE Dte. like supply, installation of pumping machineries, electrical panels & others accessories,
which will be applicable for all Divisions under all circles of PHE Dte. in different district of West Bengal,
a Schedule Committee was formed for finalizing the Schedule of Rates in terms of G.O. No.

PHt l w l20t8/W-108/2020dated. 04-12-2020.


It may be noted that rates for various items of electrical works which are already covered under SOR of .

WestBengal pHE (Mechanical / Electrical) - July 2019 (vide G.O. No. PHE/L723llT-10l189 dated. 08-08-
2018). Rate for automatic plunger type chlorinator (Flow rate 0-100 LPH& 0-200 LPH), repairing of
automatic chlorinator by supplying of different spares at different W/S Schemewerenot included in the
SOR July 2019. Hence, schedule for automatic plunger type chlorinator (Flow rate 0-L00 LPH), repairing
-
of automatic chlorinator by supplying of different spares at different W/S Schemeare prepared'

Ratesfor the items already exists in the SOR of West Bengal PHE (Mechanical / Electrical) - July 2019
have also reviewed by this SOR Committee. After review, the rate for diaphragm-type Automatic
Chlorinator (0-2OO LPH) has been modified and incorporated as amendment in this SOR.

For items like i) Schedute of Rates for Wiring with PVC lnsulated & Urrsheatlted Copper Wires irr PVC
Rigid Conduit, ii) Schedule of Rates for Earthing lnstallation, iii) Schedule of Rates for lnstallation of
Lightning Conductor, iv) Schedule of Rates for Fixing of Approved Materials (Main Switch, Distribution
Boards, Fittings, Fans etc.), etc rates are taken from PWD Schedule of Rates (Electrical Works) Vol. I
November 2017.

ln order to arrive at the rate, the prevailing market rates of chlorinator and its spares have been
considered along with carrying & forwarding charges @ 5%& contractor's profit @ 10%. GST as
applicable will have to be added to the rate of any item of this SOR in order to arrive at the final rate of
that item for preparation of estimate of supply work or GSf @ 12% & Labour Cess @ 1.%oarelo be added
at the end of the estimate for any composite work.

Put up for approval please.

P'il
*Boul,.hr Engineer, o1 lu 2l fuo*'t
Esecutjve H,r{gi*eei Plannrng Circle-I, Chief Engineer
wQNr,
Mech./Elec.) P.H.Engg. Dte. Qiech./Elec.), and
PIU, North 24-P arganas, and Convenor, SOR Southern Zone,
Committee
\{/BDWSIP, P.H.Engg. Dte. Committee P.H.Engg. Dte.
P,H.Engg. Dte.
Govt. of WestBengal. P.H.Engg. Dte. Gort. of West Bengal. Govt. of West Bengal.
Gort. of West Bengal.
File No. DPHE/16/2021'CEPWQM(DPHE)'DPHE
(Computer No' 446754 ) L
:ipt Nc 't g'17 7 1 212021 tO/oC E PWaM ( D PH E)

1': CORfr|GENQA B ADFETU|A


FOR SC.HEDULE OF RATES OF PHED ORIGINALTY
PUEtISttED gN JUI"Y 3Q19, Pase rtJo-Al, Sl Nq- 1{b) & 2{b)

tuoplv. delivery and in*tallatien of DlqphRrm $rrne Futomatic chlorinator af diffefent c?pacitlqs.

sr. Description Unit Rate


No.
1. Supply, delivery and storage at sire of automatically controlled
diaphragm type chlorinator dosing pump.
Withflow rute200 LPHandmaximumpressure of 12kg/ cr# Nos. 232733.00

[As detailed in Annexure-Il].


2. Installation and commissioning of item 1 (as detailed in Nos.
Annexute-II) 18000.00

2
File No. DPHE/16/2021 -CEPWOM(DPHE)-DPHE
(Gomputer No' 446754 ) 3
;eipt '. 19177 1212021 /O/oCEPWQM(DPHE)

Supply, Delivery and lnstallation of Automatic Plunger Type Chlorinator

Sl. No. Description Unit Rate


1) Supply, Delivery and storage at site of automatically
con&olled plunget type chlorinator dosing pump.

(a) With flow rate 0 - 100 LPH a4d maximum pressute of


10kg/cm2 with all accessories including suitable pnme
mover, storage tank etc. [As detailed in Annexue-[].
nos. 63223.00
2. Installation and commissioning of Item 1(a) (as detailed in nos. 4100.00
Annexwe-I)

3
eipt No :'19177 1212021 /O/oCEPWQM(DPHE)
FileNo.DPHEtl,l2o2l.cEPWQM(DPHE).DPHE(ComputerNo.446754) t

Annexur:e - I

specification for Supply, Delivery and lnstailation of Automatic plunger Type


chlorinator having flow rate of 0 - 1oo tpH and maximum pressure of 10 kg cm, I
(should be included in tender document)

Sl. No.
1) Supply & delivery of automatlc plunger type for feeding accurately
controlled dosage of chlorine solution lnto the water by connecbng metenng
PUrnP with
flow rate of water 0 100 LP},I with marimum sure of 0 kg cm- suitabie dosing
Pres 1,

Pump and other necessary ACCCS s ofles 0rl the delivery PiP e iine AS req urred. The PUrrIP
shall be coupled vdth Yz FIP motof having 3 phase power and 1 444 RPM 4'"/o) [Make
of Machine. As Pef attached vendor iist of PFIED]
2) Instailarion abovc of
Pump set
powef line by supplying of necess2r'Y \II1fe and confl.nuous carthing conneetcd lo auto
manual panel. Tlus includes the cosr ofrnaking necessary brick foundation base with neat
cement fi.nish by supplying all required materials and testing the endre set per direction
of EIC.

N.B. : 1) Test Certificate & Guarantee certificate of pump & motor needed.

2) All works should be carried out as per rerevant & ratest rS code.

4
File No. DPHE/16/2021'CEPWOM(DPHE)-DPHE (Computer No' 446754 ) E
:eipt : 19'177'l.212O21 /O/oCEPWQM(DPH E)

supply, Delivery and Instaration


of Automatic prunger Type chrorinator

sr. o.
1)
and storage at site of
controlled plunger ri?e chLlorinator
dosing pumP.

@) Vfith flow rate 0 - 200 LpH and maximum


12kg/ctre with all accessories pressure of
mover, storage tank etc.
ilr&il;rabtre prime
[As detarled ln A"nlexrue_Il].
2. nos. 232733.
and
;\r:uexure-I) G) (as detailed in nos.

5
File No. DPHE/16/2021-CEPWOM(DPHE)-DPHE (Computer No' 446754 ) 6
cei pt lilo : 19'177'1212021 /O/oCEPWQM(DPHE)

An4$r{trrq: tl

specification for suppry,


Derivery and rnstaration
chlorinator having flow of Automatic prunger
rate of 0 - 200 LpH Type
(should be included
and ,.*iru,
fr.rrur" of 12 kg cm2 r
in tender document)

Supply & of automadc


controlled dosage of $pe for accurately automatic
ch_lorine solution
flow rate of warer 0 * into the water by connecdno
200 LPFI with maximum o metering pump with
pressure of 12 kg cm'
pump and other necessa{y
accessories on the
delivery
I suitable dosing
shall be coupled with PiPe Iine as required. The
2 FIp rnotor having PurnP
3 phase power and 1440
Machine. As per attached RPM (t 4W
vendor list of pFIEDl. fMake of
2) I: and
above supP chlorina
powcr lirie by supplying tor pump ser and
of necessary wire and condnuous eatthino
of
manual panel. This connected to auto
includes the cost of
cement finish by suppilng making necessary brick
foundadon base with
all required materials neat
of EIC. and tesring the enure
set as pet ditection

N'B' : 1) Test Certificate


& Guarantee certificate
of pump & motor needed_
2) All works should
be carried out as per
relevant & latest ls
code.

6
File No. DPHET16I2021'CEPWOM(DPHE)'DPHE
(Computer No' 446754 ) 1
ipt No : 19177 12t202'l IO/oCEPWQM(DPHE)

REPAIRING OF AUTOMATIC CHTORINATOR BY SUPPLYING OF DIFFERENT


SPARES AND OTHER WORKS
AT DTFFERENT WS SCHEME

sl.
Rate
No.
1 of cirlcrrine machine as direction EIC. 1 no. 500.00
AS

15mm dra hose mtI. 34.00


Tail mm 1 no. 25,00
15mm dia GI 1 no. 23.00
screw 1 no. 40.00
Gate 5 1 no. 370.00
oil
335.00
Starter CoLl 1 no. 462.00
Starter chlorine motor 1 no.
15 mm dia. NRV make 1 no.
100 Iiter chlorine tank
1 no. 1 00
1 no.
GI 15mm 1 no. 46
SL lndicator
1 no. 5487.00
15mmdia. GI 1 no. 35.00
Gasket Set
1 no. 144.00
Short I 1 no. 14.00
(xii) 15mm flexibie pvc pipe foi supply chlorine solution
/mt . 34.00
Worm suitable 1 set 27
Eccentric
1 no. 2541.00
Eccentnc
1 no. 2541.00
1 no. 1

1 no. 474.00
Slider
1 no. 2512.00
'V7orm
EN 1 no. 2541.00
Washing, cleaning unit
chiorine tank, PiPe &
speciaJs etc. by engaglng skilled personnel
once 1n il month rvith suppll' o (
fas movmg sp afes
Parts such as gland pacl<rng clamp, nu & bolt e tc. as
to the unit 1n condiuon. 1 times 394.00
4) of burnt out 0. HP ctrlonne Motor from work site to nearest work
shop for repairing.
1 item 400.00
s) Rervi*ding 0. HP motor surtable Srze coPPef
heat varnishing and all compiete AS direction.
Pef
1 item 2000.00
6) of repaired 0.5 HP chlorine from work shop io slte.
1 item 400.00
\ above dozing pumP part part 'llith newly supplied
materiais as exactly feqruired
Ifrom s1. No. (,) to (*n") includrng old
serviceable and tes AS direction of EIC. 1 item 1000,00

7
g
FileNo.oPHEt16t2o21-cEPWoM(DPHE)-DPHE(ComputerNo.446754)
ipt No : 19177 12t2021 IO/oCEPWQM(DPHE)

Annexure * lll
SPECIFICATION FOR REPAIRING OF AUTOMATIC CHLORINATOR BY SUPPTYING OF DIFFERENT SPARES
AND OTHER WORKS AT DIFFERENT WS SCHEME (should be included in tender document)

sl. Desctiption
No,
1 o machine as drrection o[
,\ o as below
l5mm dia braided hose
Tail mrn
15mm dia Gi
sc{ew
GM Gate 5
Mobrl
Starter Coil
Starter motof
15 mm dra. NRV
100 liter chlorine tenk

GI 15mm
SI. Indicator
15mm GI Tee
Gasket Set
Short
15mm dia flexible for chlonne solution
Worm Wheel chlorinc
Eccentric
Eccentric

Slider
Worm Shaft
3) Washrng, of machine urut including chlorine tank,
Plpe & specials etc. by engaglng
skilied personnel once month with supply of last movrng sPares
1n A
Parts such as gland packing, clamp,
nut & bolt etc. AS to the urut ln coodition.
4) o[ brrnt out 0.5 HP Motor from work site to nearest work shop for reparring.
s) Re*,inding of 0.5 HP motor with slze copPer \J/1fe heat and all
complete as per directioo.
6) repaired 0.5 Motor rvork shop to work site.
7) Reassemble the above chlorine dozing
Pump Part by Part with newly supphed materials as exactly
tequired [from Sl. No. (r) to (xxtv) including old serviceable sPares and testlng complete
as Per
direction of EIC.

8
INDEX
Sl. No Description of Items Page No
SECTION – A : GENERAL

A.1 Introduction G-1

A.2 General Guidelines for Works G-2 to G-4

A.3 Zone Considerations Z-1

SECTION – B : ORIGINAL WORKS

B.1 Rig Bore Deep Tube-Well


Rig Board Tubewell by Direct/Reverse Rotary method of drilling TW-1 toTW-3

Deep Tubewell by ODEX-115 method of drilling TW-4 to TW-5

Deep Tubewell by ODEX-165 method of drilling TW-6

Rig Board Tubewell by DTH method of drilling (125mm x 115mm) TW-7

B.2 Different category of pipeline works for Water Supply projects. L-1 to L-24
B.3 Overhead Reservoir OH-1 to
OH-16
B.4 Iron Elimination Plant IEP- I

B.5 Arsenic-Cum-Iron Removal Plant AC-1 to AC-4

SECTION – C : MAINTENANCE WORKS

C.1 Maintenance related works of Water Supply Scheme. M-1 to M-4


SECTION – D : SPECIFICATION FOR TUBEWELLS AND IRON ELIMINATION PLANT
D.1 Specification for Tube wells T1 to T2

D.2 Specification for Iron Elimination Plant IE-I

SECTION – E : QUALITY ASSURANCE PLAN

E.1 Quality assurance plan for uPVC pipes QU-1 to 2

E.2 Quality assurance plan for HDPE pipes QH - 1

SECTION – F : RESOURCE PROCUREMENT

F.1 List of Materials R-1

SECTION – G : SUPPORTING DRAWINGS

G.1 Schedule of Drawings D-1 to D-5

Annexures
I) Copy of PHED notification of formation of a committee for finalising the schedule of rates (both
Mech. & Civil) along with general template for tendering, all type of tender.
II) Template for general abstract of cost.
SECTION - A

GENERAL
A.1 INTRODUCTION:-

 Most of the items in the schedule of rates for PHED have been framed as per the
specification as laid down in the relevant IS codes.
 The rates of the items have been derived mostly from the CPWD’s analysis of rates &
current PWD schedule of rates & amendments.
 Prices of major construction materials like stone materials, bricks, sand etc. have been
taken from recent PWD schedule of rates.
 If not specifically indicated in the items, the rates appearing in this schedule are
inclusive of cost of all supply, carriage, handling, fitting, fixing, toll charges, ferry
charges etc. & all other incidental works, hire charges of tools & plants and all ancillary
materials but excluding of GST.
 5% over head charges & 10% contractors profit have been considered along with the
aforesaid material cost, labour costs & other costs for arriving at the rate of different
item of this schedule.
The basic price of different items of work was arrived with the following considerations: -

i) For construction works where use of water is necessary, rates were framed
considering 1% sundries, 1% water charges, 5% overhead and 10% contractor’s
profit.
ii) For laying & other labour oriented items where no water is required, only 5%
overhead & 10% contractor’s profit has been considered.
iii) For supply of materials, such as valves, specials etc. only 10% contractor’s profit has
been considered.
iv) All the rates in the schedule are excluding GST and labour welfare Cess. After
framing estimates, GST and labour welfare Cess should be added as applicable as per
current norms (Please refer Annexure-II).

G-1
A.2 GENERAL GUIDELINES FOR WORK:-

A.2(a) Extras:-

(a) In riverine areas connected by river route and/or ferry crossing under Extra Rate

(i) Hasnabad & Bhangore P. S. @ 15%

(ii) Haroa, Canning. Kultali. Namkhana & Kakdwip P. S. @ 15%

(iii) Gosaba, Basanti, Sandeshkhali, Hingalganj & Minakhan P. S. @ 22.5%

(iv) Patharpratima & Sagar P.S. @ 30%

(b) In all other areas under Kakdwip PWD Sub-Division excluding the jurisdiction of
Kakdwip P.S. in riverine areas connected by river route and/or Ferry crossing. @ 10%

i) If repair works required inside running wards / cabins of hospitals are restricted by
hospital authority in writing for duration less than usual working hours an extra rate of
10% will be allowed.
ii) If for unavoidable circumstances works are to be done in emergency cases at night,
extra rate @10% will be applicable to items of night work only strictly under certificate
of Engineer- in-Charge.
iii) For works at Bhutni under Manikchawk P.S. in Malda District Extra 15% (Fifteen
per cent) over and above the rates provided in this schedule is allowed.

A.2(b) Rates of all the items will be enhanced by:-

i) 20% for works in the following places (a) Hill area of Garubathan Block (b)
Kalimpong Municipal Area (c) Dow hill area of Kurseong Sub-Division (d) Miric Block
(e) Section from Mane Bhanjan to Phalut of Simana Sandakphu Phalut Road (f) Section
from Peshoke Khola to Lopchu Tea Garden of S. H. No. 12 (g) within 10 km. from
Mongpu under Takda Block (h) Ghoom Tiger Hill Road (i) Section Pankhabari Bazarto
the Starting of Kurseong Municipal Road of Garidhura- Kurseong Road (j) Kalimpong
Block 1/lI and Mongpo & Takda Block. k)Bijanbari Block l) Sukia Pokhri Block.

G-2
ii) 20% of works in the following places:- (a) Darjeeling Municipal area (b) Kurseong
Municipal area (excluding Dow Hill area) (c) Rangit (d) Health Centers at Singritam,
Pokhriabong, Lodhama, Takling, Gitdabling, Samathahar. Saimolbong & Sittong.
iii) The rates under sections stated above for Jalpaiguri district are to be enhanced by 15% for
works in Boxa Hills
iv) The rate of this schedule will be enhanced due to various circumstances as mentioned
below:- (a) By 10% (Ten percent) for works done within the Hilly region of Ajodhya in
the District of Purulia.

[Note:- A region will be treated as hills if the altitude is more than 200 meters from the
level of any adjoining area within 10 km radius.]

v) By 5 %( Five percent) for works done within the region of Khanakul-I & II Block under
the District of Hooghly.

A.2(c) Other general guidelines

i) All materials brought to site must have approval of Engineer in-Charge. Rejected
material must be removed by the contractor from the site within 24 hours of the issue of
orders to that effect. In case of non-compliance with such orders, the ‘Engineer-in-
Charge’ shall have the authority for removal of those rejected materials at the cost and
expenses of contractor and the contractor shall not be entitled to any loss or damage on
that account.
ii) The site must be cleared by the contractor from time to time by removing rubbish,
debris etc. as accumulated during the work and on completion the whole site must be
left in a clean and tidy condition to the satisfaction of Engineer-in-Charge or his
representative.
iii) Carriage of materials (unless specifically considered in the Rate Analysis) is the sole
responsibility of the contractor for which no extra payment should be made (unless in
exigency a few of those seem to be justified by the Engineer-in-Charge, when the same
are to be approved by the concerned Superintending Engineer).

G-3
iv) Both metallic and non-metallic pipes may be considered for pipe dia up to 300 mm, the
selection being guided by cost, accessibility, nature of soil, social behavior of the
beneficiaries and traffic load. The respective BIS code for different types of pipe
should also be consulted for this purpose.
v) For Saline areas use of UPVC / HDPE pipe is preferred.
vi) For Rocky areas use of HDPE / DI K7 and K9 pipe is preferred.
vii) For Zone – VI, HDPE (PE 100, PN10) pipe can be used as per direction of EIC.

G-4
Kolkata / N-24 Parganas /S-24 Parganas / Howrah /Hoogly / Nadia /Purba Midnapore

ZONE-I

Purba Bardhhaman /Bankura /Birbhum /Murshidabad


ZONE-II

Paschim Bardhhaman /Jhargram /Paschim Midnapore / Purulia


ZONE-III

Z-1
A.4 ZONE CONSIDERATIONS:-

Malda /Dakshin Dinajpur /Uttar Dinajpur


ZONE-IV

Alipurduar /Coochbehar / Jalpaiguri /Siliguri Sub-Division


ZONE-V

Darjeeling & Kalimpong


(Hill Area)
ZONE-VI
SECTION - B

ORIGINAL WORKS
SECTION – B.1

RIG BORE DEEP TUBE-WELL


Section - B.1: RIG BORED TUBE WELL

Rig Bored Tubewell by Direct/Reverse Rotary method of drilling


Item Rate
Description of Items Unit
No. (Rs.)
1
Site Preparation, Temporary Latrine, Placement & levelling of Rig
Machine, Mast hoisting and Casing drilling (Upto 6 mtr.) Placement
LS ₹ 64,146.00
of Casing with all allied works necessary to commence drilling
woks and wind up of all machineries after completion of Drilling.

2 Drilling by Direct Rotary method of drilling using 9 7/8” dia.bit


for pilot bore follwed by subsequently reaming using 12 1/4” dia.
,15 " dia. and 17.5" dia. Rock Roller Bits/Drag Bits in consolidated,
semi consolidated and soft formation up to required depth
including casing boring and casing lowering as required including
cost of fuels and lubricants etc. as required for drilling.

Note:
1)Rate only for pilot drilling will be @ 50%. of item rate.
2)Rate for reaming by 12 1/4 " dia. bit will be @ 14% of item rate.
3)Rate for reaming by 15 " dia. bit will be @ 16% of item rate.
4)Rate for reaming by 17.5 " dia. bit will be @ 20% of item rate.

a) From 6 Mtr. to 60 Mtr. Mtr 885.00


b) From 60 Mtr. to 90 Mtr. Mtr 974.00
c) From 90 Mtr. to 120 Mtr. Mtr 1,071.00
d) From 120 Mtr. to 150 Mtr. Mtr 1,178.00
e) From 150 Mtr. to 180 Mtr. Mtr 1,296.00
f) From 180 Mtr. to 210 Mtr. Mtr 1,426.00
g) From 210 Mtr. to 240 Mtr. Mtr 1,569.00
h) From 240 Mtr. to 270 Mtr. Mtr 1,726.00
i) From 270 Mtr. to 300 Mtr. Mtr 1,899.00
j) From 300 Mtr. to 330 Mtr. Mtr 2,089.00
k) From 330 Mtr. to 360 Mtr. Mtr 2,298.00
l) From 360 Mtr. to 390 Mtr. Mtr 2,528.00
m) From 390 Mtr. to 420 Mtr. Mtr 2,781.00
n) From 420 Mtr. to 450 Mtr. Mtr 3,059.00
3 7/8
Drilling by Reverse Rotary method of drilling using 9 ” dia.bit
1/4
for pilot bore follwed by subsequently reaming using 12 ” dia. ,15
" dia. and 17.5" dia. Rock Roller Bits/ Drag Bits in consolidated,
semi consolidated and soft formation up to required depth
including casing boring and casing lowering as required including
cost of fuels and lubricants etc. as required for drilling.

Page : TW - 1
Section - B.1: RIG BORED TUBE WELL

Rig Bored Tubewell by Direct/Reverse Rotary method of drilling


Item Rate
Description of Items Unit
No. (Rs.)

