Reference SPEC - MVE2
Reference SPEC - MVE2
NSCC
TECHNICAL PROPOSAL
of
VARIABLE FREQUENCY DRIVE (VFD)
SPEC-MVe2-E01 Rev.1
P-1
INDEX
Page
SPEC-MVe2-E01 Rev.1
P-2
GENERAL CONDITIONS
1. SCOPE
This specification generally covers following scopes of electrical equipment which is supplied by TOSHIBA
MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION (TMEIC).
1) Design
2) Manufacturing
3) Test
4) Inspection
5) Transportation
However, system design, such as power distribution system design, load study, relay coordination study etc. will be
out of our scope.
The following standards will be applied for all electrical equipment listed in this specification.
3. SCREW THREADS
All bolts, nuts and screws will conform to the METRIC THREAD of ISO
(International Organization for Standardization).
SPEC-MVe2-E01 Rev.1
P-3
4. UNITS
Length in: mm
Weight in: ton/kg
Temperature: Centigrade
6. DOCUMENTS TO BE SUBMITTED
PDF file (APPROVAL/FINAL)
* Technical specification 1/1
* Motor terminal drawings 1/1
* Outline and foundation drawing 1/1
* Schematic diagrams 1/1
* Spare parts list 1/1
* Accessories list 1/1
* Instruction manual for installation and maintenance 0/1
* Test record 0/1
7. COLOR TO BE PAINTED
SPEC-MVe2-E01 Rev.1
P-4
8. SITE CONDITIONS
The ratings of devices and equipment herein specified are based on the following site conditions.
Note: When cleaning the equipment room, please use a vacuum cleaner to prevent stirring up the dust.
Do not apply silicon wax to the floor in the equipment room. It may affect the electric contact.
After external cables (grounding wires, main circuit cables and control wires) are connected,
completely seal the cable lead-in holes with putty. If the cable lead-in holes are left unfilled, open air
will enter the equipment and may cause harm to the equipment.
SPEC-MVe2-E01 Rev.1
P-5
9. DESIGN DETAIL
Design covered by this specification is subject to minor modifications by us at the time of manufacture to meet the
latest practice and most efficient arrangement of apparatus.
Test and inspection will be carried out at our works for each piece of machinery and equipment. Test records of
main equipment will be submitted. The performance test witnessed by the purchaser will be carried out at our works,
if requested. However, the necessary charges such as fare and accommodation, etc. shall be borne by the
purchaser.
13. PACKING
The equipment will be packed for exportation by ship. The special notation such as fragile, this side up, center of
gravity, weight, etc., where necessary, will be clearly described on each packing, together with tag number,
purchaser order number and brief description of the contents.
14. WARRANTY
(1) The Seller warrants that the Product shall be free from defects in design (other than a design made,
furnished or specified by the Buyer for which the Seller has disclaimed responsibility in writing), material and
workmanship for eighteen (18) months from the date of shipment or twelve (12) months from the date on
which the Product is put into operation, whichever period shall first expire, provided that the Buyer gives the
Seller written notice of any defect and satisfactory proof thereof promptly upon discovery of such defect but
in no case later that fifteen (15) days after expiration of the aforesaid warranty period.
(2) The Seller’s obligation under the aforesaid warranty shall be limited to, at the Seller’s option, (a) repairing,
(b) replacing or (c) supplying a replacement part for any part of the Product which, if properly installed, used
and maintained, proves defective owing solely to causes attributable to the Seller’s design, material or
workmanship.
(3) The Seller’s obligation under Paragraphs (1) and (2) hereof shall not apply to the Product or any part thereof
which is normally consumed in operation or has a normal life inherently shorter than the warranty period
stated herein.
SPEC-MVe2-E01 Rev.1
P-6
(4) The total liability of the Seller on any claim whether in contract, tort (including negligence) or otherwise,
arising out of, connected with or resulting from the performance or breach of any contract based upon the
Quotation shall not exceed the price of the Product or the value of any part thereof which gives rise to the
claim.
(5) In no event, whether as a result of breach of contract, warranty, alleged negligence or liability without fault, shall
the Seller be liable for special, indirect or consequential damages.
Please revise this item as needed
by each overseas affiliate.
15. SCOPE OF SUPPLY
1. VARIABLE FREQUENCY DRIVE 1 set
2. TOOL 1 set
3. SPARE PARTS 1 set
4. FACTORY WITHNESS TEST none specified
5.SITE COMMISSIONING 1 engineer (5 working days)
If Tool are not required, please delete this item.
