5. All unused pages of answer script must be cancelled out by two lines (X) across the page.
Q1. Under Continuous survey of machinery (CSM) bottom end bearing of a large 2stroke slow speed engine is due
for survey.
A. As 2nd engineer, explain the procedure involved in complete inspection of a bottom end bearing.
B. List the precaution to be taken.
C. Indicate the reasons for possible defects which could be encountered and state how they may be rectified.
D. What test are carried out on completion of survey and re-assembly.
2009/SR8 2007/SR3 2010/SR1 2012/SR1 2012/SR12 2013/SR1 2013/SR10
2013/SR11 2014/SR01 2014/SR11 2014/SR12 2015/SR01 2015/SR03 2015/SR06
2015/SR08 2016/SR02 2016/SR06 2014/SR03 2016/SR11 2016/SR12 2017/SR03
2017/SR04 2017/SR09 2017/SR10 2017/SR12 2018/SR01 2018/SR07 2020/NOV/Q7
2021/JAN/Q1 2021/APR/Q1
Q3. A. With the aid of a simple sketch, explain the “trouble spots” in a basic air-conditioning unit.
B. With reference to your sketch, explain the following: -
i. How the problem of increase in humidity of cooled air is overcome?
ii. How discomfort caused by the excessive drying effect of heated air is overcome?
2007/SR03 2012/SR01 2012/SR02 2012/SR12 2014/SR03 2014/SR12 2015/SR08
2016/SR09 2016/SR12 2017/SR06 2017/SR07 2017/SR08 2017/SR10 2018/SR08
2018/SR09 2019/JAN 2019/FEB 2019/APR 2019/JUN 2019/JULY 2019/AUG
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 2
2019/SEP 2019/OCT 2019/NOV 2019/DEC 2020/MAR/Q3 2020/NOV/Q2 2020/DEC/Q2
2021/FEB/Q9 2021/APR/Q3
Q4. Accidents occurred due to premature or accidental release of Co2 into machinery spaces With reference to
this enumerate the procedure or arrangement that you as 2nd engineer would adopt with respect of the following
A. Contractors working on Co 2 system;
B. Understanding between bridge and engine room in the event of a machinery space fire;
C. Familiarizing staff with the system;
D. Checks and tests are carried out before putting system in operation?
2011/SR4 2007/SR3 2010/SR1 2012/SR1 2012/SR2 2013/SR1 2013/SR8
2014/SR4 2014/SR11 2017/SR07 2018/SR03 2020/DEC/Q3 2021/APR/Q4
Q5. A). Describe the procedure for overhauling a boiler safety valve and explain using sketches where necessary,
those parts, which require close attention.
B). Describe the procedure for setting of boiler safety valves.
2018/SR09 2019/JAN 2019/APR 2019/JULY 2019/SEP 2019/NOV 2021/APR/Q5
Q6. A. State the circumstances owing to which it may be necessary to renew a cylinder liner.
B. Explain how the liner is removed
C. Explain how the new liner is fitted; State the important checks to be made before and after fitting.
2010/SR01 2005/SR02 2012/SR01 2012/SR12 2013/SR01 2013/SR8 2013/SR10
2013/SR11 2014/SR01 2014/SR03 2014/SR11 2014/SR12 2015/SR01 2015/SR08
2015/SR11 2016/SR06 2016/SR12 2017/SR03 2017/SR10 2017/SR11 2017/SR12
2018/SR01 2018/SR09 2018/OCT 2019/JAN 2019/MAR 2019/APR 2020/OCT/Q8
2020/DEC/Q9 2021/APR/Q6
Q8. A). Describe the procedure to be undertaken when, upon a routine schedule for changing fuel injector on a
main engine, it is found that the injector body is seized and cannot be removed by conventional means.
B). Briefly explain the routine tests that are carried out on main engine fuel injectors.
2020/NOV/Q8 2021/APR/Q8
Q9. While carrying out ship’s hull inspection, describe the various defects and corresponding repairs that might
be expected in shell plating, Ford end of ship, aft end of ship, openings in shell plating, Rudder, Propeller, and
stern tube.
2021/APR/Q9
PLEASE CLICK HERE TO PURCHASE OUR ORIGINAL BOOKS. WE HAVE SOLVED ALL PAST EXAM PAPERS OF
LAST 15 YEARS. CLEAN CONTENT, CAD DRAWING WITH OUR 15 YEARS OF EXPERTISE IN MARITIME
PUBLISHING
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 1
AUGUST 2021
2108 MEP
Instructions :
1. Answer SIX questions only
2. All Questions carry equal marks
3. Neatness in handwriting and clarity in expression carries weightage
4. Illustration of an answer with clear sketches / diagrams carries weightage.
5. All unused pages of answer script must be cancelled out by two lines (X) across the page.
Q1: A. Outline the procedure for the inspection of the rudder in a dry dock.
B. What are the requirement with respect to steeling gear as per SOLAS 74, as amended for the following:
i. Relief valve;
ii. Steering gear control;
iii. Electrical power circuits.
