Nammbva 000003
Nammbva 000003
Nammbva 000003
HIGHLIGHTS
Pages which have been revised are outlined below, together with the Highlights of the
Revision
--------------------------------------------------------------------------------------
CH/SE/SU C REASON FOR CHANGE EFFECTIVITY
PAGES
--------------------------------------------------------------------------------------
CHAPTER 05
__________
05-HIGHLIGHTS Page 1 of 1
REVISION NO. 39 Feb 01/07
BV
CHAPTER 05
__________
05-L.E.P. Page 1
Feb 01/07
BV
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
05-L.E.P. Page 2
Feb 01/07
BV
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
05-L.E.P. Page 3
Feb 01/07
BV
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
05-L.E.P. Page 4
Feb 01/07
BV
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
05-L.E.P. Page 5
Feb 01/07
BV
CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE CH/SE/SU C PAGE DATE
05-L.E.P. Page 6
Feb 01/07
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT ________
CH/SE/SU C
_ PAGE ___________
____ EFFECTIVITY
TIME LIMITS - MAINTENANCE CHECKS -
__________________________________ 05-00-00
_______
GENERAL
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Scheduled Maintenance Checks 1 ALL
(05-20-00)
Unscheduled Maintenance Checks 1 ALL
(05-50-00)
Time Limits and Maintenance Checks 1 ALL
____________________________
SCHEDULED MAINTENANCE CHECKS 05-20-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Task numbering 1 ALL
Procedure content 1 ALL
05-CONTENTS Page 1
May 01/06
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Avionic Compartment
Zonal Inspection of Nose Gear 620 ALL
Well, Including Zone 124
ZONAL INSPECTION : FORWARD CARGO 05-21-30
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of the FWD Cargo 601 ALL
Compartment (Zones 131 and 132)
Zonal Inspection of Underfloor Bay 603 ALL
of FWD Cargo Compartment
Zonal Inspection of the Bay behind 606 ALL
the FWD Cargo Compartment (Zones
137 and 138)
Zonal Inspection of Forward Cargo 608 ALL
Compartment
Zonal Inspection of the FWD Cargo 612 ALL
Compartment
ZONAL INSPECTION : CENTER WING 05-21-40
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Wing 601 ALL
Center Box (Zones 141 and 142)
Zonal Inspection of the 603 ALL
Pressurized Zone Under the Cabin
Floor
Zonal Inspection as far as visible 605 ALL
from the Ground of the Main Gear
Well and the Hydraulics
Compartment (Zones 147 and 148)
Zonal Inspection of the Main Gear 607 ALL
Well and the Hydraulics
Compartment (Zones 147 and 148)
Zonal Inspection of the Main Gear 609 ALL
Well and the Hydraulics
Compartment (Zones 147 and 148)
ZONAL INSPECTION : AFT CARGO COMPARTMENT 05-21-50
INSPECTION/CHECK 601 ALL
Zonal Inspection of Aft Cargo 601 ALL
Compartment (As Far As Visible -
If A/CT(s) is Installed)
Zonal Inspection of Underfloor Bay 603 ALL
of Aft Cargo Compartment
Zonal Inspection of Aft Cargo 605 ALL
Compartment
Zonal Inspection of the Aft Cargo 610 ALL
Compartment (Zones 151 and 152)
ZONAL INSPECTION : BULK CARGO 05-21-60
05-CONTENTS Page 2
Nov 01/05
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Bulk 601 ALL
Cargo-Compartment (Zones 161 and
162)
Zonal Inspection of the Underfloor 603 ALL
Bay of the Bulk Cargo-Compartment
(Zones 163 and 164)
Zonal Inspection of Bulk 605 ALL
Cargo-Compartment
Zonal Inspection of the Bulk 608 ALL
Cargo-Compartment (Zones 161 and
162)
ZONAL INSPECTION : AFT CABIN UNDERFLOOR 05-21-70
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Aft-Cabin 601 ALL
Underfloor Compartment (Zones 171
and 172)
Zonal Inspection of the Aft-Cabin 604 ALL
Underfloor Compartment (Zones 171
and 172)
ZONAL INSPECTION : BELLY FAIRING, AIR 05-21-90
CONDITIONING AND HYDRAULICS COMPARTMENTS
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Air 601 ALL
Conditioning Compartment and
Fairings
Zonal Inspection of the Offwing 603 ALL
escape-slide Stowage Area
Zonal Inspection of the Hydraulic 605 ALL
Compartment and Fairings
Zonal Inspection of Rear Fairing 608 ALL
Zonal Inspection of the Air 610 ALL
Conditioning Compartment and
Fairings
05-CONTENTS Page 3
May 01/05
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
the Doors Surrounds
Zonal Inspection of the Upper Half 603 ALL
of the Fuselage from the Stringer
8LH to the Stringer 8RH (Fuselage
Crown Area)
ZONAL INSPECTION : COCKPIT 05-22-10
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Cockpit 601 ALL
(Zones 211 and 212)
Zonal Inspection of the Cockpit 604 ALL
(Zones 211 and 212)
ZONAL INSPECTION : FORWARD CABIN UTILITY 05-22-20
AREAS
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Forward 601 ALL
Cabin Utility Area (Zone 221 and
222)
Zonal Inspection of the FWD Cabin 605 ALL
Utility Area Overhead Compartment
ZONAL INSPECTION : FORWARD PASSENGER 05-22-30
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Forward 601 ALL
Passenger Compartment (Zones 231
and 232)
Zonal Inspection of the Overhead 606 ALL
Compartment of the Forward
Passenger Compartment (Zones 233
and 234)
Zonal Inspection of the Floor 608 ALL
Structure of the Forward Passenger
Compartment (Zones 231 and 232)
ZONAL INSPECTION : MID PASSENGER 05-22-40
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Center 601 ALL
Passenger Compartment
Zonal Inspection of Center 606 ALL
Passenger Overhead Compartment
Zonal Inspection of the Floor 609 ALL
Structure of the Center Passenger
Compartment (Zones 241 and 242)
ZONAL INSPECTION : AFT PASSENGER 05-22-50
COMPARTMENT
INSPECTION/CHECK 601 ALL
Zonal Inspection of Aft Passenger 601 ALL
05-CONTENTS Page 4
Nov 01/05
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Compartment
Zonal Inspection of Aft Passenger 606 ALL
Overhead Compartment
Zonal Inspection of Aft Passenger 609 ALL
Compartment Including Floor
Structure
ZONAL INSPECTION : AFT CABIN UTILITY 05-22-60
AREA
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Overhead 601 ALL
Compartment of the Aft Cabin
(Zones 263 and 264)
Zonal Inspection of the Aft Cabin 603 ALL
Utility Area (zones 261 and 262)
05-CONTENTS Page 5
May 01/05
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Zonal Inspection of the Trailing 610 ALL
Edge of the Vertical Stabilizer
Zonal Inspection of Rudder 612 ALL
Zonal Inspection of Vertical 614 ALL
Stabilizer Trailing Edge
Zonal Inspection of Rudder 616 ALL
ZONAL INSPECTION : TRIMMABLE HORIZONTAL 05-23-30
STABILIZER LEFT SIDE AND LEFT ELEVATOR
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Leading 601 ALL
Edge of the Trimmable Horizontal
Stabilizer
Zonal Inspection of the Tip of the 603 ALL
Trimmable Horizontal Stabilizer
Zonal Inspection of the Spar Box 605 ALL
of the Trimmable Horizontal
Stabilizer
Zonal Inspection of the Trailing 608 ALL
Edge of the Trimmable Horizontal
Stabilizer
Zonal Inspection of the Elevator 610 ALL
Zonal Inspection of the Trailing 612 ALL
Edge of the Trimmable Horizontal
Stabilizer
05-CONTENTS Page 6
May 01/05
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Zonal Inspection of the Fan and 609 ALL
the Engine Cowling
ZONAL INSPECTION : ENGINE THRUST 05-24-50
REVERSER AND EXHAUST SECTION
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Thrust 601 ALL
Reverser Cowling
Zonal Inspection of the Hot 608 ALL
Section
ZONAL INSPECTION : ENGINE AFT PYLON 05-24-70
INSPECTION/CHECK 601 ALL
Zonal Inspection of Pylon Leading 601 ALL
Edge and Lower Fairing
05-CONTENTS Page 7
May 01/05
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Zonal Inspection of the Flap Track 617 ALL
No. 4 and Fairing
ZONAL INSPECTION : WING FUEL TANK 05-25-40
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Wing Fuel 601 ALL
Tank
Zonal Inspection of the Wing Fuel 603 ALL
Tank
ZONAL INSPECTION : WING VENT SURGE TANK 05-25-50
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Vent Surge 601 ALL
Tank
ZONAL INSPECTION : WING DRY BAY 05-25-60
(OUTBOARD)
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Dry Bay 601 ALL
(Outboard)
ZONAL INSPECTION : AFT SECTION OF WING 05-25-70
AND TRAILING EDGE FIXED STRUCTURE
INSPECTION/CHECK 601 ALL
Zonal Inspection as far as visible 601 ALL
of the Main Landing Gear Bay
Zonal Inspection of the Shroud Box 603 ALL
Zonal Inspection of the Inboard 607 ALL
Fixed Trailing Edge Structure from
the Shroud Box to the Rib 9
Zonal Inspection of the False Spar 609 ALL
Box
Zonal Inspection of the Outboard 611 ALL
Fixed Trailing Edge Structure from
the Rib 9 to the Rib 27
Zonal Inspection of the Main 615 ALL
Landing Gear Bay
ZONAL INSPECTION : WING AILERON 05-25-90
INSPECTION/CHECK 601 ALL
Zonal Inspection of the Wing 601 ALL
Aileron
05-CONTENTS Page 8
May 01/05
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Zonal Inspection of Nose Gear and 601 ALL
Nose Gear Doors
ZONAL INSPECTION : MAIN LANDING GEAR AND 05-27-30
DOORS
INSPECTION/CHECK 601 ALL
Zonal Inspection of LH/RH Main 601 ALL
Landing Gear
Zonal Inspection of Main Landing 602 ALL
Gear Cylinder Door
Zonal Inspection of Main Landing 603 ALL
Gear Secondary Door
Zonal Inspection of Main Landing 604 ALL
Gear Main Doors
05-CONTENTS Page 9
May 01/05
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
Zonal Inspection of AFT 610 ALL
Cargo-Compartment Door
Zonal Inspection of the Bulk 612 ALL
Cargo-Compartment Door and the
Stop Fittings on the Fuselage Door
Frame
Zonal Inspection of Rear Avionic 614 ALL
Compartment Door
Zonal Inspection of Rear Avionic 617 ALL
Compartment Door
ZONAL INSPECTION : PASSENGER/CREW DOORS 05-28-30
AND EMERGENCY EXITS
INSPECTION/CHECK 601 ALL
Zonal Inspection of FWD and AFT 601 ALL
Passenger/Crew Doors including
Door Stops on Fuselage Door Frames
and Door Seals
Zonal Inspection of FWD and AFT 603 ALL
Emergency Exits including Door
Surround on Fuselage Door Frames
and Door Seals
Zonal Inspection of FWD and AFT 605 ALL
Passenger/Crew Doors
Zonal Inspection of FWD and AFT 608 ALL
Emergency Exits
______________________________
UNSCHEDULED MAINTENANCE CHECKS 05-50-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
_______________________________
UNSCHEDULED MAINTENANCE CHECKS 05-50-00
MAINTENANCE PRACTICES 201 ALL
Fluid Leak Measurement - 201 ALL
Maintenance Practices
INSPECTIONS 05-51-00
DESCRIPTION AND OPERATION 1 ALL
General 1 ALL
Inspection Coverage 1 ALL
Inspection Sequence 1 ALL
Inspection Form 2 ALL
INSPECTIONS AFTER HARD/OVERWEIGHT 05-51-11
LANDING
INSPECTION/CHECK 601 ALL
Inspection After Hard/Overweight 601 ALL
05-CONTENTS Page 10
May 01/05
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Landing
Inspection After Hard/Overweight 640 ALL
Landing
INSPECTION AFTER LANDING GEAR DOWN 05-51-12
LIMITING SPEED EXCEEDED
INSPECTION/CHECK 601 ALL
Inspection after Landing Gear 601 ALL
Extension at more than the
Geardown Limiting Speed
INSPECTION AFTER FLAP/SLAT LIMITING 05-51-13
SPEED EXCEEDED
INSPECTION/CHECK 601 ALL
Inspection after Flap/Slat 601 ALL
Extension at more than the
Flap/Slat Limiting Speed
INSPECTION OF AIRFRAME AFTER BIRD OR 05-51-14
HAIL STRIKE
INSPECTION/CHECK 601 ALL
Inspection of the Airframe after a 601 ALL
Bird or Hail Strike
INSPECTION AFTER A TIRE BURST OR TREAD 05-51-15
THROW OR WHEEL FAILURE
INSPECTION/CHECK 601 ALL
Inspection after a Tire Burst or 601 ALL
Tread Throw or Wheel Failure
INSPECTION AFTER BRAKE EMERGENCY 05-51-16
APPLICATION OR OVERHEAT
INSPECTION/CHECK 601 ALL
Inspection After Brake Emergency 601 ALL
Application or Overheat
INSPECTION AFTER FLIGHT IN EXCESSIVE 05-51-17
TURBULENCE OR IN EXCESS OF VMO/MMO
INSPECTION/CHECK 601 ALL
Inspection after in Flight 601 ALL
Excessive Load Factor due to
Turbulence or Maneuver or in
Excess of VMO/MMO
INSPECTION AFTER LIGHTNING STRIKE 05-51-18
INSPECTION/CHECK 601 ALL
Inspection after Lightning Strike 601 ALL
INSPECTION AFTER ENGINE BIRD STRIKE OR 05-51-19
SLUSH INGESTION
INSPECTION/CHECK 601 ALL
Inspection of the Engine after a 601 ALL
Bird Strike or Slush Ingestion
INSPECTION AFTER TAIL RUNWAY IMPACT 05-51-21
05-CONTENTS Page 11
Nov 01/06
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
INSPECTION/CHECK 601 ALL
Inspection after a Tail Runway 601 ALL
Impact
INSPECTION AFTER NLG TOWING OVERLOAD 05-51-22
OR OVERRUN
INSPECTION/CHECK 601 ALL
Inspection After a NLG Towing 601 ALL
Overload or Overrun
INSPECTION AFTER NLG STEERING ANGLE 05-51-23
EXCEEDED
INSPECTION/CHECK 601 ALL
Inspection after NLG Steering 601 ALL
Angle of more than 95 deg.
INSPECTION AFTER LEAVING RUNWAY OR 05-51-24
TAXIWAY
INSPECTION/CHECK 601 ALL
Inspection after Leaving Runway or 601 ALL
Taxiway
INSPECTION AFTER FLIGHT THROUGH DUST 05-51-25
STORM/VOLCANIC ASH OR SEVERE
CONDITIONS ON GROUND
INSPECTION/CHECK 601 ALL
Inspection after Flight through 601 ALL
Dust Storm or Dust Contamination
on Ground
Inspection after Flight through 620 ALL
Volcanic Ash or Volcanic Ash
Contamination on Ground
INSPECTION AFTER ENGINE FAILURE 05-51-26
INSPECTION/CHECK 601 ALL
INSPECTION AFTER ENGINE FAILURE 601 ALL
INSPECTION AFTER IMPACT ON ENGINE 05-51-27
COWLS
INSPECTION/CHECK 601 ALL
Inspection after Impact on Engine 601 ALL
Cowls
PROCEDURE AFTER FLUID SPILLAGE 05-51-28
INSPECTION/CHECK 601 ALL
Procedure after Fluid Spillage 601 ALL
INSPECTION AFTER ABNORMAL PAX/CREW 05-51-29
DOOR MOVEMENT
INSPECTION/CHECK 601 ALL
Inspection after Abnormal Movement 601 ALL
of the Pax/Crew Door
INSPECTION AFTER SIGNIFICANT MLG 05-51-31
VIBRATION AT TOUCH-DOWN
05-CONTENTS Page 12
Nov 01/06
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ ____ ___________
PAGE EFFECTIVITY
INSPECTION/CHECK 601 ALL
Inspection after Significant MLG 601 ALL
Vibration at Touch-Down
INSPECTION AFTER ENGINE WINDMILLING 05-51-34
(AFTER ENGINE IN-FLIGHT SHUT-DOWN)
INSPECTION/CHECK 601 ALL
Inspection after Engine 601 ALL
Windmilling (After Engine
In-Flight Shut-Down)
INSPECTION AFTER OVERWEIGHT TAXIING 05-51-41
INSPECTION/CHECK 601 ALL
Inspection after Overweight 601 ALL
Taxiing
INSPECTION AFTER VERY HIGH WINDS ON 05-51-42
GROUND
INSPECTION/CHECK 601 ALL
Inspection after Very High Winds 601 ALL
on Ground
INSPECTIONS AFTER WORK ON SYSTEM 05-51-43
ELECTRICAL INSTALLATION
ADJUSTMENT/TEST 501 ALL
Inspection after Work on System 501 ALL
Electrical Installation
INSPECTION AFTER FLIGHT IN BAD ICING 05-51-45
CONDITIONS
INSPECTION/CHECK 601 ALL
Inspection after Flight in Bad 601 ALL
Icing Conditions
05-CONTENTS Page 13
Nov 01/06
R
BV
CHAPTER 05
__________
TABLE OF CONTENTS
_________________
_______
SUBJECT CH/SE/SU
________ C
_ PAGE ___________
____ EFFECTIVITY
Leakage
Test to Measure the Structural 544 ALL
Leakage (with AIDS)
DEMAGNETIZATION 05-54-00
MAINTENANCE PRACTICES 201 ALL
Demagnetization of the External 201 ALL
Parts of the Frames of the
Windshield and Sliding Windows
05-CONTENTS Page 14
Nov 01/06
R
BV
TIME LIMITS - MAINTENANCE CHECKS - GENERAL - DESCRIPTION AND OPERATION
______________________________________________________________________
1. _______
General
This chapter includes the following sections:
- 05-20-00: SCHEDULED MAINTENANCE CHECKS
- 05-50-00: UNSCHEDULED MAINTENANCE CHECKS
2. Time
__________________________________
Limits and Maintenance Checks
R The part of the Aircraft Maintenance Manual (AMM) was previously issued in a
R separate Manual to this AMM with the title:
-------------------------------------------------------------------------------
Aircraft Maintenance Manual
CHAPTER 05
R Time Limits and Maintenance Checks
R
-------------------------------------------------------------------------------
R The content of this manual, since revision 20 approved on JUL07, 1999, is
R into the Maintenance Planning Manual (MPD) - Section 9.1: Life
R Limits/Monitored Parts.
EFF :
ALL 05-00-00
Page 1
May 01/03
BV
SCHEDULED MAINTENANCE CHECKS - DESCRIPTION AND OPERATION
________________________________________________________
1. General
_______
A. Task numbering
This section gives the accomplishment instructions for zonal inspection
tasks
- related to the requirements of the Maintenance Planning Document (MPD)
a specific AMTOSS zonal task number which combines the ATA 05-20 and
the concerned A/C zone is used as follows :
1 : ATA
2 : Relates to ATA section 20
scheduled maintenance checks
3 : Zone
4 : Function code, E.G. 200 : INSPECTION CHECK
5 : Unique identification of discrete tasks
B. Procedure content
(1) It is thought that people which perform the zonal tasks have an
adequate knowledge of the aircraft construction and systems
installations thus a list of all the items contained in the zones to
be inspected is not given.
(3) Any Fairing, access panel, access door, etc removed or opened to gain
access to zones should also be examined during the zonal inspection.
This requirement is not specially quoted within each individual
procedure because it is a standard maintenance practice.
EFF :
ALL 05-20-00
Page 1
Feb 01/96
BV
ZONAL INSPECTION : LOWER HALF OF FUSELAGE - INSPECTION/CHECK
____________________________________________________________
TASK 05-21-00-200-001
Zonal Inspection as far as visible from the Ground of the Lower Half of the
Fuselage
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-00-869-050
A. Not Applicable
4. Procedure
_________
Subtask 05-21-00-210-050
A. Inspection
(1) Make a general visual inspection of the lower half of the fuselage
from the ground during the aircraft walkaround.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Inspect the belly fairing access panels for missing fasteners
(Ref. TASK 53-35-00-200-002)
EFF :
ALL 05-21-00
Page 601
Nov 01/03
BV
TASK 05-21-00-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-00-010-050
A. Get Access
(1) Put an access platform in position near the lower half of the
fuselage.
4. Procedure
_________
Subtask 05-21-00-210-051
A. Inspection
(1) Make a general visual inspection of the lower half of the fuselage up
to the Stringer 19 LH and RH and the doors surrounds.
(2) Make sure that there is no damage, corrosion, leaks or cracks on all
the parts of the components and the structure you can see.