16. WORK EXCLUDED
The following items are out of our scope, however TMEIC provide the technical assistance if necessary.
SPEC-MVe2-E01 Rev.1
P-7
TECHNICAL SPECIFICATIONS
1. VARIABLE FREQUENCY DRIVE
Quantity 1 set
Application Fan
Motor rating 6P - 1450kW -6000V - 50Hz - A
Load torque characteristic square-law load torque
SPEC-MVe2-E01 Rev.1
P-8
SPEC-MVe2-E01 Rev.1
P-9
Operation Board
Display LCD display (40 figures - 8 lines)
Key board Navigation Key Board, Controls Key board
3 LEDs (READY, RUN, FAULT/ALARM, DC BUS DISCHARGED )
Push buttons Interlock, Fault reset
PC Interface Ethernet LCD display (240x64 dots)
Main data displays
(Current, Frequency, etc. )
Navigation Keyboard
Fault reset
SPEC-MVe2-E01 Rev.1
P-10
SPEC-MVe2-E01 Rev.1
P-11
2. TOOL
Quantity 1 set
SPEC-MVe2-E01 Rev.1
P-12
3. SPARE PARTS
Quantity 1 set
SPEC-MVe2-E01 Rev.1
P-13
4 SEQUENCE TEST ○ ― ○
6 SIMULATION TEST ※2 ○ ― ○
※1 Rating current test will be applied for each cell inverter, not for inverter system.
※2 A factory test motor will be used for simulation test. The motor will be driven without load.,
SPEC-MVe2-E01 Rev.1
P-14
5. SITE COMMISSIONING
SPEC-MVe2-E01 Rev.1
P-15
INTERFACE LIST
SPEC-MVe2-E01 Rev.1
P-16
SPEC-MVe2-E01 Rev.1
P-17
Remarks:
1) Please provide an analog speed reference signal from the customer control system for inverter operation.
Since detail motor and load characteristics are not available, the inverter capacity is selected for this quotation
according to the motor capacity and current value specified. If detail studies of the applications results in
inverter capacity changes, appropriate price will be provided. It is assumed that the load is a standard
square-torque load.
2) It is assumed that motor acceleration will be performed under inverter rated capacity. If the load is a critical part
of customer process and require continuous running, it is recommended to install commercial power bypass
circuit in order to operate motor with commercial power in case of inverter failure.
3) 3/3.3/6/6.6kV output types are a front maintenance type construction, and 10/11kV output types are
front / rear maintenance. Therefore the maintenance spaces are required on the front and rear side
of the panels.
4) Shipping split of this MV inverter is between the transformer panel and the inverter panel.
5) External interface will be TMEIC standard shown in this specification.
6) External analog signals shall be isolated.
7) Display on the front door is TMEIC standard.
8) Cable entry shall be From bottom
9) Exhaust air duct provision is not provided.
10) Control source (3ph-380V-50Hz) shall be externally supplied.
11) External cabling shall follow TMEIC’s recommendation (See attached drawings).
Otherwise we are not responsible for any problem or technical issue.
12) By-pass circuit is recommended just in case of inverter failure.
13) If ride-through control and/or automatic restart are applied, all MV circuit breakers shall be of latched type.
SPEC-MVe2-E01 Rev.1
P-18
STRUCTURAL SPECIFICATION
SPEC-MVe2-E01 Rev.1
P-19
BUS Type Heat shrink two or four hole connector Crimp terminal also
connection (comply to JIS-C2804) available
Position Bottom (lengthwise and breadthwise) Receptacle and
telephone jack are
excluded
External TMEIC Standard
terminal block
Cable entry Main From bottom
circuit(input)
Main From bottom
circuit(output)
Control circuit From bottom
Earth From bottom
Incoming cover Main circuit : steel 2.3mm
Others : steel 2.3mm
SPEC-MVe2-E01 Rev.1
P-20
SPEC-MVe2-E01 Rev.1
P-21
REFERENCE DRAWINGS
1. If drawing is not clear, please download.
2. This outline drawing is for the equipment made by Fuchu. In case of overseas manufacturing, the outline drawing
is different, so please contact each manufacturing base.
SPEC-MVe2-E01 Rev.1
P-22
SPEC-MVe2-E01 Rev.1
P-23
SPEC-MVe2-E01 Rev.1
P-24
SPEC-MVe2-E01 Rev.1
P-25
SPEC-MVe2-E01 Rev.1
P-26
SPEC-MVe2-E01 Rev.1