2010/SR4 2006/SR3 2010/SR3 2012/SR09 2017/SR11 2018/OCT 2021/FEB/Q2
2021/AUG/Q1
Q2. A). Describe the procedure for opening a bottom end bearing for inspection making reference to the positioning
of the crank and the safety precautions to be observed.
B). State how the bearing clearance may be checked and adjusted when necessary
C). State TWO defects, which may be encountered during inspection of the bottom end bearing and crankpin giving
possible causes of EACH.
D). State TWO checks, which should be made before returning the engine to service following overhaul of the bottom
end bearing.
2015/SR11 2017/SR06 2017/SR11 2018/OCT 2021/FEB/Q7 2021/AUG/Q2
Q3. A). Describe the overhaul of a boiler safety valve and explain using sketches where necessary those parts which
require particularly close attention;
B). Describe the setting of boiler safety valve to comply with classification society requirements.
2010/SR01 2010/SR09 2010/SR10 2011/SR01 2011/SR03 2012/SR9 2015/SR10
2016/SR08 2017/SR02 2018/SR02 2018/SR09 2021/AUG/Q3
Q4. A. As a second engineer, how often would you check holding-down bolts to ascertain that they are tight? What
methods are used to check tightness?
B. If soon after joining a motor ship, you found a number of holding down bolts slack and fretting occurred in the
areas of the slack bolts, describe how you would handle the situation?
2019/AUG 2019/OCT 2020/MAR/Q8 2021/JAN/Q4 2021/JUL/Q6 2021/JUL/Q4(M) 2021/AUG/Q4
Q5. A. During the weighment of CO2 bottles required for total flooding of Engine room, it was observed that few
bottles are less than the original capacity. State the reasons for the same and checks / tests to be made prior refilling;
B. State how often the CO2 bottles are required to be weighed and pressure tested.
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 2
2008/SR1 2007/SR8 2006/SR7 2007/SR10 2007/SR2 2006/SR8 05-/EMG
2010/SR2 2015/SR10 2018/SR02 2020/FEB/Q4 2021/AUG/Q5
Q6. A. With the aid of a simple sketch, explain the “trouble spots” in a basic air-conditioning unit.
B. With reference to your sketch in 6(a), explain the following: -
i. How the problem of increase in humidity of cooled air is overcome?
ii. How discomfort caused by the excessive drying effect of heated air is overcome?
2007/SR03 2012/SR01 2012/SR02 2012/SR12 2014/SR03 2014/SR12 2015/SR08
2016/SR09 2016/SR12 2017/SR06 2017/SR07 2017/SR08 2017/SR10 2018/SR08
2018/SR09 2019/JAN 2019/FEB 2019/APR 2019/JUN 2019/JULY 2019/AUG
2019/SEP 2019/OCT 2019/NOV 2019/DEC 2020/MAR/Q3 2020/NOV/Q2 2020/DEC/Q2
2021/FEB/Q9 2021/APR/Q3 2021/APR/Q4 2021/JUL/Q1 2021/AUG/Q6
Q7. Sketch FIVE methods used to prevent the distortion of ship’s plates and frames during major welded hull repairs
in dry dock.
2021/AUG/Q7
Q8. As a second engineer, list out all the potential hazards with regard to hot work on a fuel oil heater located inside
a bunker fuel oil tank. Explain how do you carry out risk assessment for above mentioned hot work. What control
measures do you employ so that residual risk shall be reduced as low as reasonably practicable (ALARP).
2021/JAN/Q7 2021/JUL/Q7 2021/JUL/Q8(M) 2021/AUG/Q8
Q9. (a) Explain how can the cooling spaces within a cylinder jacket be examined without withdrawing the cylinder
liner?
(b) To what parts of a cylinder jacket would give attention after removing an old cylinder liner prior to fitting a new
one?
(c) What periodic attention must be given to the scavenge air space and piston-rod packing (Stuffing box) at the
bottom of a cylinder liner?
2021/MAR/Q3 2021/AUG/Q9
PLEASE CLICK HERE TO PURCHASE OUR ORIGINAL BOOKS. WE HAVE SOLVED ALL PAST EXAM PAPERS OF
LAST 15 YEARS. CLEAN CONTENT, CAD DRAWING WITH OUR 15 YEARS OF EXPERTISE IN MARITIME
PUBLISHING
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 1
JANUARY 2021
2021 MEP
NOTE :
1. Answer SIX questions only
2. All Questions carry equal marks
3. Neatness in handwriting and clarity in expression carries weightage
4. Illustration of an answer with clear sketches / diagrams carries weightage.
5. All unused pages of answer script must be cancelled out by two lines (X) across the page.
Q1. Under Continuous survey of machinery (CSM) bottom end bearing of a large 2stroke slow speed
engine is due for survey;
A. As 2nd engineer, explain the procedure involved in complete inspection of a bottom end bearing;
B. List the precaution to be taken;
C. Indicate the reasons for possible defects which could be encountered and state how they may be
rectified;