5. Close-up
________
Subtask 05-21-00-410-050
A. Close Access
EFF :
ALL 05-21-00
Page 602
Feb 01/96
BV
ZONAL INSPECTION : RADOME - INSPECTION/CHECK
____________________________________________
TASK 05-21-10-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-10-010-050
A. Get Access
EFF :
ALL 05-21-10
Page 601
Feb 01/96
BV
4. Procedure
_________
Subtask 05-21-10-210-050
A. Inspection
(2) Make sure that there are no signs of corrosions, craks or damage .
(3) Make sure that all the installations (wiring, equipment) are attached
correctly.
5. Close-up
________
Subtask 05-21-10-410-050
A. Close Access
EFF :
ALL 05-21-10
Page 602
Feb 01/96
BV
ZONAL INSPECTION : AVIONICS COMPARTMENT - INSPECTION/CHECK
__________________________________________________________
TASK 05-21-20-200-001
R Zonal Inspection of the FWD Avionics Compartment (Zones 121 and 122)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-20-010-050
A. Get Access
4. Procedure
_________
Subtask 05-21-20-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
EFF :
ALL 05-21-20
Page 601
May 01/06
BV
5. Close-up
________
Subtask 05-21-20-410-050
A. Close Access
EFF :
ALL 05-21-20
Page 602
May 01/05
BV
TASK 05-21-20-200-002
Zonal Inspection as far as Visible from the Ground of the Nose Gear Well (Zones
123)
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-20-010-051
A. Get Access
(1) Open the nose landing gear doors 713 and 714. (Ref. TASK 32-22-00-
010-001)
4. Procedure
_________
Subtask 05-21-20-210-051
A. Inspection
(1) Do a general visual inspection of the nose gear well (Zones 123 and
124).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
EFF :
ALL 05-21-20
Page 603
Nov 01/03
BV
5. Close-up
________
Subtask 05-21-20-410-051
A. Close Access
(1) Close the nose landing gear doors 713 and 714. (Ref. TASK 32-22-00-
410-001)
R
EFF :
ALL 05-21-20
Page 604
Nov 01/03
BV
TASK 05-21-20-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-20-010-052
A. Get Access
4. Procedure
_________
Subtask 05-21-20-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-21-20
Page 605
Nov 01/06
BV
R Access Doors of the Avionics Compartment (Left Side)
R Figure 601/TASK 05-21-20-991-002-A
EFF :
ALL 05-21-20
Page 606
May 01/06
BV
R Access Doors of the Avionics Compartment (Right Side)
Figure 602/TASK 05-21-20-991-007
EFF :
ALL 05-21-20
Page 607
May 01/06
BV
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-20-410-052
A. Close Access
EFF :
ALL 05-21-20
Page 608
May 01/06
BV
TASK 05-21-20-200-005
R Zonal Inspection of the AFT Avionics Compartment (Zones 127 and 128)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-20-010-054
A. Get Access
4. Procedure
_________
Subtask 05-21-20-210-054
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-21-20
Page 609
May 01/06
BV
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-20-410-054
A. Close Access
EFF :
ALL 05-21-20
Page 610
May 01/06
R
BV
TASK 05-21-20-200-007
R Zonal Inspection of the FWD Avionics Compartment (Zones 121 and 122)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-20-010-056
A. Get Access
(2) Open the avionic-compartment access door 811 and the access door
121AL.
(3) Remove the floor panels 121AF, 121BF, 121CF and 122BF from the
forward cabin utility-area (Ref. TASK 53-12-13-000-001).
EFF :
ALL 05-21-20
Page 611
May 01/06
BV
4. Procedure
_________
Subtask 05-21-20-210-056
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-20-410-056
A. Close Access
(1) Install the floor panels 121AF, 121BF, 121CF, 122BF (Ref. TASK 53-12-
13-400-001).
(2) Close the access door 121AL and the avionic-compartment access door
811.
EFF :
ALL 05-21-20
Page 612
May 01/06
R
BV
TASK 05-21-20-200-008
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-20-010-057
A. Get Access
EFF :
ALL 05-21-20
Page 613
Nov 01/06
BV
4. Procedure
_________
Subtask 05-21-20-210-057
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.
5. Close-up
________
Subtask 05-21-20-410-057
A. Close Access
EFF :
ALL 05-21-20
Page 614
May 01/05
BV
TASK 05-21-20-200-010
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
R Subtask 05-21-20-010-059-B
R A. Get Access
R (3) Open the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-001).
EFF :
ALL 05-21-20
Page 615
Nov 01/06
BV
R (4) Remove the sidewall panels 131AW, 131BW, 131CW, 131DW, 132BW, 132EW.
R (Ref. Fig. 603/TASK 05-21-20-991-006)
R (5) Remove the floor panels 127BF, 127BG, 127CF, 127DF, 128CF, 128EG.
R (Ref. TASK 53-12-13-000-001)
4. Procedure
_________
Subtask 05-21-20-210-059
A. Inspection
(2) Make sure that there are no signs of corrosion, leaks, cracks or
damage.
(3) Make sure that all the installations (wiring) are attached correctly.
5. Close-up
________
R Subtask 05-21-20-410-059-B
R A. Close Access
R (1) Install the floor panels 127BF, 127BG, 127CF, 127DF, 128CF, 128EG
R (Ref. TASK 53-12-13-400-001).
R (2) Install the sidewall panels 131AW, 131BW, 131CW, 131DW, 132BW, 132EW.
R (3) Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-
R 002).
EFF :
ALL 05-21-20
Page 616
Nov 01/06
BV
INTENTIONALLY BLANK
R
05-21-20
Page 617
May 01/05
BV
INTENTIONALLY BLANK
R
05-21-20
Page 618
May 01/05
BV
Sidewall Panels of the Forward Cargo Compartment
Figure 603/TASK 05-21-20-991-006
EFF :
ALL 05-21-20
Page 619
Nov 01/04
R
BV
TASK 05-21-20-200-012
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-20-010-062
A. Get Access
(1) Open the nose landing gear doors 713 and 714. (Ref. TASK 32-22-00-
010-001)
4. Procedure
_________
Subtask 05-21-20-210-061
A. Inspection
(1) Do a general visual inspection of the nose gear well (Zones 123 and
124).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
EFF :
ALL 05-21-20
Page 620
Nov 01/04
R
BV
5. Close-up
________
Subtask 05-21-20-410-062
A. Close Access
(1) Close the nose landing gear doors 713 and 714. (Ref. TASK 32-22-00-
410-001)
EFF :
ALL 05-21-20
Page 621
Nov 01/04
R
BV
ZONAL INSPECTION : FORWARD CARGO COMPARTMENT - INSPECTION/CHECK
_______________________________________________________________
TASK 05-21-30-200-001
Zonal Inspection of the FWD Cargo Compartment (Zones 131 and 132)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-30-010-050
A. Get Access
(1) Put an access platform in position at the zones 131 and 132.
(2) Open the FWD cargo compartment door 825. (Ref. TASK 52-30-00-860-001)
EFF :
ALL 05-21-30
Page 601
Feb 01/96
BV
4. Procedure
_________
Subtask 05-21-30-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-21-30-410-050
A. Close Access
(1) Close the FWD cargo compartment door 825. (Ref. TASK 52-30-00-860-
002)
EFF :
ALL 05-21-30
Page 602
Feb 01/96
BV
TASK 05-21-30-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-30-010-051
A. Get Access
(2) Open the forward cargo door 825 (Ref. TASK 52-30-00-860-001).
EFF :
ALL 05-21-30
Page 603
Nov 01/04
BV
Access Doors of the Lower Section of the Fuselage (Zone 130)
Figure 601/TASK 05-21-30-991-003
EFF :
ALL 05-21-30
Page 604
Feb 01/96
BV
(4) Remove the floor panels:
131LF, 131SF, 131TF,
132MF, 132NF, 132PF,
132QF, 132RF, 132SF,
R 132TF
R (Ref. TASK 53-22-14-000-001).
4. Procedure
_________
Subtask 05-21-30-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-30-410-051
A. Close Access
(3) Close the forward cargo door 825 (Ref. TASK 52-30-00-860-002).
EFF :
ALL 05-21-30
Page 605
Nov 01/04
BV
TASK 05-21-30-200-003
Zonal Inspection of the Bay behind the FWD Cargo Compartment (Zones 137 and
138)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-30-010-052
A. Get Access
(1) Put an access platform in position at the zones 137 and 138.
(2) Open the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-001).
EFF :
ALL 05-21-30
Page 606
May 01/98
BV
4. Procedure
_________
Subtask 05-21-30-210-052
A. Inspection
(1) Do a general visual inspection of the bay behind the forward cargo
compartment (Zones 137 and 138).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-30-410-052
A. Close Access
(2) Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-
002).
EFF :
ALL 05-21-30
Page 607
Feb 01/96
BV
TASK 05-21-30-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-30-010-053
A. Get Access
(1) Put an access platform in position at the zones 131 and 132.
(2) Open the forward cargo door 825 (Ref. TASK 52-30-00-860-001).
EFF :
ALL 05-21-30
Page 608
Nov 01/04
BV
(3) Remove the ceiling panels:
131AC, 131BC.
(Ref. Fig. 602/TASK 05-21-30-991-002)
4. Procedure
_________
Subtask 05-21-30-210-053
A. Inspection
R (2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-30-410-053
A. Close Access
(4) Close the forward cargo door 825 (Ref. TASK 52-30-00-860-002).
EFF :
ALL 05-21-30
Page 609
Nov 01/04
BV
Floor and Ceiling Panels of the Forward Cargo Compartment
Figure 602/TASK 05-21-30-991-002
EFF :
ALL 05-21-30
Page 610
Nov 01/04
R
BV
Sidewall Panels of the Forward Cargo Compartment
Figure 603/TASK 05-21-30-991-001
EFF :
ALL 05-21-30
Page 611
Feb 01/96
BV
TASK 05-21-30-200-006
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-30-010-055
A. Get Access
(1) Put an access platform in position at the zones 131 and 132.
(2) Open the FWD cargo compartment door 825. (Ref. TASK 52-30-00-860-001)
EFF :
ALL 05-21-30
Page 612
Feb 01/96
BV
(4) Remove the sidewall panels: 131GW, 131HW, 131MW, 132KW, 132MW.
(Ref. Fig. 603/TASK 05-21-30-991-001)
4. Procedure
_________
Subtask 05-21-30-210-055
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-30-410-055
A. Close Access
(4) Close the FWD cargo compartment door 825 (Ref. TASK 52-30-00-860-
002).
EFF :
ALL 05-21-30
Page 613
Feb 01/96
BV
(5) Remove the access platform(s).
EFF :
ALL 05-21-30
Page 614
Feb 01/96
BV
ZONAL INSPECTION : CENTER WING - INSPECTION/CHECK
_________________________________________________
TASK 05-21-40-200-001
Zonal Inspection of the Wing Center Box (Zones 141 and 142)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-40-010-050
A. Get Access
(1) Put an access platform in position at the zones 141 and 142.
EFF :
ALL 05-21-40
Page 601
Feb 01/96
BV
4. Procedure
_________
Subtask 05-21-40-210-050
A. Inspection
(1) Do a general visual inspection of the wing center box (Zones 141 and
142).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-40-410-050
A. Close Access
EFF :
ALL 05-21-40
Page 602
Feb 01/96
BV
TASK 05-21-40-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-40-010-051
A. Get Access
4. Procedure
_________
Subtask 05-21-40-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-21-40
Page 603
Feb 01/96
BV
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-40-410-051
A. Close Access
EFF :
ALL 05-21-40
Page 604
Feb 01/96
BV
TASK 05-21-40-200-003
Zonal Inspection as far as visible from the Ground of the Main Gear Well and
the Hydraulics Compartment (Zones 147 and 148)
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-40-010-052
A. Get Access
4. Procedure
_________
Subtask 05-21-40-210-052
A. Inspection
(1) Do a general visual inspection of the main gear well and the
hydraulics compartment from the ground (Zones 147 and 148).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-40-410-052
A. Close Access
EFF :
ALL 05-21-40
Page 605
Nov 01/03
BV
INTENTIONALLY BLANK
R
05-21-40
Page 606
Nov 01/03
BV
TASK 05-21-40-200-004
Zonal Inspection of the Main Gear Well and the Hydraulics Compartment (Zones
147 and 148)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-40-010-053
A. Get Access
(1) Put an access platform in position at the zones 147 and 148.
EFF :
ALL 05-21-40
Page 607
Feb 01/96
BV
4. Procedure
_________
Subtask 05-21-40-210-053
A. Inspection
(1) Do a general visual inspection of the main gear well and the
hydraulics compartment (Zones 147 and 148).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-40-410-053
A. Close Access
EFF :
ALL 05-21-40
Page 608
Feb 01/96
BV
TASK 05-21-40-200-005
Zonal Inspection of the Main Gear Well and the Hydraulics Compartment (Zones
147 and 148)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-40-010-054
A. Get Access
(1) Put an access platform in position at the zones 147 and 148.
EFF :
ALL 05-21-40
Page 609
Feb 01/96
BV
4. Procedure
_________
Subtask 05-21-40-210-054
A. Inspection
(1) Do a general visual inspection of the main gear well and the
hydraulics compartment (Zone 147 and 148).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-40-410-054
A. Close Access
EFF :
ALL 05-21-40
Page 610
Feb 01/96
BV
ZONAL INSPECTION : AFT CARGO COMPARTMENT - INSPECTION/CHECK
___________________________________________________________
TASK 05-21-50-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-50-010-050
A. Get Access
(2) Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).
EFF :
ALL 05-21-50
Page 601
May 01/05
BV
4. Procedure
_________
Subtask 05-21-50-210-050
A. Inspection
R (1) Do a general visual inspection of the aft cargo compartment (as far
R as you can see - if A/CT(S) is installed).
(2) Make sure that there are no signs of corrosion, cracks or damage.
R
5. Close-up
________
Subtask 05-21-50-410-050
A. Close Access
(1) Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-
002).
EFF :
ALL 05-21-50
Page 602
May 01/05
BV
TASK 05-21-50-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
R Subtask 05-21-50-010-051-A
R A. Get Access
R (2) Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).
EFF :
ALL 05-21-50
Page 603
May 01/05
BV
Subtask 05-21-50-020-052
B. Removal of Components
R (1) Remove the Additional Center Tank (ACT), if installed (Ref. TASK 28-
11-27-000-001).
4. Procedure
_________
Subtask 05-21-50-210-051
A. Inspection
(1) Do a general visual inspection of the underfloor bay of the aft cargo
compartment.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-50-420-052
A. Installation of Components
R Subtask 05-21-50-410-051-A
R B. Close Access
R (2) Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-
R 002).
EFF :
ALL 05-21-50
Page 604
May 01/05
BV
TASK 05-21-50-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-50-010-052
A. Get Access
(1) Put an access platform in position at the zones 151 and 152.
(2) Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).
EFF :
ALL 05-21-50
Page 605
May 01/05
R
BV
INTENTIONALLY BLANK
R
05-21-50
Page 606
May 01/05
BV
Floor and Ceiling Panels of the Aft Cargo Compartment
Figure 601/TASK 05-21-50-991-002
EFF :
ALL 05-21-50
Page 607
Nov 01/04
R
BV
(4) Remove the partition panels: 151AW, 151BW, 152BW. (Ref. TASK 25-55-
11-000-001)
4. Procedure
_________
Subtask 05-21-50-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-50-410-052
R A. Close Access
(4) Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-
002).
EFF :
ALL 05-21-50
Page 608
Nov 01/04
BV
Sidewall Panels of the Aft Cargo Compartment
Figure 602/TASK 05-21-50-991-001
EFF :
ALL 05-21-50
Page 609
Nov 01/03
R
BV
TASK 05-21-50-200-004
Zonal Inspection of the Aft Cargo Compartment (Zones 151 and 152)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
R Subtask 05-21-50-010-053-A
R A. Get Access
R (2) Open the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-001).
R
EFF :
ALL 05-21-50
Page 610
Nov 01/05
BV
(3) Remove the ceiling panels:
151AC, 151BC, 151CC, 151DC.
(Ref. Fig. 601/TASK 05-21-50-991-002)
Subtask 05-21-50-020-053
B. Not Applicable
4. Procedure
_________
Subtask 05-21-50-210-053
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
EFF :
ALL 05-21-50
Page 611
May 01/06
BV
5. Close-up
________
Subtask 05-21-50-420-053
A. Not Applicable
Subtask 05-21-50-410-053-A
B. Close Access
(5) Close the AFT cargo compartment door 826 (Ref. TASK 52-30-00-860-
002).
EFF :
ALL 05-21-50
Page 612
May 01/06
BV
ZONAL INSPECTION : BULK CARGO COMPARTMENT - INSPECTION/CHECK
____________________________________________________________
TASK 05-21-60-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-60-010-050
A. Get Access
(1) Open the aft cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)
4. Procedure
_________
Subtask 05-21-60-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-21-60
Page 601
Feb 01/96
BV
5. Close-up
________
Subtask 05-21-60-410-050
A. Close Access
(1) Close the aft cargo-compartment door 826. (Ref. TASK 52-30-00-860-
002)
EFF :
ALL 05-21-60
Page 602
Feb 01/96
BV
TASK 05-21-60-200-002
Zonal Inspection of the Underfloor Bay of the Bulk Cargo-Compartment (Zones 163
and 164)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-60-010-051
A. Get Access
R (2) Open the aft cargo-compartment door 826 (Ref. TASK 52-30-00-860-001).
EFF :
ALL 05-21-60
Page 603
Nov 01/06
BV
4. Procedure
_________
Subtask 05-21-60-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-60-410-051
A. Close Access
R (2) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-
002).
EFF :
ALL 05-21-60
Page 604
Nov 01/06
BV
TASK 05-21-60-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-21-60
Page 605
Nov 01/03
BV
3. __________
Job Set-up
Subtask 05-21-60-010-052
A. Get Access
(1) Put an access platform in position at the zones 161 and 162.
(2) Open the AFT cargo compartment door 826. (Ref. TASK 52-30-00-860-001)
4. Procedure
_________
Subtask 05-21-60-210-052
A. Inspection
R (2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-60-410-052
A. Close Access
EFF :
ALL 05-21-60
Page 606
Nov 01/03
BV
(3) Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-
002)
EFF :
ALL 05-21-60
Page 607
Nov 01/03
R
BV
TASK 05-21-60-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-60-010-053
A. Get Access
(1) Put an access platform in position at the zones 161 and 162.
(2) Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)
EFF :
ALL 05-21-60
Page 608
Nov 01/03
BV
(3) Remove the ceiling panels: 161AC, 161BC, 162CC.
(Ref. Fig. 601/TASK 05-21-60-991-001)
(4) Remove the sidewall panels: 161AW, 161BW, 161CW, 162BW, 162CW, 162EW,
162FW, 162GW.
(Ref. Fig. 602/TASK 05-21-60-991-002)
(5) Remove the partition panels: 161DW, 162DW. (Ref. TASK 25-55-12-000-
001)
(6) Remove the floor panels: 161BF, 161CF, 161EF, 161FF, 162EF, 162FF,
162GF, 162HF, 162JF, 162KF, 162LF. (Ref. TASK 53-42-17-000-001)
4. Procedure
_________
Subtask 05-21-60-210-053
A. Inspection
R (2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-60-410-053
A. Close Access
(3) Install the partition panels: 161DW, 162DW. (Ref. TASK 25-55-12-400-
001)
EFF :
ALL 05-21-60
Page 609
Nov 01/06
BV
R Floor and Ceiling Panels of the Bulk Cargo Compartment
R Figure 601/TASK 05-21-60-991-001
EFF :
ALL 05-21-60
Page 610
Nov 01/03
BV
R Sidewall Panels and Partition of the Bulk Cargo Compartment
R Figure 602/TASK 05-21-60-991-002
EFF :
ALL 05-21-60
Page 611
Nov 01/03
BV
(4) Install the sidewall panels: 161AW, 161BW, 161CW, 162BW, 162CW,
162EW, 162FW, 162GW.
(5) Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-
002)
EFF :
ALL 05-21-60
Page 612
Nov 01/03
BV
ZONAL INSPECTION : AFT CABIN UNDERFLOOR COMPARTMENT - INSPECTION/CHECK
______________________________________________________________________
TASK 05-21-70-200-001
Zonal Inspection of the Aft-Cabin Underfloor Compartment (Zones 171 and 172)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-70-010-050
A. Get Access
R (Ref. Fig. 601/TASK 05-21-70-991-001-A)
(1) Put an access platform in position at the zones 171 and 172.
R (2) Open the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-001).
EFF :
ALL 05-21-70
Page 601
Nov 01/06
BV
R Access Doors of the Aft Fuselage
R Figure 601/TASK 05-21-70-991-001-A
EFF :
ALL 05-21-70
Page 602
Nov 01/06
BV
(3) Open the access doors 171AL and 172AR.
R
R (4) Remove the partition panels 161DW and 162DW (Ref. TASK 25-55-12-000-
001).
4. Procedure
_________
Subtask 05-21-70-210-050
A. Inspection
R (2) Make sure that there are no signs of corrosion, cracks and damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-70-410-050
A. Close Access
R (1) Install the partition panels 161DW and 162DW (Ref. TASK 25-55-12-400-
001).