Note:
1)Rate only for pilot drilling will be @ 50%. of item rate.
2)Rate for reaming by 12 1/4 " dia. bit will be @ 14% of item rate.
3)Rate for reaming by 15 " dia. bit will be @ 16% of item rate.
4)Rate for reaming by 17.5 " dia. bit will be @ 20% of item rate.
a) From 6 Mtr. to 60 Mtr. Mtr 796.50
b) From 60 Mtr. to 90 Mtr. Mtr 876.60
c) From 90 Mtr. to 120 Mtr. Mtr 963.90
d) From 120 Mtr. to 150 Mtr. Mtr 1,060.20
e) From 150 Mtr. to 180 Mtr. Mtr 1,166.40
f) From 180 Mtr. to 210 Mtr. Mtr 1,283.40
g) From 210 Mtr. to 240 Mtr. Mtr 1,412.10
h) From 240 Mtr. to 270 Mtr. Mtr 1,553.40
i) From 270 Mtr. to 300 Mtr. Mtr 1,709.10
j) From 300 Mtr. to 330 Mtr. Mtr 1,880.10
k) From 330 Mtr. to 360 Mtr. Mtr 2,068.20
l) From 360 Mtr. to 390 Mtr. Mtr 2,275.20
m) From 390 Mtr. to 420 Mtr. Mtr 2,502.90
n) From 420 Mtr. to 450 Mtr. Mtr 2,753.10
4 Lowering the tube well assembly (UPVC Casing pipe ,well pipe,
strainer along with UPVC accessories) vertically in a position with
proper lowering arrangement by applying necessary jointing LS 26,571.00
compound including labour cost for subsequent gravel packing and
machine operation cost etc.
5 Cost of Consumables for drilling rigs and machineries. LS 22,077.00
6 Development (Min. 8 Hr. continuous) of tube well by using suitable
air compressor (Min. Capacity: 600CFM & operating Pressure 14
Bar) followed by yield testing with BHT pump (Head :45 to
LS 56,908.00
50mtr.,Discharge :1100 to 1000 LPM and 25 BHP engine) all
complete including To & Fro Transportation cost and Cost of fuels,
lubricants & Labour etc.
7 Water sample collection and chemical test including Arsenic Test. LS 2,425.00
8 Transportation cost of drilling equipment and accessories rig
machine etc. including cost of fuel,Lubricant & loading unloading
the materials from store/stack yard /suppliers godown and LS 59,786.00
unloading /stacking the same at site.
(Upto 60.0 km distance)

Page : TW - 2
Section - B.1: RIG BORED TUBE WELL

Rig Bored Tubewell by Direct/Reverse Rotary method of drilling


Item Rate
Description of Items Unit
No. (Rs.)
9 Supply and delivery of UPVC pipe (CD) conforming to IS
12818:2010. (CIPET Certified)
a) 300 mm dia. Mtr 4,662.00
b) 250 mm dia. Mtr 3,325.00
c) 200 mm dia. Mtr 2,173.00
d) 150 mm dia. Mtr 1,157.00
10 Supply and delivery of UPVC Deep Well Screen (RDS) Pipes with
Ribs conforming to IS 12818:2010 .(CIPET Certified)

a) 200 mm dia. Mtr 3,280.00


b) 150 mm dia. Mtr 1,832.00
11 Supply and delivery of UPVC pipe (CM) conforming to IS
12818:2010. (CIPET Certified)
a) 300 mm dia. Mtr 3,628.00
b) 250 mm dia. Mtr 2,578.00
c) 200 mm dia. Mtr 1,684.00
d) 150 mm dia. Mtr 925
12 Supply and delivery of UPVC Medium Well Screen (RMS) Pipes
with Ribs conforming to IS 12818:2010. (CIPET Certified)
a) 200 mm dia. Mtr 2,546.00
b) 150 mm dia. Mtr 1,502.00
13 Supply and delivery of UPVC Reducer
a) 300mmx 200 mm dia. (300mmx250mm-1 no & 250mmx200mm-1
no) 6,989.00
b) 250mmx 150 mm dia. (250mmx200mm-1 no & 200mmx150mm-1
no) 2,477.00
c) 250mmx 200 mm dia. Each 1,415.00
d) 200mmx 150 mm dia. Each 1,062.00
14 Supply and delivery of UPVC Cap
a) 300 mm dia. Each 1,179.00
b) 250 mm dia. Each 975
c) 200 mm dia. Each 767
d) 150 mm dia. Each 302
15 Supply and delivery of M.S. Housing clamp 250 mm dia. Set 3,252.00
16 Supply and delivery of M.S .Centre guide (Special Type). Set 950
17 Supply and delivery of Washed gravels size ranging from 1.80 mm
3
to 4.74 mm. conforming to IS 4097 : 1967. m 3,810.00
18 Supply and delivery of Bentonite Powder conforming to IS 6186 :
1986. MT 13,963.00
19 Electro-logging charge. LS 15715

Page : TW - 3
Section - B.1 : RIG BORED TUBE WELL

Deep Tubewell by ODEX-115 method of drilling


Item Rate
Description of Items Unit
No. (Rs.)
1
Drilling borehole by Rig machine with Odex-115 (Simultaneous
driving of casing pipe) method of drilling through any kind of soil,
boulder, rock etc. upto the required depth. This item includes the
cost of hiring of Rig machine, Compressor, Supporting vehicle and
other machinery & equipments with operators, drivers, laborers
etc. Proportionate cost of drilling tools and accessories such as
Hammer, Pilot bit, Reamer bit, Guide device, Guide sleeve etc.
Cost of consumable materials like fuel & lubricants, electrode for
welding, any other related equipment, materials and service etc.

a). GL to 60 mtr. Mtr 1105.00


b). 60 mtr. to 100 mtr. Mtr 1215.00
c). 100 mtr. to 120 mtr. Mtr 1326.00
FOR INDIA MARK-II HAND PUMP FITTED TW (Item 2 to item 5)
2
Lowering and placing of filter assembly of required length and
LS 5000.00
Extraction and partening off the casing pipe of required length.
3 Mobilisation and transportion of the Rig machine and its
LS 8000.00
accessories and others materials, etc. to the site.
4 Development of the tubewell by Air Compressor upto the
satisfaction of EIC. It includes arrangement of all machinery, LS 8000.00
supply of fuel & lubricants, laborers, any others etc.
5 Construction of Platform and installation of India Mark-II hand
LS 5900.00
pump as per technical specification.
FOR SUBMERSIBLE PUMP FITTED TW (Item 6 to item 8)
6
Lowering and placing of filter assembly of required length and
LS 8000.00
Extraction and partening off the casing pipe of required length.
7 Mobilisation and transportion of the Rig machine and its
LS 10000.00
accessories and others materials, etc. to the site.
8
Development of the tubewell by Air Compressor and BHT/ other
suitable pump and Yield Testing by BHT/ other suitable pumping
LS 30000.00
machinery upto the satisfaction of EIC. It includes arrangement of
all machinery, supply of fuel & lubricants, laborers, any others etc.
Supply and delivery of 128 mm ID/139 mm OD MSERW fin cut
9 Mtr 990.00
pipe
Supply and delivery of 80 mm dia x 3 mtr. Long HDPE Jacketed
10 Each 5932.00
Strainer
11 Supply and delivery of Bit tube (0.67mtr. Long) for Odex-115 Each 670.00
12 Supply and delivery of Casing Shoe (for Odex-115) Each 4404.00
Page : TW - 4
Section - B.1 : RIG BORED TUBE WELL

Deep Tubewell by ODEX-115 method of drilling


Item Rate
Description of Items Unit
No. (Rs.)
13 Supply and delivery of Packer Assembly (for Odex-115) Each 2717.00
FOR INDIA MARK-II HAND PUMP FITTED TW (Item 14 to item 15)
Supply and delivery of MS TW Specials (Clamp, Cap, Bail plug,
14 LS 1200.00
Lugs, Ring etc.)
15 Supply and delivery of India Mark-II hand pump set Set 13624.00
FOR SUBMERSIBLE PUMP FITTED TW (Item 16)
Supply and delivery of MS TW Specials (Clamp, Cap, Bail plug,
16 LS
Lugs, Ring etc.) 1800.00

Page : TW - 5
Section - B.1 : RIG BORED TUBE WELL

Deep Tubewell by ODEX-165 method of drilling


Item Rate
Description of Items Unit
No. (Rs.)

Drilling borehole by Rig machine with Odex-165 (Simultaneous


driving of casing pipe) method of drilling through any kind of soil,
boulder, rock etc. upto the required depth. This item includes the
cost of hiring of Rig machine, Compressor, Supporting vehicle and
other machinery & equipments with operators, drivers, laborers
etc. Proportionate cost of drilling tools and accessories such as
1
Hammer, Pilot bit, Reamer bit, Guide device, Guide sleeve etc.
Cost of consumable materials like fuel & lubricants, electrode for
welding, any other related equipment, materials and service etc.

a). GL to 60 mtr. Mtr 2332.00


b). 60 mtr. to 100 mtr. Mtr 2565.00
c). 100 mtr. to 120 mtr. Mtr 2798.00
Lowering and placing of filter assembly of required length and
2 LS 18700.00
Extraction and partening off the casing pipe of required length.
Mobilisation and transportion of the Rig machine and its
3 LS 18000.00
accessories and others materials, etc. to the site.
Development of the tubewell by Air Compressor and BHT/ other
suitable pump and Yield Testing by BHT/ other suitable pumping
4 LS 40000.00
machinery upto the satisfaction of EIC. It includes arrangement of
all machinery, supply of fuel & lubricants, laborers, any others etc.
Supply and Delivery of 183 mm ID/196 mm OD MSERW fin cut
5 Mtr 1470.00
pipe
Supply and Delivery of 125 mm dia LCG/HDPE/other suitable
6 Mtr 2050.00
filter
7 Supply and Delivery of Bit tube (1.5mtr. Long) for Odex-165 Each 3000.00
8 Supply and Delivery of Casing Shoe (for Odex-165) Each 15330.00
9 Packer Assembly (for Odex-165) Each 11555.00
Supply and Delivery of MS TW Specials (Clamp, Cap, Bail plug,
10 3390.00
Lugs, Ring etc.) Item

Page : TW - 6
Section - B.1 : RIG BORED TUBE WELL

Rig Bored Tubewell by DTH method of drilling (125mm x 115mm)


Item Rate
Description of Items Unit
No. (Rs.)
1 Drilling bore hole in DTH method through any kind of soils and
rocks in overburden suitable for lowering and fitting fixing of 125
mm dia. casing pipe up to an average depth of 23 mtrs. and
subsequently 115 mm diameter boring through any kind of rocky
formation upto a total depth of 70 mtrs including all other works
necessary for boring as per direction of E.I.C This item includes the
cost of hiring of Rig machine, Compressor, Supporting vehicle and
other machinery & equipments with operators, drivers, laborers
etc. Proportionate cost of drilling tools and accessories such as
Hammer, Bit, etc. Cost of consumable materials like fuel &
lubricants, any other related equipment, materials and service etc.
as per technical specification.
a). 0 to 23 mtr (Over burden) Mtr ₹ 411.00
b). Over burden / from 23 mtr to 70 mtrs and above Mtr ₹ 496.00
2 Supply & delivery of 125mm internal dia UPVC casing pipe
(minimum wall thickness 6.5 mm) having 3 mtr length each both
end threaded and one end socketed as per IS-12818CM/CS Mtr ₹ 726.00
(CEPET test may be performed before supply at store as per
direction of EIC)
3 Mobilisation and transportion of the Rig machine and its
L.S ₹ 8,000.00
accessories and others materials, etc. to the site.
4 Supply and delivery of India Mark-II hand pumps as per standard
Set ₹ 13,624.00
specification approved by PHE Dte.
5 Construction of Platform and installation of India Mark-II hand
pump as per technical specification. each ₹ 5,900.00
N.B
1. Necessary cement, sand and stone chips are to be supplied by
the agency and construction of platform is to be done in 1:2:4
ratios.
2. No transportation charge for transporting the any material from
PHE store to sites and sites to PHE store will be paid by PHE Dte.

Page : TW - 7
SECTION – B.2

DIFFERENT CATEGORY OF PIPELINE WORKS


FOR
WATER SUPPLY PROJECTS.
PUBLIC HEALTH ENGINEERING DEPARTMENT (GOVT. OF WEST BENGAL)

SCHEDULE OF RATES FOR DIFFERENT CATEGORY OF PIPE LINE WORKS FOR WATER SUPPLY PROJECTS

Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
1 Carrying CI/DI pipes with specials and valves and lowering placing in
position and laying carefully inside the trenches in proper alignment and
gradient etc. including earth work in excavation of adequate width as per
specification having min. clear cover from top of pipe is 1.10mtr. below
existing ground level in any kind of soil including mixed with boulder,
road sub-grade and its flank,but excluding moorum and laterite and stone
etc.without damaging the exisiting telephone/electric cable etc.(in case of
damaged if any type of cable line during excecution , necessary
damaged charges as applicable by the respective authority will be borne
by the agency in his own cost) preparing the bottom surface for
continuous bedding of pipe line and laying pipes, fitting, fixing specials
and valves with bailing out water if any including carriage of pipes,
specials and valves from local deptt. store within 8KM and back filling the
trenches with excavated earth in layers to original condition as per
specification and direction of EIC. The surplus materials after execution
of work are to be return to the deptt. store.

N.B: i) Any deviation from required clear cover of 1.10mtr., due to site
adverse condition, prior permission is to be obtained from the EIC in
exceptional situation and payment will be made on prorate basis over the
rate of entire item

ii) No payment will be made without hydraulic test of the pipe line either
part or full
iii) The pipes, specials and valves , rubber gasket will be supplied deptt.
free of cost.

L-1
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
a) 80mm dia Mtr. ₹ 67.00 ₹ 67.00 ₹ 67.00 ₹ 67.00 ₹ 67.00 ₹ 67.00
b) 100mm dia. Mtr. ₹ 72.00 ₹ 72.00 ₹ 72.00 ₹ 72.00 ₹ 72.00 ₹ 72.00
c) 125mm dia. Mtr, ₹ 100.00 ₹ 100.00 ₹ 100.00 ₹ 100.00 ₹ 100.00 ₹ 100.00
d) 150mm dia. Mtr. ₹ 112.00 ₹ 112.00 ₹ 112.00 ₹ 112.00 ₹ 112.00 ₹ 112.00
e) 200mm dia. Mtr. ₹ 136.00 ₹ 136.00 ₹ 136.00 ₹ 136.00 ₹ 136.00 ₹ 136.00
f) 250mm dia. Mtr. ₹ 164.00 ₹ 164.00 ₹ 164.00 ₹ 164.00 ₹ 164.00 ₹ 164.00
g) 300mm dia. Mtr. ₹ 192.00 ₹ 192.00 ₹ 192.00 ₹ 192.00 ₹ 192.00 ₹ 192.00
h) 350mm dia. Mtr. ₹ 225.00 ₹ 225.00 ₹ 225.00 ₹ 225.00 ₹ 225.00 ₹ 225.00
i) 400mm dia. Mtr. ₹ 260.00 ₹ 260.00 ₹ 260.00 ₹ 260.00 ₹ 260.00 ₹ 260.00
j) 450mm dia. Mtr. ₹ 297.00 ₹ 297.00 ₹ 297.00 ₹ 297.00 ₹ 297.00 ₹ 297.00
k) 500mm dia. Mtr. ₹ 331.00 ₹ 331.00 ₹ 331.00 ₹ 331.00 ₹ 331.00 ₹ 331.00
l) 600mm dia. Mtr. ₹ 416.00 ₹ 416.00 ₹ 416.00 ₹ 416.00 ₹ 416.00 ₹ 416.00
m) 700mm dia. Mtr. ₹ 501.00 ₹ 501.00 ₹ 501.00 ₹ 501.00 ₹ 501.00 ₹ 501.00
n) 750mm dia. Mtr. ₹ 545.00 ₹ 545.00 ₹ 545.00 ₹ 545.00 ₹ 545.00 ₹ 545.00
o) 800mm dia. Mtr. ₹ 591.00 ₹ 591.00 ₹ 591.00 ₹ 591.00 ₹ 591.00 ₹ 591.00
p) 900mm dia. Mtr. ₹ 706.00 ₹ 706.00 ₹ 706.00 ₹ 706.00 ₹ 706.00 ₹ 706.00
q) 1000mm dia. Mtr. ₹ 828.00 ₹ 828.00 ₹ 828.00 ₹ 828.00 ₹ 828.00 ₹ 828.00

L-2
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
2 Supplying, laying, fiting, fixing and jointing of UPVC pipes conforming to
IS:4985-2000 with latest revision and amendments, if any, with
necessary UPVC/CI specials, CIDF sluice valves, as per relevant I.S.
specification including labour charges for earth work in excavation in any
kind of soil including mixed soil with boulder ,road sub-grade and its
flanks but excluding moorum and laterite or sand stonehard arock
including cutting of brick payment without damaging the existing
telephone/electrical cable line etc.(in case of damage of any type of
cable line during excavation, necessary damaged charges as applicable
by the respaective authority will be borne by the agency in his own cost.
Loading, unloading, carrying of pipes, specials, valves from the local
store to work site and lowering laying of pipes specials valves carefully in
trenches maintaining proper levels and alignment ,jointing the pipe and
specials including supplying of good quality/approved brand solvent
cement (as per IS:14182-1994 including cost of all fabricated PVC fitting
i.e. tees,bend, reducers, adopter etc.as per IS:101-1988 and making
flange joints including supplying required quantity of nuts, bolts and
rubber insertion (CIDF sluice valves will be supplied by the department
free of cost) as required at site by adopting suitable method so as to
facilate the maintenance of pipe line locally as per conventional method
including back filling the trenches with good earth obtained from
excavation of trenches including consolidation with watering in layer not
exceeding 150mm thk. with maintaining an average depth of

cushion of 1.10mtr. from the top of pipe line including making


interconnection with distribution pipes etc. all complete as per drawing
direction and satisfaction of the E.I.C.

N.B. i) Manufacturer’s test certificate for UPVC pipe & specials to be


produced before laying of pipe line.

L-3
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
rd
ii) 3 party inspection of UPVC pipe & specials to be done by CEPET or
(India) SGS/NTH Kolkata or as per direction of EIC as per approved
vender list.
iii)No part payment at any stage on account of supply of materials shall
be entertained.
iv)Payment will be made on actual consumption of materials.
v)UPVC pipes for the works to be supplied as per approved vendor list
and as per direction & satisfaction of EIC. No pipes will be allowed
beyond recommendated vendor list.
vi)Submission of drawing of pipe line with statement of materials
consumed between node to node points against each R.A. & final bill.if
so.
vii) Any deviation from required clear cover of 1.10mtr.due to site
adverse condition, prior permission is to be obtained from EIC and
payment for such work will be made on prorate basis over the rate of
entire item.

viii)All pipe connection shall be completed in all respect and as per


directionof EIC. Decision of EIC in this respect is final & binding. In case
of any deviation/or any left out pipe connections an amount of
Rs.10,000.00 for each pipe connection will be realized/recovered from
the bill.

(A) Pressure Rating : Class - III


(i) Laying of pipe line including cost of pipe only excluding cost of
specials/fittings & valves.
a) 75mm(OD) Mtr. ₹ 181.00 ₹ 181.00 ₹ 181.00 ₹ 181.00 ₹ 181.00
b) 90mm (OD) Mtr. ₹ 238.00 ₹ 238.00 ₹ 238.00 ₹ 238.00 ₹ 238.00
c) 110mm(OD) Mtr, ₹ 319.00 ₹ 319.00 ₹ 319.00 ₹ 319.00 ₹ 319.00
d) 125mm(OD) Mtr. ₹ 424.00 ₹ 424.00 ₹ 424.00 ₹ 424.00 ₹ 424.00
e) 140mm(OD) Mtr. ₹ 518.00 ₹ 518.00 ₹ 518.00 ₹ 518.00 ₹ 518.00
L-4
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
f) 160mm(OD) Mtr. ₹ 645.00 ₹ 645.00 ₹ 645.00 ₹ 645.00 ₹ 645.00
g) 180mm(OD) Mtr. ₹ 813.00 ₹ 813.00 ₹ 813.00 ₹ 813.00 ₹ 813.00
h) 200mm(OD) Mtr. ₹ 989.00 ₹ 989.00 ₹ 989.00 ₹ 989.00 ₹ 989.00
i) 225mm(OD) Mtr. ₹ 1,232.00 ₹ 1,232.00 ₹ 1,232.00 ₹ 1,232.00 ₹ 1,232.00
j) 250mm(OD) Mtr. ₹ 1,515.00 ₹ 1,515.00 ₹ 1,515.00 ₹ 1,515.00 ₹ 1,515.00
k) 280mm(OD) Mtr. ₹ 1,894.00 ₹ 1,894.00 ₹ 1,894.00 ₹ 1,894.00 ₹ 1,894.00
l) 315mm(OD) Mtr. ₹ 2,390.00 ₹ 2,390.00 ₹ 2,390.00 ₹ 2,390.00 ₹ 2,390.00
(ii) Laying of pipe line including cost of pipe & fittings/specials but
excluding cost of valves.
a) 75mm(OD) Mtr. ₹ 187.00 ₹ 187.00 ₹ 187.00 ₹ 187.00 ₹ 187.00
b) 90mm (OD) Mtr. ₹ 247.00 ₹ 247.00 ₹ 247.00 ₹ 247.00 ₹ 247.00
c) 110mm(OD) Mtr, ₹ 332.00 ₹ 332.00 ₹ 332.00 ₹ 332.00 ₹ 332.00
d) 125mm(OD) Mtr. ₹ 441.00 ₹ 441.00 ₹ 441.00 ₹ 441.00 ₹ 441.00
e) 140mm(OD) Mtr. ₹ 540.00 ₹ 540.00 ₹ 540.00 ₹ 540.00 ₹ 540.00
f) 160mm(OD) Mtr. ₹ 672.00 ₹ 672.00 ₹ 672.00 ₹ 672.00 ₹ 672.00
g) 180mm(OD) Mtr. ₹ 848.00 ₹ 848.00 ₹ 848.00 ₹ 848.00 ₹ 848.00
h) 200mm(OD) Mtr. ₹ 1,033.00 ₹ 1,033.00 ₹ 1,033.00 ₹ 1,033.00 ₹ 1,033.00
i) 225mm(OD) Mtr. ₹ 1,287.00 ₹ 1,287.00 ₹ 1,287.00 ₹ 1,287.00 ₹ 1,287.00
j) 250mm(OD) Mtr. ₹ 1,584.00 ₹ 1,584.00 ₹ 1,584.00 ₹ 1,584.00 ₹ 1,584.00
k) 280mm(OD) Mtr. ₹ 1,982.00 ₹ 1,982.00 ₹ 1,982.00 ₹ 1,982.00 ₹ 1,982.00
l) 315mm(OD) Mtr. ₹ 2,502.00 ₹ 2,502.00 ₹ 2,502.00 ₹ 2,502.00 ₹ 2,502.00
(iii) Laying of pipe line including cost of pipe, fittings/specials & valves.

