0003 Residential Concreting 01

This document provides specifications for concrete works for a 90.87 square meter building located in Malolos City, Bulacan. It includes details of the concrete mix design and quantities needed for various structural elements like foundations, footings, and tie beams. The concrete mix will consist of 18,760 kilograms of cement, 9,004.80 kilograms of water, and have a 0.48 water-cement ratio. Reinforcing bar quantity is estimated at 1.31 cubic meters and concrete quantity is estimated at 45.80 cubic meters.

Uploaded by

Jet Toledo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
34 views8 pages

0003 Residential Concreting 01

This document provides specifications for concrete works for a 90.87 square meter building located in Malolos City, Bulacan. It includes details of the concrete mix design and quantities needed for various structural elements like foundations, footings, and tie beams. The concrete mix will consist of 18,760 kilograms of cement, 9,004.80 kilograms of water, and have a 0.48 water-cement ratio. Reinforcing bar quantity is estimated at 1.31 cubic meters and concrete quantity is estimated at 45.80 cubic meters.

Uploaded by

Jet Toledo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

Date: September 14, 2023

Floor Area: 90.87 SQM


Location: MALOLOS CITY, BULACAN 3000
ITEM DESCRIPTION SPECIFICATIONS PCS SETS 1.00 L W D/H QTY UNIT UNIT COST

III CONCRETING WORKS (NOTE: All weights are in KILOGRAMS and lengths are in METERS, otherwise specified)

10,295.48 kgs 10.30 tons


7,850.00 kg/m^3
Rebar 1.31 m^3
Concrete 45.80 m^3
3.1 JOB MIX 2.86%

3.1.1 Portland Cement L W D Volume bags/cu.m.


3.1.1.1 FOUNDATION FOOTINGS F1 1.90 1.70 0.30 0.97 12.00 18,760.00 469.00 18,760.00 kgs of cement 11.63 1.00 1.00 1.03 11.63 84.00 bag/s -
F2 1.80 1.65 0.30 0.89 12.00 0.48 wc ratio 10.69 1.00 1.00 10.69
F3 1.70 1.50 0.30 0.77 12.00 9,004.80 kgs of water 9.18 2.00 1.00 18.36
F4 1.60 1.45 0.30 0.70 12.00 9,004.80 liters of water 8.35 3.00 1.00 25.06
F5 1.55 1.40 0.30 0.65 12.00 9.00 m^3 water 7.81 1.00 1.00 7.81
F6 1.50 1.35 0.30 0.61 12.00 7.29 1.00 1.00 7.29
180 CD
0.050 m^3./Day
50.03 Ltrs/Day
GRIDS L B D Volume bags/cu.m.
3.1.1.2 FOOTING TIE BEAMS H1 (FTB-1) 3.50 0.20 0.40 0.28 12.00 3.36 1.00 1.00 1.03 3.36 33.00 bag/s -
H2 (FTB-1) 5.50 0.20 0.40 0.44 12.00 5.28 1.00 1.00 5.28
H3 (FTB-1) 5.75 0.20 0.40 0.46 12.00 5.52 1.00 1.00 5.52
H4 (FTB-1) 4.60 0.20 0.40 0.37 12.00 4.42 1.00 1.00 4.42
V1 (FTB-1) 5.27 0.20 0.40 0.42 12.00 5.06 1.00 1.00 5.06
V2 (FTB-1) 1.67 0.20 0.40 0.13 12.00 1.60 1.00 1.00 1.60
V3 (FTB-1) 2.78 0.20 0.40 0.22 12.00 2.67 1.00 1.00 2.67
V4 (FTB-1) 4.27 0.20 0.40 0.34 12.00 4.10 1.00 1.00 4.10

GRIDS L W D Volume bags/cu.m.