D. What test are carried out on completion of survey and re-assembly.
2009/SR8 2007/SR3 2010/SR1 2012/SR1 2012/SR12 2013/SR1 2013/SR10
2013/SR11 2014/SR01 2014/SR11 2014/SR12 2015/SR01 2015/SR03 2015/SR06
2015/SR08 2016/SR02 2016/SR06 2014/SR03 2016/SR11 2016/SR12 2017/SR03
2017/SR04 2017/SR09 2017/SR10 2017/SR12 2018/SR01 2018/SR07 2020/NOV/Q7
2021/JAN/Q1
Q2: Describe how the following conditions are prevented in auxiliary boilers:
A. Feed contamination by oil from heating coil drains;
B. Internal corrosion;
C. Furnace blowback;
D. Uptake fire;
2009/SR03 2008/SR11 2006/SR3 2005-6/EMG 2010/SR4 2010/SR3 2015/SR10
2015/SR11 2017/SR06 2017/SR11 2018/SR02 2018/OCT 2021/JAN/Q2
Q3. Enumerate the maintenance routines carried out for the proper functioning of the following systems:
A. Water hyper mist system
B. Smoke detection system
C. Quick closing valves
D. Fire hydrants and hoses.
2018/SR09 2019/FEB 2019/MAR 2019/AUG 2019/OCT 2019/NOV 2020/MAR/Q5
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 2
2021/JAN/Q3
Q4. A. As a second engineer, how often would you check holding-down bolts to ascertain that they are
tight? What methods are used to check tightness?
B. If soon after joining a motor ship, you found a number of holding down bolts slack and fretting to have
occurred in the area of slack bolts describe how you would handle the situation?
2019/AUG 2019/OCT 2020/MAR/Q8 2021/JAN/Q4
Q5. With respect to the operation of two stage reciprocating air compressor. Explain:
A. The causes of occasional lifting of 2nd stage relief valve.
B. Breakage of valve plates.
C. Puncture of bursting disc of 1st stage intercooler.
D. Noticeable reduction in capacity of the compressors over a period of time.
2018/SR09 2018/SR11 2019/JAN 2019/MAR 2019/APR 2019/JUN 2019/JULY 2019/SEP
2019/NOV 2019/DEC 2020/JAN 2020/OCT/Q3 2021/JAN/Q5
Q7. As a second engineer, list out all the potential hazards with regard to hot work on a fuel oil heater
located inside a bunker oil fuel tank. Explain how do you carry out risk assessment for above mentioned
hot work. What control measures do you employ so that residual risk shall be reduced as low as
reasonably practicable (ALARP).
2021/JAN/Q7
Q8. Severe engine vibration has recently become evident when the main engine for which you are
responsible operates within a certain speed range –
A. State, with reasons, the possible causes of such vibration;
B. State the consequences of operating the engine under such vibratory conditions;
C. Describe the procedure you, as Second Engineer, would implement in order to investigate and rectify
the problem.
2011/SR9 2012/SR4 2013/SR1 2013/SR09 2014/SR11 2015/SR04 2015/SR06
2017/SR03 2017/SR04 2017/SR07 2017/SR09 2018/SR03 2018/SR07 2018/SR11
2019/JUN 2019/DEC 2020/FEB/Q8 2021/JAN/Q8
Q9. A. Briefly explain the term fatigue and explain how fatigue failure occur;
B. State the difference between high stress / low cycle and low stress / high cycle fatigue giving an
example of each;
C. State how defect in metal can influence the expected safe life of a component;
D. State how fuel injection timing and cylinder power balance can influence the possibility of fatigue
cracks developing in the bedplate.
2015/SR10 2016/SR08 2017/SR02 2018/SR02 2021/JAN/Q9
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 3
PLEASE CLICK HERE TO PURCHASE OUR ORIGINAL BOOKS. WE HAVE SOLVED ALL PAST EXAM PAPERS OF
LAST 15 YEARS. CLEAN CONTENT, CAD DRAWING WITH OUR 15 YEARS OF EXPERTISE IN MARITIME
PUBLISHING
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 1
JULY 2021
2107 MEP
NOTE :
1. Answer SIX questions only
2. All Questions carry equal marks
3. Neatness in handwriting and clarity in expression carries weightage
4. Illustration of an answer with clear sketches / diagrams carries weightage.
5. All unused pages of answer script must be cancelled out by two lines (X) across the page.
Q1. A. As second engineer describe the procedure involved in the complete inspection of a cylinder liner and piston
assembly, indicating areas of significant interest.
B. Explain with reasons, possible faults which might be found;
C. Suggest how such faults might be avoided.
2012/SR7 2013/SR10 2015/SR06 2016/SR01 2016/SR11 2017/SR09 2018/SR07
2021/JUL/Q1
Q2. During normal engine operation, a turbocharger rapidly loses speed and the speed reduction is accompanied by
appreciable noise -
A. State with reasons the possible causes.
B. Explain in detail how the engine might be safely operated if the damage caused by this incident is such that the
turbocharger cannot function.
C. State with reasons the factors which may limit engine operating speed with the turbocharger out of action.
2011/SR9 2013/SR1 2013/SR7 2013/SR10 2014/SR11 2015/SR06 2016/SR07
2016/SR11 2017/SR03 2017/SR04 2017/SR09 2018/SR07 2021/JUL/Q2
Q3. With reference to reciprocating air compressors explain the cause of the following faults.