R (3) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-
002).
EFF :
ALL 05-21-70
Page 603
Nov 01/06
BV
TASK 05-21-70-200-002
Zonal Inspection of the Aft-Cabin Underfloor Compartment (Zones 171 and 172)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-70-010-051
A. Get Access
(1) Put an access platform in position at the zones 171 and 172.
(2) Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)
EFF :
ALL 05-21-70
Page 604
Nov 01/06
BV
(4) Remove the partition panels 161DW, 162DW. (Ref. TASK 25-55-12-000-
001)
4. Procedure
_________
Subtask 05-21-70-210-051
A. Inspection
(2) Make sure that there are no signs of corrosions, craks or damages.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-70-410-051
A. Close Access
(1) Install the partition panels 161DW, 162DW. (Ref. TASK 25-55-12-400-
001)
(3) Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-
002)
EFF :
ALL 05-21-70
Page 605
Feb 01/96
BV
______________________________________________________________________________
ZONAL INSPECTION : BELLY FAIRING, AIR CONDITIONING AND HYDRAULICS COMPARTMENTS
________________
INSPECTION/CHECK
TASK 05-21-90-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
R Subtask 05-21-90-010-050-A
R A. Get Access
R (1) Put an access platform in position at the zones 191 and 192.
R (2) Remove the access panels 191BB, 191KB, 192KB. (Ref. TASK 53-35-13-
R 000-002)
EFF :
ALL 05-21-90
Page 601
Nov 01/96
BV
4. Procedure
_________
Subtask 05-21-90-210-050
A. Inspection
R (2) Make sure that there are no signs of corrosions, cracks or damages.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-90-410-050-A
A. Close Access
(1) Install the access panels 191KB, 191BB, 192KB. (Ref. TASK 53-35-13-
400-002)
EFF :
ALL 05-21-90
Page 602
Nov 01/03
BV
TASK 05-21-90-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-90-010-052
A. Get Access
(1) Put an access platform in position at the zones 193 and 194.
EFF :
ALL 05-21-90
Page 603
Nov 01/02
BV
4. Procedure
_________
Subtask 05-21-90-210-052
A. Inspection
(2) Make sure that there are no signs of corrosions, craks or damages.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-90-410-052
A. Close Access
R (1) Install the offwing escape slide enclosure (Ref. TASK 25-62-42-400-
001)
EFF :
ALL 05-21-90
Page 604
Nov 01/02
BV
TASK 05-21-90-200-005
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-90-010-054
A. Get Access
R (1) Put an ACCESS PLATFORM 2M (6 FT) in position at zones 195 and 196.
R (2) Open the hydraulic reservoir pressurization access-door 195BB and the
R Yellow hydraulic compartment access-door 196BB.
(Ref. Fig. 601/TASK 05-21-90-991-004)
EFF :
ALL 05-21-90
Page 605
May 01/05
BV
R Hydraulic Compartment Access Doors (195BB and 196BB)
Figure 601/TASK 05-21-90-991-004
EFF :
ALL 05-21-90
Page 606
May 01/05
BV
4. Procedure
_________
Subtask 05-21-90-210-054
A. Inspection
(2) Make sure that there are no signs of corrosion damage, cracks or
other damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
correctly attached.
5. Close-up
________
Subtask 05-21-90-410-054
A. Close Access
EFF :
ALL 05-21-90
Page 607
May 01/05
BV
TASK 05-21-90-200-007
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-90-010-056
A. Get Access
EFF :
ALL 05-21-90
Page 608
May 01/05
BV
4. Procedure
_________
Subtask 05-21-90-210-056
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-90-410-056
A. Close Access
EFF :
ALL 05-21-90
Page 609
May 01/05
BV
TASK 05-21-90-200-009
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-21-90-010-058-A
A. Get Access
(1) Put an access platform in position at the zones 191 and 192.
EFF :
ALL 05-21-90
Page 610
May 01/05
R
BV
R (3) Remove the access panels:
R - 191AB, 191AT, 191GB, 191JB, 192AB, 192AT.
R (Ref. TASK 53-35-13-000-001)
R
R - 191EB, 191HB, 191KB, 192EB, 192FB, 192KB.
R (Ref. TASK 53-35-13-000-002)
4. Procedure
_________
Subtask 05-21-90-210-058
A. Inspection
R (2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-21-90-410-058-A
A. Close Access
EFF :
ALL 05-21-90
Page 611
Nov 01/03
BV
ZONAL INSPECTION : UPPER HALF OF FUSELAGE - INSPECTION/CHECK
____________________________________________________________
TASK 05-22-00-200-001
Zonal Inspection as far as Visible from the Ground of the Upper Half of the
Fuselage
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
Not Applicable
3. __________
Job Set-up
Subtask 05-22-00-869-050
A. Not Applicable
4. Procedure
_________
Subtask 05-22-00-210-050
A. Inspection
(1) Do a general visual inspection of the upper half of the fuselage from
the ground.
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-22-00
Page 601
Nov 01/03
BV
TASK 05-22-00-200-002
Zonal Inspection of the Upper Half of the Fuselage up to the Stringer 8LH and
the Stringer 8RH including the Doors Surrounds
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-00-010-053
A. Get Access
4. Procedure
_________
Subtask 05-22-00-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-22-00-410-053
A. Close Access
EFF :
ALL 05-22-00
Page 602
Feb 01/96
BV
TASK 05-22-00-200-003
Zonal Inspection of the Upper Half of the Fuselage from the Stringer 8LH to the
Stringer 8RH (Fuselage Crown Area)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-00-010-054
A. Get Access
4. Procedure
_________
Subtask 05-22-00-210-052
A. Inspection
(1) Do a general visual inspection of the upper half of the fuselage from
the stringer 8 LH to the stringer 8 RH (fuselage crown area).
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-22-00-410-054
A. Close Access
EFF :
ALL 05-22-00
Page 603
Feb 01/96
BV
ZONAL INSPECTION : COCKPIT - INSPECTION/CHECK
_____________________________________________
TASK 05-22-10-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-10-010-050
A. Get Access
(Ref. Fig. 601/TASK 05-22-10-991-001)
NOTE : You can remove the sidewall panels 211FW, 212FW and 212HW as
____
an alternative for the panels 211EW, 212EW and 212JW.
4. Procedure
_________
Subtask 05-22-10-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring) are attached correctly.
EFF :
ALL 05-22-10
Page 601
May 01/06
BV
R Access Panels of the Cockpit
Figure 601/TASK 05-22-10-991-001
EFF :
ALL 05-22-10
Page 602
May 01/06
BV
5. Close-up
________
Subtask 05-22-10-410-050
A. Close Access
NOTE : Install the sidewall access panels 211FW, 212FW and 212HW if
____
you removed them.
EFF :
ALL 05-22-10
Page 603
May 01/06
BV
TASK 05-22-10-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-10-010-051
A. Get Access
4. Procedure
_________
Subtask 05-22-10-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-22-10
Page 604
Feb 01/96
BV
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-10-410-051
A. Close Access
EFF :
ALL 05-22-10
Page 605
Feb 01/96
BV
ZONAL INSPECTION : FORWARD CABIN UTILITY AREAS - INSPECTION/CHECK
_________________________________________________________________
TASK 05-22-20-200-006
Zonal Inspection of the Forward Cabin Utility Area (Zone 221 and 222)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-22-20
Page 601
Nov 01/05
R
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-20-010-055
A. Get Access
(2) Open the FWD passenger/crew doors 831 and 841 (Ref. TASK 52-10-00-
010-001).
(3) Remove the toilets (Ref. TASK 25-41-41-000-001), (Ref. TASK 25-41-42-
000-001) and (Ref. TASK 25-41-44-000-001).
(4) Remove the galleys (Ref. TASK 25-31-41-000-001) and (Ref. TASK 25-31-
41-000-002).
EFF :
ALL 05-22-20
Page 602
Nov 01/05
BV
(9) Remove the door frame linings:
R 222AW, 222BW, 222CW,
R 222DW, 222EW, 222FW,
R 222GW, 222HW, 222JW,
R 222KW, 222LW, 222MW,
R 222NW, 222PW.
R
(Ref. TASK 25-23-45-000-002)
4. Procedure
_________
Subtask 05-22-20-210-055
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-20-410-055
A. Close Access
R
EFF :
ALL 05-22-20
Page 603
Nov 01/05
BV
(3) Install the floor panels (Ref. TASK 53-12-12-400-001).
(6) Install the galleys (Ref. TASK 25-31-41-400-001) and (Ref. TASK 25-
31-41-400-002).
(7) Install the toilet (Ref. TASK 25-41-41-400-001), (Ref. TASK 25-41-42-
400-001) and (Ref. TASK 25-41-44-400-001).
(8) Close the FWD passenger-crew doors 831 and 841 (Ref. TASK 52-10-00-
410-001).
R
EFF :
ALL 05-22-20
Page 604
Nov 01/05
BV
TASK 05-22-20-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-20-010-052
A. Get Access
EFF :
ALL 05-22-20
Page 605
Nov 01/05
R
BV
(3) Remove the overhead stowage compartment, if installed in zone 220
(Ref. TASK 25-24-41-000-001).
4. Procedure
_________
Subtask 05-22-20-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-20-410-052
A. Close Access
(3) Install the galleys (Ref. TASK 25-31-41-400-001) and (Ref. TASK 25-
31-41-400-002).
EFF :
ALL 05-22-20
Page 606
Nov 01/05
R
BV
ZONAL INSPECTION : FORWARD PASSENGER COMPARTMENT - INSPECTION/CHECK
___________________________________________________________________
TASK 05-22-30-200-001
Zonal Inspection of the Forward Passenger Compartment (Zones 231 and 232)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-22-30
Page 601
Nov 01/00
BV
3. __________
Job Set-up
Subtask 05-22-30-010-050
A. Get Access
(1) Put an access platform in position at the zones 231 and 232.
4. Procedure
_________
Subtask 05-22-30-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
EFF :
ALL 05-22-30
Page 602
Nov 01/06
BV
R Sidewall and Ceiling Panels of the Passenger Compartment (Zones 231-232)
Figure 601/TASK 05-22-30-991-001
EFF :
ALL 05-22-30
Page 603
Nov 01/06
BV
Sidewall Panels of the Passenger Compartment (Zone 232)
Figure 602/TASK 05-22-30-991-002
EFF :
ALL 05-22-30
Page 604
Feb 01/96
BV
5. Close-up
________
Subtask 05-22-30-410-050
A. Close Access
EFF :
ALL 05-22-30
Page 605
Nov 01/06
BV
TASK 05-22-30-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-30-010-052
A. Get Access
EFF :
ALL 05-22-30
Page 606
Feb 01/96
BV
4. Procedure
_________
Subtask 05-22-30-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-30-410-052
A. Close Access
EFF :
ALL 05-22-30
Page 607
Nov 01/06
BV
TASK 05-22-30-200-008
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-30-010-056
A. Get Access
EFF :
ALL 05-22-30
Page 608
May 01/05
BV
(4) Remove the dog house, if installed (Ref. TASK 25-27-46-000-001)
4. Procedure
_________
Subtask 05-22-30-210-056
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-30-410-056
A. Close Access
EFF :
ALL 05-22-30
Page 609
May 01/05
R
BV
ZONAL INSPECTION : MID PASSENGER COMPARTMENT - INSPECTION/CHECK
_______________________________________________________________
TASK 05-22-40-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-40-010-050
A. Get Access
EFF :
ALL 05-22-40
Page 601
May 01/06
BV
R Sidewall and Ceiling Panels of the Center Passenger Compartment
Figure 601/TASK 05-22-40-991-001
EFF :
ALL 05-22-40
Page 602
May 01/05
BV
Sidewall Panels of the Passenger Compartment (Zone 242)
Figure 602/TASK 05-22-40-991-002
EFF :
ALL 05-22-40
Page 603
May 01/97
R
BV
242NW, 242RW, 242UW
(Ref. TASK 25-23-44-000-001),
241PW, 241SW, 241VW,
242PW, 242SW, 242VW
R (Ref. TASK 25-23-43-000-001),
241DW, 241HW, 241MW,
241QW, 241TW, 241WW,
242DW, 242HW, 242MW,
242QW, 242TW, 242WW
(Ref. TASK 25-23-48-000-001).
4. Procedure
_________
Subtask 05-22-40-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-40-410-050
A. Close Access
EFF :
ALL 05-22-40
Page 604
May 01/06
BV
R 241CW,
R 242CW
R (Ref. TASK 25-23-47-400-002),
R 241LW,
R 242LW
R (Ref. TASK 25-23-47-400-002).
EFF :
ALL 05-22-40
Page 605
May 01/05
BV
TASK 05-22-40-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-40-010-052
A. Get Access
(2) Open the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-010-001).
EFF :
ALL 05-22-40
Page 606
May 01/05
BV
(3) Remove the toilet, if installed
(Ref. TASK 25-42-41-000-001).
(6) Remove the ceiling panels 241AC, 241BC, 241CC, 241DC, 241EC, 241FC
(Ref. TASK 25-23-41-000-001).
(Ref. Fig. 601/TASK 05-22-40-991-001)
4. Procedure
_________
Subtask 05-22-40-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-40-410-052
A. Close Access
EFF :
ALL 05-22-40
Page 607
Nov 01/06
BV
(4) Install the toilet, if removed
(Ref. TASK 25-42-41-400-001).
(5) Close the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 05-22-40
Page 608
May 01/05
BV
TASK 05-22-40-200-008
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-40-010-057
A. Get Access
4. Procedure
_________
Subtask 05-22-40-210-057
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks of damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
EFF :
ALL 05-22-40
Page 609
Feb 01/96
BV
5. Close-up
________
Subtask 05-22-40-410-057
A. Close Access
EFF :
ALL 05-22-40
Page 610
Feb 01/96
BV
ZONAL INSPECTION : AFT PASSENGER COMPARTMENT - INSPECTION/CHECK
_______________________________________________________________
TASK 05-22-50-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-22-50
Page 601
Nov 01/03
BV
3. __________
Job Set-up
Subtask 05-22-50-010-050
A. Get Access
R (2) Open the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-010-001).
4. Procedure
_________
Subtask 05-22-50-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-22-50
Page 602
Nov 01/03
BV
Sidewall and Ceiling Panels of the Aft Passenger Compartment (Zone 251)
Figure 601/TASK 05-22-50-991-001
EFF :
ALL 05-22-50
Page 603
Feb 01/96
BV
Sidewall Panels of the Passenger Compartment (Zone 252)
Figure 602/TASK 05-22-50-991-002
EFF :
ALL 05-22-50
Page 604
Feb 01/96
BV
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-50-410-050
A. Close Access
R (2) Close the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 05-22-50
Page 605
Nov 01/03
BV
TASK 05-22-50-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-50-010-052
A. Get Access
(2) Open the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-010-001).
EFF :
ALL 05-22-50
Page 606
May 01/05
BV
(5) Remove the overhead stowage compartments (Ref. TASK 25-24-41-000-
001).
4. Procedure
_________
Subtask 05-22-50-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-50-410-052
A. Close Access
(5) Close the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 05-22-50
Page 607
Nov 01/06
BV
INTENTIONALLY BLANK
R
05-22-50
Page 608
Nov 01/06
BV
TASK 05-22-50-200-008
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-50-010-057
A. Get Access
(2) Open the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-010-001).
(5) Remove the floor panels between FR47 and FR64 (Ref. TASK 53-42-12-
000-001).
EFF :
ALL 05-22-50
Page 609
May 01/05
R
BV
4. Procedure
_________
Subtask 05-22-50-210-057
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-50-410-057
A. Close Access
(1) Install the floor panels between FR47 and FR64 (Ref. TASK 53-42-12-
400-001).
(4) Close the Passenger/Crew door 832 (842) (Ref. TASK 52-10-00-410-001).
EFF :
ALL 05-22-50
Page 610
May 01/05
R
BV
ZONAL INSPECTION : AFT CABIN UTILITY AREA - INSPECTION/CHECK
____________________________________________________________
TASK 05-22-60-200-003
Zonal Inspection of the Overhead Compartment of the Aft Cabin (Zones 263 and
264)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-60-010-052
A. Get Access
EFF :
ALL 05-22-60
Page 601
Feb 01/07
BV
(2) Remove the galleys, if installed (Ref. TASK 25-33-41-000-001) or
(Ref. TASK 25-33-41-000-002).
(3) Remove the overhead stowage compartments, if installed (Ref. TASK 25-
24-41-000-001).
4. Procedure
_________
Subtask 05-22-60-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-22-60-410-052
A. Close Access
(2) Install the overhead stowage compartments, if removed (Ref. TASK 25-
24-41-400-001).
EFF :
ALL 05-22-60
Page 602
Nov 01/06
BV
TASK 05-22-60-200-004
Zonal Inspection of the Aft Cabin Utility Area (zones 261 and 262)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-22-60
Page 603
Feb 01/07
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-22-60-010-053
A. Get Access
EFF :
ALL 05-22-60
Page 604
Feb 01/07
BV
(9) Remove the toilets, if installed
(Ref. TASK 25-43-41-000-001) or (Ref. TASK 25-43-42-000-001)
R (Ref. TASK 25-43-43-000-001) or (Ref. TASK 25-43-44-000-001).
4. Procedure
_________
Subtask 05-22-60-210-053
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring) are attached correctly.
EFF :
ALL 05-22-60
Page 605
Feb 01/07
BV
5. Close-up
________
Subtask 05-22-60-410-053
A. Close Access
EFF :
ALL 05-22-60
Page 606
Feb 01/07
BV
(10) Install the cabin-attendant free-standing seat, if removed
(Ref. TASK 25-22-42-400-001).
EFF :
ALL 05-22-60
Page 607
Nov 01/06
R
BV
ZONAL INSPECTION : STABILIZERS AND CONE/REAR FUSELAGE - INSPECTION/CHECK
________________________________________________________________________
TASK 05-23-00-200-001
Zonal Inspection as far as visible from the ground of the Stabilizers and the
Cone/Rear Fuselage
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
Not Applicable
3. __________
Job Set-up
Subtask 05-23-00-869-050
A. Not Applicable
4. Procedure
_________
Subtask 05-23-00-210-050
A. Inspection
(1) Do a general visual inspection of the stabilizers and the tail unit
from ground.
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-23-00
Page 601
May 01/05
R
BV
TASK 05-23-00-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-00-010-050
A. Get Access
4. Procedure
_________
Subtask 05-23-00-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Do a visual inspection of the drain holes at the inner side of the
R lower surface of the THS.
R (4) Make sure that the drain holes are not blocked.
EFF :
ALL 05-23-00
Page 602
May 01/05
BV
R 5. Close-up
________
R Subtask 05-23-00-410-050
R A. Close Access
EFF :
ALL 05-23-00
Page 603
Nov 01/02
BV
_____________________________________________________________________
ZONAL INSPECTION : FUSELAGE TAIL SECTION AFT OF AFT PRESSURE BULKHEAD
________________
INSPECTION/CHECK
TASK 05-23-10-200-001
Zonal Inspection of the Tail Section of the Aft Fuselage (Zones 311 and 312)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-10-010-050
A. Get Access
EFF :
ALL 05-23-10
Page 601
Feb 01/96
BV
Access Provision of the Aft Fuselage Tail Section
Figure 601/TASK 05-23-10-991-001
EFF :
ALL 05-23-10
Page 602
Feb 01/96
BV
4. Procedure
_________
Subtask 05-23-10-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-10-410-050
A. Close Access
EFF :
ALL 05-23-10
Page 603
Feb 01/96
BV
TASK 05-23-10-200-002
Zonal Inspection of the Air Intake Area of the APU on the Tail Cone (Zones 313
and 314)
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-10-010-051
A. Get Access
EFF :
ALL 05-23-10
Page 604
Feb 01/96
BV
4. Procedure
_________
Subtask 05-23-10-210-051
A. Inspection
(1) Do a general visual inspection of the air intake area of the APU on
the tail cone (Zones 313 and 314).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-10-410-051
A. Close Access
EFF :
ALL 05-23-10
Page 605
Feb 01/96
BV
TASK 05-23-10-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-10-010-052
A. Get Access
EFF :
ALL 05-23-10
Page 606
Nov 01/03
BV
4. Procedure
_________
Subtask 05-23-10-210-052
A. Inspection
R (1) Do a general visual inspection of the tail cone APU and accessory
R compartment.