3.1.1.3 WALL FOOTINGS H1 (WF-1) 0.55 0.40 0.15 0.03 12.00 0.40 1.00 1.00 1.03 0.40 11.00 bag/s -
H2 (WF-1) 2.00 0.40 0.15 0.12 12.00 1.44 1.00 1.00 1.44
H3 (WF-1) 4.10 0.40 0.15 0.25 12.00 2.95 1.00 1.00 2.95
V1 (WF-21 6.10 0.40 0.15 0.37 12.00 4.39 1.00 1.00 4.39
V2 (WF-1) 1.80 0.40 0.15 0.11 12.00 1.30 1.00 1.00 1.30
V3 (WF-1) 0.20 0.40 0.15 0.01 12.00 0.14 1.00 1.00 0.14

L W D Volume bags/cu.m.
3.1.1.4 SLAB ON GRADE AREA 1 3.90 2.00 0.10 0.78 12.00 9.36 1.00 1.00 1.03 9.36 56.00 bag/s -
AREA 2 6.00 3.00 0.10 1.80 12.00 21.60 1.00 1.00 21.60
AREA 3 5.00 3.00 0.10 1.50 12.00 18.00 1.00 1.00 18.00
AREA 4 2.10 2.00 0.10 0.42 12.00 5.04 1.00 1.00 5.04

L W D Volume bags/cu.m.
3.1.1.5 SUSPENDED SLAB SECOND FLOOR AREA 1 5.00 3.90 0.10 1.95 12.00 23.40 1.00 1.00 1.03 23.40 63.00 bag/s -
SECOND FLOOR AREA 2 6.50 3.50 0.10 2.28 12.00 27.30 1.00 1.00 27.30
CANOPY 20CM FRONT 6.30 0.50 0.20 0.63 12.00 7.56 1.00 1.00 7.56
CANOPY 20CM RIGHT SIDE 2.90 0.30 0.20 0.17 12.00 2.09 1.00 1.00 2.09

B D H Volume bags/cu.m.
3.1.1.6 COLUMNS (GROUND FLOOR) C1 0.25 0.40 4.40 0.44 12.00 5.28 6.00 1.00 1.03 31.68 49.00 bag/s -
C2 0.25 0.40 4.40 0.44 12.00 5.28 3.00 1.00 15.84

B D H Volume bags/cu.m.
3.1.1.7 COLUMNS (SECOND FLOOR) C1 (A) 0.25 0.40 2.10 0.21 12.00 2.52 2.00 1.00 1.03 5.04 33.00 bag/s -
C2 (A) 0.25 0.40 2.10 0.21 12.00 2.52 1.00 1.00 2.52
C1 (B) 0.25 0.40 2.68 0.27 12.00 3.22 1.00 1.00 3.22
C2 (B) 0.25 0.40 2.68 0.27 12.00 3.22 1.00 1.00 3.22
C1 (C) 0.25 0.40 3.63 0.36 12.00 4.36 3.00 1.00 13.07
C2 (C) 0.25 0.40 3.63 0.36 12.00 4.36 1.00 1.00 4.36

L B D Volume bags/cu.m.
3.1.1.8 SECOND FLOOR BEAMS 2B1 11.25 0.30 0.45 1.52 12.00 18.23 1.00 1.00 1.03 18.23 72.00 bag/s -
2B2 4.60 0.25 0.45 0.52 12.00 6.21 1.00 1.00 6.21
2B3 13.20 0.20 0.40 1.06 12.00 12.67 1.00 1.00 12.67
2B4 30.44 0.20 0.40 2.44 12.00 29.22 1.00 1.00 29.22
2CB1 3.30 0.20 0.45 0.30 12.00 3.56 1.00 1.00 3.56

L B D Volume bags/cu.m.
3.1.1.9 ROOF BEAMS RB1 40.74 0.20 0.40 3.26 12.00 39.11 1.00 1.00 1.03 39.11 41.00 bag/s -

RUN WIDTH AVE HEIGHT Volume bags/cu.m.