A. Collapse of discharge valve springs;
B. Breakage of plate valves;
C. Overheating of the discharge air with an unrestricted air intake;
D. Inoperative piston rings.
2008/SR6 2011/SR2 2006-07/EM 2011/SR8 2012/SR6 2013/SR4 2013/SR12
2014/SR07 2014/SR08 2016/SR01 2016/SR07 2019/FEB 2019/AUG 2019/OCT
2020/MR/Q1 2021/JUL/Q3
Q4. During the past 4 months since you joined the ship as 2nd engineer a number of main engine exhaust valve have
suffered from cracking and corrosion at the seating faces; Write a report covering the following points;
A. An explanation detailing how the problem becomes evident;
B. Your action upon recognizing the extent and seriousness of the problem;
C. Your reasoned view regarding the possible cause of the problem;
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 2
D. Your recommendation to avoid future incidents.
2009/SR4 2008/SR7 2005-6/EMG 2011/SR3 2010/SR10 2015/SR02 2015/SR04
2015/SR10 2018/SR02 2019/FEB 2019/AUG 2019/OCT 2021/JUL/Q4
Q5. Accidents occurred due to premature or accidental release of Co2 into machinery spaces With reference to this
enumerate the procedure or arrangement that you as 2nd engineer would adopt with respect of the following
A. Contractors working on Co 2 system;
B. Understanding between bridge and engine room in the event of a machinery space fire;
C. Familiarizing staff with the system;
D. What checks and tests are carried out before putting system in operation?
2011/SR4 2007/SR3 2010/SR1 2012/SR1 2012/SR2 2013/SR1 2013/SR8
2014/SR4 2014/SR11 2017/SR07 2018/SR03 2020/DEC/Q3 2021/APR/Q4 2021/JUL/Q5
Q6. A. As a second engineer, how often would you check holding-down bolts to ascertain that they are tight? What
methods are used to check tightness?
B. If soon after joining a motor ship, you found a number of holding down bolts slack and fretting occurred at slacked
bolts. describe how you as a second engineer deal such situation?
2019/AUG 2019/OCT 2020/MAR/Q8 2021/JAN/Q4 2021/JUL/Q6
Q7. As a second engineer, list out all the potential hazards with regard to hot work on a fuel oil heater located inside
a bunker fuel oil tank. Explain how do you carry out risk assessment for above mentioned hot work. What control
measures do you employ so that residual risk shall be reduced as low as reasonably practicable (ALARP).
2021/JAN/Q7 2021/JUL/Q7
Q8. (a) Explain in detail how you would isolate High Pressure Water Mist (Hyper Mist) System intended for fire
protection of engine room’s machinery and equipment for routine maintenance .
(b) Describe all tests and inspections you would make and how you would return the system to service.
(c) On a U.M.S vessel, how does a High Pressure Water Mist ( Hyper Mist) System function when it is kept in auto
mode.
2021/JUL/Q8
Q9. Explain how EACH of the following hull defects should be dealt with;
A. A cracked weld;
B. A severe indentation in way of a frame;
C. Surfaces suffering from general corrosion although the extent of wastage does not warrant plate replacement;
D. A bilge head fractured at the forward end.
2007/SR3 2012/SR1 2012/SR2 2012/SR12 2013/SR6 2014/SR01 2014/SR03
2014/SR12 2015/SR01 2015/SR08 2015/SR15 2016/SR02 2016/SR06 2016/SR09
2016/SR12 2017/SR06 2017/SR08 2017/SR10 2017/SR12 2018/SR01 2020/DEC/Q6
2021/FEB/Q5 2021/APR/Q6 2021/JUL/Q9
PLEASE CLICK HERE TO PURCHASE OUR ORIGINAL BOOKS. WE HAVE SOLVED ALL PAST EXAM PAPERS OF
LAST 15 YEARS. CLEAN CONTENT, CAD DRAWING WITH OUR 15 YEARS OF EXPERTISE IN MARITIME
PUBLISHING
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 1
MARCH 2021
2103 MEP
NOTE :
1. Answer SIX questions only
2. All Questions carry equal marks
3. Neatness in handwriting and clarity in expression carries weightage
4. Illustration of an answer with clear sketches / diagrams carries weightage.
5. All unused pages of answer script must be cancelled out by two lines (X) across the page.
Q1: Describe how the following conditions are prevented in auxiliary boilers:
A. Feed contamination by oil from heating coil drains.
B. Internal corrosion.
C. Furnace blowback.
D. Uptake fire.
2009/SR03 2008/SR11 2006/SR3 2005-6/EMG 2010/SR4 2010/SR3 2015/SR10
2015/SR11 2017/SR06 2017/SR11 2018/SR02 2018/OCT 2021/JAN/Q2 2021/MAR/Q1
Q5. What examinations must be carried out when a crosshead bearing of a large, slow-speed engine is
opened up for survey?