R
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-10-410-052
A. Close Access
EFF :
ALL 05-23-10
Page 607
Nov 01/03
BV
TASK 05-23-10-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-10-010-053
A. Get Access
EFF :
ALL 05-23-10
Page 608
Feb 01/96
BV
4. Procedure
_________
Subtask 05-23-10-210-053
A. Inspection
(1) Do a general visual inspection of the APU exhaust area on the tail
cone.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-10-410-053
A. Close Access
EFF :
ALL 05-23-10
Page 609
Feb 01/96
BV
ZONAL INSPECTION : VERTICAL STABILIZER AND RUDDER - INSPECTION/CHECK
____________________________________________________________________
TASK 05-23-20-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-20-010-050
A. Get Access
EFF :
ALL 05-23-20
Page 601
Feb 01/96
BV
4. Procedure
_________
Subtask 05-23-20-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-20-410-050
A. Close Access
EFF :
ALL 05-23-20
Page 602
Feb 01/96
BV
TASK 05-23-20-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-20-010-051
A. Get Access
EFF :
ALL 05-23-20
Page 603
Nov 01/03
BV
4. Procedure
_________
Subtask 05-23-20-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-20-410-051
A. Close Access
EFF :
ALL 05-23-20
Page 604
Feb 01/96
BV
TASK 05-23-20-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-23-20
Page 605
Feb 01/07
BV
3. __________
Job Set-up
Subtask 05-23-20-010-052
A. Get Access
(3) Remove and discard the aluminium tape from the lightening holes in
the front spar.
4. Procedure
_________
Subtask 05-23-20-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-20-410-052
A. Close Access
(1) Cut and install the BONDING AND ADHESIVE COMPOUNDS (Material No. 08-
061) over the lightening holes on the front spar.
EFF :
ALL 05-23-20
Page 606
Feb 01/96
BV
(3) Remove the access platform(s).
EFF :
ALL 05-23-20
Page 607
Feb 01/96
BV
TASK 05-23-20-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-20-010-053
A. Get Access
4. Procedure
_________
Subtask 05-23-20-210-053
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-23-20
Page 608
Nov 01/03
BV
(3) Make sure that all the installations (wiring) are attached correctly.
5. Close-up
________
Subtask 05-23-20-410-053
A. Close Access
EFF :
ALL 05-23-20
Page 609
Feb 01/96
BV
TASK 05-23-20-200-005
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-20-010-054
A. Get Access
EFF :
ALL 05-23-20
Page 610
May 01/02
BV
4. Procedure
_________
Subtask 05-23-20-210-054
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-20-410-054
A. Close Access
EFF :
ALL 05-23-20
Page 611
May 01/02
BV
TASK 05-23-20-200-006
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-23-20
Page 612
Nov 01/03
BV
3. __________
Job Set-up
Subtask 05-23-20-010-055
A. Get Access
4. Procedure
_________
Subtask 05-23-20-210-055
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-20-410-055
A. Close Access
EFF :
ALL 05-23-20
Page 613
May 01/05
BV
TASK 05-23-20-200-007
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-23-20
Page 614
Nov 01/03
BV
3. __________
Job Set-up
Subtask 05-23-20-010-056
A. Get Access
4. Procedure
_________
Subtask 05-23-20-210-056
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-20-410-056
A. Close Access
EFF :
ALL 05-23-20
Page 615
Nov 01/03
BV
TASK 05-23-20-200-008
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-23-20
Page 616
Feb 01/07
BV
3. __________
Job Set-up
Subtask 05-23-20-010-057
A. Get Access
(3) Remove and discard the aluminium foil from the lightening holes in
the front spar.
4. Procedure
_________
Subtask 05-23-20-210-057
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-20-410-057
A. Close Access
(1) Cut and install the BONDING AND ADHESIVE COMPOUNDS (Material No. 08-
061) over the lightening holes on the front spar.
EFF :
ALL 05-23-20
Page 617
Nov 01/03
BV
(Ref. TASK 55-33-13-410-001) or (Ref. TASK 55-33-13-410-002).
EFF :
ALL 05-23-20
Page 618
Feb 01/96
BV
______________________________________________________________________________
ZONAL INSPECTION : TRIMMABLE HORIZONTAL STABILIZER LEFT SIDE AND LEFT ELEVATOR
________________
INSPECTION/CHECK
TASK 05-23-30-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-30-010-050
A. Get Access
EFF :
ALL 05-23-30
Page 601
Feb 01/96
BV
4. Procedure
_________
Subtask 05-23-30-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (ducting, piping) are attached
correctly.
5. Close-up
________
Subtask 05-23-30-410-050
A. Close Access
EFF :
ALL 05-23-30
Page 602
Feb 01/96
BV
TASK 05-23-30-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-30-010-051
A. Get Access
4. Procedure
_________
Subtask 05-23-30-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-23-30
Page 603
Feb 01/96
BV
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-30-410-051
A. Close Access
EFF :
ALL 05-23-30
Page 604
Feb 01/96
BV
TASK 05-23-30-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-30-010-052
A. Get Access
R (3) Remove the aprons 333AT, 333AB, 343AT and 343AB (Ref. TASK 55-15-11-
R 000-001).
EFF :
ALL 05-23-30
Page 605
May 01/05
BV
Access provision of the Aft Fuselage Tail Section
Figure 601/TASK 05-23-30-991-007
EFF :
ALL 05-23-30
Page 606
Feb 01/96
BV
4. Procedure
_________
Subtask 05-23-30-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-30-410-052
A. Close Access
R (1) Install the aprons 333AT, 333AB, 343AT and 343AB (Ref. TASK 55-15-11-
R 400-001).
EFF :
ALL 05-23-30
Page 607
May 01/05
BV
TASK 05-23-30-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-30-010-053
A. Get Access
EFF :
ALL 05-23-30
Page 608
Feb 01/96
BV
4. Procedure
_________
Subtask 05-23-30-210-053
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-30-410-053
A. Close Access
EFF :
ALL 05-23-30
Page 609
Feb 01/96
BV
TASK 05-23-30-200-005
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-30-010-054
A. Get Access
EFF :
ALL 05-23-30
Page 610
Feb 01/96
BV
(3) Remove the elevator leading edge access panels
335AB, 335BB, 335CB, 335DB.
345AB, 345BB, 345CB, 345DB.
(Ref. TASK 55-22-11-000-001)
4. Procedure
_________
Subtask 05-23-30-210-054
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-30-410-054
A. Close Access
EFF :
ALL 05-23-30
Page 611
Feb 01/96
BV
TASK 05-23-30-200-007
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-23-30-010-056
A. Get Access
EFF :
ALL 05-23-30
Page 612
Feb 01/96
BV
4. Procedure
_________
Subtask 05-23-30-210-056
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-23-30-410-056
A. Close Access
EFF :
ALL 05-23-30
Page 613
Feb 01/96
BV
ZONAL INSPECTION : POWER PLANT, NACELLES AND PYLONS - INSPECTION/CHECK
______________________________________________________________________
TASK 05-24-00-200-001
Zonal Inspection as far as Visible from the Ground of the Power Plant, the
Nacelles and the Pylons
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
Not Applicable
3. __________
Job Set-up
Subtask 05-24-00-869-050
A. Not Applicable
4. Procedure
_________
Subtask 05-24-00-210-050
A. Inspection
(1) Do a general visual inspection of the power plant, the nacelles and
the pylons from the ground during the aircraft walkaround.
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-24-00
Page 601
Nov 01/03
BV
TASK 05-24-00-200-002
Zonal Inspection of the Power Plant, the Nacelles and the Pylons
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-24-00-010-051
A. Get Access
4. Procedure
_________
Subtask 05-24-00-210-051
A. Inspection
(1) Do a general visual inspection of the power plant, the nacelles and
the pylons.
(2) Make sure that there are no signs of corrosion, craks or damage.
5. Close-up
________
Subtask 05-24-00-410-051
A. Close Access
EFF :
ALL 05-24-00
Page 602
Feb 01/96
BV
ZONAL INSPECTION : ENGINE PYLON BOX AND FORWARD FAIRING - INSPECTION/CHECK
__________________________________________________________________________
TASK 05-24-10-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-24-10-010-050
A. Get Access
EFF :
ALL 05-24-10
Page 601
May 01/04
BV
R Access Panels and Doors of the Left Nacelle (Left Side)
Figure 601/TASK 05-24-10-991-001
EFF :
ALL 05-24-10
Page 602
May 01/04
BV
R (Ref. Fig. 602/TASK 05-24-10-991-002)
R 414AR, 414AZ, 414BR,
R 414CR, 414FR.
- For the right pylon:
R
R (Ref. Fig. 603/TASK 05-24-10-991-003)
R
R 423AL, 423AZ, 423BL,
R 423CL, 423DL, 423FL.
R
R (Ref. Fig. 604/TASK 05-24-10-991-004)
R
R 424AR, 424BR,
R 424CR, 424ER.
4. Procedure
_________
Subtask 05-24-10-210-050
A. Inspection
(1) Do a general visual inspection of the upper forward pylon (Zones 411,
413, 414, 421, 423 and 424).
(2) Make sure that there are no signs of corrosion, craks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-24-10-410-050
A. Close Access
EFF :
ALL 05-24-10
Page 603
May 01/04
BV
R Access Panels and Doors of the Left Nacelle (Right Side)
Figure 602/TASK 05-24-10-991-002
EFF :
ALL 05-24-10
Page 604
May 01/04
BV
R Access Panels and Doors of the Right Nacelle (Left Side)
Figure 603/TASK 05-24-10-991-003
EFF :
ALL 05-24-10
Page 605
May 01/04
BV
R Access Panels and Doors of the Right Nacelle (Right Side)
Figure 604/TASK 05-24-10-991-004
EFF :
ALL 05-24-10
Page 606
May 01/04
BV
(2) Remove the access platform(s).
EFF :
ALL 05-24-10
Page 607
Nov 01/04
R
BV
TASK 05-24-10-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-24-10-010-051
A. Get Access
EFF :
ALL 05-24-10
Page 608
Nov 01/04
BV
4. Procedure
_________
Subtask 05-24-10-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-24-10-410-051
A. Close Access
EFF :
ALL 05-24-10
Page 609
Nov 01/04
BV
_______________________________________________________________
ZONAL INSPECTION : ENGINE AIR INTAKE, FAN AND ACCESSORY GEARBOX
________________
INSPECTION/CHECK
TASK 05-24-30-200-001
Zonal Inspection of the Air Intake Lip and the Inlet Cowl
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
R Subtask 05-24-30-010-050-A
R A. Get Access
R (1) Put the access platform in position at the zones 433 and 443.
EFF :
ALL 05-24-30
Page 601
May 01/02
BV
R Access Doors of the Left Nacelle (Left Side)
R Figure 601/TASK 05-24-30-991-001-A
EFF :
ALL 05-24-30
Page 602
May 01/02
BV
R Access Doors of the Left Nacelle (Right Side)
R Figure 602/TASK 05-24-30-991-002-A
EFF :
ALL 05-24-30
Page 603
May 01/02
BV
Access Doors of the Right Nacelle (Right Side)
Figure 603/TASK 05-24-30-991-003
EFF :
ALL 05-24-30
Page 604
Feb 01/96
BV
Access Doors of the Right Nacelle (Left Side)
Figure 604/TASK 05-24-30-991-004
EFF :
ALL 05-24-30
Page 605
Feb 01/96
BV
4. Procedure
_________
Subtask 05-24-30-210-050
A. Inspection
(1) Do a general visual inspection of the air intake lip and the inlet
cowl.
(2) Make sure that there are no signs of corrosion, craks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
R Subtask 05-24-30-410-050-A
R A. Close Access
EFF :
ALL 05-24-30
Page 606
May 01/02
BV
TASK 05-24-30-200-002
Zonal Inspection of the Area of the Fan and the Accessory Gearbox
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-24-30-010-051
A. Get Access
EFF :
ALL 05-24-30
Page 607
May 01/04
BV
4. Procedure
_________
Subtask 05-24-30-210-051
A. Inspection
R (1) Do a general visual inspection of the area of the fan case and the
R accessory gearbox.
R (2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-24-30-410-051
A. Close Access
EFF :
ALL 05-24-30
Page 608
May 01/04
BV
TASK 05-24-30-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-24-30-010-052
A. Get Access
(1) Put an access platform in position at the zones 437 and 447.
EFF :
ALL 05-24-30
Page 609
May 01/02
BV
4. Procedure
_________
Subtask 05-24-30-210-052
A. Inspection
(1) Do a general visual inspection of the fan and the engine cowling.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-24-30-410-052
A. Close Access
EFF :
ALL 05-24-30
Page 610
Feb 01/96
BV
_____________________________________________________________
ZONAL INSPECTION : ENGINE THRUST REVERSER AND EXHAUST SECTION
________________
INSPECTION/CHECK
TASK 05-24-50-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-24-50
Page 601
May 01/00
BV
3. __________
Job Set-up
Subtask 05-24-50-010-050
A. Get Access
R WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER
_______
R COWLS ARE DEPLOYED IN THE 45 DEG. POSITION.
(1) Put an access platform in position at the zones 451 and 461.
(Ref. Fig. 601/TASK 05-24-50-991-001, 602/TASK 05-24-50-991-002,
603/TASK 05-24-50-991-003, 604/TASK 05-24-50-991-004)
4. Procedure
_________
Subtask 05-24-50-210-050
A. Inspection
(1) Do a general visual inspection of the thrust reverser and the zone
below the thrust reverser.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-24-50-410-050
A. Close Access
EFF :
ALL 05-24-50
Page 602
May 01/00
BV
Access Doors of the Left Nacelle (Left Side)
Figure 601/TASK 05-24-50-991-001
EFF :
ALL 05-24-50
Page 603
Feb 01/96
BV
Access Doors of the Left Nacelle (Right Side)
Figure 602/TASK 05-24-50-991-002
EFF :
ALL 05-24-50
Page 604
Feb 01/96
BV
Access Doors of the Right Nacelle (Left Side)
Figure 603/TASK 05-24-50-991-003
EFF :
ALL 05-24-50
Page 605
Feb 01/96
BV
Access Doors of the Right Nacelle (Right Side)
Figure 604/TASK 05-24-50-991-004
EFF :
ALL 05-24-50
Page 606
Feb 01/96
BV
(2) Close the thrust reverser doors. (Ref. TASK 78-36-00-410-040)
451AL, 452AR
461AL, 462AR
EFF :
ALL 05-24-50
Page 607
May 01/00
R
BV
TASK 05-24-50-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-24-50-010-051
A. Get Access
R WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER
_______
R COWLS ARE DEPLOYED IN THE 45 DEG. POSITION.
(1) Put an access platform in position at the zones 453 and 463.
(Ref. Fig. 601/TASK 05-24-50-991-001, 602/TASK 05-24-50-991-002,
603/TASK 05-24-50-991-003, 604/TASK 05-24-50-991-004)
EFF :
ALL 05-24-50
Page 608
May 01/00
BV
(2) Open the fan cowl doors. (Ref. TASK 71-13-00-010-040)
437AL, 438AR
447AL, 448AR
4. Procedure
_________
Subtask 05-24-50-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-24-50-410-051
A. Close Access
EFF :
ALL 05-24-50
Page 609
May 01/00
BV
ZONAL INSPECTION : ENGINE AFT PYLON - INSPECTION/CHECK
______________________________________________________
TASK 05-24-70-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-24-70-010-050
A. Get Access
EFF :
ALL 05-24-70
Page 601
Nov 01/05
BV
R Location of the Access Panels of the Left Nacelle (Left Side)
Figure 601/TASK 05-24-70-991-001
EFF :
ALL 05-24-70
Page 602
May 01/04
BV
(Ref. Fig. 602/TASK 05-24-70-991-002)
472AR, 472BR, 473AR,
476AR, 476BR, 476CR.
- For the right pylon:
4. Procedure
_________
Subtask 05-24-70-210-050
A. Inspection
(1) Do a general visual inspection of the leading edge of the pylon and
the lower fairing (Zones 471, 472, 473, 475, 476, 477, 481, 482, 483,
485, 486 and 487).
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-24-70-410-050
A. Close Access
EFF :
ALL 05-24-70
Page 603
Nov 01/06
BV
R Location of the Access Panels of the Left Nacelle (Right Side)
Figure 602/TASK 05-24-70-991-002
EFF :
ALL 05-24-70
Page 604
May 01/04
BV
R Location of the Access Panels of the Right Nacelle (Left Side)
R Figure 603/TASK 05-24-70-991-005
EFF :
ALL 05-24-70
Page 605
May 01/04
BV
R Location of the Access Panels of the Right Nacelle (Right Side)
R Figure 604/TASK 05-24-70-991-006
EFF :
ALL 05-24-70
Page 606
May 01/04
BV
482AR, 482BR, 482CR,
483AR,
R 486AR, 486BR, 486CR,
487AR.
EFF :
ALL 05-24-70
Page 607
Nov 01/06
BV
ZONAL INSPECTION : WING - INSPECTION/CHECK
__________________________________________
TASK 05-25-00-200-001
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
Not Applicable
3. __________
Job Set-up
Subtask 05-25-00-869-050
A. Not Applicable
4. Procedure
_________
Subtask 05-25-00-210-050
A. Inspection
(1) Do a general visual inspection of the wing (zone 500 and zone 600)
from the ground.
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-25-00
Page 601
Nov 01/03
BV
TASK 05-25-00-200-002
Zonal Inspection of the Wing Lower Surface including the Upper and Lower
Surfaces of the Flaps and the Slats
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-00-866-050
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER
_______
COWLS ARE DEPLOYED IN THE 45 DEG. POSITION.
(1) Fully extend the flaps and the slats (Ref. TASK 27-50-00-866-008)
(Ref. TASK 27-80-00-866-004).
4. Procedure
_________
Subtask 05-25-00-210-051
A. Inspection
(1) Do a general visual inspection of the wing lower surface (zones 500
and 600).
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-25-00
Page 602
May 01/98
R
BV
5. Close-up
________
Subtask 05-25-00-866-051
(1) Retract the flaps and the slats (Ref. TASK 27-50-00-866-009),
(Ref. TASK 27-80-00-866-005).
EFF :
ALL 05-25-00
Page 603
Feb 01/96
BV
TASK 05-25-00-200-003
Zonal Inspection of the Wing Upper Surface including the Slats, the Flaps and
the Spoilers
R
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-00-866-052
R WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER
_______
R COWLS ARE DEPLOYED IN THE 45 DEG. POSITION.
(2) Fully extend the flaps and the slats (Ref. TASK 27-50-00-866-008)
(Ref. TASK 27-80-00-866-004)
EFF :
ALL 05-25-00
Page 604
Nov 01/96
BV
Subtask 05-25-00-941-050
B. Get Access
4. Procedure
_________
Subtask 05-25-00-210-052
A. Inspection
(1) Do a general visual inspection of the wing upper surface (zones 500
and 600).
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-25-00-942-050
A. Close Access
Subtask 05-25-00-866-053
(2) Retract the flaps and the slats (Ref. TASK 27-50-00-866-009),
(Ref. TASK 27-80-00-866-005).
EFF :
ALL 05-25-00
Page 605
Feb 01/96
BV
ZONAL INSPECTION : WING FIXED LEADING EDGE - INSPECTION/CHECK
_____________________________________________________________
TASK 05-25-20-200-001
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-20-866-050
EFF :
ALL 05-25-20
Page 601
Feb 01/96
BV
Subtask 05-25-20-010-050
B. Get Access
4. Procedure
_________
Subtask 05-25-20-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-25-20-410-050
A. Close Access
EFF :
ALL 05-25-20
Page 602
Feb 01/96
BV
R Access Panels of the Upper Leading Edge of the Wing
Figure 601/TASK 05-25-20-991-001
EFF :
ALL 05-25-20
Page 603
May 01/98
BV
R Access Panels of the Lower Surface of the Wing
Figure 602/TASK 05-25-20-991-002
EFF :
ALL 05-25-20
Page 604
May 01/98
BV
Subtask 05-25-20-866-051
EFF :
ALL 05-25-20
Page 605
Feb 01/96
BV
TASK 05-25-20-200-002
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-20-866-052
EFF :
ALL 05-25-20
Page 606
May 01/98
BV
Subtask 05-25-20-010-051
B. Get Access
4. Procedure
_________
Subtask 05-25-20-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-25-20-410-051
A. Close Access
EFF :
ALL 05-25-20
Page 607
Feb 01/96
BV
622HB, 622JB, 622KB,
622LB, 622NB, 622QB,
622SB, 622UB.
Subtask 05-25-20-866-053
EFF :
ALL 05-25-20
Page 608
Feb 01/96
BV
ZONAL INSPECTION : WING FLAP TRACK FAIRINGS AND WING TIP - INSPECTION/CHECK
___________________________________________________________________________
TASK 05-25-30-200-001
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-30-866-050
EFF :
ALL 05-25-30
Page 601
May 01/05
BV
Subtask 05-25-30-010-050
B. Get Access
4. Procedure
_________
Subtask 05-25-30-210-050
R A. Inspection
(1) Do a general visual inspection of the flap track No. 2 and the
related fairing.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up
________
Subtask 05-25-30-410-050
A. Close Access
Subtask 05-25-30-866-051
EFF :
ALL 05-25-30
Page 602
May 01/05
BV
Access Panels of the Flap Track Fairings
Figure 601/TASK 05-25-30-991-001
EFF :
ALL 05-25-30
Page 603
Feb 01/96
BV
TASK 05-25-30-200-002
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-30-866-052
Subtask 05-25-30-010-051
B. Get Access
EFF :
ALL 05-25-30
Page 604
May 01/05
BV
4. Procedure
_________
Subtask 05-25-30-210-051
R A. Inspection
(1) Do a general visual inspection of the flap track No. 3 and the
related fairing.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up
________
Subtask 05-25-30-410-051
A. Close Access
Subtask 05-25-30-866-053
EFF :
ALL 05-25-30
Page 605
May 01/05
BV
TASK 05-25-30-200-003
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-30-866-054
Subtask 05-25-30-010-052
B. Get Access
EFF :
ALL 05-25-30
Page 606
May 01/05
BV
4. Procedure
_________
Subtask 05-25-30-210-052
R A. Inspection
R (1) Do a general visual inspection of the flap track No. 4 and the
R related fairing.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up
________
Subtask 05-25-30-410-052
A. Close Access
Subtask 05-25-30-866-055
EFF :
ALL 05-25-30
Page 607
May 01/05
BV
TASK 05-25-30-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-30-010-053
A. Get Access
(2) Remove the access panels 534AB, 534AL, 534BL 634AB, 634AR, 634BR.