3.1.1.10 STAIRCASE STEPS 1 0.38 1.00 0.22 0.08 12.00 3.75 2.20 0.99 10.00 1.00 1.03 9.90 17.00 bag/s -
WINDER 1 0.63 1.00 0.22 0.14 12.00 2.50 0.88 1.65 4.00 1.00 6.60
6.25 3.08 6.97

W L D Volume bags/cu.m.
3.1.1.11 COUNTERTOPS GROUND FLR COUNTERTOP 1 0.64 2.90 0.10 0.18 12.00 2.21 1.00 1.00 1.03 2.21 4.00 bag/s -
GROUND FLR COUNTERTOP 2 0.50 1.80 0.10 0.09 12.00 1.08 1.00 1.00 1.08

L W D Volume bags/cu.m.
3.1.1.12 CANOPY CANOPY (W2) 5.50 0.50 0.10 0.28 12.00 3.30 1.00 1.00 1.03 3.30 6.00 bag/s -
CANOPY (W3) 1.80 0.50 0.10 0.09 12.00 1.08 1.00 1.00 1.08
CANOPY (D2) 1.50 0.40 0.10 0.06 12.00 0.72 1.00 1.00 0.72
3.1.2 Washed Sand (S-1) L W D Volume cu.m./cu.m.
3.1.2.1 FOUNDATION FOOTINGS F1 1.90 1.70 0.30 0.97 0.50 0.48 1.00 1.00 1.03 0.48 3.47 m3 -
F2 1.80 1.65 0.30 0.89 0.50 0.45 1.00 1.00 0.45
F3 1.70 1.50 0.30 0.77 0.50 0.38 2.00 1.00 0.77
F4 1.60 1.45 0.30 0.70 0.50 0.35 3.00 1.00 1.04
F5 1.55 1.40 0.30 0.65 0.50 0.33 1.00 1.00 0.33
F6 1.50 1.35 0.30 0.61 0.50 0.30 1.00 1.00 0.30

GRIDS L B D Volume cu.m./cu.m.


3.1.2.2 FOOTING TIE BEAMS H1 (FTB-1) 3.50 0.20 0.40 0.28 0.50 0.14 1.00 1.00 1.03 0.14 1.37 m3 -
H2 (FTB-1) 5.50 0.20 0.40 0.44 0.50 0.22 1.00 1.00 0.22
H3 (FTB-1) 5.75 0.20 0.40 0.46 0.50 0.23 1.00 1.00 0.23
H4 (FTB-1) 4.60 0.20 0.40 0.37 0.50 0.18 1.00 1.00 0.18
V1 (FTB-1) 5.27 0.20 0.40 0.42 0.50 0.21 1.00 1.00 0.21
V2 (FTB-1) 1.67 0.20 0.40 0.13 0.50 0.07 1.00 1.00 0.07
V3 (FTB-1) 2.78 0.20 0.40 0.22 0.50 0.11 1.00 1.00 0.11
V4 (FTB-1) 4.27 0.20 0.40 0.34 0.50 0.17 1.00 1.00 0.17

GRIDS L W D Volume cu.m./cu.m.


3.1.2.3 WALL FOOTINGS H1 (WF-1) 0.55 0.40 0.15 0.03 0.50 0.02 1.00 1.00 1.03 0.02 0.46 m3 -
H2 (WF-1) 2.00 0.40 0.15 0.12 0.50 0.06 1.00 1.00 0.06
H3 (WF-1) 4.10 0.40 0.15 0.25 0.50 0.12 1.00 1.00 0.12
V1 (WF-21 6.10 0.40 0.15 0.37 0.50 0.18 1.00 1.00 0.18
V2 (WF-1) 1.80 0.40 0.15 0.11 0.50 0.05 1.00 1.00 0.05
V3 (WF-1) 0.20 0.40 0.15 0.01 0.50 0.01 1.00 1.00 0.01

L W D Volume cu.m./cu.m.
3.1.2.4 SLAB ON GRADE AREA 1 3.90 2.00 0.10 0.78 0.50 0.39 1.00 1.00 1.03 0.39 2.32 m3 -
AREA 2 6.00 3.00 0.10 1.80 0.50 0.90 1.00 1.00 0.90
AREA 3 5.00 3.00 0.10 1.50 0.50 0.75 1.00 1.00 0.75
AREA 4 2.10 2.00 0.10 0.42 0.50 0.21 1.00 1.00 0.21