a) 75mm(OD) Mtr. ₹ 200.00 ₹ 200.00 ₹ 200.00 ₹ 200.00 ₹ 200.00


b) 90mm (OD) Mtr. ₹ 265.00 ₹ 265.00 ₹ 265.00 ₹ 265.00 ₹ 265.00
c) 110mm(OD) Mtr, ₹ 376.00 ₹ 376.00 ₹ 376.00 ₹ 376.00 ₹ 376.00
d) 125mm(OD) Mtr. ₹ 498.00 ₹ 498.00 ₹ 498.00 ₹ 498.00 ₹ 498.00
e) 140mm(OD) Mtr. ₹ 612.00 ₹ 612.00 ₹ 612.00 ₹ 612.00 ₹ 612.00
f) 160mm(OD) Mtr. ₹ 763.00 ₹ 763.00 ₹ 763.00 ₹ 763.00 ₹ 763.00
g) 180mm(OD) Mtr. ₹ 967.00 ₹ 967.00 ₹ 967.00 ₹ 967.00 ₹ 967.00
L-5
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
h) 200mm(OD) Mtr. ₹ 1,179.00 ₹ 1,179.00 ₹ 1,179.00 ₹ 1,179.00 ₹ 1,179.00
i) 225mm(OD) Mtr. ₹ 1,472.00 ₹ 1,472.00 ₹ 1,472.00 ₹ 1,472.00 ₹ 1,472.00
j) 250mm(OD) Mtr. ₹ 1,813.00 ₹ 1,813.00 ₹ 1,813.00 ₹ 1,813.00 ₹ 1,813.00
k) 280mm(OD) Mtr. ₹ 2,270.00 ₹ 2,270.00 ₹ 2,270.00 ₹ 2,270.00 ₹ 2,270.00
l) 315mm(OD) Mtr. ₹ 2,866.00 ₹ 2,866.00 ₹ 2,866.00 ₹ 2,866.00 ₹ 2,866.00
(B) Pressure Rating : Class V
(i) Laying of pipe line including cost of pipe only excluding cost of
specials/fittings valves.
a) 75mm(OD) Mtr. ₹ 260.00 ₹ 260.00 ₹ 260.00 ₹ 260.00 ₹ 260.00
b) 90mm (OD) Mtr. ₹ 330.00 ₹ 330.00 ₹ 330.00 ₹ 330.00 ₹ 330.00
c) 110mm(OD) Mtr, ₹ 477.00 ₹ 477.00 ₹ 477.00 ₹ 477.00 ₹ 477.00
d) 125mm(OD) Mtr. ₹ 618.00 ₹ 618.00 ₹ 618.00 ₹ 618.00 ₹ 618.00
e) 140mm(OD) Mtr. ₹ 773.00 ₹ 773.00 ₹ 773.00 ₹ 773.00 ₹ 773.00
f) 160mm(OD) Mtr. ₹ 993.00 ₹ 993.00 ₹ 993.00 ₹ 993.00 ₹ 993.00
g) 180mm(OD) Mtr. ₹ 1,244.00 ₹ 1,244.00 ₹ 1,244.00 ₹ 1,244.00 ₹ 1,244.00
h) 200mm(OD) Mtr. ₹ 1,454.00 ₹ 1,454.00 ₹ 1,454.00 ₹ 1,454.00 ₹ 1,454.00
i) 225mm(OD) Mtr. ₹ 1,824.00 ₹ 1,824.00 ₹ 1,824.00 ₹ 1,824.00 ₹ 1,824.00
j) 250mm(OD) Mtr. ₹ 2,240.00 ₹ 2,240.00 ₹ 2,240.00 ₹ 2,240.00 ₹ 2,240.00
k) 280mm(OD) Mtr. ₹ 2,788.00 ₹ 2,788.00 ₹ 2,788.00 ₹ 2,788.00 ₹ 2,788.00
l) 315mm(OD) Mtr. ₹ 3,486.00 ₹ 3,486.00 ₹ 3,486.00 ₹ 3,486.00 ₹ 3,486.00
(ii) Laying of pipe line including cost of pipe & fittings/specials but
excluding cost of valves.
a) 75mm(OD) Mtr. ₹ 271.00 ₹ 271.00 ₹ 271.00 ₹ 271.00 ₹ 271.00
b) 90mm (OD) Mtr. ₹ 344.00 ₹ 344.00 ₹ 344.00 ₹ 344.00 ₹ 344.00
c) 110mm(OD) Mtr, ₹ 497.00 ₹ 497.00 ₹ 497.00 ₹ 497.00 ₹ 497.00
d) 125mm(OD) Mtr. ₹ 645.00 ₹ 645.00 ₹ 645.00 ₹ 645.00 ₹ 645.00
e) 140mm(OD) Mtr. ₹ 807.00 ₹ 807.00 ₹ 807.00 ₹ 807.00 ₹ 807.00
f) 160mm(OD) Mtr. ₹ 1,038.00 ₹ 1,038.00 ₹ 1,038.00 ₹ 1,038.00 ₹ 1,038.00
g) 180mm(OD) Mtr. ₹ 1,301.00 ₹ 1,301.00 ₹ 1,301.00 ₹ 1,301.00 ₹ 1,301.00
h) 200mm(OD) Mtr. ₹ 1,521.00 ₹ 1,521.00 ₹ 1,521.00 ₹ 1,521.00 ₹ 1,521.00
L-6
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
i) 225mm(OD) Mtr. ₹ 1,909.00 ₹ 1,909.00 ₹ 1,909.00 ₹ 1,909.00 ₹ 1,909.00
j) 250mm(OD) Mtr. ₹ 2,345.00 ₹ 2,345.00 ₹ 2,345.00 ₹ 2,345.00 ₹ 2,345.00
k) 280mm(OD) Mtr. ₹ 2,920.00 ₹ 2,920.00 ₹ 2,920.00 ₹ 2,920.00 ₹ 2,920.00
l) 315mm(OD) Mtr. ₹ 3,652.00 ₹ 3,652.00 ₹ 3,652.00 ₹ 3,652.00 ₹ 3,652.00
(iii) Laying of pipe line including cost of pipe, fittings/specials & valves.

a) 75mm(OD) Mtr. ₹ 291.00 ₹ 291.00 ₹ 291.00 ₹ 291.00 ₹ 291.00


b) 90mm (OD) Mtr. ₹ 371.00 ₹ 371.00 ₹ 371.00 ₹ 371.00 ₹ 371.00
c) 110mm(OD) Mtr, ₹ 566.00 ₹ 566.00 ₹ 566.00 ₹ 566.00 ₹ 566.00
d) 125mm(OD) Mtr. ₹ 733.00 ₹ 733.00 ₹ 733.00 ₹ 733.00 ₹ 733.00
e) 140mm(OD) Mtr. ₹ 919.00 ₹ 919.00 ₹ 919.00 ₹ 919.00 ₹ 919.00
f) 160mm(OD) Mtr. ₹ 1,184.00 ₹ 1,184.00 ₹ 1,184.00 ₹ 1,184.00 ₹ 1,184.00
g) 180mm(OD) Mtr. ₹ 1,488.00 ₹ 1,488.00 ₹ 1,488.00 ₹ 1,488.00 ₹ 1,488.00
h) 200mm(OD) Mtr. ₹ 1,740.00 ₹ 1,740.00 ₹ 1,740.00 ₹ 1,740.00 ₹ 1,740.00
i) 225mm(OD) Mtr. ₹ 2,188.00 ₹ 2,188.00 ₹ 2,188.00 ₹ 2,188.00 ₹ 2,188.00
j) 250mm(OD) Mtr. ₹ 2,688.00 ₹ 2,688.00 ₹ 2,688.00 ₹ 2,688.00 ₹ 2,688.00
k) 280mm(OD) Mtr. ₹ 3,349.00 ₹ 3,349.00 ₹ 3,349.00 ₹ 3,349.00 ₹ 3,349.00
l) 315mm(OD) Mtr. ₹ 4,189.00 ₹ 4,189.00 ₹ 4,189.00 ₹ 4,189.00 ₹ 4,189.00

L-7
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
3 Supplying HDPE (Materials grade PE-80) pipes conforming to IS 4984-
1995 with latest revision & amendments if any with necessary HDPE
specials (excluding cost of CIDF valves) including labour charges for
earth work in excavation in any kind of soil including mixed soil with
boulder,road sub-grade and aits flank but excluding moorum laterite or
sand stone / hard rock cutting with chisel required including cutting road
flank/ brick pavement etc. without damaging the exisiting
telephone/electrical cable line etc.(in case of damage of any type of
cable line by the agency at the time of execution necessary damage
charge as applicable by the respective authority will have to be brone by
the agency at his own cost)upto the depth (av.) so as to maintain
1.10m.earth cushion from top of the pipe upto G.L. including loading
unloading carrying lowering laying fitting fixing carefully pipes, valves and
specials with the all types of jointing materials in trenches maintaining
proper levels and alignment jointing the pipes and specials by butt
welding/ adopting suitable method (But weld jointing with help of
hydraulic tack and trimming machines, Hitter etc. for reaching at
necessary melting point of HDPE pipe so that joint can be monolithic) so
as to facilitate the maintenance of pipe line locally as per conventional
method in future.

(A) Pressure Rating : PN 6


(i) Laying of pipe line including cost of pipe only excluding cost of
specials/fittings & valves.
a) 75mm(OD) Mtr. ₹ 276.00 ₹ 276.00 ₹ 276.00 ₹ 276.00 ₹ 276.00
b) 90mm (OD) Mtr. ₹ 367.00 ₹ 367.00 ₹ 367.00 ₹ 367.00 ₹ 367.00
c) 110mm(OD) Mtr, ₹ 513.00 ₹ 513.00 ₹ 513.00 ₹ 513.00 ₹ 513.00
d) 125mm(OD) Mtr. ₹ 661.00 ₹ 661.00 ₹ 661.00 ₹ 661.00 ₹ 661.00
e) 140mm(OD) Mtr. ₹ 808.00 ₹ 808.00 ₹ 808.00 ₹ 808.00 ₹ 808.00
f) 160mm(OD) Mtr. ₹ 1,028.00 ₹ 1,028.00 ₹ 1,028.00 ₹ 1,028.00 ₹ 1,028.00
g) 180mm(OD) Mtr. ₹ 1,271.00 ₹ 1,271.00 ₹ 1,271.00 ₹ 1,271.00 ₹ 1,271.00
L-8
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
h) 200mm(OD) Mtr. ₹ 1,550.00 ₹ 1,550.00 ₹ 1,550.00 ₹ 1,550.00 ₹ 1,550.00
i) 225mm(OD) Mtr. ₹ 1,928.00 ₹ 1,928.00 ₹ 1,928.00 ₹ 1,928.00 ₹ 1,928.00
j) 250mm(OD) Mtr. ₹ 2,353.00 ₹ 2,353.00 ₹ 2,353.00 ₹ 2,353.00 ₹ 2,353.00
k) 280mm(OD) Mtr. ₹ 2,912.00 ₹ 2,912.00 ₹ 2,912.00 ₹ 2,912.00 ₹ 2,912.00
l) 315mm(OD) Mtr. ₹ 3,651.00 ₹ 3,651.00 ₹ 3,651.00 ₹ 3,651.00 ₹ 3,651.00
(ii) Laying of pipe line including cost of pipe & fittings/specials but
excluding cost of valves.
a) 75mm(OD) Mtr. ₹ 286.00 ₹ 286.00 ₹ 286.00 ₹ 286.00 ₹ 286.00
b) 90mm (OD) Mtr. ₹ 381.00 ₹ 381.00 ₹ 381.00 ₹ 381.00 ₹ 381.00
c) 110mm(OD) Mtr, ₹ 535.00 ₹ 535.00 ₹ 535.00 ₹ 535.00 ₹ 535.00
d) 125mm(OD) Mtr. ₹ 688.00 ₹ 688.00 ₹ 688.00 ₹ 688.00 ₹ 688.00
e) 140mm(OD) Mtr. ₹ 842.00 ₹ 842.00 ₹ 842.00 ₹ 842.00 ₹ 842.00
f) 160mm(OD) Mtr. ₹ 1,073.00 ₹ 1,073.00 ₹ 1,073.00 ₹ 1,073.00 ₹ 1,073.00
g) 180mm(OD) Mtr. ₹ 1,327.00 ₹ 1,327.00 ₹ 1,327.00 ₹ 1,327.00 ₹ 1,327.00
h) 200mm(OD) Mtr. ₹ 1,620.00 ₹ 1,620.00 ₹ 1,620.00 ₹ 1,620.00 ₹ 1,620.00
i) 225mm(OD) Mtr. ₹ 2,015.00 ₹ 2,015.00 ₹ 2,015.00 ₹ 2,015.00 ₹ 2,015.00
j) 250mm(OD) Mtr. ₹ 2,461.00 ₹ 2,461.00 ₹ 2,461.00 ₹ 2,461.00 ₹ 2,461.00
k) 280mm(OD) Mtr. ₹ 3,047.00 ₹ 3,047.00 ₹ 3,047.00 ₹ 3,047.00 ₹ 3,047.00
l) 315mm(OD) Mtr. ₹ 3,822.00 ₹ 3,822.00 ₹ 3,822.00 ₹ 3,822.00 ₹ 3,822.00
(iii) Laying of pipe line including cost of pipe, fittings/specials & valves.

a) 75mm(OD) Mtr. ₹ 306.00 ₹ 306.00 ₹ 306.00 ₹ 306.00 ₹ 306.00


b) 90mm (OD) Mtr. ₹ 410.00 ₹ 410.00 ₹ 410.00 ₹ 410.00 ₹ 410.00
c) 110mm(OD) Mtr, ₹ 604.00 ₹ 604.00 ₹ 604.00 ₹ 604.00 ₹ 604.00
d) 125mm(OD) Mtr. ₹ 777.00 ₹ 777.00 ₹ 777.00 ₹ 777.00 ₹ 777.00
e) 140mm(OD) Mtr. ₹ 954.00 ₹ 954.00 ₹ 954.00 ₹ 954.00 ₹ 954.00
f) 160mm(OD) Mtr. ₹ 1,218.00 ₹ 1,218.00 ₹ 1,218.00 ₹ 1,218.00 ₹ 1,218.00
g) 180mm(OD) Mtr. ₹ 1,511.00 ₹ 1,511.00 ₹ 1,511.00 ₹ 1,511.00 ₹ 1,511.00
h) 200mm(OD) Mtr. ₹ 1,846.00 ₹ 1,846.00 ₹ 1,846.00 ₹ 1,846.00 ₹ 1,846.00
i) 225mm(OD) Mtr. ₹ 2,301.00 ₹ 2,301.00 ₹ 2,301.00 ₹ 2,301.00 ₹ 2,301.00
L-9
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
j) 250mm(OD) Mtr. ₹ 2,811.00 ₹ 2,811.00 ₹ 2,811.00 ₹ 2,811.00 ₹ 2,811.00
k) 280mm(OD) Mtr. ₹ 3,485.00 ₹ 3,485.00 ₹ 3,485.00 ₹ 3,485.00 ₹ 3,485.00
l) 315mm(OD) Mtr. ₹ 4,372.00 ₹ 4,372.00 ₹ 4,372.00 ₹ 4,372.00 ₹ 4,372.00
(B) Pressure Rating : PN 10
(i) Laying of pipe line including cost of pipe only excluding cost of
specials/fittings & valves.
a) 75mm(OD) Mtr. ₹ 379.00 ₹ 379.00 ₹ 379.00 ₹ 379.00 ₹ 379.00
b) 90mm (OD) Mtr. ₹ 517.00 ₹ 517.00 ₹ 517.00 ₹ 517.00 ₹ 517.00
c) 110mm(OD) Mtr, ₹ 732.00 ₹ 732.00 ₹ 732.00 ₹ 732.00 ₹ 732.00
d) 125mm(OD) Mtr. ₹ 951.00 ₹ 951.00 ₹ 951.00 ₹ 951.00 ₹ 951.00
e) 140mm(OD) Mtr. ₹ 1,173.00 ₹ 1,173.00 ₹ 1,173.00 ₹ 1,173.00 ₹ 1,173.00
f) 160mm(OD) Mtr. ₹ 1,501.00 ₹ 1,501.00 ₹ 1,501.00 ₹ 1,501.00 ₹ 1,501.00
g) 180mm(OD) Mtr. ₹ 1,877.00 ₹ 1,877.00 ₹ 1,877.00 ₹ 1,877.00 ₹ 1,877.00
h) 200mm(OD) Mtr. ₹ 2,288.00 ₹ 2,288.00 ₹ 2,288.00 ₹ 2,288.00 ₹ 2,288.00
i) 225mm(OD) Mtr. ₹ 2,870.00 ₹ 2,870.00 ₹ 2,870.00 ₹ 2,870.00 ₹ 2,870.00
j) 250mm(OD) Mtr. ₹ 3,514.00 ₹ 3,514.00 ₹ 3,514.00 ₹ 3,514.00 ₹ 3,514.00
k) 280mm(OD) Mtr. ₹ 4,372.00 ₹ 4,372.00 ₹ 4,372.00 ₹ 4,372.00 ₹ 4,372.00
l) 315mm(OD) Mtr. ₹ 5,497.00 ₹ 5,497.00 ₹ 5,497.00 ₹ 5,497.00 ₹ 5,497.00
(ii) Laying of pipe line including cost of pipe & fittings/specials but
excluding cost of valves.
a) 75mm(OD) Mtr. ₹ 394.00 ₹ 394.00 ₹ 394.00 ₹ 394.00 ₹ 394.00
b) 90mm (OD) Mtr. ₹ 538.00 ₹ 538.00 ₹ 538.00 ₹ 538.00 ₹ 538.00
c) 110mm(OD) Mtr, ₹ 764.00 ₹ 764.00 ₹ 764.00 ₹ 764.00 ₹ 764.00
d) 125mm(OD) Mtr. ₹ 993.00 ₹ 993.00 ₹ 993.00 ₹ 993.00 ₹ 993.00
e) 140mm(OD) Mtr. ₹ 1,225.00 ₹ 1,225.00 ₹ 1,225.00 ₹ 1,225.00 ₹ 1,225.00
f) 160mm(OD) Mtr. ₹ 1,569.00 ₹ 1,569.00 ₹ 1,569.00 ₹ 1,569.00 ₹ 1,569.00
g) 180mm(OD) Mtr. ₹ 1,964.00 ₹ 1,964.00 ₹ 1,964.00 ₹ 1,964.00 ₹ 1,964.00
h) 200mm(OD) Mtr. ₹ 2,394.00 ₹ 2,394.00 ₹ 2,394.00 ₹ 2,394.00 ₹ 2,394.00
i) 225mm(OD) Mtr. ₹ 3,004.00 ₹ 3,004.00 ₹ 3,004.00 ₹ 3,004.00 ₹ 3,004.00
j) 250mm(OD) Mtr. ₹ 3,680.00 ₹ 3,680.00 ₹ 3,680.00 ₹ 3,680.00 ₹ 3,680.00
L-10
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
k) 280mm(OD) Mtr. ₹ 4,580.00 ₹ 4,580.00 ₹ 4,580.00 ₹ 4,580.00 ₹ 4,580.00
l) 315mm(OD) Mtr. ₹ 5,760.00 ₹ 5,760.00 ₹ 5,760.00 ₹ 5,760.00 ₹ 5,760.00
(iii) Laying of pipe line including cost of pipe, fittings/specials & valves.

a) 75mm(OD) Mtr. ₹ 425.00 ₹ 425.00 ₹ 425.00 ₹ 425.00 ₹ 425.00


b) 90mm (OD) Mtr. ₹ 582.00 ₹ 582.00 ₹ 582.00 ₹ 582.00 ₹ 582.00
c) 110mm(OD) Mtr, ₹ 868.00 ₹ 868.00 ₹ 868.00 ₹ 868.00 ₹ 868.00
d) 125mm(OD) Mtr. ₹ 1,127.00 ₹ 1,127.00 ₹ 1,127.00 ₹ 1,127.00 ₹ 1,127.00
e) 140mm(OD) Mtr. ₹ 1,394.00 ₹ 1,394.00 ₹ 1,394.00 ₹ 1,394.00 ₹ 1,394.00
f) 160mm(OD) Mtr. ₹ 1,788.00 ₹ 1,788.00 ₹ 1,788.00 ₹ 1,788.00 ₹ 1,788.00
g) 180mm(OD) Mtr. ₹ 2,242.00 ₹ 2,242.00 ₹ 2,242.00 ₹ 2,242.00 ₹ 2,242.00
h) 200mm(OD) Mtr. ₹ 2,736.00 ₹ 2,736.00 ₹ 2,736.00 ₹ 2,736.00 ₹ 2,736.00
i) 225mm(OD) Mtr. ₹ 3,438.00 ₹ 3,438.00 ₹ 3,438.00 ₹ 3,438.00 ₹ 3,438.00
j) 250mm(OD) Mtr. ₹ 4,213.00 ₹ 4,213.00 ₹ 4,213.00 ₹ 4,213.00 ₹ 4,213.00
k) 280mm(OD) Mtr. ₹ 5,247.00 ₹ 5,247.00 ₹ 5,247.00 ₹ 5,247.00 ₹ 5,247.00
l) 315mm(OD) Mtr. ₹ 6,601.00 ₹ 6,601.00 ₹ 6,601.00 ₹ 6,601.00 ₹ 6,601.00

L-11
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
4 Supplying HDPE (Materials grade PE-100) pipes conforming to IS 4984-
1995 with latest revision & amendments if any with necessary HDPE
specials (excluding cost of CIDF valves) including labour charges for
earth work in excavation in any kind of soil including mixed soil with
boulder,road sub-grade and aits flank but excluding moorum laterite or
sand stone / hard rock cutting with chisel required including cutting road
flank/ brick pavement etc. without damaging the exisiting
telephone/electrical cable line etc.(in case of damage of any type of
cable line by the agency at the time of execution necessary damage
charge as applicable by the respective authority will have to be brone by
the agency at his own cost)upto the depth (av.) so as to maintain
1.10m.earth cushion from top of the pipe upto G.L. including loading
unloading carrying lowering laying fitting fixing carefully pipes, valves and
specials with the all types of jointing materials in trenches maintaining
proper levels and alignment jointing the pipes and specials by butt
welding/ adopting suitable method (But weld jointing with help of
hydraulic tack and trimming machines, Hitter etc. for reaching at
necessary melting point of HDPE pipe so that joint can be monolithic) so
as to facilitate the maintenance of pipe line locally as per conventional
method in future.