2018/SR08 2018/SR11 2021/MAR/Q5
Q6: Your ship after having been accidentally grounded was taken to a dry-dock for inspection and
necessary repairs. What defects would you look for in the following parts, that may have sustained
damage due to grounding and suggest methods of repairs and tests that may be required to be carried
out to the defects noticed:
A. Propeller and tail end shaft.
B. Main engine crankshaft.
2009/SR4 2008/SR7 2006/SR5 2006/SR1 2011/SR3 2010/SR10 2015/SR09
2015/SR12 2017/SR1 2017/SR06 2017/SR08 2018/SR04 2020/JAN 2021/MAR/Q6
Q7. During the cleaning & inspection oily bilge tank onboard your vessel;
A. As second engineer, explain the procedure involved in transferring the water, emptying out tank,
without violating MARPOL Regulation.
B. List the precaution to be taken before entering and while cleaning the progress.
C. Explain what all checks to be carried out, before and after cleaning.
2018/SR11 2021/MAR/Q7
Q8. A. Sketch a transmission shaft coupling which enables the propeller shaft to be withdrawn outward.
B. (i) describe the coupling and method fitting and dismantling;
(ii) state how the grip of the coupling can be checked when fitted;
(iii) why should coupling bolts be interference fits
(iv) State what precaution should be taken when dismantling the coupling.
(V) State reasons why the metal that the intermediate and tail end remission shaft are made of.
2011/SR8 2012/SR11 2013/SR1 2014/SR02 2016/SR03 2016/SR10 2017/SR03
2021/MAR/Q8
Q9. With respect to the operation of two stage reciprocating air compressor. Explain:
A. The causes of occasional lifting of 2nd stage relief valve.
B. Breakage of valve plates.
C. Puncture of bursting disc of 1st stage intercooler.
D. Noticeable reduction in capacity of the compressors over a period of time.
2018/SR09 2018/SR11 2019/JAN 2019/MAR 2019/APR 2019/JUN 2019/JULY 2019/SEP
2019/NOV 2019/DEC 2020/JAN 2020/OCT/Q3 2021/JAN/Q5 2021/MAR/Q9
PLEASE CLICK HERE TO PURCHASE OUR ORIGINAL BOOKS. WE HAVE SOLVED ALL PAST EXAM PAPERS OF
LAST 15 YEARS. CLEAN CONTENT, CAD DRAWING WITH OUR 15 YEARS OF EXPERTISE IN MARITIME
PUBLISHING
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 3
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 1
NOVEMBER 2021
2111 MEP
Instructions :
1. Answer SIX questions only
2. All Questions carry equal marks
3. Neatness in handwriting and clarity in expression carries weightage
4. Illustration of an answer with clear sketches / diagrams carries weightage.
5. All unused pages of answer script must be cancelled out by two lines (X) across the page.
Q2. With reference to reciprocating air compressors explain the cause of the following faults.
A. Collapse of discharge valve springs;
B. Breakage of plate valves;
C. Overheating of the discharge air with an unrestricted air intake;
D. Inoperative piston rings.
2008/SR6 2011/SR2 2006-07/EM 2011/SR8 2012/SR6 2013/SR4 2013/SR12
2014/SR07 2014/SR08 2016/SR01 2016/SR07 2019/FEB 2019/AUG 2019/OCT
2020/MR/Q1 2021/JUL/Q3 2021/NOV/Q2
Q4. Sketch and show all parts of two-stroke engine’s Stuffing box. Describe the procedure of overhauling two stroke
engine’s Stuffing box, without removing the piston. Your answer should include all safety precautions taken and
proper tools used during this Stuffing box overhaul.
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 2
2021/NOV/Q4
Q5. With the aid of a simple sketch, explain the “trouble spots” in a basic air-conditioning unit and with reference to
your sketch, explain the following: -
(a). How the problem of increase in humidity of cooled air is overcome?
(b). How discomfort caused by the excessive drying effect of heated air is overcome?
(c). With a simple drawing, explain Psychrometric Chart.
Q6. Enumerate the maintenance routines carried out for the proper functioning of the following systems:
A. Water hyper mist system
B. Smoke detection system
C. Quick closing valves
D. Fire hydrants and hoses.
2018/SR09 2019/FEB 2019/MAR 2019/AUG 2019/OCT 2019/NOV 2020/MAR/Q5
2021/JAN/Q3 2021/NOV/Q6
Q7. There are approximately ten days of a voyage remaining for a ship before reaching port and the chemicals
intended for the boiler water treatment are found unfit for further use.
A. Describe, with reasons, how the boiler and plant can be best protected whilst steaming before a fresh supply of
chemicals is received.
B. Upon arrival at the port describe any inspection and precautions that may be necessary before proceeding.
2015/SR12 2017/SR08 2021/NOV/Q7
Q8. List out all the potential hazards with regard to hot work on a fuel oil heater located inside a bunker fuel oil tank.
As a second engineer, explain how do you carry out risk assessment for above mentioned hot work. What control
measures do you employ so that residual risk shall be reduced as low as reasonably practicable (ALARP).