L W D Volume cu.m./cu.m.
3.1.2.5 SUSPENDED SLAB SECOND FLOOR AREA 1 5.00 3.90 0.10 1.95 0.50 0.98 1.00 1.00 1.03 0.98 2.59 m3 -
SECOND FLOOR AREA 2 6.50 3.50 0.10 2.28 0.50 1.14 1.00 1.00 1.14
CANOPY 20CM FRONT 6.30 0.50 0.20 0.63 0.50 0.32 1.00 1.00 0.32
CANOPY 20CM RIGHT SIDE 2.90 0.30 0.20 0.17 0.50 0.09 1.00 1.00 0.09

B D H Volume cu.m./cu.m.
3.1.2.6 COLUMNS (GROUND FLOOR) C1 0.25 0.40 4.40 0.44 0.50 0.22 6.00 1.00 1.03 1.32 2.04 m3 -
C2 0.25 0.40 4.40 0.44 0.50 0.22 3.00 1.00 0.66

B D H Volume cu.m./cu.m.
3.1.2.7 COLUMNS (SECOND FLOOR) C1 (A) 0.25 0.40 2.10 0.21 0.50 0.11 2.00 1.00 1.03 0.21 1.35 m3 -
C2 (A) 0.25 0.40 2.10 0.21 0.50 0.11 1.00 1.00 0.11
C1 (B) 0.25 0.40 2.68 0.27 0.50 0.13 1.00 1.00 0.13
C2 (B) 0.25 0.40 2.68 0.27 0.50 0.13 1.00 1.00 0.13
C1 (C) 0.25 0.40 3.63 0.36 0.50 0.18 3.00 1.00 0.54
C2 (C) 0.25 0.40 3.63 0.36 0.50 0.18 1.00 1.00 0.18

L B D Volume cu.m./cu.m.
3.1.2.8 SECOND FLOOR BEAMS 2B1 11.25 0.30 0.45 1.52 0.50 0.76 1.00 1.00 1.03 0.76 3.00 m3 -
2B2 4.60 0.25 0.45 0.52 0.50 0.26 1.00 1.00 0.26
2B3 13.20 0.20 0.40 1.06 0.50 0.53 1.00 1.00 0.53
2B4 30.44 0.20 0.40 2.44 0.50 1.22 1.00 1.00 1.22
2CB1 3.30 0.20 0.45 0.30 0.50 0.15 1.00 1.00 0.15

L B D Volume cu.m./cu.m.
3.1.2.9 ROOF BEAMS RB1 40.74 0.20 0.40 3.26 0.50 1.63 1.00 1.00 1.03 1.63 1.68 m3 -

RUN WIDTH AVE HEIGHT Volume cu.m./cu.m.


3.1.2.10 STAIRCASE STEPS 1 0.38 1.00 0.22 0.08 0.50 0.04 10.00 1.00 1.03 0.41 0.71 m3 -
WINDER 1 0.63 1.00 0.22 0.14 0.50 0.07 4.00 1.00 0.28

W L D Volume cu.m./cu.m.
3.1.2.11 COUNTERTOPS GROUND FLR COUNTERTOP 1 0.64 2.90 0.10 0.18 0.50 0.09 1.00 1.00 1.03 0.09 0.14 m3 -
GROUND FLR COUNTERTOP 2 0.50 1.80 0.10 0.09 0.50 0.05 1.00 1.00 0.05

L W D Volume cu.m./cu.m.
3.1.2.12 CANOPY CANOPY (W2) 5.50 0.50 0.10 0.28 0.50 0.14 1.00 1.00 1.03 0.14 0.21 m3 -
CANOPY (W3) 1.80 0.50 0.10 0.09 0.50 0.05 1.00 1.00 0.05
CANOPY (D2) 1.50 0.40 0.10 0.06 0.50 0.03 1.00 1.00 0.03
3.1.3 Gravel 3/4 L W D Volume cu.m./cu.m.
3.1.3.1 FOUNDATION FOOTINGS F1 1.90 1.70 0.30 0.97 1.00 0.97 1.00 1.00 1.03 0.97 6.94 m3 -
F2 1.80 1.65 0.30 0.89 1.00 0.89 1.00 1.00 0.89
F3 1.70 1.50 0.30 0.77 1.00 0.77 2.00 1.00 1.53
F4 1.60 1.45 0.30 0.70 1.00 0.70 3.00 1.00 2.09
F5 1.55 1.40 0.30 0.65 1.00 0.65 1.00 1.00 0.65
F6 1.50 1.35 0.30 0.61 1.00 0.61 1.00 1.00 0.61

GRIDS L B D Volume cu.m./cu.m.