(A) Pressure Rating : PN 6


(i) Laying of pipe line including cost of pipe only excluding cost of
specials/fittings valves.
a) 75mm(OD) Mtr. ₹ 244.00 ₹ 244.00 ₹ 244.00 ₹ 244.00 ₹ 244.00
b) 90mm (OD) Mtr. ₹ 319.00 ₹ 319.00 ₹ 319.00 ₹ 319.00 ₹ 319.00
c) 110mm(OD) Mtr, ₹ 436.00 ₹ 436.00 ₹ 436.00 ₹ 436.00 ₹ 436.00
d) 125mm(OD) Mtr. ₹ 568.00 ₹ 568.00 ₹ 568.00 ₹ 568.00 ₹ 568.00
e) 140mm(OD) Mtr. ₹ 693.00 ₹ 693.00 ₹ 693.00 ₹ 693.00 ₹ 693.00
f) 160mm(OD) Mtr. ₹ 874.00 ₹ 874.00 ₹ 874.00 ₹ 874.00 ₹ 874.00
g) 180mm(OD) Mtr. ₹ 1,083.00 ₹ 1,083.00 ₹ 1,083.00 ₹ 1,083.00 ₹ 1,083.00
L-12
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
h) 200mm(OD) Mtr. ₹ 1,308.00 ₹ 1,308.00 ₹ 1,308.00 ₹ 1,308.00 ₹ 1,308.00
i) 225mm(OD) Mtr. ₹ 1,635.00 ₹ 1,635.00 ₹ 1,635.00 ₹ 1,635.00 ₹ 1,635.00
j) 250mm(OD) Mtr. ₹ 1,980.00 ₹ 1,980.00 ₹ 1,980.00 ₹ 1,980.00 ₹ 1,980.00
k) 280mm(OD) Mtr. ₹ 2,456.00 ₹ 2,456.00 ₹ 2,456.00 ₹ 2,456.00 ₹ 2,456.00
l) 315mm(OD) Mtr. ₹ 3,074.00 ₹ 3,074.00 ₹ 3,074.00 ₹ 3,074.00 ₹ 3,074.00
(ii) Laying of pipe line including cost of pipe & fittings/specials but
excluding cost of valves.
a) 75mm(OD) Mtr. ₹ 252.00 ₹ 252.00 ₹ 252.00 ₹ 252.00 ₹ 252.00
b) 90mm (OD) Mtr. ₹ 331.00 ₹ 331.00 ₹ 331.00 ₹ 331.00 ₹ 331.00
c) 110mm(OD) Mtr, ₹ 454.00 ₹ 454.00 ₹ 454.00 ₹ 454.00 ₹ 454.00
d) 125mm(OD) Mtr. ₹ 590.00 ₹ 590.00 ₹ 590.00 ₹ 590.00 ₹ 590.00
e) 140mm(OD) Mtr. ₹ 722.00 ₹ 722.00 ₹ 722.00 ₹ 722.00 ₹ 722.00
f) 160mm(OD) Mtr. ₹ 911.00 ₹ 911.00 ₹ 911.00 ₹ 911.00 ₹ 911.00
g) 180mm(OD) Mtr. ₹ 1,129.00 ₹ 1,129.00 ₹ 1,129.00 ₹ 1,129.00 ₹ 1,129.00
h) 200mm(OD) Mtr. ₹ 1,365.00 ₹ 1,365.00 ₹ 1,365.00 ₹ 1,365.00 ₹ 1,365.00
i) 225mm(OD) Mtr. ₹ 1,708.00 ₹ 1,708.00 ₹ 1,708.00 ₹ 1,708.00 ₹ 1,708.00
j) 250mm(OD) Mtr. ₹ 2,070.00 ₹ 2,070.00 ₹ 2,070.00 ₹ 2,070.00 ₹ 2,070.00
k) 280mm(OD) Mtr. ₹ 2,568.00 ₹ 2,568.00 ₹ 2,568.00 ₹ 2,568.00 ₹ 2,568.00
l) 315mm(OD) Mtr. ₹ 3,216.00 ₹ 3,216.00 ₹ 3,216.00 ₹ 3,216.00 ₹ 3,216.00
(iii) Laying of pipe line including cost of pipe, fittings/specials & valves.
a) 75mm(OD) Mtr. ₹ 269.00 ₹ 269.00 ₹ 269.00 ₹ 269.00 ₹ 269.00
b) 90mm (OD) Mtr. ₹ 354.00 ₹ 354.00 ₹ 354.00 ₹ 354.00 ₹ 354.00
c) 110mm(OD) Mtr, ₹ 511.00 ₹ 511.00 ₹ 511.00 ₹ 511.00 ₹ 511.00
d) 125mm(OD) Mtr. ₹ 665.00 ₹ 665.00 ₹ 665.00 ₹ 665.00 ₹ 665.00
e) 140mm(OD) Mtr. ₹ 815.00 ₹ 815.00 ₹ 815.00 ₹ 815.00 ₹ 815.00
f) 160mm(OD) Mtr. ₹ 1,032.00 ₹ 1,032.00 ₹ 1,032.00 ₹ 1,032.00 ₹ 1,032.00
g) 180mm(OD) Mtr. ₹ 1,283.00 ₹ 1,283.00 ₹ 1,283.00 ₹ 1,283.00 ₹ 1,283.00
h) 200mm(OD) Mtr. ₹ 1,553.00 ₹ 1,553.00 ₹ 1,553.00 ₹ 1,553.00 ₹ 1,553.00
i) 225mm(OD) Mtr. ₹ 1,946.00 ₹ 1,946.00 ₹ 1,946.00 ₹ 1,946.00 ₹ 1,946.00
j) 250mm(OD) Mtr. ₹ 2,361.00 ₹ 2,361.00 ₹ 2,361.00 ₹ 2,361.00 ₹ 2,361.00
L-13
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
k) 280mm(OD) Mtr. ₹ 2,933.00 ₹ 2,933.00 ₹ 2,933.00 ₹ 2,933.00 ₹ 2,933.00
l) 315mm(OD) Mtr. ₹ 3,675.00 ₹ 3,675.00 ₹ 3,675.00 ₹ 3,675.00 ₹ 3,675.00
(B) Pressure Rating : PN 10
(i) Laying of pipe line including cost of pipe only excluding cost of
specials/fittings valves.
a) 75mm(OD) Mtr. ₹ 332.00 ₹ 332.00 ₹ 332.00 ₹ 332.00 ₹ 332.00 ₹ 332.00
b) 90mm (OD) Mtr. ₹ 449.00 ₹ 449.00 ₹ 449.00 ₹ 449.00 ₹ 449.00 ₹ 449.00
c) 110mm(OD) Mtr, ₹ 627.00 ₹ 627.00 ₹ 627.00 ₹ 627.00 ₹ 627.00 ₹ 627.00
d) 125mm(OD) Mtr. ₹ 816.00 ₹ 816.00 ₹ 816.00 ₹ 816.00 ₹ 816.00 ₹ 816.00
e) 140mm(OD) Mtr. ₹ 1,001.00 ₹ 1,001.00 ₹ 1,001.00 ₹ 1,001.00 ₹ 1,001.00 ₹ 1,001.00
f) 160mm(OD) Mtr. ₹ 1,284.00 ₹ 1,284.00 ₹ 1,284.00 ₹ 1,284.00 ₹ 1,284.00 ₹ 1,284.00
g) 180mm(OD) Mtr. ₹ 1,602.00 ₹ 1,602.00 ₹ 1,602.00 ₹ 1,602.00 ₹ 1,602.00 ₹ 1,602.00
h) 200mm(OD) Mtr. ₹ 1,947.00 ₹ 1,947.00 ₹ 1,947.00 ₹ 1,947.00 ₹ 1,947.00 ₹ 1,947.00
i) 225mm(OD) Mtr. ₹ 2,445.00 ₹ 2,445.00 ₹ 2,445.00 ₹ 2,445.00 ₹ 2,445.00 ₹ 2,445.00
j) 250mm(OD) Mtr. ₹ 2,976.00 ₹ 2,976.00 ₹ 2,976.00 ₹ 2,976.00 ₹ 2,976.00 ₹ 2,976.00
k) 280mm(OD) Mtr. ₹ 3,700.00 ₹ 3,700.00 ₹ 3,700.00 ₹ 3,700.00 ₹ 3,700.00 ₹ 3,700.00
l) 315mm(OD) Mtr. ₹ 4,654.00 ₹ 4,654.00 ₹ 4,654.00 ₹ 4,654.00 ₹ 4,654.00 ₹ 4,654.00
(ii) Laying of pipe line including cost of pipe & fittings/specials but
excluding cost of valves.
a) 75mm(OD) Mtr. ₹ 345.00 ₹ 345.00 ₹ 345.00 ₹ 345.00 ₹ 345.00 ₹ 345.00
b) 90mm (OD) Mtr. ₹ 467.00 ₹ 467.00 ₹ 467.00 ₹ 467.00 ₹ 467.00 ₹ 467.00
c) 110mm(OD) Mtr, ₹ 654.00 ₹ 654.00 ₹ 654.00 ₹ 654.00 ₹ 654.00 ₹ 654.00
d) 125mm(OD) Mtr. ₹ 850.00 ₹ 850.00 ₹ 850.00 ₹ 850.00 ₹ 850.00 ₹ 850.00
e) 140mm(OD) Mtr. ₹ 1,045.00 ₹ 1,045.00 ₹ 1,045.00 ₹ 1,045.00 ₹ 1,045.00 ₹ 1,045.00
f) 160mm(OD) Mtr. ₹ 1,341.00 ₹ 1,341.00 ₹ 1,341.00 ₹ 1,341.00 ₹ 1,341.00 ₹ 1,341.00
g) 180mm(OD) Mtr. ₹ 1,674.00 ₹ 1,674.00 ₹ 1,674.00 ₹ 1,674.00 ₹ 1,674.00 ₹ 1,674.00
h) 200mm(OD) Mtr. ₹ 2,036.00 ₹ 2,036.00 ₹ 2,036.00 ₹ 2,036.00 ₹ 2,036.00 ₹ 2,036.00
i) 225mm(OD) Mtr. ₹ 2,558.00 ₹ 2,558.00 ₹ 2,558.00 ₹ 2,558.00 ₹ 2,558.00 ₹ 2,558.00
j) 250mm(OD) Mtr. ₹ 3,115.00 ₹ 3,115.00 ₹ 3,115.00 ₹ 3,115.00 ₹ 3,115.00 ₹ 3,115.00
k) 280mm(OD) Mtr. ₹ 3,875.00 ₹ 3,875.00 ₹ 3,875.00 ₹ 3,875.00 ₹ 3,875.00 ₹ 3,875.00
L-14
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
l) 315mm(OD) Mtr. ₹ 4,875.00 ₹ 4,875.00 ₹ 4,875.00 ₹ 4,875.00 ₹ 4,875.00 ₹ 4,875.00
(iii) Laying of pipe line including cost of pipe, fittings/specials & valves.

a) 75mm(OD) Mtr. ₹ 371.00 ₹ 371.00 ₹ 371.00 ₹ 371.00 ₹ 371.00 ₹ 371.00


b) 90mm (OD) Mtr. ₹ 504.00 ₹ 504.00 ₹ 504.00 ₹ 504.00 ₹ 504.00 ₹ 504.00
c) 110mm(OD) Mtr, ₹ 740.00 ₹ 740.00 ₹ 740.00 ₹ 740.00 ₹ 740.00 ₹ 740.00
d) 125mm(OD) Mtr. ₹ 963.00 ₹ 963.00 ₹ 963.00 ₹ 963.00 ₹ 963.00 ₹ 963.00
e) 140mm(OD) Mtr. ₹ 1,186.00 ₹ 1,186.00 ₹ 1,186.00 ₹ 1,186.00 ₹ 1,186.00 ₹ 1,186.00
f) 160mm(OD) Mtr. ₹ 1,526.00 ₹ 1,526.00 ₹ 1,526.00 ₹ 1,526.00 ₹ 1,526.00 ₹ 1,526.00
g) 180mm(OD) Mtr. ₹ 1,909.00 ₹ 1,909.00 ₹ 1,909.00 ₹ 1,909.00 ₹ 1,909.00 ₹ 1,909.00
h) 200mm(OD) Mtr. ₹ 2,323.00 ₹ 2,323.00 ₹ 2,323.00 ₹ 2,323.00 ₹ 2,323.00 ₹ 2,323.00
i) 225mm(OD) Mtr. ₹ 2,924.00 ₹ 2,924.00 ₹ 2,924.00 ₹ 2,924.00 ₹ 2,924.00 ₹ 2,924.00
j) 250mm(OD) Mtr. ₹ 3,562.00 ₹ 3,562.00 ₹ 3,562.00 ₹ 3,562.00 ₹ 3,562.00 ₹ 3,562.00
k) 280mm(OD) Mtr. ₹ 4,436.00 ₹ 4,436.00 ₹ 4,436.00 ₹ 4,436.00 ₹ 4,436.00 ₹ 4,436.00
l) 315mm(OD) Mtr. ₹ 5,582.00 ₹ 5,582.00 ₹ 5,582.00 ₹ 5,582.00 ₹ 5,582.00 ₹ 5,582.00
5 Making rubber gasket joint to CI/DI pipes maintaining proper alignment
level etc. by mechanical arrangement with or without using mobile cranes
where necessary and with help of all other equipments tools and tackles
etc. as required providing lubricants of approved quality and direction of
EIC. (rubber gasket will be supplied deptt. free of cost)

a) 80mm dia Each ₹ 13.00 ₹ 13.00 ₹ 13.00 ₹ 13.00 ₹ 13.00 ₹ 13.00


b) 100mm dia. Each. ₹ 20.00 ₹ 20.00 ₹ 20.00 ₹ 20.00 ₹ 20.00 ₹ 20.00
c) 125mm dia. Each. ₹ 38.00 ₹ 38.00 ₹ 38.00 ₹ 38.00 ₹ 38.00 ₹ 38.00
d) 150mm dia. Each. ₹ 38.00 ₹ 38.00 ₹ 38.00 ₹ 38.00 ₹ 38.00 ₹ 38.00
e) 200mm dia. Each. ₹ 51.00 ₹ 51.00 ₹ 51.00 ₹ 51.00 ₹ 51.00 ₹ 51.00
f) 250mm dia. Each. ₹ 64.00 ₹ 64.00 ₹ 64.00 ₹ 64.00 ₹ 64.00 ₹ 64.00
g) 300mm dia. Each. ₹ 76.00 ₹ 76.00 ₹ 76.00 ₹ 76.00 ₹ 76.00 ₹ 76.00
h) 350mm dia. Each. ₹ 76.00 ₹ 76.00 ₹ 76.00 ₹ 76.00 ₹ 76.00 ₹ 76.00
i) 400mm dia. Each. ₹ 102.00 ₹ 102.00 ₹ 102.00 ₹ 102.00 ₹ 102.00 ₹ 102.00
j) 450mm dia. Each ₹ 114.00 ₹ 114.00 ₹ 114.00 ₹ 114.00 ₹ 114.00 ₹ 114.00
L-15
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
k) 500mm dia. Each. ₹ 121.00 ₹ 121.00 ₹ 121.00 ₹ 121.00 ₹ 121.00 ₹ 121.00
l) 600mm dia. Each. ₹ 165.00 ₹ 165.00 ₹ 165.00 ₹ 165.00 ₹ 165.00 ₹ 165.00
m) 700mm dia. Each. ₹ 196.00 ₹ 196.00 ₹ 196.00 ₹ 196.00 ₹ 196.00 ₹ 196.00
n) 750mm dia. Each ₹ 196.00 ₹ 196.00 ₹ 196.00 ₹ 196.00 ₹ 196.00 ₹ 196.00
o) 800mm dia. Each ₹ 216.00 ₹ 216.00 ₹ 216.00 ₹ 216.00 ₹ 216.00 ₹ 216.00
p) 900mm dia. Each ₹ 254.00 ₹ 254.00 ₹ 254.00 ₹ 254.00 ₹ 254.00 ₹ 254.00
q) 1000mm dia. Each ₹ 280.00 ₹ 280.00 ₹ 280.00 ₹ 280.00 ₹ 280.00 ₹ 280.00
6 Making flange joint to DI/CI pipes, specials and valves where necessary
with supply of required rubber insertion and nut bolts, washers etc. of
approved quality and type all complete as per specification and direction
of EIC (Nut and bolts shall be of TATA/GKW rate).

a) 80mm dia Each ₹ 112.00 ₹ 112.00 ₹ 112.00 ₹ 112.00 ₹ 112.00 ₹ 112.00


b) 100mm dia. Each. ₹ 182.00 ₹ 182.00 ₹ 182.00 ₹ 182.00 ₹ 182.00 ₹ 182.00
c) 125mm dia. Each. ₹ 189.00 ₹ 189.00 ₹ 189.00 ₹ 189.00 ₹ 189.00 ₹ 189.00
d) 150mm dia. Each. ₹ 220.00 ₹ 220.00 ₹ 220.00 ₹ 220.00 ₹ 220.00 ₹ 220.00
e) 200mm dia. Each. ₹ 237.00 ₹ 237.00 ₹ 237.00 ₹ 237.00 ₹ 237.00 ₹ 237.00
f) 250mm dia. Each. ₹ 329.00 ₹ 329.00 ₹ 329.00 ₹ 329.00 ₹ 329.00 ₹ 329.00
g) 300mm dia. Each. ₹ 351.00 ₹ 351.00 ₹ 351.00 ₹ 351.00 ₹ 351.00 ₹ 351.00
h) 350mm dia. Each. ₹ 448.00 ₹ 448.00 ₹ 448.00 ₹ 448.00 ₹ 448.00 ₹ 448.00
i) 400mm dia. Each. ₹ 518.00 ₹ 518.00 ₹ 518.00 ₹ 518.00 ₹ 518.00 ₹ 518.00
j) 450mm dia. Each ₹ 628.00 ₹ 628.00 ₹ 628.00 ₹ 628.00 ₹ 628.00 ₹ 628.00
k) 500mm dia. Each. ₹ 666.00 ₹ 666.00 ₹ 666.00 ₹ 666.00 ₹ 666.00 ₹ 666.00
l) 600mm dia. Each. ₹ 821.00 ₹ 821.00 ₹ 821.00 ₹ 821.00 ₹ 821.00 ₹ 821.00
m) 700mm dia. Each. ₹ 1,004.00 ₹ 1,004.00 ₹ 1,004.00 ₹ 1,004.00 ₹ 1,004.00 ₹ 1,004.00
n) 750mm dia. Each ₹ 1,070.00 ₹ 1,070.00 ₹ 1,070.00 ₹ 1,070.00 ₹ 1,070.00 ₹ 1,070.00
o) 800mm dia. Each ₹ 1,249.00 ₹ 1,249.00 ₹ 1,249.00 ₹ 1,249.00 ₹ 1,249.00 ₹ 1,249.00
p) 900mm dia. Each ₹ 1,457.00 ₹ 1,457.00 ₹ 1,457.00 ₹ 1,457.00 ₹ 1,457.00 ₹ 1,457.00
q) 1000mm dia. Each ₹ 1,836.00 ₹ 1,836.00 ₹ 1,836.00 ₹ 1,836.00 ₹ 1,836.00 ₹ 1,836.00

L-16
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
7 Cutting DI pipe (all class & type) to required length with cutting device
etc. and grinding the cutting portion with file as per direction and
satisfaction of EIC.

a) 80mm.dia. to 125mm.dia pipe Each ₹ 109.00 ₹ 109.00 ₹ 109.00 ₹ 109.00 ₹ 109.00 ₹ 109.00
b) 150mm.dia.to 200mm.dia pipe Each. ₹ 141.00 ₹ 141.00 ₹ 141.00 ₹ 141.00 ₹ 141.00 ₹ 141.00
c) 250mm.dia.to 350mm.dia pipe Each. ₹ 263.00 ₹ 263.00 ₹ 263.00 ₹ 263.00 ₹ 263.00 ₹ 263.00
d) 400mm.dia.to 450mm.dia pipe Each. ₹ 385.00 ₹ 385.00 ₹ 385.00 ₹ 385.00 ₹ 385.00 ₹ 385.00
e) 500mm.dia.to 600mm.dia pipe Each. ₹ 436.00 ₹ 436.00 ₹ 436.00 ₹ 436.00 ₹ 436.00 ₹ 436.00
f) 700mm.dia.pipe Each ₹ 539.00 ₹ 539.00 ₹ 539.00 ₹ 539.00 ₹ 539.00 ₹ 539.00
g) 750mm.dia to 800mm.dia.pipe Each ₹ 706.00 ₹ 706.00 ₹ 706.00 ₹ 706.00 ₹ 706.00 ₹ 706.00
h) 900mm.dia to 1000mm.dia pipe Each ₹ 873.00 ₹ 873.00 ₹ 873.00 ₹ 873.00 ₹ 873.00 ₹ 873.00
8 Chamfering the spigot end of all type/class of DI pipe for proper using of
push joint by means of grinder set at site for proper joint etc. all complete
as per direction of EIC.

a) 80mm dia Each ₹ 81.00 ₹ 81.00 ₹ 81.00 ₹ 81.00 ₹ 81.00 ₹ 81.00


b) 100mm dia. Each. ₹ 82.00 ₹ 82.00 ₹ 82.00 ₹ 82.00 ₹ 82.00 ₹ 82.00
c) 125mm dia. Each. ₹ 85.00 ₹ 85.00 ₹ 85.00 ₹ 85.00 ₹ 85.00 ₹ 85.00
d) 150mm dia. Each. ₹ 108.00 ₹ 108.00 ₹ 108.00 ₹ 108.00 ₹ 108.00 ₹ 108.00
e) 200mm dia. Each. ₹ 113.00 ₹ 113.00 ₹ 113.00 ₹ 113.00 ₹ 113.00 ₹ 113.00
f) 250mm dia. Each. ₹ 120.00 ₹ 120.00 ₹ 120.00 ₹ 120.00 ₹ 120.00 ₹ 120.00
g) 300mm dia. Each. ₹ 160.00 ₹ 160.00 ₹ 160.00 ₹ 160.00 ₹ 160.00 ₹ 160.00
h) 350mm dia. Each. ₹ 185.00 ₹ 185.00 ₹ 185.00 ₹ 185.00 ₹ 185.00 ₹ 185.00
i) 400mm dia. Each. ₹ 209.00 ₹ 209.00 ₹ 209.00 ₹ 209.00 ₹ 209.00 ₹ 209.00
j) 450mm dia. Each ₹ 280.00 ₹ 280.00 ₹ 280.00 ₹ 280.00 ₹ 280.00 ₹ 280.00
k) 500mm dia. Each. ₹ 313.00 ₹ 313.00 ₹ 313.00 ₹ 313.00 ₹ 313.00 ₹ 313.00
l) 600mm dia. Each. ₹ 369.00 ₹ 369.00 ₹ 369.00 ₹ 369.00 ₹ 369.00 ₹ 369.00
m) 700mm dia. Each. ₹ 501.00 ₹ 501.00 ₹ 501.00 ₹ 501.00 ₹ 501.00 ₹ 501.00
n) 750mm dia. Each ₹ 549.00 ₹ 549.00 ₹ 549.00 ₹ 549.00 ₹ 549.00 ₹ 549.00
o) 800mm dia. Each ₹ 613.00 ₹ 613.00 ₹ 613.00 ₹ 613.00 ₹ 613.00 ₹ 613.00
p) 900mm dia. Each ₹ 729.00 ₹ 729.00 ₹ 729.00 ₹ 729.00 ₹ 729.00 ₹ 729.00
L-17
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
q) 1000mm dia. Each ₹ 768.00 ₹ 768.00 ₹ 768.00 ₹ 768.00 ₹ 768.00 ₹ 768.00
9 Filling the pipe line with water, testing hydraulically as per I.S 3114-1965
(Article-6) in section of a length not exceeding 500mtr. for head of
pressure as per specification including supplying installing and fixing all
equipments such as diesel pump set, blank flange, pressure gauge,
valve, pressure pump and all other tools and plants including drilling
topping and plugging of necessary holes to pipes, blocking ends
providing temporary thrust block and subsequent blocking of holes and
other jointing materials and dismantling and removal of the same
including disposal of water etc. all complete as per specification and
direction of EIC. The rate is inclusive of cost of requisite water to be
arranged by the contractor (Recovery rate of water @ Rs.10.00/m3, if
contractor used water from deptt. source).