(Ref. Fig. 602/TASK 05-25-30-991-002)
4. Procedure
_________
Subtask 05-25-30-210-053
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-25-30
Page 608
Feb 01/96
BV
Access Panels of the Wing Tip
Figure 602/TASK 05-25-30-991-002
EFF :
ALL 05-25-30
Page 609
Feb 01/96
BV
(3) Make sure that all the installations (wiring) are attached correctly.
5. Close-up
________
Subtask 05-25-30-410-053
A. Close Access
(1) Install the access panels 534AB, 534AL, 534BL, 634AB, 634AR, 634BR.
EFF :
ALL 05-25-30
Page 610
Feb 01/96
BV
TASK 05-25-30-200-005
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-30-866-056
EFF :
ALL 05-25-30
Page 611
May 01/05
BV
Subtask 05-25-30-010-054
B. Get Access
4. Procedure
_________
Subtask 05-25-30-210-054
R A. Inspection
(1) Do a general visual inspection of the flap track No. 2 and the
related fairing.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up
________
Subtask 05-25-30-410-054
A. Close Access
EFF :
ALL 05-25-30
Page 612
May 01/05
BV
Subtask 05-25-30-866-057
EFF :
ALL 05-25-30
Page 613
May 01/05
BV
TASK 05-25-30-200-006
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-30-866-058
EFF :
ALL 05-25-30
Page 614
Nov 01/03
BV
Subtask 05-25-30-010-055
B. Get Access
4. Procedure
_________
Subtask 05-25-30-210-055
R A. Inspection
R (1) Do a general visual inspection of the flap track No. 3 and the
R related fairing.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up
________
Subtask 05-25-30-410-055
A. Close Access
EFF :
ALL 05-25-30
Page 615
May 01/05
BV
R (3) Remove the access platform(s).
Subtask 05-25-30-866-059
EFF :
ALL 05-25-30
Page 616
Nov 01/03
BV
TASK 05-25-30-200-007
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-30-866-060
EFF :
ALL 05-25-30
Page 617
Nov 01/03
BV
Subtask 05-25-30-010-056
B. Get Access
4. Procedure
_________
Subtask 05-25-30-210-056
A. Inspection
(1) Do a general visual inspection of the flap track No. 4 and the
related fairing.
(2) Make sure that there are no signs of corrosion, cracks or damage.
R (3) Make sure that all the installations are attached correctly.
5. Close-up
________
Subtask 05-25-30-410-056
A. Close Access
EFF :
ALL 05-25-30
Page 618
May 01/05
BV
Subtask 05-25-30-866-061
EFF :
ALL 05-25-30
Page 619
Feb 01/96
BV
ZONAL INSPECTION : WING FUEL TANK - INSPECTION/CHECK
____________________________________________________
R TASK 05-25-40-200-005
R 1. __________________
Reason for the Job
R 2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
EFF :
ALL 05-25-40
Page 601
May 01/05
BV
R 3. __________
Job Set-up
R Subtask 05-25-40-010-054
R A. Get Access
R 4. Procedure
_________
R Subtask 05-25-40-210-054
R A. Inspection
R (2) Make sure that there are no signs of corrosion, cracks or damage.
R (3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.
R 5. Close-up
________
R Subtask 05-25-40-410-054
R A. Close Access
EFF :
ALL 05-25-40
Page 602
May 01/05
BV
TASK 05-25-40-200-004
1. __________________
Reason for the Job
R NOTE : Do this procedure at the same time as MPD Task 572004-03 (Ref Task
____
R 57-20-00-220-08), MDP Task 572027-03 (Ref Task 57-20-00-220-010), MPD
R Task 572060-02 (Ref Task 57-20-00-220-006) and MPD Task 572061-02
R (Ref Task 57-20-00-220-007).
R It is not then necessary to remove the access panels 540CZ, 540DZ,
R 640CZ and 640DZ.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-25-40
Page 603
Nov 01/06
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-40-010-053
A. Get Access
EFF :
ALL 05-25-40
Page 604
Nov 01/06
BV
4. Procedure
_________
Subtask 05-25-40-210-053
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-25-40-410-053
A. Close Access
EFF :
ALL 05-25-40
Page 605
Nov 01/06
BV
ZONAL INSPECTION : WING VENT SURGE TANK - INSPECTION/CHECK
__________________________________________________________
TASK 05-25-50-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-25-50
Page 601
May 01/98
BV
3. __________
Job Set-up
Subtask 05-25-50-010-050
A. Get Access
4. Procedure
_________
Subtask 05-25-50-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (ducting, piping) are attached
correctly.
5. Close-up
________
Subtask 05-25-50-410-050
A. Close Access
EFF :
ALL 05-25-50
Page 602
May 01/98
BV
Access Panels of the Vent Surge Tank of the Wing
Figure 601/TASK 05-25-50-991-001
EFF :
ALL 05-25-50
Page 603
Feb 01/96
BV
ZONAL INSPECTION : WING DRY BAY (OUTBOARD) - INSPECTION/CHECK
_____________________________________________________________
TASK 05-25-60-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-60-010-050
A. Get Access
R (2) Remove the access panel 560AB, (Ref. TASK 57-27-11-000-002). 660AB
EFF :
ALL 05-25-60
Page 601
May 01/98
BV
4. Procedure
_________
Subtask 05-25-60-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (ducting, piping) are attached
correctly.
5. Close-up
________
Subtask 05-25-60-410-050
A. Close Access
R (1) Install the access panel 560AB, 660AB. (Ref. TASK 57-27-11-400-002)
EFF :
ALL 05-25-60
Page 602
May 01/98
BV
________________________________________________________________________
ZONAL INSPECTION : AFT SECTION OF WING AND TRAILING EDGE FIXED STRUCTURE
________________
INSPECTION/CHECK
TASK 05-25-70-200-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-70-010-050
A. Get Access
4. Procedure
_________
Subtask 05-25-70-210-050
A. Inspection
(1) Do a general visual inspection of the main landing-gear bay from the
ground.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-25-70-410-050
A. Close Access
EFF :
ALL 05-25-70
Page 601
May 01/06
R
BV
INTENTIONALLY BLANK
R
05-25-70
Page 602
Nov 01/03
BV
TASK 05-25-70-200-002
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-70-866-050
EFF :
ALL 05-25-70
Page 603
Feb 01/96
BV
Subtask 05-25-70-010-051
B. Get Access
4. Procedure
_________
Subtask 05-25-70-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up
________
Subtask 05-25-70-410-051
A. Close Access
Subtask 05-25-70-866-051
EFF :
ALL 05-25-70
Page 604
Feb 01/96
BV
Access Panels of the Left Wing Lower Trailing Edge
Figure 601/TASK 05-25-70-991-001
EFF :
ALL 05-25-70
Page 605
Feb 01/96
BV
Access Panels of the Right Wing Lower Trailing Edge
Figure 602/TASK 05-25-70-991-003
EFF :
ALL 05-25-70
Page 606
Feb 01/96
BV
TASK 05-25-70-200-003
Zonal Inspection of the Inboard Fixed Trailing Edge Structure from the Shroud
Box to the Rib 9
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-70-866-052
Subtask 05-25-70-941-051
B. Get Access
EFF :
ALL 05-25-70
Page 607
Feb 01/96
BV
4. Procedure
_________
Subtask 05-25-70-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-25-70-942-051
A. Close Access
Subtask 05-25-70-866-053
EFF :
ALL 05-25-70
Page 608
Feb 01/96
BV
TASK 05-25-70-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-70-010-053
A. Get Access
EFF :
ALL 05-25-70
Page 609
Nov 01/06
BV
4. Procedure
_________
Subtask 05-25-70-210-053
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-25-70-410-053
A. Close Access
EFF :
ALL 05-25-70
Page 610
Nov 01/06
BV
TASK 05-25-70-200-005
Zonal Inspection of the Outboard Fixed Trailing Edge Structure from the Rib 9
to the Rib 27
WARNING : DO NOT EXTEND THE SLATS AND FLAPS WHEN THE THRUST REVERSER COWLS ARE
_______
DEPLOYED IN THE 45 DEG. POSITION.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-25-70
Page 611
May 01/06
BV
3. __________
Job Set-up
Subtask 05-25-70-866-054
Subtask 05-25-70-010-054
B. Get Access
4. Procedure
_________
Subtask 05-25-70-210-054
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
EFF :
ALL 05-25-70
Page 612
May 01/06
BV
5. Close-up
________
Subtask 05-25-70-410-054
A. Close Access
Subtask 05-25-70-866-055
EFF :
ALL 05-25-70
Page 613
May 01/06
BV
INTENTIONALLY BLANK
R
05-25-70
Page 614
May 01/06
BV
TASK 05-25-70-200-006
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-70-010-055
A. Get Access
(1) Put an access platform in position at the zones 571 and 671.
4. Procedure
_________
Subtask 05-25-70-210-055
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-25-70
Page 615
Feb 01/96
BV
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
5. Close-up
________
Subtask 05-25-70-410-055
A. Close Access
EFF :
ALL 05-25-70
Page 616
Feb 01/96
BV
Access Panel of the Upper Surface of the Wing
Figure 603/TASK 05-25-70-991-002
EFF :
ALL 05-25-70
Page 617
May 01/06
BV
ZONAL INSPECTION : WING AILERON - INSPECTION/CHECK
__________________________________________________
TASK 05-25-90-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-25-90-010-050
A. Get Access
EFF :
ALL 05-25-90
Page 601
Feb 01/96
BV
Access Panels of the Wing Aileron
Figure 601/TASK 05-25-90-991-001
EFF :
ALL 05-25-90
Page 602
Feb 01/96
BV
4. Procedure
_________
Subtask 05-25-90-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up
________
Subtask 05-25-90-410-050
A. Close Access
EFF :
ALL 05-25-90
Page 603
Feb 01/96
BV
ZONAL INSPECTION : LANDING GEAR AND LANDING GEAR DOORS - INSPECTION/CHECK
_________________________________________________________________________
TASK 05-27-00-200-001
Zonal Inspection as far as Visible from the Ground of the Landing Gear and the
Landing Gear Doors
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
Not Applicable
3. __________
Job Set-up
Subtask 05-27-00-869-050
A. Not applicable
4. Procedure
_________
Subtask 05-27-00-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-27-00
Page 601
Nov 01/03
BV
ZONAL INSPECTION : NOSE GEAR AND DOORS - INSPECTION/CHECK
_________________________________________________________
TASK 05-27-10-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-27-10-010-050
A. Get Access
(1) Open the nose gear doors 713 and 714. (Ref. TASK 32-22-00-010-001)
4. Procedure
_________
Subtask 05-27-10-210-050
A. Inspection
R (1) Do a general visual inspection of the nose gear, the nose gear doors
R and the leg door attached to the nose gear. This inspection includes
R the zones 711, 712, 713, 714, 715 and 716.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
EFF :
ALL 05-27-10
Page 601
Nov 01/03
BV
5. Close-up
________
Subtask 05-27-10-410-050
A. Close Access
(1) Close the nose gear doors 713 and 714. (Ref. TASK 32-22-00-410-001)
EFF :
ALL 05-27-10
Page 602
Feb 01/96
BV
ZONAL INSPECTION : MAIN LANDING GEAR AND DOORS - INSPECTION/CHECK
_________________________________________________________________
TASK 05-27-30-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
R Not Applicable
3. __________
Job Set-up
Subtask 05-27-30-010-050
R A. Not Applicable
4. Procedure
_________
Subtask 05-27-30-210-050
A. Inspection
R (1) Do a general visual inspection of the main landing gear, left and
R right sides. This inspection includes the zones 731 and 741.
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, ducting, piping) are
attached correctly.
R
EFF :
ALL 05-27-30
Page 601
Nov 01/03
BV
R TASK 05-27-30-200-002
R 1. __________________
Reason for the Job
R 2. ______________________
Job Set-up Information
R Not Applicable
R 3. __________
Job Set-up
R Subtask 05-27-30-010-051
R A. Not Applicable
R 4. Procedure
_________
R Subtask 05-27-30-210-051
R A. Inspection
R (2) Make sure that there are no signs of corrosion, cracks or damage.
R (3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.
EFF :
ALL 05-27-30
Page 602
Nov 01/03
BV
R TASK 05-27-30-200-003
R 1. __________________
Reason for the Job
R 2. ______________________
Job Set-up Information
R Not Applicable
R 3. __________
Job Set-up
R Subtask 05-27-30-010-052
R A. Not Applicable
R 4. Procedure
_________
R Subtask 05-27-30-210-052
R A. Inspection
R (2) Make sure that there are no signs of corrosion, cracks or damage.
R (3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.
EFF :
ALL 05-27-30
Page 603
Nov 01/03
BV
R TASK 05-27-30-200-004
R 1. __________________
Reason for the Job
R 2. ______________________
Job Set-up Information
R A. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 05-27-30-010-053
R A. Get Access
R (1) Open the main gear doors 734, 744. (Ref. TASK 32-12-00-010-001)
R 4. Procedure
_________
R Subtask 05-27-30-210-053
R A. Inspection
R (1) Do a general visual inspection of the main landing gear main doors.
R This inspection includes the zones 734 and 744.
R (2) Make sure that there are no signs of corrosion, cracks or damage.
R (3) Make sure that all the installations (wiring, ducting, piping) are
R attached correctly.
EFF :
ALL 05-27-30
Page 604
Nov 01/03
BV
R 5. Close-up
________
R Subtask 05-27-30-410-053
R A. Close Access
R (1) Close the main gear doors 734, 744. (Ref. TASK 32-12-00-410-001)
EFF :
ALL 05-27-30
Page 605
Nov 01/03
BV
ZONAL INSPECTION : DOORS - INSPECTION/CHECK
___________________________________________
TASK 05-28-00-200-001
1. __________________
Reason for the Job
R
R Self Explanatory
2. ______________________
Job Set-up Information
Not Applicable
3. __________
Job Set-up
Subtask 05-28-00-869-050
A. Not Applicable.
4. Procedure
_________
Subtask 05-28-00-210-050
A. Inspection
(1) Do a general visual inspection of the doors from the ground during
the aircraft walkaround.
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-28-00
Page 601
Nov 01/03
BV
___________________________________________________________________
ZONAL INSPECTION : AVIONICS COMPARTMENT DOORS (FORWARD AND LATERAL)
________________
INSPECTION/CHECK
TASK 05-28-10-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-10-010-050
A. Get Access
R (2) Open the forward avionics compartment door 811, (Ref. TASK 52-41-00-
R 010-002).
(Ref. Fig. 601/TASK 05-28-10-991-001)
EFF :
ALL 05-28-10
Page 601
Nov 01/03
BV
R Avionics Compartment Left Side Door and Forward Door
Figure 601/TASK 05-28-10-991-001
EFF :
ALL 05-28-10
Page 602
Nov 01/03
BV
4. Procedure
_________
Subtask 05-28-10-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-28-10-410-050
A. Close Access
R (1) Close the forward avionics compartment door 811, (Ref. TASK 52-41-00-
R 410-002).
EFF :
ALL 05-28-10
Page 603
Nov 01/03
BV
TASK 05-28-10-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-10-010-051
A. Get Access
R (2) Open the forward avionics compartment door 811, (Ref. TASK 52-41-00-
R 010-002).
(Ref. Fig. 601/TASK 05-28-10-991-001)
EFF :
ALL 05-28-10
Page 604
Nov 01/03
BV
4. Procedure
_________
Subtask 05-28-10-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-28-10-410-051
A. Close Access
R (2) Close the forward avionics compartment door 811, (Ref. TASK 52-41-00-
R 410-002).
EFF :
ALL 05-28-10
Page 605
Nov 01/03
BV
TASK 05-28-10-200-003
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-10-010-052
A. Get Access
R (2) Open the forward avionics compartment doors 812, 822 (Ref. TASK 52-
41-00-010-002).
(Ref. Fig. 601/TASK 05-28-10-991-001, 602/TASK 05-28-10-991-002)
EFF :
ALL 05-28-10
Page 606
May 01/05
BV
R Avionics Compartment Right Side Door
Figure 602/TASK 05-28-10-991-002
EFF :
ALL 05-28-10
Page 607
Nov 01/03
BV
4. Procedure
_________
Subtask 05-28-10-210-052
A. Inspection
R (2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-28-10-410-052
A. Close Access
R (1) Close the lateral avionics compartment doors 812, 822 (Ref. TASK 52-
41-00-410-002).
EFF :
ALL 05-28-10
Page 608
May 01/05
BV
TASK 05-28-10-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-10-010-053
A. Get Access
R (2) Open the forward avionics compartment doors 812, 822 (Ref. TASK 52-
41-00-010-002).
(Ref. Fig. 601/TASK 05-28-10-991-001, 602/TASK 05-28-10-991-002)
EFF :
ALL 05-28-10
Page 609
May 01/05
BV
4. Procedure
_________
Subtask 05-28-10-210-053
R A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-28-10-410-053
A. Close Access
R (2) Close the lateral avionics compartment doors 812, 822 (Ref. TASK 52-
41-00-410-002).
EFF :
ALL 05-28-10
Page 610
May 01/05
BV
_____________________________________________________________________________
ZONAL INSPECTION : AVIONICS COMPARTMENT DOORS, CARGO COMPARTMENT DOORS (RIGHT
SIDE) - INSPECTION/CHECK
________________________
TASK 05-28-20-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-20-010-050
A. Get Access
R (2) Open the forward cargo-compartment door 825. (Ref. TASK 52-30-00-860-
001)
EFF :
ALL 05-28-20
Page 601
Nov 01/03
BV
4. Procedure
_________
Subtask 05-28-20-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring,piping) are attached
correctly.
5. Close-up
________
Subtask 05-28-20-410-050
A. Close Access
R (1) Close the forward cargo-compartment door 825. (Ref. TASK 52-30-00-
860-002)
EFF :
ALL 05-28-20
Page 602
Nov 01/03
BV
TASK 05-28-20-200-002
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-20-010-051
A. Get Access
R (2) Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)
EFF :
ALL 05-28-20
Page 603
Nov 01/03
BV
4. Procedure
_________
Subtask 05-28-20-210-051
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, piping) are attached
correctly.
5. Close-up
________
Subtask 05-28-20-410-051
A. Close Access
R (1) Close the AFT cargo-compartment door 826 (Ref. TASK 52-30-00-860-
002).
EFF :
ALL 05-28-20
Page 604
Nov 01/03
BV
TASK 05-28-20-200-003
Zonal Inspection of the Bulk Cargo-Compartment Door and the Stop Fittings on
the Door Frame
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-20-010-052
A. Get Access
(1) Open the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-
006)
4. Procedure
_________
Subtask 05-28-20-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
EFF :
ALL 05-28-20
Page 605
May 01/05
R
BV
5. Close-up
________
Subtask 05-28-20-410-052
A. Close Access
(1) Close the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-
008)
EFF :
ALL 05-28-20
Page 606
May 01/05
R
BV
TASK 05-28-20-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-20-010-053
A. Get Access
R (2) Open the forward cargo-compartment door 825 (Ref. TASK 52-30-00-860-
001).
EFF :
ALL 05-28-20
Page 607
May 01/05
BV
Access Panels of the Cargo Compartment Doors
Figure 601/TASK 05-28-20-991-001
EFF :
ALL 05-28-20
Page 608
May 01/05
R
BV
4. Procedure
_________
Subtask 05-28-20-210-053
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, piping) are attached
correctly.
5. Close-up
________
Subtask 05-28-20-410-053
A. Close Access
R (2) Close the forward cargo-compartment door 825 (Ref. TASK 52-30-00-860-
002).
EFF :
ALL 05-28-20
Page 609
May 01/05
BV
TASK 05-28-20-200-005
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-20-010-054
A. Get Access
(2) Open the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-001)
(3) Remove the access panel 826AR and the insulation blanket.
(Ref. Fig. 601/TASK 05-28-20-991-001)
EFF :
ALL 05-28-20
Page 610
May 01/05
R
BV
4. Procedure
_________
Subtask 05-28-20-210-054
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring,piping) are attached
correctly.