3.1.3.2 FOOTING TIE BEAMS H1 (FTB-1) 3.50 0.20 0.40 0.28 1.00 0.28 1.00 1.00 1.03 0.28 2.75 m3 -
H2 (FTB-1) 5.50 0.20 0.40 0.44 1.00 0.44 1.00 1.00 0.44
H3 (FTB-1) 5.75 0.20 0.40 0.46 1.00 0.46 1.00 1.00 0.46
H4 (FTB-1) 4.60 0.20 0.40 0.37 1.00 0.37 1.00 1.00 0.37
V1 (FTB-1) 5.27 0.20 0.40 0.42 1.00 0.42 1.00 1.00 0.42
V2 (FTB-1) 1.67 0.20 0.40 0.13 1.00 0.13 1.00 1.00 0.13
V3 (FTB-1) 2.78 0.20 0.40 0.22 1.00 0.22 1.00 1.00 0.22
V4 (FTB-1) 4.27 0.20 0.40 0.34 1.00 0.34 1.00 1.00 0.34

GRIDS L W D Volume cu.m./cu.m.


3.1.3.3 WALL FOOTINGS H1 (WF-1) 0.55 0.40 0.15 0.03 1.00 0.03 1.00 1.00 1.03 0.03 0.91 m3 -
H2 (WF-1) 2.00 0.40 0.15 0.12 1.00 0.12 1.00 1.00 0.12
H3 (WF-1) 4.10 0.40 0.15 0.25 1.00 0.25 1.00 1.00 0.25
V1 (WF-21 6.10 0.40 0.15 0.37 1.00 0.37 1.00 1.00 0.37
V2 (WF-1) 1.80 0.40 0.15 0.11 1.00 0.11 1.00 1.00 0.11
V3 (WF-1) 0.20 0.40 0.15 0.01 1.00 0.01 1.00 1.00 0.01

L W D Volume cu.m./cu.m.
3.1.3.4 SLAB ON GRADE AREA 1 3.90 2.00 0.10 0.78 1.00 0.78 1.00 1.00 1.03 0.78 4.64 m3 -
AREA 2 6.00 3.00 0.10 1.80 1.00 1.80 1.00 1.00 1.80
AREA 3 5.00 3.00 0.10 1.50 1.00 1.50 1.00 1.00 1.50
AREA 4 2.10 2.00 0.10 0.42 1.00 0.42 1.00 1.00 0.42

L W D Volume cu.m./cu.m.
3.1.3.5 SUSPENDED SLAB SECOND FLOOR AREA 1 5.00 3.90 0.10 1.95 1.00 1.95 1.00 1.00 1.03 1.95 5.18 m3 -
SECOND FLOOR AREA 2 6.50 3.50 0.10 2.28 1.00 2.28 1.00 1.00 2.28
CANOPY 20CM FRONT 6.30 0.50 0.20 0.63 1.00 0.63 1.00 1.00 0.63
CANOPY 20CM RIGHT SIDE 2.90 0.30 0.20 0.17 1.00 0.17 1.00 1.00 0.17

B D H Volume cu.m./cu.m.
3.1.3.6 COLUMNS (GROUND FLOOR) C1 0.25 0.40 4.40 0.44 1.00 0.44 6.00 1.00 1.03 2.64 4.08 m3 -
C2 0.25 0.40 4.40 0.44 1.00 0.44 3.00 1.00 1.32