A) For CI/DI pipe


a) 80mm dia Mtr. ₹ 3.17 ₹ 3.17 ₹ 3.17 ₹ 3.17 ₹ 3.17 ₹ 3.17
b) 100mm dia. Mtr. ₹ 3.33 ₹ 3.33 ₹ 3.33 ₹ 3.33 ₹ 3.33 ₹ 3.33
c) 125mm dia. Mtr. ₹ 3.71 ₹ 3.71 ₹ 3.71 ₹ 3.71 ₹ 3.71 ₹ 3.71
d) 150mm dia. Mtr. ₹ 4.20 ₹ 4.20 ₹ 4.20 ₹ 4.20 ₹ 4.20 ₹ 4.20
e) 200mm dia. Mtr. ₹ 5.61 ₹ 5.61 ₹ 5.61 ₹ 5.61 ₹ 5.61 ₹ 5.61
f) 250mm dia. Mtr. ₹ 6.66 ₹ 6.66 ₹ 6.66 ₹ 6.66 ₹ 6.66 ₹ 6.66
g) 300mm dia. Mtr. ₹ 7.22 ₹ 7.22 ₹ 7.22 ₹ 7.22 ₹ 7.22 ₹ 7.22
h) 350mm dia. Mtr. ₹ 7.67 ₹ 7.67 ₹ 7.67 ₹ 7.67 ₹ 7.67 ₹ 7.67
i) 400mm dia. Mtr. ₹ 8.87 ₹ 8.87 ₹ 8.87 ₹ 8.87 ₹ 8.87 ₹ 8.87
j) 450mm dia. Mtr. ₹ 9.43 ₹ 9.43 ₹ 9.43 ₹ 9.43 ₹ 9.43 ₹ 9.43
k) 500mm dia. Mtr. ₹ 10.00 ₹ 10.00 ₹ 10.00 ₹ 10.00 ₹ 10.00 ₹ 10.00
l) 600mm dia. Mtr. ₹ 11.55 ₹ 11.55 ₹ 11.55 ₹ 11.55 ₹ 11.55 ₹ 11.55
m) 700mm dia. Mtr. ₹ 13.10 ₹ 13.10 ₹ 13.10 ₹ 13.10 ₹ 13.10 ₹ 13.10
n) 750mm dia. Mtr. ₹ 14.26 ₹ 14.26 ₹ 14.26 ₹ 14.26 ₹ 14.26 ₹ 14.26
o) 800mm dia. Mtr. ₹ 15.36 ₹ 15.36 ₹ 15.36 ₹ 15.36 ₹ 15.36 ₹ 15.36
p) 900mm dia. Mtr. ₹ 17.45 ₹ 17.45 ₹ 17.45 ₹ 17.45 ₹ 17.45 ₹ 17.45
q) 1000mm dia. Mtr. ₹ 19.72 ₹ 19.72 ₹ 19.72 ₹ 19.72 ₹ 19.72 ₹ 19.72
L-18
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
B) For UPVC/HDPE Pipe
a) 75mm dia (OD) Mtr. ₹ 3.15 ₹ 3.15 ₹ 3.15 ₹ 3.15 ₹ 3.15 ₹ 3.15
b) 90mm dia (OD) Mtr. ₹ 3.60 ₹ 3.60 ₹ 3.60 ₹ 3.60 ₹ 3.60 ₹ 3.60
c) 110mm dia (OD) Mtr. ₹ 3.78 ₹ 3.78 ₹ 3.78 ₹ 3.78 ₹ 3.78 ₹ 3.78
d) 125mm dia (OD) Mtr. ₹ 3.82 ₹ 3.82 ₹ 3.82 ₹ 3.82 ₹ 3.82 ₹ 3.82
e) 140mm dia (OD) Mtr. ₹ 4.24 ₹ 4.24 ₹ 4.24 ₹ 4.24 ₹ 4.24 ₹ 4.24
f) 160mm dia (OD) Mtr. ₹ 4.78 ₹ 4.78 ₹ 4.78 ₹ 4.78 ₹ 4.78 ₹ 4.78
g) 180mm dia (OD) Mtr. ₹ 5.17 ₹ 5.17 ₹ 5.17 ₹ 5.17 ₹ 5.17 ₹ 5.17
h) 200mm dia (OD) Mtr. ₹ 5.64 ₹ 5.64 ₹ 5.64 ₹ 5.64 ₹ 5.64 ₹ 5.64
i) 225mm dia (OD) Mtr. ₹ 6.44 ₹ 6.44 ₹ 6.44 ₹ 6.44 ₹ 6.44 ₹ 6.44
j) 250mm dia (OD) Mtr. ₹ 6.79 ₹ 6.79 ₹ 6.79 ₹ 6.79 ₹ 6.79 ₹ 6.79
k) 280mm dia (OD) Mtr. ₹ 7.66 ₹ 7.66 ₹ 7.66 ₹ 7.66 ₹ 7.66 ₹ 7.66
l) 315mm dia (OD) Mtr. ₹ 8.18 ₹ 8.18 ₹ 8.18 ₹ 8.18 ₹ 8.18 ₹ 8.18
10 Cleaning thoroughly the inner surface of pipe line including specials and
valves by flushing with water and subsequently disinfection of the same
pipe line by flushing again with water containing bleaching powder
resulting in residual chlorine not less than 15mg/ltrs. after 24hrs. of such
filling including laboratory testing of water samples obtain from the
disinfested pipe line and disposal of water from the pipe line after
completion of the work. The rates including of cost of requisite water to
3
be arranged by the contractor) (The rate of water @Rs. 10/m may be
recovered, if the contractor used water from deptt. source).

A) For CI/DI pipe


a) 80mm dia Mtr. ₹ 0.76 ₹ 0.76 ₹ 0.76 ₹ 0.76 ₹ 0.76 ₹ 0.76
b) 100mm dia. Mtr. ₹ 0.94 ₹ 0.94 ₹ 0.94 ₹ 0.94 ₹ 0.94 ₹ 0.94
c) 125mm dia. Mtr. ₹ 1.21 ₹ 1.21 ₹ 1.21 ₹ 1.21 ₹ 1.21 ₹ 1.21
d) 150mm dia. Mtr. ₹ 1.54 ₹ 1.54 ₹ 1.54 ₹ 1.54 ₹ 1.54 ₹ 1.54
e) 200mm dia. Mtr. ₹ 2.38 ₹ 2.38 ₹ 2.38 ₹ 2.38 ₹ 2.38 ₹ 2.38
f) 250mm dia. Mtr. ₹ 3.47 ₹ 3.47 ₹ 3.47 ₹ 3.47 ₹ 3.47 ₹ 3.47
g) 300mm dia. Mtr. ₹ 4.80 ₹ 4.80 ₹ 4.80 ₹ 4.80 ₹ 4.80 ₹ 4.80
L-19
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
h) 350mm dia. Mtr. ₹ 6.36 ₹ 6.36 ₹ 6.36 ₹ 6.36 ₹ 6.36 ₹ 6.36
i) 400mm dia. Mtr. ₹ 8.17 ₹ 8.17 ₹ 8.17 ₹ 8.17 ₹ 8.17 ₹ 8.17
j) 450mm dia. Mtr. ₹ 10.22 ₹ 10.22 ₹ 10.22 ₹ 10.22 ₹ 10.22 ₹ 10.22
k) 500mm dia. Mtr. ₹ 12.51 ₹ 12.51 ₹ 12.51 ₹ 12.51 ₹ 12.51 ₹ 12.51
l) 600mm dia. Mtr. ₹ 17.82 ₹ 17.82 ₹ 17.82 ₹ 17.82 ₹ 17.82 ₹ 17.82
m) 700mm dia. Mtr. ₹ 24.09 ₹ 24.09 ₹ 24.09 ₹ 24.09 ₹ 24.09 ₹ 24.09
n) 750mm dia. Mtr. ₹ 27.71 ₹ 27.71 ₹ 27.71 ₹ 27.71 ₹ 27.71 ₹ 27.71
o) 800mm dia. Mtr. ₹ 31.45 ₹ 31.45 ₹ 31.45 ₹ 31.45 ₹ 31.45 ₹ 31.45
p) 900mm dia. Mtr. ₹ 39.65 ₹ 39.65 ₹ 39.65 ₹ 39.65 ₹ 39.65 ₹ 39.65
q) 1000mm dia. Mtr. ₹ 48.82 ₹ 48.82 ₹ 48.82 ₹ 48.82 ₹ 48.82 ₹ 48.82
B) For UPVC/HDPE Pipe

a) 75mm dia (OD) Mtr. ₹ 0.69 ₹ 0.69 ₹ 0.69 ₹ 0.69 ₹ 0.69 ₹ 0.69
b) 90mm dia (OD) ₹ 0.88 ₹ 0.88 ₹ 0.88 ₹ 0.88 ₹ 0.88 ₹ 0.88
Mtr.
c) 110mm dia (OD) Mtr. ₹ 1.08 ₹ 1.08 ₹ 1.08 ₹ 1.08 ₹ 1.08 ₹ 1.08
d) 125mm dia (OD) Mtr. ₹ 1.24 ₹ 1.24 ₹ 1.24 ₹ 1.24 ₹ 1.24 ₹ 1.24
e) 140mm dia (OD) Mtr. ₹ 1.44 ₹ 1.44 ₹ 1.44 ₹ 1.44 ₹ 1.44 ₹ 1.44
f) 160mm dia (OD) Mtr. ₹ 1.73 ₹ 1.73 ₹ 1.73 ₹ 1.73 ₹ 1.73 ₹ 1.73
g) 180mm dia (OD) Mtr. ₹ 2.05 ₹ 2.05 ₹ 2.05 ₹ 2.05 ₹ 2.05 ₹ 2.05
h) 200mm dia (OD) Mtr. ₹ 2.42 ₹ 2.42 ₹ 2.42 ₹ 2.42 ₹ 2.42 ₹ 2.42
i) 225mm dia (OD) Mtr. ₹ 2.93 ₹ 2.93 ₹ 2.93 ₹ 2.93 ₹ 2.93 ₹ 2.93
j) 250mm dia (OD) Mtr. ₹ 3.50 ₹ 3.50 ₹ 3.50 ₹ 3.50 ₹ 3.50 ₹ 3.50
k) 280mm dia (OD)
Mtr. ₹ 4.27 ₹ 4.27 ₹ 4.27 ₹ 4.27 ₹ 4.27 ₹ 4.27
l) 315mm dia (OD) Mtr. ₹ 5.28 ₹ 5.28 ₹ 5.28 ₹ 5.28 ₹ 5.28 ₹ 5.28
L-20
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
11 Submission of complete detailed drawing of distribution system, rising
main etc. after execution of work showing position of different types of
valves, fittings/specials sluice valve chamber with location, node to node
wise in the sanctioned drawing as completion drawing of the water
supply scheme as per direction and satisfaction of EIC. The list of dia
Mtr. ₹ 0.38 ₹ 0.38 ₹ 0.38 ₹ 0.38 ₹ 0.38 ₹ 0.38
wise fitting/specials, different pipes ;of valve used in the rising main
should be shown in the completion drawing (not separate) with verified
by SAE & AE in-charge of the scheme. The above drawing will be
submitted in 5 copies.

12 Bituminous pucca road (approx. 450mm depth) cutting by using gaiti,


chisel, hammer etc. and picking uip the withdrawing excavated materials
and remove the same within distance of 30mtr. at least all complete for
fixing/crossing all dia of pipe line as per direction of EIC
cum ₹ 1,023.00 ₹ 1,023.00 ₹ 1,023.00 ₹ 1,023.00 ₹ 1,023.00 ₹ 1,023.00
13 Dismantling all type of plain cement concrete works, stacking serviceable
materials of site and removing rubbish as directed within a lead of 75mtr.
for laying all dia pipe line in ground floor, upto 150mm thick.

Ref. Item 2(a), page-10, PWD SOR Vol-I cum ₹ 939.00 ₹ 939.00 ₹ 939.00 ₹ 939.00 ₹ 939.00 ₹ 939.00
14 Construction of different dia Sluice valve /Air valve /Washout chamber in
different sizes for village road where light traffic run and for main road
where heavy traffic run as deptt.approved drawing with 25cm thick brick
work (1:6) over cement concrete (4:2:1) over a single B/F soling
over150mm.thick sand filling in foundation including earth work in
excavation and disposal of excess earth from work site with RCC
(1:1.5:3) cover slab 100mm / 150mm thick slab on top of chamber with
1% reinforcement in RCC cover slab with necessary opening for
operation of valve all complete including cost of labour & materials as per
Departmental Dwg. [Reinforcement type:- Other manufactuerers not
specified]

i) 80 mm to 150 mm dia pipe Each ₹ 12,649.00 ₹ 11,804.00 ₹ 12,055.00 ₹ 11,990.00 ₹ 11,835.00


i) 200 mm dia pipe Each ₹ 16,045.00 ₹ 14,965.00 ₹ 15,289.00 ₹ 15,194.00 ₹ 14,997.00
L-21
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
i) 250 mm to350 mm dia pipe Each ₹ 19,964.00 ₹ 18,606.00 ₹ 19,020.00 ₹ 18,881.00 ₹ 18,636.00
i) 400 mm to 450 mm dia pipe Each ₹ 23,585.00 ₹ 21,972.00 ₹ 22,472.00 ₹ 22,286.00 ₹ 21,998.00
15 Making holes in two sides of wall of culvert/drain or any other
structures in any places for laying any dia pipe line within
structures intwo sides of wall of culvert /drain /any structure at any
places and mending good damages all complete as per direction of Each
EIC. Side ₹ 574.00 ₹ 567.00 ₹ 565.00 ₹ 571.00 ₹ 568.00 ₹ 583.00
16 Making lighting arrangement for continuation work during night
including all charges (Applicable exclusively for emergency
situation and as per direction of EIC.)
Hour ₹ 182.00 ₹ 182.00 ₹ 182.00 ₹ 182.00 ₹ 182.00 ₹ 182.00
17 a) Construction of RCC street stand post (700mm height) of RCC
(1:1.5:3) footing over 75mm thick 4:2:1 P.C.C over a single B/F
soling with 1% reinforcement, connected with saddle piece &
15mm dia brass ferrule with supplying fitting, fixing 15mm dia G.I.
nipple, G.I.socket, G.I. 200mm x 150mm reducing elbow and
20mm dia GI(m) TATA pipe of (avg.) 2.6mtr. long and one 15mm
dia alloy Iron with brass spindle bib cock with socket and 20mm
G.I. elbow 2nos. with 15mm GI(m) TATA pipe of 0.225mtr. for
connection of stand post to distribution line as per deptt. design
and drawing as per direction of EIC along with Construction of
platform of size CC platform (1:2:4) over a single B/F soling below
G.L over 150mm.thick sand filling, neat cement finish over platform
and inner side of band and 15mm thick cement plaster (4:1) on top
of platform band and outside upto G.L. as per deptt. drawing and
as per direction of EIC

Each ₹ 7,549.00 ₹ 7,166.00 ₹ 7,256.00 ₹ 7,215.00 ₹ 7,152.00 ₹ 8,117.00

L-22
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
18 Carriage of different type of departmental pipes from
Divisional/Sub-divisional store to the work site by truck including
loading, unloading, stacking etc. including cost of fuel, lubricant
and also cost of driver, helper etc. and all other taxes and charges
as applicable as per direction of EIC
a) Any distance upto 5 Km Trip ₹ 956.00 ₹ 956.00 ₹ 956.00 ₹ 956.00 ₹ 956.00 ₹ 956.00
b) Above 5 Km upto 10 Km Trip ₹ 1,360.00 ₹ 1,360.00 ₹ 1,360.00 ₹ 1,360.00 ₹ 1,360.00 ₹ 1,360.00
c) Above 10 Km upto 20 Km Trip ₹ 2,057.00 ₹ 2,057.00 ₹ 2,057.00 ₹ 2,057.00 ₹ 2,057.00 ₹ 2,057.00
d) Above 20 Km upto 30 Km Trip ₹ 2,658.00 ₹ 2,658.00 ₹ 2,658.00 ₹ 2,658.00 ₹ 2,658.00 ₹ 2,658.00
e) Above 30 Km upto 40 Km Trip ₹ 3,213.00 ₹ 3,213.00 ₹ 3,213.00 ₹ 3,213.00 ₹ 3,213.00 ₹ 3,213.00
f) Above 40 Km upto 50 Km Trip ₹ 3,754.00 ₹ 3,754.00 ₹ 3,754.00 ₹ 3,754.00 ₹ 3,754.00 ₹ 3,754.00
g) Above 50 Km (Extra cost per Km) Km ₹ 57.00 ₹ 57.00 ₹ 57.00 ₹ 57.00 ₹ 57.00 ₹ 57.00
19 Making barricading of excavation trenches of road width upto
15mtr. to avoid any accident by providing 75mm dia bamboo post
placed vertically & horizontally with the help of 6”size iron rail as
per direction and satisfaction of EIC. (Applicable where critical
situation arise and take up the work as per direction of EIC)
Mtr. ₹ 118.00 ₹ 118.00 ₹ 118.00 ₹ 118.00 ₹ 118.00 ₹ 118.00

L-23
Item
No. Rate (Rs.)
Description of items Unit
ZONE -I ZONE - II ZONE-III ZONE-IV ZONE-V ZONE-VI
20 Excavation of Trench as per drawing and laying,fixing and jointing
with detachable joints AC pressure pipes with necessary spaceals
and valves, cutting pipes to required size, if necessary in any kind
of soil (including mix soil with boulder, road sub-grade and its flank)
prepairing the bottom serface for continous bedding of pipe line in
proper alignment as per specification instuction with joint holes,
sluice valve, wash out valve etc. bailing out water where necessary
including carrage of all materials from local store within 25 Km.,
making a clear cover of 1.00 mtr.between top of the pipe in trench
and existing ground level and backfilling the depth of the trench in
layers as directed (useing excavated earth ) two original conditions
with progresive submission of drawings of pipe lines layed and with
a statement of materials consumed against each R.A and Final
Bill. N.B.
(i) Any deviation from required depth of 1.00 mtr over pipe line in
trench has to be got permitted by the EIC and payment will be
made on prorate basis over the rate of entair item, if executed with
permission of EIC. (ii) 25% payment
against this item will be withheld till hydraulic test of pipe line is not
done as provided separately.

a) 80mm dia Mtr. ₹ 60.00 ₹ 60.00 ₹ 60.00 ₹ 60.00 ₹ 60.00


b) 100mm dia. Mtr. ₹ 62.00 ₹ 62.00 ₹ 62.00 ₹ 62.00 ₹ 62.00
c) 125mm dia. Mtr, ₹ 87.00 ₹ 87.00 ₹ 87.00 ₹ 87.00 ₹ 87.00
d) 150mm dia. Mtr. ₹ 97.00 ₹ 97.00 ₹ 97.00 ₹ 97.00 ₹ 97.00
e) 200mm dia. Mtr. ₹ 113.00 ₹ 113.00 ₹ 113.00 ₹ 113.00 ₹ 113.00
f) 250mm dia. Mtr. ₹ 130.00 ₹ 130.00 ₹ 130.00 ₹ 130.00 ₹ 130.00

L-24
SECTION – B.3

OVERHEAD RESERVOIR
OVERHEAD RESERVOIR

Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

1 Cleaning compound premises of shrubs, plants, jungles etc. as per direction of E.I.C. sqm Refer respective Item of PWD SOR
2 Providing Bored Cast-in-situ R.C.C. pile in position as per specifications in all kinds of soil
including cost of boring using drilling mud to stabilize the bore and flushing the bore of excess
mud with freshly prepared drilling fluid by using pumps prior to placing concrete by tremie pipe
in one continuous operation and including the cost of all materials and labour for placing of
concrete and also including the cost of mobilization and hire charges of all equipment necessary
for boring, welding of reinforcement cage as necessary and lowering of reinforcement cage,
preparation and placing of concrete, including the cost of concrete but excluding the cost of
reinforcement and labour for bending binding etc. complete as per Drawing and Technical
Specifications and removal of excavated earth with all lifts and lead upto 1000 m. Work to be
executed as per IS: 2911 (Part II Sec 2).
(Using tripod, winches) / (Using Hydraulic Piling Rig)

Refer respective Item of PWD SOR


Pile diameter :- (As per design) Mtr.
i) (The rate provided to be used is exclusive of cost of concrete.)
Construction wing is to add cost of concrete of desired grade for volume corresponding to 1.0m
length of pile length, to arrive at the complete rate. Also the desired crushing strength is to be
mentioned. The Rate of providing the temporary steel casing upto 3m depth is included.

ii) To obtain the complete rate the construction wing have to add cost of concrete volume for 1.0
mtr. Length of pile, multiplied by a factor,
[1+{Dummy length of Pile(Max 1.50mtr.)/Individual Length of Pile}]
iii) Rate for concrete may be adopted same as for bottom plug vide item no. 12.09(C) (IV).
iv) The cost of dismantling the length of the pile above cut off level is to be added.

OH -1
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

3 Plain / Reinforced Cement Concrete, in pile foundation with coarse aggregates of appropriate
nominal size and grading, fine aggregate (sand) conforming to proper grading zone, both of
approved quality, cement and water reducing admixtures, as necessary, including labour, cost
and carriage of all materials and including preparation of design mix, approval of the same by the
Engineer-in-Charge and cost for quality control, sampling, testing etc. all complete as per
drawing and technical specification including the cost of necessary form work and staging
complete. ( PCC Grade M25 with providing 10 % extra cement and Using concrete mixer ) { Refer respective Item of PWD SOR
From durability consideration, the value of minimum cement content and maximum water cement
ratio to be considered in the mix design shall be 420 kg/cu.m. and 0.4 respectively. }

Pile diameter :- (As per design) Cum


4 Performing Vertical load test on single Pile in accordance with IS:2911(Part-IV) by hydraulic
jackson pile/piles with 1.5 times the design load including preparation of the head of piles with
concrete of required strength for receiving the jacks with all ancillary arrangements for setting up
gauges, construction of suitable platforms, keeping the loads and dismantling and removing all
arrangement etc. complete as per IS specification and direction of Engineer-in-charge

a) Testing load upto 100T Each


Refer respective Item of PWD SOR
b) Testing load between 100 T to 150T Each
c) Testing load between 150T to 200T Each
d) Testing load between 200T to 250T Each
e) Testing load between 250T to 300T Each
N.B. This test shall be done on working piles only in a pile group and should satisfy the
provisions of routine test as given in IS-2911 (Part-4) 1985.

OH -2
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

5 Performing Lateral load test on two piles or two groups of piles by introducing a hydraulic jack
with gauge between two piles or pile groups under test by applying horizontal loads in
increments of about 20% of the estimated safe load at each stage and applying the next
increment after the rate of displacement is nearer to 0.1 mm. per 30 minutes till the total
displacement becomes, 12 mm at the cut-off level including the cost of arranging the entire set- Refer respective Item of PWD SOR
up, hire charges of all implements including at least two dial gauges, preparing the pile head if
necessary, and removal of all arrangement after completion etc. complete in all respect including
cost of carriage of all materials and as per IS specification and direction of Engineer-in-charge.
Each
6 Reinforcement for piling work including main bars, stirrups, binders etc. initial straightening and
removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct
shape. Cost of mobilization and welding of reinforcement cage as necessary and lowering of
reinforcement cage placing in proper position , including labour cost complete as per drawing Refer respective Item of PWD SOR
and direction.
a) HYSD bars (Tor steel) M.T
7 Earth work in excavation of foundation trenches ordrains, inallsorts of soil (including mixed soil
but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a
lead of 75m. as directed. The item includes necessary trimming the sides of trenches, levelling,
dressing and ramming the bottom, bailing out water as required complete.

Refer respective Item of PWD SOR


(a) Depth of excavation not exceeding 1.50m. cum
(b) Depth 1.50m. and upto 3.00m. cum
Add extra for excavation of morrum soil cum
Add extra for cutting laterite /sand stone with chiseling cum
Add extra for cutting with blasting cum
8 Extra over the corresponding item of earth work for semi liquied mud or slashy earth by iron pans
cum Refer respective Item of PWD SOR
, buckets etc.
9 Bailing out water from foundation trench. cum Refer respective Item of PWD SOR

OH -3
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

10 Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding
150mm. including watering and ramming etc. layer by layer complete. (Payment to be made on
the basis of measurement of finished quantity of work)

(a) With earth obtain for excavation of foundation cum


(b) With earth obtained by fresh excavation (including cost of excavation upto
1,800mm.depth)from land arranged by the Deptt. within a lead of 100m. cum

(c) With carried earth arranged by the contractor within a radius of 1km.including cost of carried
cum Refer respective Item of PWD SOR
earth.
(d) With carried earth arranged by the contractor within a radius of 3km.including cost of carried
earth. cum

(e) With carried earth arranged by the contractor within a radius exceeding 3km.but not
exceeding 5km. including cost of carried earth. cum

(f) With carried earth arranged by the contractor within a radius exceeding 5km.but not
exceeding 10km.including cost of carried earth. cum

11 Filling in foundation or plinth by silver sand in layers not exceeding 150mm as directed and
consolidating the same by thorough saturation with water, ramming complete including the cost cum Refer respective Item of PWD SOR
of supply of sand. (payment to be made on measurement of finished quantity)
12 Filling in foundation plinth by fine sand cum Refer respective Item of PWD SOR
13 Hire and labour charges for shoring work (including necessary close plank walling, framing,
Eucalyptus/ Jhoubulla piling, strutting etc) complete as per direction of the Engineer-in- charge
for foundation excavation (vertical surface are incontact with supported earth is to be measured.)
(This item should be executed on specific direction of the Enginner in charge).
a) Depth upto 1.5mtr. sqm
Refer respective Item of PWD SOR
b) For add. depth beyond 1.5m.upto 3m. sqm
14 Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper
level and filling joints with local sand. sqm Refer respective Item of PWD SOR

15 Ordinary Cement concrete (mix1:2:4) with graded stone chips (20mm nominal size) excluding
shuttering and reinforcement, if any, in ground floor as per relevant IS codes.
(a) Pakur variety OH -4 cum Refer respective Item of PWD SOR
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

16 Controlled Cement concrete with well graded stone chips (20mm graded nominal size) excluding
shuttering and reinforcement with complete design of concrete as per IS: 456 and relevant
special publications, submission of job mix formula after preliminary mix design after testing of
concrete cubes as per direction of Engineer- incharge. Consumption of cement will not be less
than 300Kg of cement with Super plasticiser per cubic meter of controlled concrete but actual
consumption will be determined on the basis of preliminary test and job mix foumula. In ground
floor and foundation.