2021/JAN/Q7 2021/JUL/Q7 2021/JUL/Q8(M) 2021/AUG/Q8 2021/NOV/Q8
Q9. (a) If soon after joining as a second engineer on a motor vessel, you observed that number of holding down bolts
are slack and fretting has occurred in the area of slack holding down bolts. Describe what actions do you take.
(b) Explain the correct procedure for checking the holding down bolts tightness?
2021/NOV/Q9
PLEASE CLICK HERE TO PURCHASE OUR ORIGINAL BOOKS. WE HAVE SOLVED ALL PAST EXAM PAPERS OF
LAST 15 YEARS. CLEAN CONTENT, CAD DRAWING WITH OUR 15 YEARS OF EXPERTISE IN MARITIME
PUBLISHING
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 1
OCTOBER 2021
2110 MEP
Instructions :
1. Answer SIX questions only
2. All Questions carry equal marks
3. Neatness in handwriting and clarity in expression carries weightage
4. Illustration of an answer with clear sketches / diagrams carries weightage.
5. All unused pages of answer script must be cancelled out by two lines (X) across the page.
Q2. When ship is in dry dock, as a Second Engineer, describe inspections you would make prior to the start of work,
during the work and after completion of the work of the following:
(a) Large sea water inlet chest and valves;
(b) Forward end of ship;
(c) Propeller and stern bush;
2020/NOV/Q1 2021/OCT/Q2
Q3 (a) Sketch and explain any two methods used to prevent the distortion of ships plates and frames during major
welded hull repairs in dry dock.
(b). Explain how EACH of the following hull defects should be dealt with;
(i). A cracked weld;
(ii). A severe indentation in way of a frame;
(iii). Surfaces suffering from general corrosion although the extent of wastage does not warrant plate replacement;
(iv). A bilge head fractured at the forward end.
2007/SR3 2012/SR1 2012/SR2 2012/SR12 2013/SR6 2014/SR01 2014/SR03
2014/SR12 2015/SR01 2015/SR08 2015/SR15 2016/SR02 2016/SR06 2016/SR09
2016/SR12 2017/SR06 2017/SR08 2017/SR10 2017/SR12 2018/SR01 2020/DEC/Q6
2021/FEB/Q5 2021/APR/Q6 2021/JUL/Q9 2021/SEP/Q7 2021/OCT/Q3
Q4. Describe the procedure to be undertaken when, upon a routine schedule for changing fuel injector on a main
engine, it is found that the injector body is seized and cannot be removed by conventional means.
2020/NOV/Q8 2021/APR/Q8 2021/OCT/Q4
Q6. List out all the potential hazards with regard to cylinder head lifting job during main engine overhaul. As a second
engineer, explain how do you carry out risk assessment for above mentioned job.
2021/OCT/Q6
Q7. With the aid of a simple sketch, explain the “trouble spots” in a basic air-conditioning unit and with reference to
your sketch explain the following: -
(a). How the problem of increase in humidity of cooled air is overcome?
(b). How discomfort caused by the excessive drying effect of heated air is overcome?
2007/SR03 2012/SR01 2012/SR02 2012/SR12 2014/SR03 2014/SR12 2015/SR08
2016/SR09 2016/SR12 2017/SR06 2017/SR07 2017/SR08 2017/SR10 2018/SR08
2018/SR09 2019/JAN 2019/FEB 2019/APR 2019/JUN 2019/JULY 2019/AUG
2019/SEP 2019/OCT 2019/NOV 2019/DEC 2020/MAR/Q3 2020/NOV/Q2 2020/DEC/Q2
2021/FEB/Q9 2021/APR/Q3 2021/APR/Q4 2021/JUL/Q1 2021/AUG/Q6 2021/SEP/Q5 2021/OCT/Q7
Q9. Under Continuous survey of machinery (CSM) bottom end bearing of a large 2stroke slow speed engine is due
for survey.
A. As second engineer, explain the procedure involved in complete inspection of a bottom end bearing.
B. List the precaution to be taken.
C. Indicate the reasons for possible defects which could be encountered and state how they may be rectified.
D. What test are carried out on completion of survey and re-assembly.
2009/SR8 2007/SR3 2010/SR1 2012/SR1 2012/SR12 2013/SR1 2013/SR10
2013/SR11 2014/SR01 2014/SR11 2014/SR12 2015/SR01 2015/SR03 2015/SR06
2015/SR08 2016/SR02 2016/SR06 2014/SR03 2016/SR11 2016/SR12 2017/SR03
2017/SR04 2017/SR09 2017/SR10 2017/SR12 2018/SR01 2018/SR07 2020/NOV/Q7
2021/JAN/Q1 2021/APR/Q1 2021/JUL/Q2 2021/OCT/Q9
PLEASE CLICK HERE TO PURCHASE OUR ORIGINAL BOOKS. WE HAVE SOLVED ALL PAST EXAM PAPERS OF
LAST 15 YEARS. CLEAN CONTENT, CAD DRAWING WITH OUR 15 YEARS OF EXPERTISE IN MARITIME
PUBLISHING
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 1
SEPTEMBER 2021
2109 MEP
Instructions :
1. Answer SIX questions only
2. All Questions carry equal marks
3. Neatness in handwriting and clarity in expression carries weightage
4. Illustration of an answer with clear sketches / diagrams carries weightage.
5. All unused pages of answer script must be cancelled out by two lines (X) across the page.
Q1. As a second engineer, list out all the hazards identified with regard to cylinder head lifting job during main engine
overhaul. Explain how do you carry out risk assessment for above mentioned job.