B D H Volume cu.m./cu.m.
3.1.3.7 COLUMNS (SECOND FLOOR) C1 (A) 0.25 0.40 2.10 0.21 1.00 0.21 2.00 1.00 1.03 0.42 2.70 m3 -
C2 (A) 0.25 0.40 2.10 0.21 1.00 0.21 1.00 1.00 0.21
C1 (B) 0.25 0.40 2.68 0.27 1.00 0.27 1.00 1.00 0.27
C2 (B) 0.25 0.40 2.68 0.27 1.00 0.27 1.00 1.00 0.27
C1 (C) 0.25 0.40 3.63 0.36 1.00 0.36 3.00 1.00 1.09
C2 (C) 0.25 0.40 3.63 0.36 1.00 0.36 1.00 1.00 0.36

L B D Volume cu.m./cu.m.
3.1.3.8 SECOND FLOOR BEAMS 2B1 11.25 0.30 0.45 1.52 1.00 1.52 1.00 1.00 1.03 1.52 6.00 m3 -
2B2 4.60 0.25 0.45 0.52 1.00 0.52 1.00 1.00 0.52
2B3 13.20 0.20 0.40 1.06 1.00 1.06 1.00 1.00 1.06
2B4 30.44 0.20 0.40 2.44 1.00 2.44 1.00 1.00 2.44
2CB1 3.30 0.20 0.45 0.30 1.00 0.30 1.00 1.00 0.30

L B D Volume cu.m./cu.m.
3.1.3.9 ROOF BEAMS RB1 40.74 0.20 0.40 3.26 1.00 3.26 1.00 1.00 1.03 3.26 3.36 m3 -

RUN WIDTH AVE HEIGHT Volume cu.m./cu.m.


3.1.3.10 STAIRCASE STEPS 1 0.38 1.00 0.22 0.08 1.00 0.08 10.00 1.00 1.03 0.83 1.42 m3 -
WINDER 1 0.63 1.00 0.22 0.14 1.00 0.14 4.00 1.00 0.55

W L D Volume cu.m./cu.m.
3.1.3.11 COUNTERTOPS GROUND FLR COUNTERTOP 1 0.64 2.90 0.10 0.18 1.00 0.18 1.00 1.00 1.03 0.18 0.28 m3 -
GROUND FLR COUNTERTOP 2 0.50 1.80 0.10 0.09 1.00 0.09 1.00 1.00 0.09
- - - -

L W D Volume cu.m./cu.m.
3.1.3.12 CANOPY CANOPY (W2) 5.50 0.50 0.10 0.28 1.00 0.28 1.00 1.00 1.03 0.28 0.44 m3 -
CANOPY (W3) 1.80 0.50 0.10 0.09 1.00 0.09 1.00 1.00 0.09
CANOPY (D2) 1.50 0.40 0.10 0.06 1.00 0.06 1.00 1.00 0.06
L W D Volume cu.m./cu.m.
3.1.3.13 GRAVEL BED F1 1.90 1.70 0.10 0.32 1.00 0.32 1.00 1.00 1.03 0.32 7.12 m3 -
F2 1.80 1.65 0.10 0.30 1.00 0.30 1.00 1.00 0.30
F3 1.70 1.50 0.10 0.26 1.00 0.26 2.00 1.00 0.51
F4 1.60 1.45 0.10 0.23 1.00 0.23 3.00 1.00 0.70
F5 1.55 1.40 0.10 0.22 1.00 0.22 1.00 1.00 0.22
F6 1.50 1.35 0.10 0.20 1.00 0.20 1.00 1.00 0.20
AREA 1 3.90 2.00 0.10 0.78 1.00 0.78 1.00 1.00 0.78
AREA 2 6.00 3.00 0.10 1.80 1.00 1.80 1.00 1.00 1.80
AREA 3 5.00 3.00 0.10 1.50 1.00 1.50 1.00 1.00 1.50
SEPTIC TANK 3.45 1.70 0.10 0.59 1.00 0.59 1.00 1.00 0.59

SUBTOTAL ITEM III


DIRECT MAT DIRECT LAB TOTAL MAT TOTAL LAB SUBTOTAL -

0.00% 100.00% 0.00%

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
-

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

-
- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- - - - -
- - - - -

PhP -