M-25 grade : i) Pakur variety cum Refer respective Item of PWD SOR
17 Add extra over the rate of ground floor for basement and each additional floor above ground floor

a) From G.L 4mtr. upto 8mtr. cum


b) From G.L 8mtr. upto 12mtr. cum
c) From G.L 12mtr. upto 16mtr. cum
Refer respective Item of PWD SOR
d) From G.L 16mtr. upto 20mtr. cum
e) From G.L 20mtr. upto 24mtr. cum
f) From G.L 24mtr. upto 28mtr. cum
18 Controlled Cement concrete with well graded stone chips (20mm nominal size) excluding
shuttering and reinforcement with complete design of concrete as per IS:456 and relevant
special publications, submission of job mix formula after preliminary mix design after testing of
concrete cubes as per direction of Engineer- incharge. Consumption of cement will not be less
than 320Kg of cement with super plasticiser per cubic meter of controlled concrete but actual
consumption will be determined on the basis of preliminary test and job mix foumula. In ground
floor and foundation. M-30 grade

i) Pakur variety (for Tank wall, Tank floor, top & bottom ring beam heal beam etc. above work)

a) 20mtr. to 24mtr. cum


Refer respective Item of PWD SOR
b) 24mtr. to 28mtr. cum

OH -5
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

19 Hire and labour charges for shuttering for concrete work in ove rhead R.C.Reservoir on separate
R.C.frame including fitting, fixing and striking of fafter compeltion of work including staging upto sqm Refer respective Item of PWD SOR
4m using ply board or steel shuttering.

20 Extra for Staging beyond 4m [mode of measurement: Area of unsupported horizontal projection
(where staging beyond 4m is practically unavoidable)x mean height of staging] above initial 4m
cum Refer respective Item of PWD SOR
D= Outer dia of cell wall of tank, h= ht. of G.L. to bottom of Heal beam
A=0.785 x D² ; V=A x h
21 Reinforcement for reinforced concrete work in all sorts of structures including distribution bars,
stirrups, binder set initial straightening and removal of loose rust (ifnecessary), cutting to
requisite length, hooking and bending to correct shape, placing in proper position and binding
with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.

a) For works in foundation, basement & upto roof of ground floor/4mtr.


Refer respective Item of PWD SOR
(i) Tor steel/Mild steel. M.T.
b)Extra for work beyond roof of ground floor/initial 4mtr.
i) 4mtr. to 8mtr. Qntl.
ii) 8mtr. to 12mtr. Qntl.
iii)12mtr. to 16mtr. Qntl.
Refer respective Item of PWD SOR
iv)16mtr. to 20mtr. Qntl.
v) 20mtr. to 24mtr. Qntl.
vi)24mtr. to 28mtr. Qntl.
22 Artificial stone in floor, dado, stair case etc with cement concrete (1:2:4) with stone chips, laid in
panels as directed with topping made with ordinary or white cement (as necessary) and marble
dust in proportion (1:2) including smooth finishing and rounding off corners including raking out
joints or roughening of concrete surface and application of cement slurry before flooring works
using [email protected]/sq. mall complete including all materials and labour.

OH -6
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

a) 25mm.thick for wall and floor of tank Add extra @ 1.5% for each additional floor upto 4th .floor
th sqm Refer respective Item of PWD SOR
and @ 1.75% for each additional floor above 4 .floor for original item.
23 Plaster (toe wall, floor, ceilingetc.) with sand and cement mortar including rounding of for
chamfering corners as directed and raking out joints including throating, no singanddrip course,
scaffolding / staging where necessary (Groundfloor). [Excluding cost of chipping over concrete
surface]
I) With (1:4) cement mortar external surface(a) 20mm thick sqm Refer respective Item of PWD SOR
Extra for each addl. floor over the rate of ground floor as above.
i) 4mtr. to 8mtr. sqm
ii) 8mtr. to 12mtr. sqm
iii)12mtr. to 16mtr. sqm
Refer respective Item of PWD SOR
iv)16mtr. to 20mtr. sqm
v) 20mtr. to 24mtr. sqm
vi)24mtr. to 28mtr.. sqm
II) with (1:3) cement mortar Internal surface (a) 15mm thick sqm Refer respective Item of PWD SOR
Extra for each addl. floor over the rate of ground floor as above.
i) 4mtr. to 8mtr. sqm
ii) 8mtr. to 12mtr. sqm
iii)12mtr. to 16mtr. sqm
Refer respective Item of PWD SOR
iv)16mtr. to 20mtr. sqm
v) 20mtr. to 24mtr. sqm
vi)24mtr. to 28mtr. sqm
24 Neat cement punning about 1.5mm.thick sqm Refer respective Item of PWD SOR
25 Expansion joint in floor,roof wall etc. formed with V strips made of 22.50cm wide strips of
24gauge aluminium sheets with anchor am projecting on each side(and end turned) embedded
in adjacent cement concrete , including shaping and finishing the edges on either side of the
joint(Including the cost of bituminous filler if any) complete as per direction. Mtr. Refer respective Item of PWD SOR

OH -7
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

26 Applying 2 (two) coats of bonding agent with synthetic multi funtional rubber emulsion having
adhesive and water proofing properties by making with water in proportion ( 1 bonding agent : 4
water : 6 cement) as per manufacturer's specification. sqm
27 Extra rate for using water proofing and plastering admixture @ 0.2%by weight of cement ( or at
manufacturer's specified rate for concrete of various grades). /Kg
28 Apply exterior grade Acrylic primer of approved quality
Ground floor, Two coats upto 4mtr. from G.L. sqm
Add extra for each adding floor over the rate for ground Refer respective Item of PWD SOR
i) 4mtr. to 8mtr. sqm
ii) 8mtr. to 12mtr. sqm
iii)12mtr. to 16mtr. sqm
Refer respective Item of PWD SOR
iv)16mtr. to 20mtr. sqm
v) 20mtr. to 24mtr. sqm
vi) 24mtr. to 28mtr. sqm
29 Protective and Decorative Acrylic exterior emulsion paint of approved quality, as per
manufacturer's specification and as per direction of EIC to be applied over acrylic primer as
required. The rate includes cost of material, labour, scaffolding and allincidental charges but
excluding the cost of primer. (two coat)

a) Premium 100% Acrylic emulsion upto 4mtr. sqm Refer respective Item of PWD SOR
Add extra for each adding floor over the rate for ground
i) 4mtr. to 8mtr. sqm
ii) 8mtr. to 12mtr. sqm
iii)12mtr. to 16mtr. sqm
Refer respective Item of PWD SOR
iv)16mtr. to 20mtr. sqm
v) 20mtr. to 24mtr. sqm
vi) 24mtr. to 28mtr. sqm
30 Bitumen paint on roof domes including scraping & polishing as per drawing and direction
including cost of paint. i)Two coats (for top of roof Refer respective Item of PWD SOR
sqm
OH -8
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

31 a) M.S or W.I ornamental grill.


i) Grill wt. above 10kg./m2 and upto16kg/m2 Qntl. Refer respective Item of PWD SOR
ii) Grill wt. above 16kg./m2 and above Qntl. Refer respective Item of PWD SOR
32 Priming one coat on steel or metal surface sqm Refer respective Item of PWD SOR
33 Painting with best quality synthetic
a)On steel or other metal surface with super gloss (hi-gloss)
i)Two coat (any shade except white) sqm Refer respective Item of PWD SOR
34 Supplying at site filling ,fixing ,erecting and building in position where necessary 600mm.wide
M.S. Cat ladder as per design consisting of 2nos.ISMC 150, 8mm.thick with necessary base
plate of 8mm.thick 100mm.wide M.S. plate as steep @ 300mm.a/c supported on ISA 50x50x6 ,
ISA 60x60x8mm.thick both side as per requirement.900mm.ht. as post on one side/both side @
1000 and ISA 45x45x6 as horiz. Runner to cover side railing including fabrication, welding
,drilling etc.as per drawing and direction and finished with two coats of synthetic enamel painting
over a coat of primer etc. all complete as per direction of EIC. for cat ladder, railing of stair &
platform, walkway etc.

nd
a) Upto 2 Lift (upto 8.0mtr. from G.L) Kg. ₹ 78.99 ₹ 78.99 ₹ 78.99 ₹ 78.99 ₹ 78.99
b) from 8mtr. to 12mtr. @ 1.5%extra of (a) Kg. ₹ 80.17 ₹ 80.17 ₹ 80.17 ₹ 80.17 ₹ 80.17
c) from 12mtr. to 16mtr. @ 1.5%extra of (b) Kg. ₹ 81.37 ₹ 81.37 ₹ 81.37 ₹ 81.37 ₹ 81.37
d) from 16mtr. to 20mtr. @ 1.5%extra of (c) Kg. ₹ 82.59 ₹ 82.59 ₹ 82.59 ₹ 82.59 ₹ 82.59
e) from 20mtr. to 24mtr. @ 1.5%extra of (d) Kg. ₹ 83.83 ₹ 83.83 ₹ 83.83 ₹ 83.83 ₹ 83.83
f) from 24mtr. to 28mtr. @ 1.5%extra of (e) Kg. ₹ 85.09 ₹ 85.09 ₹ 85.09 ₹ 85.09 ₹ 85.09
35 Supplying at site hoisting, fitting, fixing erecting and building in position where necessary
450mm.wide ladder as per design consisting of 2nos. M.S.Plate of 8mm.thick with necessary
base plate 60mm wide; and 16mm.dia M.S.round or square bar as steeps placed @ 300 c/c
including fabrication, welding drilling etc. as per drawing and direction and finished with two
coats of synthetic enamel painting over a coat of red lead primer etc. all complete as per
;direction of the EIC
Mtr. ₹ 1,067.00 ₹ 1,067.00 ₹ 1,067.00 ₹ 1,067.00 ₹ 1,067.00

OH -9
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

36 Supplying & labour for mixing of super plasticizer of approved make brand sika/cico conforming
to IS-2645-1975 & IS-9130-1979 to be need in mortar admixture @ 0.20% by wt. of cement (i.e
100ml per 50kg of cement) for improving workability, reducing shrinkage and improvement of
water tightness of the concrete.
/Kg. ₹ 139.00 ₹ 139.00 ₹ 139.00 ₹ 139.00 ₹ 139.00
37 Supplying, fitting, fixing 900 mm high G.I. pipe railing for R.C.C stair cat ladder walk way
fabrication,erection,welding of 40 mm G.I (NON TATA medium) pipe place at top of railing and
2 nos 25 mm dia. G.I pipe (NON TATA medium) placed equally in between railing top & floor,
vertical post of railling are 40 mm dia. G.I pipe (NON TATA medium) placed at 900 mm c/c . The
each end of the vertical post is join by the 62 mm (25 mm X 6 mm X 0.062 m long) MS flat and
150 mm length (propes pipes) are grouted in concrete base of stair, walk way etc. All complete
with supplying of all materials including hoisting up to the any height complete with 2 coats of
painting with super gloss (Hi gloss) in any shade except white and black over a coat of primer
complete as per direction of E.I.C. Analysis of rate enclosed in seperate sheets. ( Analysis
Rate )
Mtr. ₹ 1,804.00 ₹ 1,804.00 ₹ 1,804.00 ₹ 1,804.00 ₹ 1,804.00
38 Bituminous filer of approved type in excavation joint between the shell wall & roof including
finishing the top surface as per ;drawing, specification and direction of EIC cum ₹ 54,737.00 ₹ 54,737.00 ₹ 54,737.00 ₹ 54,737.00 ₹ 54,737.00
39 Supplying hoisting, fitting fixing approved type water level indicator with copper float, guide
pulley, wire boards etc. as per standard specification and direction and satisfaction of EIC
Each ₹ 64,271.00 ₹ 64,271.00 ₹ 64,271.00 ₹ 64,271.00 ₹ 64,271.00
40 Supplying fitting and fixing in position reinforced cement polymer concrete manhole cover with
matching frame as per IS-12592 (MD)
a) 5MT load bearing capacity round manhole cover parovided with two nos. lifter hook with
machining frame of size 550mm x 65mm(cover) and 650mm x 125mm(frame) opening 470mm
and WT. 90KG. approx. Each ₹ 3,013.00 ₹ 3,013.00 ₹ 3,013.00 ₹ 3,013.00 ₹ 3,013.00
41 Band moulding (Horizontal/vertical) rectangular section made with cement plaster(1:4) complete

a) Depth or width (75mm to 100mm) [Cement 1.25kg/mtr.]


Mtr. Refer respective Item of PWD SOR

OH -10
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

42 (A)Earthing with 50mm.dia G.I. pipe3.64mm.thick x 3mtr. (10”-0”) long and l;1 x 4SWG G.I. (Hot
dip)wire 4mtr. long 13mm. dia x 80mm.long G.I.Bolts, double nuts , washer including S&F
15mm.dia G.I.pipe protection (1mtr. long) to be filled with bitumen partly below ground level to an
av. Depth of 3.65m below G.L. and restoring the surface duly rammed as per IEE rule

i)For soft soil.


a)By ISI Medium G.I.Pipe. Set. ₹ 1,715.00 ₹ 1,715.00 ₹ 1,715.00 ₹ 1,715.00 ₹ 1,715.00
b)By TATA Medium G.I.Pipe Set. ₹ 1,890.00 ₹ 1,890.00 ₹ 1,890.00 ₹ 1,890.00 ₹ 1,890.00
ii)For Moorum soil
a)By ISI Medium G.I.Pipe Set. ₹ 1,786.00 ₹ 1,786.00 ₹ 1,786.00 ₹ 1,786.00 ₹ 1,786.00
b)By TATA Medium G.I.Pipe. Set. ₹ 1,961.00 ₹ 1,961.00 ₹ 1,961.00 ₹ 1,961.00 ₹ 1,961.00
(B) Extra for treatment of soil by salt and charcoal coke for pipe electrode Item. ₹ 598.00 ₹ 598.00 ₹ 598.00 ₹ 598.00 ₹ 598.00
(C) Connecting the equipments to earth Bushbar including S&F G.I. (Hot Dip) wire of size as
below on wall / floor with stables buried inside wall/floor as required and making connection to
equipments with bolts, nuts, washer, cable lugs etc. as required and mending good damages as
per IEE rule.
i)No.8 SWG Mtr. ₹ 10.00 ₹ 10.00 ₹ 10.00 ₹ 10.00 ₹ 10.00
43 Horn gap lighting arrestor complete parts and pin insulators supplying, fitting fixing all complete
as per direction of E.I.C. Set. ₹ 2,739.00 ₹ 2,739.00 ₹ 2,739.00 ₹ 2,739.00 ₹ 2,739.00
44 Provision for embossing the name and capacity of reservoir with 20mm.thick (3:1) raised sand
cement plaster with letter size 30cm x 20cm. on the outside of shell wall of the reservoir painted
complete as pr direction of EIC Each. ₹ 108.00 ₹ 108.00 ₹ 108.00 ₹ 108.00 ₹ 108.00
45 Making arrangement for water tightness test conforming to the provision laid in IS:3370(Pt-I)
1956 by filling with water upto top water level (TWL) as shown in the drawing and as per
direction of EIC. .
(if water is supplied by the Department rate shall be reduced as per prevailing departmental
rate)) cum ₹ 95.00 ₹ 95.00 ₹ 95.00 ₹ 95.00 ₹ 95.00
46 Disinfection and washing the tank and pipe connection including clearing the inside of the tank
etc. complete as per direction of EIC. Item. ₹ 4,751.00 ₹ 4,751.00 ₹ 4,751.00 ₹ 4,751.00 ₹ 4,751.00
OH -11
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

47 Construction of masonry drain 300 mm X 250 mm inner section with 1st class 250 mm th. Brick
work in cement mortar(1:4) over a layer of single brick flat soling , sand filling 100mm th. and 100
mm th. weak cement concrete(6:3:1) with graded stone ballast pakur variety (40mm size)
including earth work in excavation , 15mm th. Cement plaster(4:1) and neat cement punning all
rounding the drain etc. all complete as per approved design , drawing and direction of the
Engineer in-charge. ( Ref. Deptt. Dwg)
Mtr. Refer respective Item of PWD SOR
48 Fitting, fixing Duck foot bend including construction of cement concrete(4:2:1) base with
approved grade stone chips and including excavation of earth & filling etc. all complete in all
respect as per direction of EIC.
a) 400mm.dia (Base size 450mmx450mmx600mm.deep) Each. ₹ 950.00 ₹ 950.00 ₹ 950.00 ₹ 950.00 ₹ 950.00
b) 300mm.dia (Base size 350mmx350mmx500mm.deep) Each. ₹ 527.00 ₹ 527.00 ₹ 527.00 ₹ 527.00 ₹ 527.00
c) 250mm.dia (Base size 300mmx300mmx450mm.deep) Each. ₹ 367.00 ₹ 367.00 ₹ 367.00 ₹ 367.00 ₹ 367.00
d) 200mm.dia (Base size 250mmx250mmx400mm.deep) Each. ₹ 261.00 ₹ 261.00 ₹ 261.00 ₹ 261.00 ₹ 261.00
e) 150mm.dia (Base size 200mmx200mmx350mm.deep) Each. ₹ 168.00 ₹ 168.00 ₹ 168.00 ₹ 168.00 ₹ 168.00
49 Supplying mosquito proof net made of polythene (NETLON) size 75cm. X 75cm. for ventilator
including fitting, fixing in the best sal wood frame of 8cm. X 5cm. cross section with necessary
wooden batten fixing the assembly with necessary MS clamp in RCC wall at the lantern.
Sqm. ₹ 1,681.00 ₹ 1,681.00 ₹ 1,681.00 ₹ 1,681.00 ₹ 1,681.00
50 Supplying fitting and fixing door made with IRC febric mesh of 75mm x50mmx4.5mmx2.7mm on
50mm x 50mm x 6mm angle iron frames all round and one 37.5mm x 6mm M.S. flat bar over the
netting all round welded to angle iron frame and providing locking arrangements if necessary and
with two coats of synthetic enamel paint(Other than Hi-gloss) fitted and fixed with clamps or
haskal doomney etc. complete at the lantern of R.C.C. over head reservoir.

Sqm ₹ 2,850.00 ₹ 2,850.00 ₹ 2,850.00 ₹ 2,850.00 ₹ 2,850.00

OH -12
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

51 Providing water thirable non-toxic expoxy coating (techoxy or equivalent brand of approved
quality)2(two)finished coats over 2(two)of primer of same brand to the ceiling of roof dome
including supply of requisite coating materials, cleaning of the substrate properly to make it free
from dirt, paint, oil and grease, sludge, blister, loose plaster, fungus, moss and all other
undesirable particles using wire brush, sand papers etc. including mending good all damages all
complete as per direction of EIC & his satisfaction.
sqm ₹ 299.00 ₹ 299.00 ₹ 299.00 ₹ 299.00 ₹ 299.00
52 Labour for chipping of concrete surface before taking up plastering work. sqm Refer respective Item of PWD SOR
PIPING ARRANGEMENT
53 Making flange joint to CIDF pipe, specials, valves etc.with supply of necessary nuts and bolts,
rubber insertion of 6kg/m2 (3mm gauge) and materials required including dewatering if any tools
and plants, labour cost etc. as per specification and direction of EIC (Nut and bolts shall be of
TATA/GKW make) for
i)300mm.dia. Each ₹ 849.00 ₹ 849.00 ₹ 849.00 ₹ 849.00 ₹ 849.00
ii)250mm.dia. Each ₹ 693.00 ₹ 693.00 ₹ 693.00 ₹ 693.00 ₹ 693.00
iii)200mm.dia. Each ₹ 508.00 ₹ 508.00 ₹ 508.00 ₹ 508.00 ₹ 508.00
iv)150mm.dia. Each ₹ 431.00 ₹ 431.00 ₹ 431.00 ₹ 431.00 ₹ 431.00
v)100mm.dia. Each ₹ 399.00 ₹ 399.00 ₹ 399.00 ₹ 399.00 ₹ 399.00
vi)80mm.dia. Each ₹ 239.00 ₹ 239.00 ₹ 239.00 ₹ 239.00 ₹ 239.00
54 Hoisting,fitting,fixing of C.I. bell mouth with puddle collar in RCC work as per drawing
specification and direction of EIC all complete.
a) 300mm.dia. Each ₹ 151.00 ₹ 151.00 ₹ 151.00 ₹ 151.00 ₹ 151.00
b) 250mm.dia. Each ₹ 113.00 ₹ 113.00 ₹ 113.00 ₹ 113.00 ₹ 113.00
c) 200mm.dia. Each ₹ 90.00 ₹ 90.00 ₹ 90.00 ₹ 90.00 ₹ 90.00
d) 150mm.dia. Each ₹ 75.00 ₹ 75.00 ₹ 75.00 ₹ 75.00 ₹ 75.00
e) 100mm.dia. Each ₹ 65.00 ₹ 65.00 ₹ 65.00 ₹ 65.00 ₹ 65.00
55 Hoisting, erection ,placing connecting with pipes and specials CIDF pipes, specials) securing
with building specials providing stays, clamps as required including cost of staging platform for
the work etc.all complete in all respects as per drawing and direction of EIC.