5. Close-up
________
Subtask 05-28-20-410-054
A. Close Access
(1) Install the insulation blanket and the access panel 826AR.
(2) Close the AFT cargo-compartment door 826. (Ref. TASK 52-30-00-860-
002)
EFF :
ALL 05-28-20
Page 611
May 01/05
R
BV
TASK 05-28-20-200-006
Zonal Inspection of the Bulk Cargo-Compartment Door and the Stop Fittings on
the Fuselage Door Frame
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-20-010-055
A. Get Access
(1) Open the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-
006)
4. Procedure
_________
Subtask 05-28-20-210-055
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
EFF :
ALL 05-28-20
Page 612
May 01/05
R
BV
5. Close-up
________
Subtask 05-28-20-410-055
A. Close Access
(1) Close the bulk cargo-compartment door 827. (Ref. TASK 52-30-00-860-
008)
EFF :
ALL 05-28-20
Page 613
May 01/05
R
BV
TASK 05-28-20-200-007
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-20-010-056
A. Get Access
R (2) Open the rear avionic compartment door 824 (Ref. TASK 52-41-00-010-
002).
(Ref. Fig. 602/TASK 05-28-20-991-002)
EFF :
ALL 05-28-20
Page 614
May 01/05
BV
R Rear Avionic Compartment Door
Figure 602/TASK 05-28-20-991-002
EFF :
ALL 05-28-20
Page 615
May 01/05
BV
4. Procedure
_________
Subtask 05-28-20-210-056
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-28-20-410-056
A. Close Access
R (1) Close the rear avionic compartment door 824 (Ref. TASK 52-41-00-410-
002).
EFF :
ALL 05-28-20
Page 616
May 01/05
BV
TASK 05-28-20-200-008
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-20-010-057
A. Get Access
R (2) Open the rear avionic compartment door 824 (Ref. TASK 52-41-00-010-
002).
(Ref. Fig. 602/TASK 05-28-20-991-002)
EFF :
ALL 05-28-20
Page 617
May 01/05
BV
4. Procedure
_________
Subtask 05-28-20-210-057
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
5. Close-up
________
Subtask 05-28-20-410-057
A. Close Access
R (2) Close the rear avionic compartment door 824 (Ref. TASK 52-41-00-410-
002).
EFF :
ALL 05-28-20
Page 618
May 01/05
BV
ZONAL INSPECTION : PASSENGER/CREW DOORS AND EMERGENCY EXITS - INSPECTION/CHECK
______________________________________________________________________________
TASK 05-28-30-200-001
Zonal Inspection of FWD and AFT Passenger/Crew Doors including Door Stops on
Fuselage Door Frames and Door Seals
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-30-010-060
A. Get Access
(2) Open the passenger/crew doors 831(841) or 832(842) (Ref. TASK 52-10-
00-010-001).
EFF :
ALL 05-28-30
Page 601
Nov 01/04
R
BV
4. Procedure
_________
Subtask 05-28-30-210-050
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, piping) are attached
correctly.
R
5. Close-up
________
Subtask 05-28-30-410-060
A. Close Access
(1) Close the passenger/crew doors 831(841) or 832(842) (Ref. TASK 52-10-
00-410-001).
EFF :
ALL 05-28-30
Page 602
Nov 01/04
BV
TASK 05-28-30-200-003
Zonal Inspection of FWD and AFT Emergency Exits including Door Surround on
Fuselage Door Frames and Door Seals
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-30-010-050
A. Get Access
(2) Open the passenger/crew door 831(841) or 832(842) (Ref. TASK 52-10-
00-010-001).
R (3) Open the emergency exit doors 833(843), 834(844) (Ref. TASK 52-21-11-
000-001).
EFF :
ALL 05-28-30
Page 603
Nov 01/05
BV
4. Procedure
_________
Subtask 05-28-30-210-052
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up
________
Subtask 05-28-30-410-050
A. Close Access
R (1) Install the emergency exit doors 833(843), 834(844) (Ref. TASK 52-21-
11-400-001).
(2) Close the passenger/crew door 831(841) or 832(842) (Ref. TASK 52-10-
00-410-001).
EFF :
ALL 05-28-30
Page 604
Nov 01/05
BV
TASK 05-28-30-200-005
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-30-010-052
A. Get Access
EFF :
ALL 05-28-30
Page 605
Nov 01/05
BV
4. Procedure
_________
Subtask 05-28-30-210-054
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations (wiring, piping) are attached
correctly.
5. Close-up
________
Subtask 05-28-30-410-052
A. Close Access
EFF :
ALL 05-28-30
Page 606
Nov 01/05
BV
R (Ref. TASK 25-23-46-400-002).
EFF :
ALL 05-28-30
Page 607
May 01/04
BV
TASK 05-28-30-200-007
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
R -------------------------------------------------------------------------------
R REFERENCE QTY DESIGNATION
R -------------------------------------------------------------------------------
R B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-28-30-010-054
A. Get Access
R (2) Open the passenger/crew door 831(841) or 832(842) (Ref. TASK 52-10-
R 00-010-001).
R (3) Open the emergency exit doors 833(843) and 834(844) (Ref. TASK 52-21-
11-000-001).
EFF :
ALL 05-28-30
Page 608
May 01/04
BV
R (4) Remove the emergency-exit door panels
R 833AZ, 833BZ, 834AZ, 834BZ, 843AZ, 843BZ, 844AZ, 844BZ (Ref. TASK 25-
23-47-000-001).
4. Procedure
_________
Subtask 05-28-30-210-056
A. Inspection
(2) Make sure that there are no signs of corrosion, cracks or damage.
(3) Make sure that all the installations are attached correctly.
5. Close-up
________
Subtask 05-28-30-410-054
A. Close Access
R (3) Close the emergency exit doors 833(843) and 834(844) (Ref. TASK 52-
21-11-400-001).
R (4) Close the passenger/crew door 831(841) or 832(842) (Ref. TASK 52-10-
R 00-410-001).
EFF :
ALL 05-28-30
Page 609
May 01/04
BV
UNSCHEDULED MAINTENANCE CHECKS - DESCRIPTION AND OPERATION
__________________________________________________________
1. _______
General
This section gives information related to the unsheduled maintenance checks:
- inspection/checks after the aircraft has gone through special or abnormal
conditions (Ref. ATA 05-51),
R - pressurization test of fuselage (leakage checks) after A/C abnormal
R operation or repair (Ref. ATA 05-53),
R - demagnetization of the external parts of the frames of the windshield and
R sliding windows (Ref. ATA 05-54),
- levelling and measurement after aircraft abnormal operation (Ref. ATA
05-56),
- aircraft stability (Ref. ATA 05-57),
- requirements of non-revenue flight following maintenance actions (Ref. ATA
05-59).
EFF :
ALL 05-50-00
Page 1
Nov 01/97
BV
UNSCHEDULED MAINTENANCE CHECKS - MAINTENANCE PRACTICES
______________________________________________________
TASK 05-50-00-790-001
1. __________________
Reason for the Job
This task gives you all the fluid leak measurement procedures for flight
R controls, fuel, hydraulic, landing gear, cargo door and power plant systems.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-50-00-941-052
A. Not Applicable
4. Procedure
_________
Subtask 05-50-00-360-050
A. Measurement of Leaks
EFF :
ALL 05-50-00
Page 201
May 01/01
BV
R (5) Measurement of cargo door system leaks (Ref. TASK 29-00-00-790-001).
EFF :
ALL 05-50-00
Page 202
May 01/01
BV
INSPECTIONS - DESCRIPTION AND OPERATION
_______________________________________
1. _______
General
This section contains those inspections that are necessary after an incident
or flight in abnormal conditions and will, in most cases, be called for as a
result of flight crew report.
R If there is no inspection in this section applicable to incident or abnormal
R flight conditions that occurred, operators must tell Airbus and make a
R request for more instructions.
A. Inspection Coverage
It is not possible to lay down precise details of the inspection
procedure to adopted after every incident because of the wide variations
of weight, speed, nature and direction of loads, weather conditions and
component failure patterns. Therefore these inspections have been written
for the worst possible case. In order to gain an indication of the
severity of the incident and to facilitate rapid location of primary
damage it is essential that full information is obtained from the flight
crew. Therefore prior to starting an inspection consult the crew and
ascertain details of:
- Weather conditions
- Aircraft speed and flight attitude
- Aircraft weight and fuel distribution
- In landing mode, if touchdown was straight, drifting, wing low, nose
high or low
- If any noise of impact or indicative of structure or component failure
was heard
- Relevant instrument indications
Printout of the maintenance data recorder tape will provide valuable
additional data and indication of system malfunction.
B. Inspection Sequence
To permit simultaneous inspection of several areas of the aircraft the
inspection has been divided into a number of Packages.
For example: Inspection after Hail Impact requires on Phase 1 a
complete airframe external check. Therefore this is divided into four
major zones: fuselage, wings, nacelles/pylons and stabilizers. These
major zones are further divided into smailer zones or major components.
The small zones are then broken down into items, which can be
individually signed off as inspection is completed.
The inspections are divided into three phases:
- Phase 1: is a general inspection for primary damage and indication of
remote damage and is mainly external.
- Phase 2: is a more detailed inspection and is mainly internal. Some
component removal may be called up.
- Phase 3: is a very detailed inspection involving component removal and
strip down.
EFF :
ALL 05-51-00
Page 1
Nov 01/04
BV
If the Phase 1 inspection reveals no damage, no further examination is
necessary.
If Phase 1 reveals damage then Phase 2 must be accomplished.
If Phase 2 reveals damage then Phase 3 must be accomplished.
C. Inspection Form
(Ref. Fig. 001)
The layout of the inspection form has been arranged as follows:
- columns are explained on the figure
- columns INSP. CODE and INSP. SIGN are provided for use by the
operators, they wish to use them, for inspection intensity code and
accomplishment signature. The forms may thus be photo-copied, used as
work cards and then filed with the aircraft technical record on
completion.
EFF :
ALL 05-51-00
Page 2
Nov 01/04
R
BV
R Inspection Form
Figure 001
EFF :
ALL 05-51-00
Page 3
Nov 01/00
BV
INSPECTIONS AFTER HARD/OVERWEIGHT LANDING - INSPECTION/CHECK
____________________________________________________________
TASK 05-51-11-200-004
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 601
May 01/04
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 602
Nov 01/06
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 603
Nov 01/06
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-11-941-050
A. Inspection Preparation
(a) From the crew about the landing conditions. For example, find
out:
R - if the landing was straight, drifting, wing-low, tail or nose
R heavy
- if the crew heard a noise possibly related to a structural
failure.
EFF :
ALL 05-51-11
Page 604
May 01/06
BV
R (3) With these pieces of information refer to the inspection definition
diagram.
(Ref. Fig. 601/TASK 05-51-11-991-004)
Subtask 05-51-11-481-050
B. Safety precautions
(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
(2) Put a warning notice in the cockpit to tell persons not to operate
the aircraft systems.
Subtask 05-51-11-866-050
Subtask 05-51-11-010-051
D. Get access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).
(4) Open the thrust reverser cowl doors (Ref. TASK 78-36-00-010-040).
(5) Put the access platform in position (Zone 400, 500 and 600).
EFF :
ALL 05-51-11
Page 605
May 01/06
BV
Inspection - Definition Diagram
Figure 601/TASK 05-51-11-991-004
EFF :
ALL 05-51-11
Page 606
May 01/06
R
BV
Subtask 05-51-11-860-052
(1) Make sure that the hydraulic system is depressurized (Ref. TASK 29-
00-00-864-001).
(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
4. Procedure
_________
Subtask 05-51-11-210-051
R NOTE : Refer to the latest revision of the EASA AD 2006-0069 (or any
____
R related Airworthiness Authorities directive) for other possible
R inspection requirements for the wing botton skin area at MLG
R support Rib 5, before the subsequent flight.
NOTE : All the inspection are visual unless differently specified in the
____
text. Operators can refer to the Non-destructive Testing Manual
(NTM) and use the non-destructive procedures.
Subtask 05-51-11-210-050
B. General Inspection
(1) Do a walk around inspection of the aircraft. Make sure that you
cannot see damage and fluid leaks. Carefully examine the landing
gears, the wheels, the tires and the brake units.
EFF :
ALL 05-51-11
Page 607
Nov 01/06
BV
Aircraft Structure - Critical Areas
Figure 602/TASK 05-51-11-991-005
EFF :
ALL 05-51-11
Page 608
Feb 01/96
BV
Subtask 05-51-11-210-052
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Examine the engine pylon | | | | | |
| | | | | | | | |
| A.| | Examine the pylon panels, the doors | X | | | | |
| | | and the auxiliary structure. Make sure| | | | | |
| | | that there are no: | | | | | |
| | | buckling, cracks and pulled or missing| | | | | |
| | | fasteners. | | | | | |
| | | | | | | | |
| B.| | Examine the main frame and pylon lower| X | | | | |
| | | area. Make sure that: | | | | | |
| | | - there are no distortion or cracks, | | | | | |
| | | - the paint is in the correct | | | | | |
| | | condition, | | | | | |
| | | - the rivets are not loose, | | | | | |
| | | - there are no signs of shearing. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove or open the access doors | | X | | | |
| | | and the inspection panels. Examine| | | | | |
| | | the panels and the adjacent | | | | | |
| | | structure. Make sure that: | | | | | |
| | | - there is no distortion, | | | | | |
| | | - the plates have no buckles, | | | | | |
| | | wrinkles or tears where they are| | | | | |
| | | riveted to the panels. | | | | | |
| | | (2) Do an internal inspection. Make | | X | | | |
| | | sure that: | | | | | |
| | | - there is no distortion on the | | | | | |
| | | pylon main frame and the spars | | | | | |
| | | connected to the side panels are| | | | | |
| | | in the correct condition, | | | | | |
| | | - examine the attachment between | | | | | |
| | | main ribs (1, 3, 4 and 10), the | | | | | |
| | | side panels, the upper and | | | | | |
| | | lower spars, | | | | | |
| | | - examine the fire protection | | | | | |
| | | system especially extinguishing | | | | | |
| | | containers attachments, | | | | | |
| | | - examine the electrical cables, | | | | | |
EFF :
ALL 05-51-11
Page 609
May 01/06
R
BV
Primary Structure - Materials and Protections Description
Figure 603/TASK 05-51-11-991-007
EFF :
ALL 05-51-11
Page 610
May 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | the hydraulic pipes, the fuel | | | | | |
| | | pipes and the components of the | | | | | |
| | | engine air-bleed system, | | | | | |
| | | - examine the different components| | | | | |
| | | installed on the main frame. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Do the inspection of the | | | | | |
| | | engine-to-pylon and the | | | | | |
| | | pylon-to-wing attachments. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-053
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Examine the Engine-to-Pylon Attach | | | | | |
| | | Fittings | | | | | |
| | | | | | | | |
| A.| | Remove the engine | | | X | | |
| | | (Ref. TASK 71-00-00-000-040). | | | | | |
| | | | | | | | |
| B.| | Do an inspection of the attach | | | X | | |
| | | fittings at the head of rib 1 pyramid | | | | | |
| | | and under rib 3. | | | | | |
| | | (1) Make sure that there are no signs | | | | | |
| | | of distortion, damage to the | | | | | |
| | | structure (cracks, rupture and | | | | | |
| | | signs of oxydation or burning). | | | | | |
| | | | | | | | |
|2. | | Examine the Pylon-to-Wing Attach | | | | | |
| | | Fittings | | | | | |
| | | | | | | | |
| A.| | Remove the center fillets at the | | | X | | |
EFF :
ALL 05-51-11
Page 611
May 01/06
R
BV
Engine-to-Pylon Attach Fittings
Figure 604/TASK 05-51-11-991-008
EFF :
ALL 05-51-11
Page 612
May 01/06
R
BV
Pylon-to-Wing Attach Fittings
Figure 605/TASK 05-51-11-991-009
EFF :
ALL 05-51-11
Page 613
May 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | pylon-to-wing junction. | | | | | |
| | | | | | | | |
| B.| | Remove the pylon-to-wing attach | | | X | | |
| | | fittings | | | | | |
| | | (Ref. TASK 54-51-17-000-001) | | | | | |
| | | (Ref. TASK 54-51-17-000-002). | | | | | |
| | | | | | | | |
| C.| | Do a detailed visual inspection of : | | | X | | |
| | | - the forward attach fitting at rib 4 | | | | | |
| | | (Ref. TASK 54-51-17-200-001), | | | | | |
| | | - the spigot between ribs 4 and 5, | | | | | |
| | | - the rear attach fitting at rib 10 | | | | | |
| | | (Ref. TASK 54-51-17-200-002). | | | | | |
| | | If there are signs of damage: | | | | | |
| | | (1) Defuel the wing | | | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the internal | | | | | |
| | | structure adjacent to ribs 7 and | | | | | |
| | | 8 (Ref. TASK 28-10-00-910-002). | | | | | |
| | | Make a full inspection of these | | | | | |
| | | items. Make sure that: | | | | | |
| | | - there are no cracks or damage, | | | | | |
| | | - the paint and the sealant are | | | | | |
| | | not damaged, the fasteners and | | | | | |
| | | safety devices are in the | | | | | |
| | | correct condition. | | | | | |
| | | Examine the rear face of the front| | | | | |
| | | spar, inboard of rib 7 to outboard| | | | | |
| | | of rib 8. | | | | | |
| | | Examine the front face of the rear| | | | | |
| | | spar inboard of rib 7 to outboard | | | | | |
| | | of rib 8. | | | | | |
| | | Examine the pylon rear attachment:| | | | | |
| | | - ribs 7 and 8, | | | | | |
| | | - the stringers and brackets. | | | | | |
| | | | | | | | |
| D.| | Do an inspection of all the pipes and | | | X | | |
| | | holes. Make sure that they are | | | | | |
| | | attached correctly. Make sure that | | | | | |
| | | there are no leaks. | | | | | |
| | | | | | | | |
| E.| | Close access doors to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
EFF :
ALL 05-51-11
Page 614
May 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| F.| | Install the pylon-to-wing attach | | | | | |
| | | fittings | | | | | |
| | | (Ref. TASK 54-51-17-400-001) | | | | | |
| | | (Ref. TASK 54-51-17-400-002). | | | | | |
| | | | | | | | |
| G.| | Install the engine | | | | | |
| | | (Ref. TASK 71-00-00-400-040). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-054
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Examine the Nacelle | | | | | |
| | | | | | | | |
| A.| | Do an external inspection of: | X | | | | |
| | | - air intake cowls, | | | | | |
| | | - fan Cowls, | | | | | |
| | | - fan thrust reverser cowls. | | | | | |
| | | | | | | | |
| | | Make sure that: | | | | | |
| | | - there are no distortion, cracks, | | | | | |
| | | delamination, the paint is not | | | | | |
| | | cracked or flaked, | | | | | |
| | | - the rivets are not loose, | | | | | |
| | | - there are no signs of shearing. | | | | | |
| | | | | | | | |
| B.| | Do an internal inspection of the same | X | | | | |
| | | items of equipment. Make sure that | | | | | |
| | | there are no signs of damage. | | | | | |
| | | | | | | | |
| C.| | Examine all the cowl attachment points| X | | | | |
| | | on the pylon and all the cowl hinge | | | | | |
| | | fittings. | | | | | |
| | | | | | | | |
| D | | Examine all the cowl latches. Make | X | | | | |
| | | sure that they are not damaged and | | | | | |
| | | operate correctly. | | | | | |
EFF :
ALL 05-51-11
Page 615
May 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | If you find damage on the thrust | | | | | |
| | | reverser cowls : | | | | | |
| | | (1) Do an operational test of the | | X | | | |
| | | thrust reverser system. Make sure | | | | | |
| | | that the thrust reversers can move| | | | | |
| | | fully and freely | | | | | |
| | | (Ref. TASK 78-31-00-710-040). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-055
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Examine the Engine | | | | | |
| | | | | | | | |
| A.| | Turn the fan rotor by hand. Make sure | X | | | | |
| | | that there are no bearing roughness, | | | | | |
| | | unusual noises and bindings (high | | | | | |
| | | rubbing of the seals and the shrouds | | | | | |
| | | is normal). | | | | | |
| | | | | | | | |
| B.| | Examine the primary nozzle. Make sure | X | | | | |
| | | that : | | | | | |
| | | - it is correctly attached to the | | | | | |
| | | engine, | | | | | |
| | | - there are no distortion or cracks, | | | | | |
| | | no loose rivets, no signs of | | | | | |
| | | shearing or delamination. | | | | | |
| | | | | | | | |
| C.| | Examine the nose cowl attachments to | X | | | | |
| | | the fan case. Make sure that there are| | | | | |
| | | no distortion, delamination, cracks, | | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Do an inspection of the engine | | X | | | |
| | | after rough landing | | | | | |
| | | (Ref. TASK 72-00-00-200-003). | | | | | |
| | | (2) If you find seal or shroud | | X | | | |
EFF :
ALL 05-51-11
Page 616
May 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | interference and you think it is | | | | | |
| | | minor : | | | | | |
| | | - the engine is serviceable after | | | | | |
| | | you do a satisfactory power | | | | | |
| | | assurance check | | | | | |
| | | (Ref. TASK 71-00-00-710-008). | | | | | |
| | | (3) After the test, examine the | | X | | | |
| | | magnetic chip detectors and the | | | | | |
| | | elements of the scavenge oil | | | | | |
| | | filter. | | | | | |
| | | Make sure that there are no sign | | | | | |
| | | of bearing distress | | | | | |
| | | (Ref. TASK 79-21-10-210-002). | | | | | |
| | | If you find damage : | | | | | |
| | | (a) Remove the engine | | | X | | |
| | | (Ref. TASK 71-00-00-000-040). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-056
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Main Landing Gear | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the MLG | X | | | | |
| | | (Ref. TASK 32-11-00-200-001). | | | | | |
| | | | | | | | |
| B.| | If there are signs of damage, do an | | X | | | |
| | | alignment check of the MLG, the axles | | | | | |
| | | and the main fitting | | | | | |
| | | (Ref. TASK 05-56-00-200-001). | | | | | |
| | | | | | | | |
| C.| | If the dimensions are more than | | | X | | |
| | | given in TASK 05-56-00-200-001 : | | | | | |
| | | | | | | | |
| | | (1) Lift the aircraft | | | | | |
| | | (Ref. TASK 07-11-00-581-001). | | | | | |
| | | (2) Remove the shock absorber from | | | | | |
| | | the main fitting | | | | | |
| | | (Ref. TASK 32-11-13-000-001). | | | | | |
| | | (3) Remove and examine these items: | | | | | |
EFF :
ALL 05-51-11
Page 617
May 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the retainer pin, | | | | | |
| | | - the retainer pin bushes, | | | | | |
| | | - the main fitting adjacent to the| | | | | |
| | | retainer pin bushes, | | | | | |
| | | - the center tube. | | | | | |
| | | Make sure that there are no signs | | | | | |
| | | of distortion, cracks or damage. | | | | | |
| | | (4) Make sure that the charge pressure| | | | | |
| | | of the shock absorber is correct | | | | | |
| | | (Ref. TASK 12-14-32-614-003). | | | | | |
| | | | | | | | |
| D.| | If there are signs of damage, you | | | X | | |
| | | must remove the main fitting and the | | | | | |
| | | shock absorber for component | | | | | |
| | | maintenance. | | | | | |
| | | | | | | | |
|2. | | Nose Landing Gear | | | | | |
| | | | | | | | |
| | |NOTE: If the crew makes a report of a | | | | | |
| | | hight pitch rate, AIRBUS | | | | | |
| | | recommends to lift the aircraft | | | | | |
| | | at the nose jacking point to do | | | | | |
| | | a check of the shock absorber | | | | | |
| | | extension. | | | | | |
| | | | | | | | |
| A.| | Examine the shock absorber. Make sure | X | | | | |
| | | that there are no oil leaks. | | | | | |
| | | If you can see signs of oil leaks: | | | | | |
| | | (1) Remove the shock absorber for | | X | | | |