2020/NOV/Q1 2020/DEC/Q5 2021/SEP/Q1
Q5. A. With the aid of a simple sketch, explain the “trouble spots” in a basic air-conditioning unit.
B. With reference to your sketch in (A), explain the following: -
i. How the problem of increase in humidity of cooled air is overcome?
ii. How discomfort caused by the excessive drying effect of heated air is overcome?
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 2
2007/SR03 2012/SR01 2012/SR02 2012/SR12 2014/SR03 2014/SR12 2015/SR08
2016/SR09 2016/SR12 2017/SR06 2017/SR07 2017/SR08 2017/SR10 2018/SR08
2018/SR09 2019/JAN 2019/FEB 2019/APR 2019/JUN 2019/JULY 2019/AUG
2019/SEP 2019/OCT 2019/NOV 2019/DEC 2020/MAR/Q3 2020/NOV/Q2 2020/DEC/Q2
2021/FEB/Q9 2021/APR/Q3 2021/APR/Q4 2021/JUL/Q1 2021/AUG/Q6 2021/SEP/Q5
Q6. With regard to keeping the gas side of boilers in good condition discusses EACH of the following:
A. the mechanism of combustion, stating the factors which are important to good combustion;
B. Oil fuel treatments;
C. Soot removal equipment;
2009/SR6 2008/SR7 2008/SR1 2007/EMG 2007/SR8 2006/SR7 2006/SR4
2006/SR1 2011/SR3 2010/SR10 2010/SR9 2010/SR6 2012/SR4 2012/SR8
2013/SR8 2014/SR01 2014/SR9 2014/SR12 2016/SR03 2016/SR10 2016/SR02
2016/SR06 2017/SR07 2017/SR12 2018/SR01 2018/SR03 2018/SR04 2018/SR08
2019/MAR 2020/JAN 2021/SEP/Q6
Q7. Explain how EACH of the following hull defects should be dealt with;
A. A cracked weld;
B. A severe indentation in way of a frame;
C. Surfaces suffering from general corrosion although the extent of wastage does not warrant plate replacement;
D. A bilge head fractured at the forward end.
2007/SR3 2012/SR1 2012/SR2 2012/SR12 2013/SR6 2014/SR01 2014/SR03
2014/SR12 2015/SR01 2015/SR08 2015/SR15 2016/SR02 2016/SR06 2016/SR09
2016/SR12 2017/SR06 2017/SR08 2017/SR10 2017/SR12 2018/SR01 2020/DEC/Q6
2021/FEB/Q5 2021/APR/Q6 2021/JUL/Q9 2021/SEP/Q7
Q8. A. As a second engineer, how often would you check holding-down bolts to ascertain that they are tight? What
methods are used to check tightness?
B. If soon after joining a motor ship, you found a number of holding down bolts slack and fretting occurred in the
areas of the slack bolts, describe how you would handle the situation?
2019/AUG 2019/OCT 2020/MAR/Q8 2021/JAN/Q4 2021/JUL/Q6 2021/JUL/Q4(M) 2021/AUG/Q4
2021/SEP/Q8
Q9. During normal engine operation, a turbocharger rapidly loses speed and the speed reduction is accompanied by
appreciable noise -
A. State with reasons the possible causes.
B. Explain in detail how the engine might be safely operated if the damage caused by this incident is such that the
turbocharger cannot function.
C. State with reasons the factors which may limit engine operating speed with the turbocharger out of action.
2011/SR9 2013/SR1 2013/SR7 2013/SR10 2014/SR11 2015/SR06 2016/SR07
2016/SR11 2017/SR03 2017/SR04 2017/SR09 2018/SR07 2021/JUL/Q2 2021/SEP/Q9
PLEASE CLICK HERE TO PURCHASE OUR ORIGINAL BOOKS. WE HAVE SOLVED ALL PAST EXAM PAPERS OF
LAST 15 YEARS. CLEAN CONTENT, CAD DRAWING WITH OUR 15 YEARS OF EXPERTISE IN MARITIME
PUBLISHING
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 1
DECEMBER 2021
2112 MEP
Instructions :
1. Answer SIX questions only
2. All Questions carry equal marks
3. Neatness in handwriting and clarity in expression carries weightage
4. Illustration of an answer with clear sketches / diagrams carries weightage.
5. All unused pages of answer script must be cancelled out by two lines (X) across the page.
Q1. (a) If soon after joining as a second engineer on a motor vessel, you observed that number of holding down bolts
are slack and fretting has occurred in the area of slack holding down bolts. Describe what actions do you take.
(b) Explain the correct procedure for checking the holding down bolts tightness?