OH -13
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

a) 300mm.dia. Mtr ₹ 152.00 ₹ 152.00 ₹ 152.00 ₹ 152.00 ₹ 152.00


b) 250mm.dia. Mtr ₹ 122.00 ₹ 122.00 ₹ 122.00 ₹ 122.00 ₹ 122.00
c) 200mm.dia. Mtr ₹ 105.00 ₹ 105.00 ₹ 105.00 ₹ 105.00 ₹ 105.00
d) 150mm.dia. Mtr ₹ 91.00 ₹ 91.00 ₹ 91.00 ₹ 91.00 ₹ 91.00
e) 100mm.dia. Mtr ₹ 84.00 ₹ 84.00 ₹ 84.00 ₹ 84.00 ₹ 84.00
56 Laying of CIDF /D.I Pipes with specials,valves etc. in trenches including excavation in all sorts of
soil, moorum, soft rock and refilling the trenches after laying & jointing of pipes etc. all complete
as per specification and direction of EIC.
a) 300mm.dia. Mtr. ₹ 192.00 ₹ 192.00 ₹ 192.00 ₹ 192.00 ₹ 192.00
b) 250mm.dia. Mtr. ₹ 164.00 ₹ 164.00 ₹ 164.00 ₹ 164.00 ₹ 164.00
c) 200mm.dia. Mtr. ₹ 136.00 ₹ 136.00 ₹ 136.00 ₹ 136.00 ₹ 136.00
d) 150mm.dia. Mtr. ₹ 112.00 ₹ 112.00 ₹ 112.00 ₹ 112.00 ₹ 112.00
e) 100mm.dia. Mtr. ₹ 72.00 ₹ 72.00 ₹ 72.00 ₹ 72.00 ₹ 72.00
57 Construction of different dia Sluice valve /Air valve /Washout chamber in different sizes for
village road where light traffic run and for main road where heavy traffic run as deptt.approved
drawing with 25cm thick brick work (1:6) over cement concrete (4:2:1) over a single B/F soling
over150mm.thick sand filling in foundation including earth work in excavation and disposal of
excess earth from work site with RCC (1:1.5:3) cover slab 100mm / 150mm thick slab on top of
chamber with 1% reinforcement in RCC cover slab with necessary opening for operation of
valve all complete including cost of labour & materials as per Departmental Dwg. [Reinforcement
type:- Other manufactuerers not specified]

a) 300mm.dia. Each ₹ 19,964.00 ₹ 18,606.00 ₹ 19,020.00 ₹ 18,881.00 ₹ 18,636.00


b) 250mm.dia. Each ₹ 19,964.00 ₹ 18,606.00 ₹ 19,020.00 ₹ 18,881.00 ₹ 18,636.00
c) 200mm.dia. Each ₹ 16,045.00 ₹ 14,965.00 ₹ 15,289.00 ₹ 15,194.00 ₹ 14,997.00
d) 150mm.dia. Each ₹ 12,649.00 ₹ 11,804.00 ₹ 12,055.00 ₹ 11,990.00 ₹ 11,835.00
e) 100mm.dia. Each ₹ 12,694.00 ₹ 11,804.00 ₹ 12,055.00 ₹ 11,990.00 ₹ 11,835.00
58 Supply the following materials for connection of inlet, outlet, overflow, washout of OHR as per
deptt. Drawings.
(A) CIDF pipe Class-B as per I.S. 7181-1986 with latest revision. OH -14 Kg ₹ 63.00 ₹ 63.00 ₹ 63.00 ₹ 63.00 ₹ 63.00
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

N.B: For OHR use CIDF class B pipe for inlet, outlet, overflow and washout.
(B) CIDF Duck foot bend as per I.S. 1538 1976 with latest revision. Kg ₹ 61.00 ₹ 61.00 ₹ 61.00 ₹ 61.00 ₹ 61.00
(C) CIDF Bell mouth pes. with puddle collar as per ISI 1538-1976 with latest revision Kg ₹ 61.00 ₹ 61.00 ₹ 61.00 ₹ 61.00 ₹ 61.00
(D) C.I.D.F 90˚ Bend as per I.S.1538 (Part-XXI)-1976 with latest amended Kg ₹ 61.00 ₹ 61.00 ₹ 61.00 ₹ 61.00 ₹ 61.00
59 Supply and delivery of CIDF sluice valve (Special type) PW-1.00 of different dia make with CI
double flanged non rusting spindle sluice valves conforming to IS 14846 -2000 with latest
emended having body dome/bonnet and cover of C.I.Gr-F.G 210mtr. spindle of IS-6603 G.R-
12/Gr-13 non-magnetic, nuts seat rings are of Gunonetal as per IS:318 LTB-2 flanges and drilled
to IS:1538 Part IV & VI valves are suitable for max. working pressure of 10kg/cm2(seat test) and
body tested to 15kg/cm2.

N.B: The above item should be procured from the reputed manufactures as per deptt. approved
vender list
i) 300mm.dia. Each ₹ 29,700.00 ₹ 29,700.00 ₹ 29,700.00 ₹ 29,700.00 ₹ 29,700.00
ii)250mm.dia. Each ₹ 24,420.00 ₹ 24,420.00 ₹ 24,420.00 ₹ 24,420.00 ₹ 24,420.00
iii)200mm.dia. Each ₹ 16,632.00 ₹ 16,632.00 ₹ 16,632.00 ₹ 16,632.00 ₹ 16,632.00
iv)150mm.dia. Each ₹ 9,174.00 ₹ 9,174.00 ₹ 9,174.00 ₹ 9,174.00 ₹ 9,174.00
v) 100 mm dia. Each ₹ 6,138.00 ₹ 6,138.00 ₹ 6,138.00 ₹ 6,138.00 ₹ 6,138.00
60 Removal of rubbish, earth etc. from the working site and disposal of the same beyond the
compound, inconformity with the Municipal/Corporation Rules for such disposal, loading in to
truck and cleaning the site inall respect as per direction of Engineer in charge
Cum Refer respective Item of PWD SOR
61 Commissioning the R.C.C. over head reservoir by operating of all category of sluice valves ,
testing of hoisted pipe joints including repairing the leakage(s) if detected , including making
inter connections,flange jointing/lead jointing with the newly laid rising main and distribution main
all complete as per direction of the EIC. Each ₹ 6,000.00 ₹ 6,000.00 ₹ 6,000.00 ₹ 6,000.00 ₹ 6,000.00

OH -15
Rate (Rs.)
Item
Description of item Unit
No. ZONE - I ZONE - II ZONE - III ZONE - IV ZONE - V

62 Soil Investigation studies for all disturbed & un-disturbed soil in different areas for selection of
nature of foundation of structural works including supplying, preparation & submission of report
in six copies giving relevant information, data, site plan borelog and water table, test results,
calculations discussion suggestion and recommendation in respect of suitable foundation etc
including determination of silt factor, calculation of water ways and complete design of Item. Refer respective Item of PWD SOR
foundation including analysis of bearing capacities and settlements in bound and presentable
form complete as per direction of EIC.

OH -16
SECTION – B.4

IRON ELIMINATION PLANT


PRESSURE TYPE IRON ELIMINATION PLANT

Item Rate
Description of Items Unit
No. (Rs.)
1 Supplying, Fabrication, Erection on suitable RCC
foundation and Commissioning with 3 (three) months Trial
Run (including cost of routine testing of water sample for
performance evaluation) of pressure type Iron removal
plant as per design norms of the P.H.E. Dte. with necessary
accessories viz. MS fabricated shell with minimum 10 mm
thick MS plate with 2 (two) coats of anticorrosive paint &
minimum 12 mm thick MS media supporting plate fitted
with required no. of pot strainer, MS fabricated oxidation
chamber with minimum 10 mm thick plate with necessary
pipe connection, valves, Gauges & other instruments as
required as per departmental approved design & drawing
including cost of filter media, Air Compressor & Air blower
with motor, starter, main switch etc. of required capacity &
approved specification including power connection from
main line etc. all complete.
Rate excludes the cost of Concrete Platform & drain, and
the cost of Blower Room
For more than 50 cum/hr, twin unit of equal size in parallel
shall be adopted.
i) 5 cum/hr 1 612400.00
ii) 10 cum/hr 1 732100.00
iii) 15 cum/hr 1 788100.00
iv) 20 cum/hr 1 862800.00
v) 25 cum/hr 1 940300.00
vi) 30 cum/hr 1 1027900.00
vii) 35 cum/hr 1 1084400.00
viii) 40 cum/hr 1 1144300.00
ix) 45 cum/hr 1 1196200.00
x) 50 cum/hr 1 1312700.00

IEP-1
SECTION – B.5

ARSENIC-CUM-IRON REMOVAL PLANT


RATES OF ARSENIC-CUM-IRON REMOVAL PLANT (AIRP)

SL No Description of Item Rate Unit

1 Construction of Arsenic-cum-Iron Removal Plant (AIRP) to reduce Arsenic concentration to 10 ppb (0.01 mg/l) and Iron
to 100 ppb (0.1 mg/l) from influent concentration upto 500 ppb (0.5 mg/l) and 3000 ppb (3 mg/1) respectively (single /
multi-stage) based on oxidation followed by chemical co-precipitation, filtration etc. and departmental
process/hydraulic design consisting of inlet arrangement, oxidation chamber (30 minute detention time), flash mixer,
flocculation and sedimentation unit, filtration unit with Back washing arrangement (including the cost of 2 years
polishing media where applicable) with air and water, back wash water tank of suitable capacity, and staging
height, air compressors, blower etc, with or without activated alumina chamber all with pneumatic valve and
control arrangements, clear water reservoir (30 minute detention time), Solid-liquid sludge separation bed with 100%
recirculation facility, including the cost of all mechanical and electrical items (but excluding the cost of Raw water inlet
pumps and clear water pumps), all accessories & RCC sludge storage tank etc, chemical house-cum-store, administrative
building (with minimum 100 m2 plinth area), allied pipeline, integration of total plant etc. all complete showing all
necessary arrangements, structural & hydraulic detail based on departmental drawing and specification with trial run for a
period of 3 (three) months after completion of the works and 3 months maintenance after successful trial run
including the cost of chemicals but excluding the cost of electricity charges.

Type-1 - Fully Gravity System with RG Filter — with baffled flocculator,plain sedimentation tank, rapid gravity filter, with or
A without gravity type activated alumina chamber all complete as per departmental drawing no. PC I/AIRP/Type-1/Sheet- 1 & 2.
Each

A
B Type-2- Fully Gravity System with Mechanised Clariflocculator -- With mechanized clariflocculator, rapid gravity filter, s
with or without gravity type activated alumina chamber all complete as per departmental drawing no.PC- I/AIRP/Type-
P
Each
2/Sheet-1 & 2.
e
Type-3- Partial Gravity System With RG Filter and Pressurized Upflow Polishing Unit — with mechanized clariflocculator, r
C C
rapid gravity filter, with or without pressurized up-flow activated alumina chamber all complete as per departmental C Each
drawing no. PC-I/AIRP/Type-3/Sheet-1 & 2. h
a
r
Type-4- Partial Gravity System with Pressure Filter and Pressurized Upflow Polishing Unit — with mechanized t
D clariflocculator, pressure filter, with or without pressurized up-flow activated alumina chamber all complete as per Each
departmental drawing no. PC-I/AIRP/Type-4/Sheet-1 & 2.

AC-1
RATE CHART

COST OF CONSTRUCTION OF ARSENIC-CUM-IRON ELIMINATION PLANT (AIRP)


(in Rs. Lakh)

ZONE I

WITH ACTIVATED ALUMINA POLISHING UNIT WITHOUT ACTIVATED ALUMINA POLISHING UNIT

CAPACITY UNIT TYPE -1 TYPE-2 TYPE-3 TYPE-4 TYPE -1 TYPE-2 TYPE-3 TYPE-4

30 Cum/Hr 1 Unit 119 114 117 113 102 97 98 94

50 Cum/Hr 1 Unit 135 126 127 123 109 100 101 97

70 Cum/Hr 1 Unit 155 143 144 142 119 107 108 106

90 Cum/Hr 1 Unit 176 162 - - 131 118 - -

120 Cum/Hr 1 Unit 220 204 - - 159 143 - -

135 Cum/Hr 1 Unit 234 218 - - 166 149 - -

150 Cum/Hr 1 Unit 250 231 - - 175 155 - -

180 Cum/Hr 1 Unit 290 267 - - 201 178 - -

AC-2
RATE CHART

COST OF CONSTRUCTION OF ARSENIC-CUM-IRON ELIMINATION PLANT (AIRP)


(in Rs. Lakh)

ZONE II

WITH ACTIVATED ALUMINA POLISHING UNIT WITHOUT ACTIVATED ALUMINA POLISHING UNIT

CAPACITY UNIT TYPE -1 TYPE-2 TYPE-3 TYPE-4 TYPE -1 TYPE-2 TYPE-3 TYPE-4

30 Cum/Hr 1 Unit 119 113 116 112 102 96 97 93

50 Cum/Hr 1 Unit 134 125 126 123 108 99 100 96

70 Cum/Hr 1 Unit 154 142 143 142 118 107 107 106

90 Cum/Hr 1 Unit 174 161 - - 130 117 - -

120 Cum/Hr 1 Unit 219 203 - - 157 142 - -

135 Cum/Hr 1 Unit 233 216 - - 165 148 - -

150 Cum/Hr 1 Unit 248 229 - - 173 154 - -

180 Cum/Hr 1 Unit 288 265 - - 200 177 - -

AC-3
RATE CHART

COST OF CONSTRUCTION OF ARSENIC-CUM-IRON ELIMINATION PLANT (AIRP)


(in Rs. Lakh)

ZONE IV

WITH ACTIVATED ALUMINA POLISHING UNIT WITHOUT ACTIVATED ALUMINA POLISHING UNIT

CAPACITY UNIT TYPE -1 TYPE-2 TYPE-3 TYPE-4 TYPE -1 TYPE-2 TYPE-3 TYPE-4

30 Cum/Hr 1 Unit 118 113 116 112 101 96 97 93

50 Cum/Hr 1 Unit 134 125 126 122 108 99 100 96

70 Cum/Hr 1 Unit 153 142 143 141 118 106 107 105

90 Cum/Hr 1 Unit 174 161 - - 130 116 - -

120 Cum/Hr 1 Unit 218 203 - - 157 142 - -

135 Cum/Hr 1 Unit 232 216 - - 164 148 - -

150 Cum/Hr 1 Unit 247 229 - - 173 154 - -

180 Cum/Hr 1 Unit 287 265 - - 199 177 - -

AC-4
SECTION - C

MAINTENANCE WORK
Schedule of Rates for Maintenance related works of Water Supply Scheme.
Sl.
No.
Description Of Item Rate Unit
PART - A
1 Opening & closing of all the different dia Sluice Valves (80 rum dia to 350 mm dial on different places along the alignment of the rising main and distribution main at different places
over the command area daily as and when required for regulating the supply of water and distributing' water all over the command area smoothly including changing and restoration of
gland packing of sluice valve, air valve if required including opening the cap / plug of wash out point or opening the sluice valves including de-jointing flange joints (80 mm to 350
387.00 Each per day.
mm dial including repairing works and cleaning the pipeline or changing of gate, spindle or liner etc. of sluice valves all complete, restoration works to be done including earth work in
the excavation bailing out of water, re-filling the excavated earth, taking out of RCC slab or slab cover and refaxing true to position etc. all complete as per the specification and
direction of EIC.
# Please see the special clause against this item in Tender Document

PART - B
2 Labour charges for repairing the bursting/damage/leakage of 80 mm. dia, to 200 mm. dia. A.C. Pipeline with detachable joints including earth work in excavation tracing out the actual
position of burst/leak, cutting pipe of required length, refitting the same with new pipes and old/new detachable joints after chiseling and shaping the pipe, bailing out water from the
trenches and refilling the trenches to its original condition all complete as per direction of E.I.C. (Extra A.C. Pipes and detachable joints with rubber ring, nuts and bolls etc. will be
supplied from the scheme store, Surplus and unserviceable pipes and specials will have to be returned to the same store. The rates are inclusive of carriage to site of work and back
carriage of materials to and from scheme store as mentioned above.)
i) 80mm to 125 mm dia 496.00 Each
ii) 150mm to 200 mm dia 552.00 Each
3 Extra repairing charges over item no 2 for changing of gland packing of sluice valve/air valve with supplying of gland packing grease etc. bailing out of water including removing the
top cover slab of vaIve chamber and refixing the same after completion of work as per direction of EIC.
a) 80 mm dia. to 125 mm dia. 230.00 Each
b) 150 mm dia. to 250 mm dia. 322.00 Each
c) 300 mm dia to 350 mm dia. 488.00 Each
4 Repairing of flange joint after dismantling the joints, removing the unserviceable rubber insertion and supply new rubber insertion and supply upto 50 % of new nuts and bolts all
complete including necessary earth work dewatering & supply of washer etc. all complete as per direction of EIC
a) 80 mm dia. to 100 mm dia. 311.00 Each
b) 125 mm dia. to 200 mm dia. 545.00 Each
c) 250 mm dia to 350 mm dia. 744.00 Each
d) 400 mm dia to 500 mm dia. 888.00 Each
e) 600 mm dia to 700 mm dia. 1269.00 Each
5 Repairing of air valves by changing the ball with changing the requisite nuts and bolts and rubber insertion all complete as per direction of EIC. 260.00 Each
6 Making barricading for protecting the trench to avoid any accident including making arrangement of road light during the night. 962.00 Each location

M-1
Sl.
No.
Description Of Item Rate Unit
7 Renewing lead joint to CI pipes and specials and spun yam 'including reusing 60% of old and using 40% new lead of approved quality new span yam and caulking the same properly
including labour charges for dismantling the existing damaged portion complete as per direction of EIC. Approved quality lead, spun yarn, fuel and other materials will be supplied by
the agency including necessary earth work in exacavation & back filling in same trenches (Lead if supplied by the department will be recovered @ 145/- per kg) NB:-This item
will be executed as per specific direction of EIC
a) 80 mm dia. to 150 mm dia. 1080.00 Each
b) 200 mm dia. to 250 mm dia. 1412.00 Each
c) 300 mm dia to 350 mm dia. 2214.00 Each
d) 400 mm dia. with supply of 10.80 Kg lead & 750 gms yarn to each. 2254.00 Each
e) 450 mm dia. with supply of 12.20 Kg lead & 950 gms yarn to each. 2545.00 Each
f) 500 mm dia. with supply of 15.00 Kg lead & 1.00 Kg. yarn to each. 2957.00 Each
g) 600 mm dia. with supply of 19.00 Kg lead & 1.20 Kg. yarn to each. 3831.00 Each
h) 700 mm dia. with supply of 22.00 Kg lead & 1.35 Kg. yarn to each. 4337.00 Each
8 (i) Carrying charges of materials M.S. Rod, D.I. Pipe, G.I. Pipe, TW materials, C.I.Dt. Joints, A.C. Coupling, Brass Strainer, H.D.P. Strainer, A.C. Pressure Pipes, M.S. Pipes etc. by
road from different stack yard to any places within West Bengal including loading (upto a lead of 20 mtr. from loading point), packing, unloading and stacking charges etc. complete
as per direction.
a) For distance 0 Km. to 5 Km. 44.42 MT/Km.
b) For distance (above) 5 Km.to 10 Km. [Subject to minimum of Rs. 222.10/MT] 24.87 MT/Km.
c) For distance (above) 10 Km.to 15 Km. [Subject to minimum of Rs. 248.70/MT] 23.20 MT/Km.
d) For distance (above) 15 Km.to 25 Km. [Subject to minimum of Rs. 348.00/MT] 19.84 MT/Km.
e) For distance (above) 25 Km.to 50 Km. [Subject to minimum of Rs. 496.00/MT] 15.68 MT/Km.
f) For distance (above) 50 Km.to 100 Km. [Subject to minimum of Rs. 784.00/MT] 14.07 MT/Km.
g) For distance (above) 100 Km.to 125 Km. [Subject to minimum of Rs. 1407.00/MT] 13.14 MT/Km.
h) For distance (above) 125 Km.to 150 Km. [Subject to minimum of Rs. 1642.00/MT] 10.99 MT/Km.
i) For distance (above) 150 Km.to 200 Km. [Subject to minimum of Rs. 1648.00/MT] 8.53 MT/Km.
(ii) Carriage of pipe and specials from Depttl. Store including loading and unloading and stacking at store of any PWSS. ( By Van or other means ) 638.00 Trip
9 Cleaning silt (every month) from the over head reservoir, cleaning washing and disinfecting the same with bleaching powder, including machinery, tools and plants as per direction of
EIC complete (Bleaching powder will be supplied by the agency).
a) Upto 1.50 lakh gallon capacity OHR. 2408.00 /Occ
b) Above 1.50 lakh gallon and upto 2.5 lakh gallon capacity OHR 2852.00 /Occ
10 Withdrawing and relaying of DI/CI pipes / AC pipe after excavation of earth and with the help of chain pully derrick etc. by dismantling & jointing by rubber gasket joint or lead joint
or flange joint and stacking the withdrawn pipes and specials at site store /road flank, godown etc. all complete in the excavated same trench & as per direction of EIC.

a) 80 mm dia to 125 mm dia 144.00 /Mtr.


b) 150 mm dia to 200 mm dia 147.00 /Mtr.
c) 250 mm dia to 350 mm dia 191.00 /Mtr.
11 Withdrawing of DI/CI pipes / AC pipe after excavation of earth and with the help of chain pully derrick etc. by dismantling of jointing of rubber gasket joint or lead joint or flange
joint and stacking the withdrawn pipes and specials at site store /road flank godown etc. all complete as per direction of ElC.

M-2
Sl.
No.
Description Of Item Rate Unit
a) 80 mm to 125 mm AC/DI/CI Pipe 210.00 /Mtr.
b) 150 mm dia to 200 mm AC/DI/CI Pipe 213.00 /Mtr.
c) 250 mm dia to 350 mm dia DI/CI Pipe 281.00 /Mtr.
12 Dismantling existing ferule with fitting and refixing the same after cleaning and washing of pipe line upto stand post. 394.00 Each
13 Labour charges for repairing of UPVC pipe by using UPVC socket and solvent cement including earth work in excavation with dewatering and necessary tracing out the actual
position of brusting / leakage, cutting the pipe to required length in the trenches and replacing the same with new pipe (as per required length) including fitting fixing after roughing
the UPVC surface & supplying and applying solvent cement, back filling the trenches with excavated earth upto the same as per direction of EIC all complete (UPVC pipes and
specials, solvent cement to be supplied by the Agency). Unserviceable broken withdrawn surplus materials are to be deposited to the Deptt. store.

i) 63 mm Dia 575.00 Each


ii) 75 mm Dia 603.00 Each
iii) 90 mm Dia 653.00 Each
iv) 110 mm Dia 736.00 Each
v) 125 mm Dia 819.00 Each
vi) 140 mm Dia 1202.00 Each
vii) 160 mm Dia 1345.00 Each
vii) 180 mm Dia 1493.00 Each
ix) 200 mm Dia 1714.00 Each
14 Opening the cap / plug of washout point and opening sluice valve to clean the pipe, cleaning the cap / plug and sluice valve after completion of the work including earth work in
excavation and refilling the same, draining out washed water etc. as per direction of ElC and replacing RCC Top slab cover where necessary including refixing the opened cap/plug in
position complete.
a) Cap Opening. 410.00 Each
15 Bailing or pumping out water from foundation trenches. Ref : PWD SOR
16 Dewatering from the excavated trenches for repairing any type of pipe line including Hire Charge of pump / carriage / Fuel & lubricant / Operator etc. for big dia pipes more, than 200
mrn dia all complete as per direction of EIC. 931.00 / Hour
(This item will be executed after the permission of E.l.C.)
17 Charges for health check-up for water bome disease of the workers deputed in maintenance work (including testing of blood ( T.C, D.C, ESR, HB %), Urine (R/E), Stool (R/E) by a
registered Medical Practitioner.
750.00 L.S
N.B:- i) This item to be completed within a month from date of receiving of work order and applicable for once in a year
ii) All test reports in original to be submitted within 45 days from date of receiving of work order.
18 C.W.R cleaning, washing and disinfecting the same with bleaching powder, including machinery, tools & plants etc. as per direction of EIC complete (bleaching power will be
supplied by the agency )
a) Up to 20,000 gallon Capacity 1683.00 Each/Occ
b) Above 20,000 gallon capacity 2079.00 Each/Occ
19 Cleaning the chokage of AC/DI/CI / UPVC Pipes in the existing line by split bamboo passing through the new pit on the line and cleaning silt, bats or any obstructed materials in the
84.00 Mtr.
line and cleaning by washed water. (Work to be executed as per prior approval and direction of EIC).