| | | overhaul | | | | | |
| | | (Ref. TASK 32-21-13-000-001). | | | | | |
| | | | | | | | |
| B.| | Make sure that the charge pressure | X | | | | |
| | | of the shock absorber is correct | | | | | |
| | | (Ref. TASK 12-14-32-614-004). | | | | | |
| | | | | | | | |
| C.| | Make sure that the hydraulic lines and| X | | | | |
| | | the electrical harness are in the | | | | | |
| | | correct condition. | | | | | |
| | | | | | | | |
| D.| | Make sure that the NLG safety lock | X | | | | |
| | | can be installed easily. | | | | | |
| | | | | | | | |
| E.| | Make sure that the wheels and the | X | | | | |
| | | tires are in the correct condition | | | | | |
| | | (Ref. TASK 32-41-00-210-002). | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 618
May 01/06
R
BV
Subtask 05-51-11-210-057
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Fuselage-Nose-landing-gear section | | | | | |
| | | between STA539/FR9 and STA808/FR20. | | | | | |
| | | | | | | | |
| | | NOTE : This inspection is necessary if| | | | | |
| | | you find, damage during the | | | | | |
| | | phase 1 check of the nose | | | | | |
| | | landing gear. | | | | | |
| | | | | | | | |
| A.| | Nose-gear upper strut attachments | | X | | | |
| | | (FR14). Examine the area around the | | | | | |
| | | bearing, the attachment of the | | | | | |
| | | fitting on the FWD frame and roof of | | | | | |
| | | the nose wheel well and the link rods.| | | | | |
| | | | | | | | |
| B.| | Nose-gear actuating cylinder | | X | | | |
| | | attachment-fitting (FR20). | | | | | |
| | | Examine the attachment of the | | | | | |
| | | actuating cylinder fitting to the | | | | | |
| | | upper link at FR19 and FR20. | | | | | |
| | | | | | | | |
| C.| | Nose-gear leg attachments (FR19). | | X | | | |
| | | Examine the attachments at FR19 and | | | | | |
| | | FR20 and the longitudinal beams. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 619
Nov 01/01
R
BV
Nose Landing Gear
Figure 606/TASK 05-51-11-991-010
EFF :
ALL 05-51-11
Page 620
Feb 01/96
BV
Subtask 05-51-11-210-058
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Main Gear Doors | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the doors, the | X | | | | |
| | | hinges and the adjacent structure. | | | | | |
| | | | | | | | |
|2. | | Main-Gear Fixed Fairing | | | | | |
| | | | | | | | |
| A.| | Make an inspection of the fixed | X | | | | |
| | | fairing and the attachments to the | | | | | |
| | | main-gear leg | | | | | |
| | | | | | | | |
|3. | | Main-Gear Hinged Fairing | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the hinged fairing| X | | | | |
| | | and the attachments to the main gear | | | | | |
| | | leg and the wing. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-059
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Flap Operating Mechanism | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the flap operating| X | | | | |
| | | mechanism | | | | | |
| | | (Ref. TASK 27-54-00-200-001). | | | | | |
| | | If there are indications of damage: | | | | | |
| | | (1) Remove the applicable component(s)| | X | | | |
| | | for component maintenance. | | | | | |
| | | (2) Do an inspection of the | | X | | | |
| | | component(s) attachments. | | | | | |
| | | If these are indications of damage| | | | | |
| | | (a) Remove the attachments of the | | | X | | |
| | | component(s). | | | | | |
EFF :
ALL 05-51-11
Page 621
Nov 01/01
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (b) Do an inspection of the component | | | X | | |
| | | attachment/structure interface. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-070
L. Inspection of the Flap Tracks and Attachments (Fuselage) (Ref. TASK 57-
51-33-000-001) (Ref. TASK 57-51-33-400-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Flap Tracks and Attachments | | | | | |
| | | | | | | | |
| A.| | Get access to the MLG well and the aft| X | | | | |
| | | cargo compartment. | | | | | |
| | | Do an inspection of the flap track N⁰1| | | | | |
| | | attachments at FR45 and FR47 for: | | | | | |
| | | - damage, | | | | | |
| | | - cracks, | | | | | |
| | | - correct condition of the fasteners | | | | | |
| | | and the safety devices. | | | | | |
| | | | | | | | |
| B.| | Examine the flap track N⁰1 for: | X | | | | |
| | | - cracks, | | | | | |
| | | - correct condition of the fasteners | | | | | |
| | | and the safety devices, | | | | | |
| | | - damaged sealant. | | | | | |
| | | | | | | | |
| | | If you find signs of damage: | | X | | | |
| | | (1) Remove the flap track N⁰1 for | | | | | |
| | | component maintenance | | | | | |
| | | (Ref. TASK 57-51-33-000-001). | | | | | |
| | | (2) Remove the flap track N⁰1 | | | | | |
| | | attachments at FR45 and FR47. | | | | | |
| | | (3) Do an inspection of the flap track| | | | | |
| | | N⁰1 attachment/structure interface| | | | | |
| | | for damage. | | | | | |
| | | (4) Install the flap track N⁰1 | | | | | |
| | | (Ref. TASK 57-51-33-400-001). | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 622
Nov 01/01
R
BV
Subtask 05-51-11-210-060
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Top Skin | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the wing top skin.| X | | | | |
| | | Make sure that: | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - the fasteners are in the correct | | | | | |
| | | condition. Pay particular attention | | | | | |
| | | to the fasteners at the rear spar | | | | | |
| | | between rib 3 and rib 5. | | | | | |
| | | | | | | | |
|2. | | Bottom Skin | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the wing bottom | X | | | | |
| | | skin. Carefully examine the areas | | | | | |
| | | adjacent to: | | | | | |
| | | - the flap beams, | | | | | |
| | | - the engine pylon, | | | | | |
| | | - the MLG attachments. | | | | | |
| | | Make sure that: | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there are no fluid leaks, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - the fasteners are in the correct | | | | | |
| | | condition. | | | | | |
| | | | | | | | |
| B.| | If there are signs of damage adjacent | | X | | | |
| | | to the beams of flaps N⁰2, 3 or 4. | | | | | |
| | | (1) Remove the applicable flap beam | | | | | |
| | | fairing | | | | | |
EFF :
ALL 05-51-11
Page 623
Nov 01/01
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 57-55-11-000-001). | | | | | |
| | | | | | | | |
| C.| | Do an inspection of the flap beam | | X | | | |
| | | assembly(ies). Make sure that: | | | | | |
| | | - the clearance to the wing is | | | | | |
| | | correct, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - there is no damage, | | | | | |
| | | - the fasteners and safety devices are| | | | | |
| | | in the correct condition. | | | | | |
| | | | | | | | |
| D.| | Do an inspection of the applicable | | X | | | |
| | | flap track. Make sure that there are | | | | | |
| | | no cracks and damage. Do this | | | | | |
| | | inspection with the flaps extended and| | | | | |
| | | retracted. | | | | | |
| | | | | | | | |
| | | NOTE : Use the applicable NTM | | | | | |
| | | procedure to find small cracks | | | | | |
| | | into the track radii. | | | | | |
| | | | | | | | |
| E.| | If there are signs of damage to the | | | X | | |
| | | flap beam(s) or flap track(s). | | | | | |
| | | (1) Remove the related flap beam | | | | | |
| | | assembly for component maintenance| | | | | |
| | | - for the flaps N⁰2 beam assembly | | | | | |
| | | (Ref. TASK 57-51-33-000-002), | | | | | |
| | | - for the flaps N⁰3 beam assembly | | | | | |
| | | (Ref. TASK 57-51-33-000-003), | | | | | |
| | | - for the flaps N⁰4 beam assembly | | | | | |
| | | (Ref. TASK 57-51-33-000-004). | | | | | |
| | | (2) Get access to the area(s) | | | | | |
| | | adjacent to the applicable flap | | | | | |
| | | beam(s). | | | | | |
| | | Do an internal inspection of: | | | | | |
| | | - the ribs, | | | | | |
| | | - the wing top and bottom skins, | | | | | |
| | | - the internal face of the rear | | | | | |
| | | spar for flap beams 3 and 4, | | | | | |
| | | - the internal face of the false | | | | | |
| | | rear spar for the N⁰2 beam, | | | | | |
EFF :
ALL 05-51-11
Page 624
Nov 01/01
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the applicable flap beam | | | | | |
| | | attachments. | | | | | |
| | | | | | | | |
| F.| | If there are signs of damage on the | | X | | | |
| | | wing top or bottom skins | | | | | |
| | | (1) Defuel the wing | | | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the area adjacent to| | | | | |
| | | the damage | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | Do an internal inspection of: | | | | | |
| | | - the applicable ribs, the front | | | | | |
| | | and rear spars, the top and | | | | | |
| | | bottom skins, the stringers, | | | | | |
| | | the riblets, the brackets and | | | | | |
| | | the plates. | | | | | |
| | | | | | | | |
|3. | | Wing rib 1 to rib 10 area | | | | | |
| | | | | | | | |
| | | Front, Rear and False rear Spars and | | | | | |
| | | Trailing, Edge False work. | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the front, rear | X | | | | |
| | | and false rear spars, the shroud box, | | | | | |
| | | the fixed shroud, the riblets, | | | | | |
| | | stringers and brackets. Make sure | | | | | |
| | | that: | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there is no damage, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - there are no fluid leaks, | | | | | |
| | | - the fasteners and safety devices are| | | | | |
| | | in the correct condition. | | | | | |
| | | | | | | | |
| B.| | If there are signs of damage on the | | X | | | |
| | | front and rear spars | | | | | |
| | | (1) Defuel the wing | | | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access in the wing adjacent to| | | | | |
| | | the damage | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | Do an internal inspection of all | | | | | |
EFF :
ALL 05-51-11
Page 625
Nov 01/01
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | the ribs, riblets, stringers, | | | | | |
| | | brackets and plates. | | | | | |
| | | Make sure that: | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there is no damage, | | | | | |
| | | - the paint and the sealant are | | | | | |
| | | not damaged, | | | | | |
| | | - the fasteners are in the correct| | | | | |
| | | condition. | | | | | |
| C.| | If there are indications of damage on | | X | | | |
| | | the rear spar and false rear spar | | | | | |
| | | (1) Do an inspection of these items: | | | | | |
| | | - the top diagonal stiffener, | | | | | |
| | | - the MLG attachment, | | | | | |
| | | - the top edge beam, | | | | | |
| | | - the MLG pintle fitting, | | | | | |
| | | - the MLG actuator fitting, | | | | | |
| | | - the sidestay attachment, | | | | | |
| | | - the MLG support rib, | | | | | |
| | | - the riblets, stringers and | | | | | |
| | | brackets. | | | | | |
| | | Make sure that: | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there is no damage, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - the fasteners are in the correct | | | | | |
| | | condition. | | | | | |
| | | | | | | | |
| D.| | Do an inspection of all the pipes, | X | | | | |
| | | the hoses, the electrical looms and | | | | | |
| | | the raceways. | | | | | |
| | | | | | | | |
| E.| | Close access to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | | | | | | |
| F.| | Install the flap beam | | | | | |
| | | - for the flap No.2 beam | | | | | |
| | | (Ref. TASK 57-51-33-400-002), | | | | | |
| | | - for the flap No.3 beam | | | | | |
| | | (Ref. TASK 57-51-33-400-003), | | | | | |
| | | - for the flap No.4 beam | | | | | |
| | | (Ref. TASK 57-51-33-400-004). | | | | | |
EFF :
ALL 05-51-11
Page 626
Nov 01/01
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| G.| | Install the flap beam fairings | | | | | |
R | | | (Ref. TASK 57-55-11-400-001). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-061
N. Flight Data and Cockpit Voice Recorders Inspection (Ref. TASK 31-33-00-
710-007) (Ref. TASK 23-71-00-710-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Flight Data, Cockpit Voice Recorders | | | | | |
| | | | | | | | |
| A.| | Open access door 312AR. Make sure that| X | | | | |
| | | the recording units are not damaged | | | | | |
| | | and are attached correctly. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Make sure that these systems | | X | | | |
| | | operate correctly: | | | | | |
| | | - digital Flight Data Recorder | | | | | |
| | | (DFDR) | | | | | |
| | | (Ref. TASK 31-33-00-710-007), | | | | | |
| | | - cockpit Voice Recorder (CVR) | | | | | |
| | | (Ref. TASK 23-71-00-710-001). | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 627
Nov 01/06
BV
Subtask 05-51-11-210-063
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Avionics Compartment | | | | | |
| | | (Zones 121-122) | | | | | |
| | | | | | | | |
| A.| | Open the access doors to the avionics | X | | | | |
| | | compartment. Examine the electrical | | | | | |
| | | and electronic components, the radio, | | | | | |
| | | the battery and the racks. Make sure | | | | | |
| | | that they are not damaged and are | | | | | |
| | | installed correctly. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) If there is structural damage | | X | | | |
| | | that makes repairs necessary: | | | | | |
| | | - examine all types of connectors.| | | | | |
| | | Make sure that they are not | | | | | |
| | | cracked and/or chipped. | | | | | |
| | | (2) Make sure that the Quick Access | | X | | | |
| | | Recorder (QAR) operates correctly | | | | | |
| | | (Ref. TASK 31-33-00-710-005). | | | | | |
| | | | | | | | |
| B.| | Make sure that the batteries are | X | | | | |
| | | attached correctly. Make sure that | | | | | |
| | | there are no leaks | | | | | |
| | | (Ref. TASK 24-38-00-210-001). | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Make sure that the system operates| | X | | | |
| | | correctly | | | | | |
| | | (Ref. TASK 24-38-00-710-001). | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 628
Nov 01/01
R
BV
Subtask 05-51-11-210-064
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Fuselage/Tail Section | | | | | |
| | | | | | | | |
| | |Examine the unpressurized area behind | | | | | |
| | |the pressure bulkhead - Between FR70 | | | | | |
| | |and FR77 - and the adjacent structure. | | | | | |
| | | | | | | | |
| A.| |Examine the skin and the stringers for:| | | | | |
| | |- wrinkles, buckles, cracked or flaking| | | | | |
| | | paint, loose rivets, | | | | | |
| | |- signs of shearing, distorted and | | | | | |
| | | twisted stringers. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-065
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Fuselage section between FR35 and FR47| | | | | |
| | | | | | | | |
| A.| | Examine the belly fairing panels for: | X | | | | |
| | | - loose fasteners, cracked or flaking | | | | | |
| | | paint, correct attachement, | | | | | |
| | | delamination. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the panels and examine | | X | | | |
| | | internally the belly fairing for: | | | | | |
| | | - the correct attachment of all | | | | | |
| | | the components, | | | | | |
| | | - loose rivets. | | | | | |
| | | (2) Examine the fuselage skin | | X | | | |
| | | externally below the belly fairing| | | | | |
| | | zone for: | | | | | |
EFF :
ALL 05-51-11
Page 629
Nov 01/01
R
BV
Main Structure of the Cone/Rear Fuselage
Figure 607/TASK 05-51-11-991-011
EFF :
ALL 05-51-11
Page 630
Feb 01/96
BV
Lower Part of the Center Fuselage
Figure 608/TASK 05-51-11-991-012
EFF :
ALL 05-51-11
Page 631
Nov 01/00
R
BV
Center Section
Figure 609/TASK 05-51-11-991-013
EFF :
ALL 05-51-11
Page 632
Nov 01/00
R
BV
Component Location in the Belly Fairing Structure
Figure 610/TASK 05-51-11-991-014
EFF :
ALL 05-51-11
Page 633
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - buckling, loose rivets, cracked | | | | | |
| | | or flaking paint. | | | | | |
| | | | | | | | |
| B.| | Examine the canted frames at the | X | | | | |
| | | boundaries of the wheel wells, their | | | | | |
| | | junctions, the fittings at FR42 and | | | | | |
| | | the adjacent areas. | | | | | |
| | | | | | | | |
| C.| | Examine the main-gear locking-system | X | | | | |
| | | attachment at FR44 | | | | | |
| | | | | | | | |
| D.| | Examine the longitudinal edging spars | X | | | | |
| | | of the keel beam section. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine the structure of the keel | | X | | | |
| | | beam. | | | | | |
| | | (2) Examine the structure of the | | X | | | |
| | | passenger compartment floor in | | | | | |
| | | the main gear well. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) From FR35 to FR47, examine | | | X | | |
| | | internally the panels junction of | | | | | |
| | | the upper fuselage at stringers | | | | | |
| | | 6L and 6R. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 634
Nov 01/01
R
BV
Subtask 05-51-11-210-066
S. Inspection of the Tail Unit (Ref. TASK 55-10-00-210-001) (Ref. TASK 55-
30-00-200-001) (Ref. TASK 49-16-00-210-001) (Ref. TASK 55-16-00-200-001)
(Ref. TASK 55-36-00-210-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Tail Unit (Fuselage Tail Section) | | | | | |
| | |(Zones 310-320-330-340) | | | | | |
| | | | | | | | |
| A.| |Do a general visual inspection of: | X | | | | |
| | |- the attachment areas of the | | | | | |
| | | horizontal and vertical stabilizers, | | | | | |
| | |- the APU air-intake areas of the tail | | | | | |
| | | cone. | | | | | |
| | |Horizontal stabilizer | | | | | |
| | |(Ref. TASK 55-16-00-200-001) | | | | | |
| | |Vertical stabilizer | | | | | |
| | |(Ref. TASK 55-36-00-210-001) | | | | | |
| | |APU intake (Ref. TASK 49-16-00-210-001)| | | | | |
| | |If you find damage: | | | | | |
| | |(1) Do a detailed visual inspection | | X | | | |
| | | of the vertical stabilizer center | | | | | |
| | | box (Ref. TASK 55-30-00-200-001) | | | | | |
| | |(2) Do a visual inspection of the THS | | | | | |
| | | sparbox | | | | | |
| | | (Ref. TASK 55-10-00-210-001) | | | | | |
| | |(3) Examine the hinges of the elevator | | X | | | |
| | | and the rudder for cracks | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 635
Nov 01/01
R
BV
Subtask 05-51-11-210-067
T. Inspection of the Water System, Ram Air Turbine and APU (Ref. TASK 29-22-
00-720-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Water System (Zone 171) | | | | | |
| | |Examine the tanks for correct | X | | | | |
| | |attachment and signs of leakage | | | | | |
| | | | | | | | |
|2. | |Ram Air Turbine (Zone 195) | | | | | |
| | |Examine the turbine for correct stowage| X | | | | |
| | |If it is not latched: | | | | | |
| | |(1) Examine all the installation. | | X | | | |
| | |If you find damage: | | | | | |
| | |(a) Do a functional test of the ram | | | X | | |
| | | air turbine and system | | | | | |
| | | (Ref. TASK 29-22-00-720-001) | | | | | |
| | | | | | | | |
|3. | |APU (Zones 313-314-315-316-317) | | | | | |
| | |Do a general inspection of the APU | X | | | | |
| | |compartment for leakage. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Examine the APU for correct | | X | | | |
| | | installation. | | | | | |
| | | Examine the mountings for damage, | | | | | |
| | | distortion and signs of movement. | | | | | |
| | |(2) Examine the container brackets and | | X | | | |
| | | the container of the APU fire | | | | | |
| | | extinguisher for: | | | | | |
| | | - damage | | | | | |
| | | - condition | | | | | |
| | | - correct attachment and | | | | | |
| | | installation. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 636
Nov 01/01
R
BV
Subtask 05-51-11-210-068
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Cargo Compartments | | | | | |
| | |(Zones 131-132-151-152-161-162) | | | | | |
| | | | | | | | |
| A.| |Do a visual inspection of the cargo | X | | | | |
| | |compartments for general condition | | | | | |
| | |and damage. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Examine the loading and unloading | | X | | | |
| | | systems of the containers/pallets | | | | | |
| | | and examine the cargo restraint | | | | | |
| | | system. In the forward and aft | | | | | |
| | | cargo compartments, examine the | | | | | |
| | | side guides, pallet locks and | | | | | |
| | | rollers (ball units, roller | | | | | |
| | | assemblies, drive units, guide | | | | | |
| | | latches and tracks). | | | | | |
| | | Make sure that they can move | | | | | |
| | | freely. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-069
V. Equipment/Furnishings
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Equipment/Furnishings | | | | | |
| | | | | | | | |
| | |NOTE: This inspection is only necessary| | | | | |
| | |after a hard landing. | | | | | |
| | | | | | | | |
| A.| |Examine the equipment and furnishings | X | | | | |
| | |for correct installation. Examine: | | | | | |
| | |- the passenger and crew seats, | | | | | |
| | |- the storage compartments, | | | | | |
| | |- the partitions, | | | | | |
| | |- the side and ceiling panels in the | | | | | |
EFF :
ALL 05-51-11
Page 637
Nov 01/01
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | passenger compartment, | | | | | |
| | |- the flight and passenger compartment | | | | | |
| | | stowages, | | | | | |
| | |- the buffet/galley, | | | | | |
| | |- the lavatories, | | | | | |
| | |- the emergency/evacuation equipment. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-942-050
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 05-51-11-410-050
X. Close Access
(5) Close the thrust reverser cowls door (Ref. TASK 78-36-00-410-040)
Subtask 05-51-11-866-051
EFF :
ALL 05-51-11
Page 638
Nov 01/01
R
BV
Subtask 05-51-11-720-050
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| 1. | | If you found damage on the landing | | x | | | |
| | | gear, attached parts or the adjacent | | | | | |
| | | structure, do this test. | | | | | |
| | | Do a functional test of the landing | | | | | |
| | | gear (Ref. TASK 32-31-00-720-002). | | | | | |
| | | Make sure it moves smoothly and | | | | | |
| | | freely. | | | | | |
| | | | | | | | |
| 2. | | If you found damage on the doors, the | | x | | | |
| | | attached parts or adjacent structure | | | | | |
| | | Do an operational test of the doors | | | | | |
| | | (Ref. TASK 32-12-00-710-002). | | | | | |
| | | | | | | | |
| 3. | | If you found damage on the wing, do | | x | | | |
| | | these tests. | | | | | |
| | | Do an operational test of the flaps | | | | | |
| | | (Ref. TASK 27-54-00-710-001) | | | | | |
| | | and the spoilers | | | | | |
| | | (Ref. TASK 27-64-00-710-001). | | | | | |
| | | Make sure the flaps and spoilers move | | | | | |
| | | smoothly and freely. | | | | | |
| | | | | | | | |
| 4. | | Do a BITE test of the proximity | | | | | |
| | | detectors | | | | | |
| | | (Ref. TASK 32-69-00-740-001). | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-11-586-050
EFF :
ALL 05-51-11
Page 639
Nov 01/01
R
BV
**ON A/C ALL
TASK 05-51-11-200-004-A
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
R
EFF :
ALL 05-51-11
Page 640
May 01/04
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 641
May 01/04
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 642
Nov 01/06
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-11-210-090
(1) Definitions
There are several categories of hard/overweight landing:
EFF :
ALL 05-51-11
Page 643
May 01/04
R
BV
Hard/Overweight landing criteria
Figure 611/TASK 05-51-11-991-015
EFF :
ALL 05-51-11
Page 644
May 01/04
R
BV
R Inspection Flow Chart
Figure 612/TASK 05-51-11-991-016
EFF :
ALL 05-51-11
Page 645
May 01/06
BV
- a vertical speed (Vs) equal to or more than 13 ft/s.