2021/NOV/Q9 2021/DEC/Q1
Q2. Under Continuous survey of machinery (CSM) bottom end bearing of a large 2stroke slow speed engine is due
for survey.
A. As second engineer, explain the procedure involved in complete inspection of a bottom end bearing.
B. List the precaution to be taken.
C. Indicate the reasons for possible defects which could be encountered and state how they may be rectified.
D. What test are carried out on completion of survey and re-assembly.
2009/SR8 2007/SR3 2010/SR1 2012/SR1 2012/SR12 2013/SR1 2013/SR10
2013/SR11 2014/SR01 2014/SR11 2014/SR12 2015/SR01 2015/SR03 2015/SR06
2015/SR08 2016/SR02 2016/SR06 2014/SR03 2016/SR11 2016/SR12 2017/SR03
2017/SR04 2017/SR09 2017/SR10 2017/SR12 2018/SR01 2018/SR07 2020/NOV/Q7
2021/JAN/Q1 2021/APR/Q1 2021/JUL/Q2 2021/OCT/Q9 2021/DEC/Q2
Q3. Sketch and describe any THREE methods used to prevent the distortion of ship’s plates and frames during major
welded hull repairs in dry dock.
2021/AUG/Q7 2021/DEC/Q3
WWW.DIESELSHIP.COM DIESELSHIP
WWW.DIESELSHIP.COM 2
2008/SR9 2010/SR11 2010/SR8 2013/SR10 2014/SR10 2014SR11 2015/SR06
2016/SR11 2017/SR04 2017/SR07 2017/SR09 2018/SR03 2018/SR07 2018/DEC
2019/JAN 2019/JUN 2019/DEC 2020/DEC/Q4 2021/FEB/Q3 2021/JUL/Q3 2021/DEC/Q5
Q6. (a) With the aid of a simple sketch, explain the “trouble spots” in a basic air-conditioning unit
(b) With reference to your sketch, explain the following: -
(i). How the problem of increase in humidity of cooled air is overcome?
(ii). How discomfort caused by the excessive drying effect of heated air is overcome?
2007/SR03 2012/SR01 2012/SR02 2012/SR12 2014/SR03 2014/SR12 2015/SR08
2016/SR09 2016/SR12 2017/SR06 2017/SR07 2017/SR08 2017/SR10 2018/SR08
2018/SR09 2019/JAN 2019/FEB 2019/APR 2019/JUN 2019/JULY 2019/AUG
2019/SEP 2019/OCT 2019/NOV 2019/DEC 2020/MAR/Q3 2020/NOV/Q2 2020/DEC/Q2
2021/FEB/Q9 2021/APR/Q3 2021/APR/Q4 2021/JUL/Q1 2021/AUG/Q6 2021/SEP/Q5 2021/OCT/Q7
2021/NOV/Q5 2021/DEC/Q6
Q7. What is Rocking test of Deck Crane? Explain the procedure of rocking test. Tabulate and indicate fault finding
procedure. What is the action taken if deviation is out of limit?
2018/SR09 2018/SR11 2019/JAN 2019/MAR 2019/NOV 2020/JAN 2021/FEB/Q6
2021/APR/Q7 2021/DEC/Q7
Q8. With respect to hydraulic Ram steering gears;
A. What emergency locking device can be used in order to speedily bring the steering gear to rest? State one reason
the best angular position to lock the steering gear.
B. Use a simple sketch to show where the “Jumping” (top) and wear down (bottom) rudder carrier ring clearances
can be measured. Indicate what clearances you would expect with a new steering gear;
C. State the consequences of the wear down clearances being reduced to less than zero.
2011/SR4 2010/SR4 2010/SR3 2010/SR2 2012/SR1 2014/SR01 2014/SR03 2014/SR4
2014/SR12 2015/SR01 2015/SR08 2016/SR02 2016/SR06 2016/SR12 2017/SR07 2017/SR10
2017/SR12 2018/SR01 2020/DEC/Q7 2021/APR/Q2 2021/APR/Q8 2021/SEP/Q4 2021/NOV/Q3 2021/DEC/Q8
Q9. Severe engine vibration has recently become evident when the main engine for which you are responsible
operates within a certain speed range –
A. State, with reasons, the possible causes of such vibration;
B. State the consequences of operating the engine under such vibratory conditions;
C. Describe the procedure you, as Second Engineer, would implement in order to investigate and rectify the problem.
2011/SR9 2012/SR4 2013/SR1 2013/SR09 2014/SR11 2015/SR04 2015/SR06
2017/SR03 2017/SR04 2017/SR07 2017/SR09 2018/SR03 2018/SR07 2018/SR11
2019/JUN 2019/DEC 2020/FEB/Q8 2021/JAN/Q8 2021/JUL/Q9 2021/DEC/Q9
PLEASE CLICK HERE TO PURCHASE OUR ORIGINAL BOOKS. WE HAVE SOLVED ALL PAST EXAM PAPERS OF
LAST 15 YEARS. CLEAN CONTENT, CAD DRAWING WITH OUR 15 YEARS OF EXPERTISE IN MARITIME
PUBLISHING
WWW.DIESELSHIP.COM DIESELSHIP