M-3
Sl.
No.
Description Of Item Rate Unit
20 Taking out of old and damaged valve of any type from the existing line after dismantling of Flange Joint or Socket Joint and fitting, fixing of New Valve. ( Cost of dismantling of joint
and renewing the same to be added with this item to complete the job in all respect )
i) 80 mm to 100 mm dia 250.00 Each
ii) 125 mm to 150 mm dia 280.00 Each
iii) 200 mm to 250 mm dia 500.00 Each
iv) 300 mm to 350 mm dia 844.00 Each
21 Charges for day to day conveyance towards reporting related to operation and maintenance of smooth water supply from the scheme including cost of Tele-communication charges etc.
30.00 per day
all complete whatsoever required for the purpose as per direction and satisfaction of the E.I.C.
22 Supplying Bleaching Powder of approved brand (DCM/Modi/Kanoria) including all charges and free delivery at site.
50.00 Kg.
23 Supplying Alum bar of approved brand including all charges and free delivery at site. 50.00 Kg.
24 Supplying of UPVC Coupler 6Kg., class – III conforming to IS : 4985 – 2000 with latest revision and amendments ( This item is applicable for maintenance/ repairing work of pipe
line only).
a) 63 mm dia ( OD ) 35.00 Each
b) 75 mm dia ( OD ) 48.00 Each
c) 90 mm dia ( OD ) 67.00 Each
d) 110 mm dia ( OD ) 99.00 Each
e) 140 mm dia ( OD ) 185.60 Each
f) 160 mm dia ( OD ) 347.50 Each
25 Supplying bolts with nuts matching with different dia. C.I. detachable joint as per IS : 8794 -1988 with latest amendment.
119.00 Kg.
a) 10 to 25 mm dia.
26 Supplying rubber ring matching with different dia. C.I. detachable joint as per IS : 8794 -1988 with latest amendment.
a) For 80mm dia. 4.80 Each
b) For 100mm dia. 5.45 Each
c) For 125mm dia. 6.25 Each
d) For 150mm dia. 7.00 Each
e) For 200 mm dia. 8.50 Each

M-4
SECTION – D

SPECIFICATION FOR TUBEWELLS AND IRON


ELIMINATION PLANT
SEC: D.1

T-1
T-2
D.2

IE-1
SECTION – E

QUALITY ASSURANCE PLAN


QUALITY ASSURANCE PLAN

Different Type of uPVC Pipes As Per IS-4985/2000 01 of


SEC:-E.1 01

INSPECTION
Dimensional, Visual, Physical & Chemical Properties
Sl. Parameter Instrument Sampling size & Manufacturer Third
No. frequency Party/
Departmen
t
1 Visual Appearance -- Every pipe Perform Witness

2 Dimension of Pipe Pi Tape. As per


a) Mean Outside Diameter Vernier Caliper IS:4985/2000 Perform Witness
b) O.D at any Point CL. -
c) Wall Thickness Ball ended D-1.4, Table-13
d) Length Micrometer

3 Opacity Opacity Tester As per Perform Witness


IS:4985/2000
Annex. -
D, CL-2.1.1
4 Effect on Water Titrator As per Perform Witness
IS:4985/2000
Annex. -
D, CL-2.1.2
5 Reversion Test Vernier Caliper As per Perform Witness
& Reversion Bath IS:4985/2000
CL. -
6 Vicat Softening VSP Apparatus D-1.5 & D-1.6,
Temperature Table-14

7 Density Electronic Balance As per Perform Witness


IS:4985/2000
CL. –
D-1.7, Table-14
8 Sulphated Ash content Muffle Furnace & As per Perform Witness
Electronic Balance IS:4985/2000
CL. –
D-1.8, Table-14
(But Limited to
9%)

Qu-1
INSPECTION
Mechanical Properties
Sl. Parameter Instrument Sampling size & Manufacturer Third
No. frequency Party/
Departmen
t
9 Hydraulic charecteristics As per Review Report Review
a) Type Test IS:4985/2000 Report
Annex –
Hydraulic testing D, CL.-2.1.3
machine & End As per Perform Witness
fittings IS:4985/2000
b) Acceptance test CL. –
D.1.10, Table-17

10 Resistance to external Deep Freezer & As per


blows at zero degree Impact Testing IS:4985/2000 Perform Witness
Centigrade M/C CL. -
D-1.9, Table-16

11 Marking Perform Witness

Calibration Certificate of all measuring & testing equipments will be provided for review.

Qu-2
SEC:-E.2

QH-1
SECTION – F

RESOURCE PROCUREMENT
LIST OF DEPARTMENTAL MATERIALS SUPPLIED
BY
THE RESOURCES DIVISION, PHED.

SL. NO. LIST OF ITEMS REMARKS


1 DI PIPES OF DIFFERNT DIAMETER (K-9 & K-7) Issue rate of the
Listed materials will
2 DI SPECIALS OF DIFFERENT DIAMETERS (K-9 & K-7) be available from
the Executive
3 MARK –II TUBEWELL HEAD SET & ATTACHMENTS
Engineer, Resources
4 AC PIPES OF DIFFERNT DIAMETER Division, PHED as
required.
5 DETACHABLE JOINTS OF DIFFERNT DIAMETER

R-1
SECTION – G

SUPPORTING DRAWINGS
SCHEDULE OF DRAWINGS

Sl. No. Description Drawing No.


1. STREET STAND POST S.S.P/I/SCH

2. SLUICE VALVE CHAMBER

a) 80 M.M-150 M.M DIA PIPE SVC/I/SCH

b) 200 M.M DIA PIPE SVC/II/SCH

c) 250 M.M-350 M.M DIA PIPE SVC/III/SCH

d) 400 M.M-450 M.M DIA PIPE SVC/IV/SCH

3. OVERHEAD RESERVOIR RELATED OTHER DRAWING OHR/OD/1


ANNEXURES
Scanned by TapScanner
Scanned by TapScanner
Government of West Bengal
Office of the Chief Engineer
Public Health Engineering Directorate
New Secretariat Buildings, 7th Floor
Kolkata - 700 001{Phone & Fax-O33-22488264}
e-mail: ce_pwqm @wbphed.gov.in

Memo. No: 5813-58391801 Al20L3 dated, Kolkata, the 02-07-2020

To
The Chief Engineer

(Ail)

The Superintending Engineer

(All) Circle

Sub: Publication of PHE Schedule of Rates

Corrigendum No.-I & Addendum No.-I along with general specifications of materials to be used for
house connection of the schedule of rates of P.H.E. Dte. (Both Civil & Mechanical) has been given
in the departmental web site (with effect from 0210712020).

This is for information and necessary action please.

Planning & W r Quality Management


PHE Dte.
7
(,
-< 5d a
)
a
C
(D g,..(DoC)_<o
E rg fi tH.E;
=oJ=-)<<f: a
o
I

O
O F a: [ji 3:i=i=s
- =
IF
oo
= 5E-.=5s,rao
=
f-.
i=r- Pco=d6'!1 6* = w
p
s c 4 4-= f
=6'-=-:its I
I

r=+=1+=e
=q=
g,E
(].r

lh

\A
#.J 3 $ r- L\)
\$
.t
-Q6=:.-o(,
6;=='==---
$ a-=. =a6 = a'
€9.=4E+;o
Eo p ii d-= 3 5
cr3
..\
\>
+
T (D
= P QI Pl io: ?
>: () r =.+ s2 (D o
(D
a)
vLs
+
P

lA 0 .=-
^L C) -= o a .li I
a"p Ln=.8 -il
(D GJC) -
D.\
I'z =
o fr \n
E=.
=
--v:t)- +
o
-.1

F t
--=1o=€E a-f
s.sHE=a o
an
?
E
u^-rr.-O
44 (D -
F =fr+q
-JUJ=A :.-

g3i;B BlBilA
= LAJ

!t'
eEd
ra Ealos+3
== i.-
3e ; il.i 5 E I1l
p
I E E 9H P: =
6"==*e5+ (n
lt tl
-
F-q
(.o
. ^:3=
'Ti x :
io_(oa I $=
= O--
(D
rna
4
/!

o
r C.q
+-'o o
q==HloEo-
=
g€
i6 so-(b:L(,
sp6.
-no N
@
(4
t-
fr,1
.\c-
r)
L1l
7.

-
I E qe'a 3B
q (oo-
- rC
Fi7
H d .'t.>
,P
= 1 /,

rn?
Th I

m G
o)
c) o
=- =
-
N
^))
N) o
z.
a-r
b-, m ,/)
5
so
x
(n
O
o Y

^u
N
o -
-@ z. N)
O
m or-
s !v
!D
b
o
'n
-a
I

AI N
o n
oi
U
F-
N) z. (D
m i
O
(,
(, v? -+
L
b
O t
/*o
N F
^lt o
z. \)
-@
(o m
P
o
o
A) N
o
z.
"co
(, m
9r'
O
o
o
5 p 3
o
N & a c- p u =
a P
z
C
C
a c =
='
e C C - oc ='
I
:.
c c j D
= ?.
= o =' 3 = =
+ c ot lc= + ? p ='
.JC
o o p
= a p = D
a a
C a a =
l!
C
N p L 7
C
- o= = : C
C
C
a
p
1.^9
a a
= a p = =' - 2 I
= a p =.
!
a
- =g /,
fic ='
fii i I I-.
D -- c s p a g, Fl c6
z
f,
p a
= p
VI c U a L - - - u- t^i
p a' z \s
d: $ a -aa
;'-o
D
C
:.
a
D
=
1
G
C

a
-a- c\
\)
k) @

a 9. =.

I r ,>
n'_.
= -
G
I -
0!
U,
a
q. )s
D
.$ a
2.
!
D =
G
i= !
!
o
J
a-
a
= E
IA 0 - a
9 o ao. c U \..r)
a a - p o
\N a a -a o
r ,
a G p
c c) + o
D
Fo 7
!
a
, a D
-.
a
a
i
= = al
a G 1
E 0.
o c -
=. I
D D
p D

F a
=
G
a
d
d
=
D
c
=
c-
-l
[--
F

I
! D =
c o
a rJ)
a =
qo
a
I
- o C
=
c
c e =
= =' t
-a
a
5
=_
a
E
= J
:/ -
.z
t. o C a p a
= a =
=o J.
= a : ar't o
t-
N
1
='
a
a
a
6
?a ==-
'; tl
a\)
o 7
---7
/=
a J
: a
p
a
I I
:-7
= = =. -trz
:ll =
p ? o
a
), =
= - - a
-r:
- IF -. =
=
a
T
a
!-r
p
='
a a'
-
=.
- -D U'
--
c -.
='
- -
rIa a =
=' a-
oc U
- C
= 55 h a -at
!

a
OE
D
= \.=' o
'n
c + T
p a
o a
a
?. =. T
a I.T
a a = =
c
(,
oq
D U
=' a
o a
o - o
a o)

I 5 o
o 9.
s - ?. t-
=
c =
c o
o P
=
R"
o
o F I
= o e X o
o
arc
a
:''
a
a
=
v +
=' = I
0c
- As
\J
lJ
I\D rl
C)

1\
>+
>t
GENERAL SPECIFICATIONS OF MATERIALS TO BE USED FOR

Ferrule
Gun Metal Confirming to lS 269211994(reaffirmed 2005) lSl Marked.

Non Return Valve (NRV) for connection of meter.


Gun Metal Horizontal Non Return Valve Confirming to lS 779 lSl Marked

PVC Pipe & Fittings for house connection:-


15 mm dia nominal bore PVC pipes for underground work of approved make of Schedule 80
(medium duty) conforming to ASTMD -1785 and threaded to match with Gl Pipes as per lS : 1239
(Part - l).

HDPE Pipe for House Seruice Connection:


Pipes shall be made out of HDPE raw materials, the pipes shall be conforming to 15:4984-2016,
20mm dia OD, PE-100, PN 16. (Average 15 mtrs.)

COMPRESSION FITTINGS FOR HDPE PIPES

90 DEG COMPRESSION ELBOWWTH METAL INSERT (Male/Female)


90 DEG COMP ELBOWwith COMPRESSION JOINT BOTH ENDS
FEMALE / MALE THREADED ADAPTER With METAL OFFTAKE
The com shall be tested as below
Type test Standard
Dimensions of the threads rso 7/1
Tiqhtness of the ioints tso 3458
Tiqhtness of the ioints when subjected to bending tso 3503
Resistance to pull-out tso 3501
I nternal under-pressure test tso 3459
Lonq term pressure test tso/Dts 14236

s+ r^J g
Trc,\,f 3c,!"-Jrr.!,.-
rn^"'"^^ tt<<
N{enroNo.:- gL1- 5g29l8rfnlr313 Date:- cL',)7-)-,a't-->
ADDENDUM No.-1
Section -8.6: SMALL TUBE WELL USING WATER-IET METHOD, SCI{EDULE OF RATES
(cIVrL woRKS), JULY 201.9

Item Rate
Description of Items Unit
No. (Rs.)
1 Labour for boring tube well of required diameter by water jet
system through any type of soil strata including hire and labour
charges for boring pipes, scaffolding, tools and plants as necessary
and taking out them and lowering pipes, strainers, blank pipe etc.
and fitting and fixing the same complete including other
incidental works as per direction of Engineer-in-charge. The tube
well should have a rninimum 50mm gap in between the outside of
the tube well pipe and the bore.

A) 100mm x 40mm dia TW for Mark-II hand Pump


i) boring for L00 mrn diameter top enlargement Mtr < 424.00
ii)boring for 40 mrrr diameter TW
a) upto 150m depth Mtr < 219.00
b) above 150m depth Mtr < 285.00
B) 100mm x 50mrn dia TW for dual use/stand-alone comrrrunity
supply with solar pump set
i) boring for 100 mm diameter top enlargement Mtr < 424.00
ii) boring for 50 mm diameter TW
a) upto 150m depth Mtr < 285.00
b) above 150m depth Mtr < 351.00
2 Mobilisation and transportion of all machinery /bortng set and its
accessories and others materials, etc. to the site. LS < 2,000.00
J Cost of Development of Tubewells LS < 1,600.00
4 Supply and packing of Coarse sand Bags < 25.00
5 Installation of India Mark-II hand pump assembly completed with
cylinder, connecting rod, riser pipes etc. (departmentally supply)
upto on an average depth oI 25 metre as per direction of EIC
including carriage of materials & all other incidental charges
during installation of work.
Rates are inclusive of complete labour and other charges, testing
the yield of TW and submission of report complete. LS < 1,195.00
6 Construction of tube well platform (Size 1.20m x 1.20m) with
75rnsr. thick cement concrete (6:3:1) using 20mrn down jhama
chips'ovel a layer of blick flat soling including necessary earth

m keeping outlet for drainage, 12mrn thick


de-s.
ce with neat cement finishing to the exposed
surface including the concrete surface below ground level in the
periphery of the land includtng 1,.2 m length surface drain with
necessary shuttering & curing complete in all respect with all
labours & materials . Each < 3,805.00

)L
Page:STW-1
(cIVrL woRKS), JULv 2019

Item Rate
Description of Items Unit
No. (R..)
7 Supp11, of PVC pipes & fittings Scheclule 80 (n-redium clutv)
conforming to ASTMD - 7785 and threadecl to match u.ith GI Pipes
as per IS :7239 (Palt - I).
A) PVC pipes
a) 40rnm dia Mtr < 207.00
b) 50rnm dia Mh. <282.00
c) 100mm dia Mtr < 874.00
B) Reducing Socket (mm X mrn)
a) 100 x 40 Each { 202.00
b) 100 x 50 Each < 171.00
B Supplying high density polythene strainer of approved make with
adapter conforming to I.S. specifications.
a) 40mrn dia Mtr < 376.00
b) 50mm dia Mtr < 532.00
9 Supplying PVC strainer of approved make with adapter
conforming to I.S.12818 specifications.
a) 40mrn dia Mtr r 293.00
b) 50mm dia Mtr < 367.00
10 Supplying, fitttng and fixing steel cutter piece upto 450 mrn long
with sockets.
a) 40mm dia Mtr < 124.00
b) 50mrn dia Mtr < 189.00
11 Supply and delivery of MS TW Specials (Clamp, Cap, Bail plug,
Lrgs, Ring etc.) LS < 1,200.00
72 Supply and delively of India Mark-II hand pump set Set <13,624.00

\^Its- L
(qvprqt S,J^"-!r^Qe
q9'-^"^: +l-==-

Page:STW-2
?
N 7i rD

)
J

z
*E$a + [g *iElFqaBAlFr ig+tnBfi iE :.
q
I

ti+1i ?iFTi;c;; 1; +3lr ts; :ia;3: oo


|-*
!J,

Fi $rl +iETi$E:srgEiigi$:EEEf
i

f.4
.D
l..r5

isiErBt;
ch
a

,[ t31
\^1

eI =F B
-
*gi iF*xe=a*:EEFEiE
Fd
r:(1
C

gp+iri=s +: IeiEai1 o
in
-l,

i *iIi$
,\3
U
o
)ul t^9-

s g; *iFe*=iiiE3*'gfit*u-iT +=
g gF i6+iEfgr*iE*+;Ei:IEBil3
rssg$i[;iriiaen;*+Fli;iig e U
U
rn
z
ts
o N dE
+ ri
N zrn z
I
't

N
zln
I U
!')
.t
o
I

N r\
p
zln I

I
D
D.)

o + I

N r l.o
NJ
z
Lll
b
I

N
z
Lll
4I

N
z
LI]
I

U
f"
7i
J c :'. v{ p<
C-t
=, C- =:
--/.- !. ='=:
= -v a.= =. to)-
c =|<
= = a |-- =
IC D = C,'
c- '/
,tr
-aq =
b
a,
a ;>
G
=
=
-o
!
G+ a
C
=
IJ . =
O UJ D=
;u. =- q C
C
FJ =
-;' ,=.
= o
V L
a-
C
0. = tz_
_et
= = = =
-:, c-<
=A G
!='
@
o-
= C = = = F ;,
c-
a C
o
o p o=. c
a
a
a
=' a U U E' -,= =
-. U q !
a
IIL :
=.
=
G
!
o
3. i.: z -o..t
o
= c=.
a
= ^= T = - o
e- a
p =
o g-.
o -lf
€a -F'
c .= a
C
!)
= .D
AA th
(; <.a q a
a o =
t1 -, 1 =
? 6= I a ajt - =
o
a
- =-c
=c
a
o- - r_t
F6
= =' =
o
a- {.).t :l
a'-'
oa G
-o E.
!
+
=' o D a*
0a
0a
c --' o o-
o
aa 9. a
o C = h E
o a = -o c -O o
o
q !, --a
c+, n z' G =
-o oo UA
ti
a
o
a a GC_ o- _o F' o
-+) -o o- o -tr
o a a=' t-!
cd @ ;
;' (D
a = (D o
o-c G c
q)
(D
a p
o
=
a I
o-
lJ
,)' E'
o o-
6
& = F' c
a =. @ ='-
a P o-
o
o ='@ +O
::1 o
Ia a o
io
C - o
o e C. ..
-t=

=. c
.D o=. Cr.
0. !J 5F'
=
c- o
a
a = o
C :n -El
-o o- o
c-* -a
I+
tt
.D 0a p t)c -n
9. o = oi -o"'
=^1
(D
la -l
d
a o o
=
o =='
O-@ -
? ? 7 ? e
H :r B -
d

NJ
)v )tl N
o )+1 )14
P H ts P
NJ P
O
5
@
O
!
F
u) zrn
b
o b
o o b
b O I

N
)t A )t )q
H P P P z
P 5 o
!
F
tll
O 90
UJ
b o o b
I

o o o

N
.)* )l )!1 )11
P
L
(! P
P
P
5
@
P
o
!
F (JJ
z
P Lrl
o o b
b I
F) 9J
iJ O O O o

N ch
)t4 )ll )q )t
P
P
o
P
5
P
o
{
P
F
L^J
z
Lll
90
o o b
b I

o o o

.)y /.t1 )14 A N


P P P H
H
P
F
@
o Li)
:o b
S z
tll
o
O
b
O O o \
I

qo gl
-o
@' N
o
) o
(o
o,
zln
I

\
Memo No.1 L\2g 8o/ft I \3 Dare I q-f lz'[ 2 -o 2't
If
ADDENDU]\I NO. - 2
WBPHED SCHEDULE OF RATES (CryIL WORKS), JULY,2O19

SOR OF PP-RC PIPES AND FLOW CONTROL VALVES


Item
Description of item Unit Rate (Rs.)
No.
L Providing and fixing 3 layer PP-R (Poly propylene Random copolymer) pipes
confirming to lS:15801 UV stabilized & anti - microbial fusion welded, having
thermal stability for hot & cold water supply, including all PP - R plain & brass
threaded polypropylene random fittings, including trenching, refilling & testing of
joints complete as per direction of Engineer-in-Charge.

A) External work (Class - SDR7.4 / PN16)


a)20mm dia OD mtr 117.00
b) 25mm dia OD mtr 151.00
c) 32mm dia OD mtr 20s.00
d)40mm dia OD mtr 295.00
B) External work (Class - 5DR11 / PN10)
a)50mm dia OD mtr 409.00
b) 63mm dia OD mtr 480.00
c)75mm dia OD mtr 672.4O
d)90mm dia OD mtr 942.OO
e) 110mm dia OD mtr 1349.00
f)160mm dia OD mtr 3660.00
) Supply of tamper proof Flow Control Valve (FCV) cum Non Return Valve (NRV),
made with solid steel bar (hexagonal and round) body & SS ball for float option,
materials grade of Stainless Steel finished with CNC machining of size not less
than 71 mm with connection size: 15mm Dia BSP thread, design and working in
float principle (as per CPHEEO manual) including cost of materials, manufacturing,
Loading, unloading, transit insurance and transportation.

Manufactures must proride tfrira party inspection report from PHE authorised
Laboratory.
Materials grade of stainless steel made with SS316
a) 5 LPM discharge @ 0.5 bar pressure. Each 157 00
b) 1-0 LPM discharge @ 0.5 bar pressure. Each 166.00

& Ch ngineer
Planning Circle-|, PHE Dte. Planning & WQM, PHE Dte,
CORRIGENDUM N
WBPHED SCHEDULE OF RATES (CrVIL WORKS), IULY,2019
SOR OF FHTC (FUNCTIONAL HOUSEHOLD TAP CONN
Item
Description of item Unit Rate (Rs.)
No.
1 For New FHTC
1.1 Providing FHTC from the existing CIIDIIuPVCIHDPE/Gl/AC distribution pipeline by
installing 10 mm NB Gun-metal Ferrule conforming to lS 2692:1989 with latest
amendments on the said pipeline with supply, fitting & flxing of all other accessories like
saddle piece of required size to fit the existing distribution pipeline, specials, nut & bolts,
rubber sheet, washers etc and supply & laying of 15mm NB PVC (schedule 80)/20mm OD
HDPE (PE100, PN16)/20mm OD PPR-C (Class - SDR7.4 / PN16) pipe (average 15m length)
with all necessary specials l-.0 metre below the ground connecting the ferrule/flow
control valve including cutting trenches in all sorts of soil and filling up trenches as per
direction of the Engineer-in-charge and upto a point just inside the premises of the
household or as directed by ElC. Supply and installation of a 15mm dia. alloy iron Bib
Cock (tested to 2L Kglcm2) above 1.0 Mtr. from ground, an alloy Stop Cock of 15 mm
dia. with brass spindle (tested to 21 Kg/cm2) to be fitted in a position as directed by
E.l.C. G.l pipe of TATA make (medium duly) of 2 metre length with all necessary specials
/PPR-C pipe and upto 1.0 m above ground

duty) conforming to ASTMD -7785 and


2j9 (Part - t).
er) pipes shall be 3'loyer confirming to
ion welded, hoving thermal stobility for
- R plain & bross threoded polypropylene

lomm NB gun-metol Ferrule/flow control

PVC (schedule 80)/20mm OD HDPE (PE700,


PN76) pipe with dll necessory specials 7.0
octuol meosurement bosis. The rote of this
Each 304,1.00

Chairman, tee
& Superintending Engineer
Planning Circle-1, PHE Dte. Planning & WQM, PHE Dte.

You might also like