(c) When you know the category of the landing, you must do the
inspections for that category.
NOTE : If you cannot comfirm the impact parameter values with the
____
DMU or the FDRS, you must do the inspection with the steps
for a severe hard/overweight landing.
(a) Make sure that you know the category of landing (hard/overweight
or severe hard/overweight landing).
(b) We recommend that you get information from the flight crew about
the landing conditions, e.g.:
- touch down straight, drifting, wing low, tail or nose heavy,
- touch down on main gears or on main and nose gears or high
pitch rate on nose gear,
EFF :
ALL 05-51-11
Page 646
May 01/04
BV
The full inspection is necessary.
(c) We recommend that you get the related Post Flight Report (PFR).
(d) You must also do all additional checks related to the events
specified in the flight crew report or the PFR.
Subtask 05-51-11-481-069
B. Safety Precautions
(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
Subtask 05-51-11-866-052
Subtask 05-51-11-010-052
D. Get Access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).
EFF :
ALL 05-51-11
Page 647
Feb 01/07
R
BV
Subtask 05-51-11-860-053
(1) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
(2) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).
(3) Put warning notices in the cockpit to tell persons not to operate the
systems.
4. Procedure
_________
Subtask 05-51-11-210-091
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the nose landing gear | | | | | |
| | |NOTE: You can do this inspection with | | | | | |
| | | the aircraft on its wheels or on | | | | | |
| | | jacks. | | | | | |
| | | However, if the crew makes a | | | | | |
R | | | a report of a hight pitch | | | | | |
| | | rate AIRBUS recommends to lift | | | | | |
| | | the aircraft at the nose | | | | | |
| | | jacking point to do a check of | | | | | |
EFF :
ALL 05-51-11
Page 648
Feb 01/07
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | the shock absorber extension. | | | | | |
| | | | | | | | |
| A.| |Do a check of the pressure in the shock| X | | | | |
| | |absorber | | | | | |
| | |(Ref. TASK 12-14-32-614-004) | | | | | |
| | |If you find unsatisfactory condition: | | | | | |
| | |(1) Remove the shock absorber for | | X | | | |
| | | overhaul | | | | | |
| | | (Ref. TASK 32-21-13-000-001) | | | | | |
| | | | | | | | |
| B.| |Do a visual inspection of the wheels | X | | | | |
| | |for distortion, cracks and damaged | | | | | |
| | |paintwork. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the wheels | | X | | | |
| | | (Ref. TASK 32-41-12-000-001) | | | | | |
| | |(2) Remove the axle sleeve | | X | | | |
| | | (Ref. TASK 32-41-12-000-002) | | | | | |
| | |(3) Do a visual inspection of the axle | | X | | | |
| | | and sleeve for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the NLG for overhaul | | | X | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
| | | | | | | | |
| C.| |Examine: | X | | | | |
| | |- the nose landing gear and all the | | | | | |
| | | components installed on it for | | | | | |
| | | cracks, scores, tears, rupture, | | | | | |
| | | leakage and damaged paintwork. | | | | | |
| | |- the attachment fittings of the nose | | | | | |
| | | landing gear. | | | | | |
| | |- the hydraulic lines and electrical | | | | | |
| | | harnesses for correct condition. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) In the avionics compartment, | | X | | | |
| | | examine the gear-well roof, | | | | | |
| | | the roof-to-sidewall joint, and the| | | | | |
| | | floor support-strut attach-fittings| | | | | |
| | | for distortion, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | | | | | | |
| D.| |Make sure that you can install the NLG | X | | | | |
R | | |safety lock easily. | | | | | |
EFF :
ALL 05-51-11
Page 649
Feb 01/07
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| E.| |Examine the shock absorber sliding rod | X | | | | |
| | |(the part you can see) for blue color, | | | | | |
| | |signs of bronze, chrome damage or | | | | | |
| | |external oil leaks. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the shock absorber for | | X | | | |
| | | overhaul: | | | | | |
| | | (Ref. TASK 32-21-13-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | | | | | | |
| F.| |Examine the drag strut assembly and its| X | | | | |
| | |attachment fittings for distortion, | | | | | |
| | |cracks and damaged paintwork. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the drag strut assembly for | | X | | | |
| | | overhaul: | | | | | |
| | | (Ref. TASK 32-21-16-000-002) | | | | | |
| | | (refer to the manufactures | | | | | |
| | | instruction for the overhaul | | | | | |
| | | procedure) | | | | | |
| | |(2) On the aircraft, examine the | | X | | | |
| | | attachment fitting for damage. | | | | | |
| | |(3) Examine the drag strut | | X | | | |
| | | attachment-lugs on NLG leg and | | | | | |
| | | measure the distance between them: | | | | | |
| | | (Ref. TASK 32-21-00-200-006) | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the NLG | | | X | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
| | | | | | | | |
| G.| |Examine the lockstay assembly for | X | | | | |
| | |distortion, cracks and damaged | | | | | |
| | |paintwork. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the lockstay assembly for | | X | | | |
| | | overhaul. | | | | | |
| | | (Ref. TASK 32-21-17-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
EFF :
ALL 05-51-11
Page 650
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |(2) On the aircraft, examine the | | X | | | |
| | | attachment fittings for damage. | | | | | |
| | | | | | | | |
| H.| |Examine the NLG actuating cylinder and | X | | | | |
| | |its attachment fittings for distortion,| | | | | |
| | |cracks, pulled or torn fasteners and | | | | | |
| | |damaged paintwork. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the actuating cylinder for | | X | | | |
| | | strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-22-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the | | | | | |
| | | strip-down inspection). | | | | | |
| | |(2) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | | | | | | |
| J.| |If you removed components, install | | | | | |
| | |serviceable components: | | | | | |
| | |- for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-31-22-400-001) | | | | | |
| | |- for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-21-17-400-001) | | | | | |
| | |- for the NLG | | | | | |
| | | (Ref. TASK 32-21-11-400-002) | | | | | |
| | |- for the drag strut assembly | | | | | |
| | | (Ref. TASK 32-21-16-400-002) | | | | | |
| | |- for the shock absorber | | | | | |
| | | (Ref. TASK 32-21-13-400-001) | | | | | |
| | |- for the axle sleeve | | | | | |
| | | (Ref. TASK 32-41-12-400-002) | | | | | |
| | |- for the wheels | | | | | |
| | | (Ref. TASK 32-41-12-400-001) | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 651
Nov 01/06
R
BV
Subtask 05-51-11-210-103
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Fuselage-Nose/landing-gear section | | | | | |
| | | between FR9 and FR20. | | | | | |
| | | NOTE : This inspection is necessary if| | | | | |
| | | you found damage during the | | | | | |
| | | phase 1 checks of the NLG. | | | | | |
| | | | | | | | |
| A.| | Nose-gear upper-strut attachments | | | | | |
| | | (FR14). | | | | | |
| | | (1) Examine: | | X | | | |
| | | - the area around the bearing, | | | | | |
| | | - the attachment of the fitting on| | | | | |
| | | FWD frame and roof of the nose | | | | | |
| | | wheel well, | | | | | |
| | | - the link rods. | | | | | |
| | | | | | | | |
| B.| | Nose-gear actuating cylinder | | | | | |
| | | attachment-fitting (FR20). | | | | | |
| | | (1) Examine the attachment of the | | X | | | |
| | | actuating cylinder fitting to the | | | | | |
| | | upper link at FR19 and FR20. | | | | | |
| | | | | | | | |
| C.| | Nose-gear leg attachments (FR19). | | X | | | |
| | | (1) Examine the attachments at FR19 | | | | | |
| | | and FR20 and the longitudinal | | | | | |
| | | beams. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-092
EFF :
ALL 05-51-11
Page 652
Nov 01/06
R
BV
(Ref. TASK 12-14-32-614-003) (Ref. TASK 32-41-00-210-002)
(Ref. TASK 32-11-00-200-006) (Ref. TASK 32-11-13-000-001)
(Ref. TASK 32-11-16-000-001) (Ref. TASK 32-11-00-200-004)
(Ref. TASK 32-11-11-000-001) (Ref. TASK 32-11-17-000-001)
(Ref. TASK 32-11-21-000-001) (Ref. TASK 32-31-46-000-001)
(Ref. TASK 32-31-46-400-001) (Ref. TASK 32-11-21-400-001)
(Ref. TASK 32-11-17-400-001) (Ref. TASK 32-11-11-400-001)
(Ref. TASK 32-11-16-400-001) (Ref. TASK 32-11-13-400-001)
(Ref. TASK 07-11-00-581-001) (Ref. TASK 32-11-00-200-005)
(Ref. TASK 32-31-00-720-002) (Ref. TASK 32-33-00-720-001)
(Ref. TASK 05-56-00-200-001) (Ref. TASK 07-11-00-586-002)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the MLG after | | | | | |
| | |hard/overweight landing | | | | | |
| | |NOTE : You can do this inspection with | | | | | |
| | | the aircraft on its wheels or on| | | | | |
| | | jacks. | | | | | |
| | | | | | | | |
| A.| |Do a check of the pressure in the MLG | X | | | | |
| | |shock absorber | | | | | |
| | |(Ref. TASK 12-14-32-614-003) | | | | | |
| | | | | | | | |
| B.| |Do a visual inspection of the wheels | X | | | | |
| | |for distortion, cracks, damaged | | | | | |
| | |paintwork and correct installation. | | | | | |
| | |Examine the side walls of the tires for| | | | | |
| | |damage | | | | | |
| | |(Ref. TASK 32-41-00-210-002) | | | | | |
| | |If you find damage. | | | | | |
| | |(1) Do the inspection of the axle and | | X | | | |
| | | the axle sleeve for damage and | | | | | |
| | | out-of-roundness. | | | | | |
| | | (Ref. TASK 32-11-00-200-006) | | | | | |
| | | | | | | | |
| C.| |Examine: | X | | | | |
| | |- the MLG and all the components | | | | | |
| | | installed on it for cracks, scores, | | | | | |
| | | tears, rupture, leakage and damaged | | | | | |
| | | paintwork (carefully examine the drag| | | | | |
| | | stay blend and the forward pintle pin| | | | | |
| | | areas). | | | | | |
| | |- the attachment fittings of the MLG | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-11
Page 653
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| D.| |Examine the shock absorber sliding rod | X | | | | |
| | |(the part you can see) for blue color, | | | | | |
| | |signs of bronze, chrome damage or | | | | | |
| | |external oil leaks. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the shock absorber for | | X | | | |
| | | overhaul: | | | | | |
| | | (Ref. TASK 32-11-13-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | | | | | | |
| E.| |Examine the side stay assembly and its | X | | | | |
| | |attachment fittings for distortion, | | | | | |
| | |cracks and damaged paintwork and chrome| | | | | |
| | |plating. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the side-stay assembly for | | X | | | |
| | | overhaul. | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | |(2) Do the dimensional inspection of | | X | | | |
| | | the side-stay cardan pin-joint lugs| | | | | |
| | | on MLG leg. | | | | | |
| | | (Ref. TASK 32-11-00-200-004) | | | | | |
| | | If you find damage: | | | | | |
| | | - remove the MLG | | | X | | |
| | | (Ref. TASK 32-11-11-000-001) | | | | | |
| | |(3) On the aircraft, continue the | | X | | | |
| | | inspection of the side-stay | | | | | |
| | | attachment fitting. | | | | | |
| | | | | | | | |
| F.| |Examine the lockstay assembly and | X | | | | |
| | |lockstay actuator for distortion, | | | | | |
| | |cracks and damaged paintwork and chrome| | | | | |
| | |plating. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the lockstay assembly and | | X | | | |
| | | lockstay actuator for overhaul | | | | | |
| | | (Ref. TASK 32-11-17-000-001) | | | | | |
| | | (Ref. TASK 32-11-21-000-001) | | | | | |
R
EFF :
ALL 05-51-11
Page 654
Nov 01/06
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | |(2) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | | | | | | |
| G.| |Examine the MLG retraction actuator and| X | | | | |
| | |its attachment fittings for distortion,| | | | | |
| | |cracks and damaged paintwork and chrome| | | | | |
| | |plating. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the retraction actuator for | | X | | | |
| | | strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-46-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the | | | | | |
| | | strip-down procedure). | | | | | |
| | |(2) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | | | | | | |
| H.| |Examine the MLG well for distortion, | X | | | | |
| | |cracks, pulled or torn fasteners and | | | | | |
| | |damaged paintwork. | | | | | |
| | | | | | | | |
| I.| |Examine the electrical conduits, | X | | | | |
| | |connections, connectors and flexible | | | | | |
| | |conduits for damage. | | | | | |
| | | | | | | | |
| J.| |If you removed components, install | | | | | |
| | |serviceable components: | | | | | |
| | |- for the retraction actuator | | | | | |
| | | (Ref. TASK 32-31-46-400-001) | | | | | |
| | |- for the lockstay actuator | | | | | |
| | | (Ref. TASK 32-11-21-400-001) | | | | | |
| | |- for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-11-17-400-001) | | | | | |
| | |- for the MLG | | | | | |
| | | (Ref. TASK 32-11-11-400-001) | | | | | |
| | |- for the side-stay assembly | | | | | |
| | | (Ref. TASK 32-11-16-400-001) | | | | | |
| | |- for the shock absorber | | | | | |
EFF :
ALL 05-51-11
Page 655
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 32-11-13-400-001) | | | | | |
| | | | | | | | |
|2. | | Inspection of the MLG after severe | | | | | |
| | | hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Do the inspection of the MLG after | X | | | | |
| | |hard or overweight landing | | | | | |
| | |(Ref. item 1.) | | | | | |
| | | | | | | | |
| B.| |Lift the aircraft: | X | | | | |
| | |(Ref. TASK 07-11-00-581-001) | | | | | |
| | |- make sure that extension of the shock| X | | | | |
| | | absorber is smooth and full. | | | | | |
| | |- examine the sliding rod (the part you| X | | | | |
| | | can see) for blue color, signs of | | | | | |
| | | bronze or chrome damage. | | | | | |
| | | | | | | | |
| C.| |Examine the shock absorber for external| X | | | | |
| | |leaks. | | | | | |
| | | | | | | | |
| D.| |Do a check of the pressure in the MLG | X | | | | |
| | |shock absorber | | | | | |
| | |(Ref. TASK 12-14-32-614-003) | | | | | |
| | | | | | | | |
| E.| |Do the inspection of the MLG | X | | | | |
| | |(Ref. TASK 32-11-00-200-005) for: | | | | | |
| | |- out-of-roundness of shock absorber | | | | | |
| | | sliding-rod. | | | | | |
| | |- distortion of side-stay lower cardan | | | | | |
| | | pin-joint (side-stay disconnected). | | | | | |
| | |- distortion of torque link pin. | | | | | |
| | |- detailed visual inspection of the | | | | | |
| | | barrel in the drag stay blend area. | | | | | |
| | |- detailed visual inspection of the | | | | | |
| | | barrel forward pintle-pin area. | | | | | |
| | | | | | | | |
| F.| |Do the functional test of the normal | X | | | | |
| | |Extension/Retraction of the landing | | | | | |
| | |gear | | | | | |
| | |(Ref. TASK 32-31-00-720-002) | | | | | |
| | |- with the MLG door open and the safety| | | | | |
| | | lock installed, make sure that the | | | | | |
| | | MLG is correctly engaged in the MLG | | | | | |
EFF :
ALL 05-51-11
Page 656
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | uplock (MLG centered in uplock). | | | | | |
| | | | | | | | |
| G.| |Do the functional test of the free fall| X | | | | |
| | |extension of the landing gear | | | | | |
| | |(Ref. TASK 32-33-00-720-001) | | | | | |
| | | | | | | | |
| H.| |Do the alignment check of the main | X | | | | |
| | |landing gear, the axles and the main | | | | | |
| | |fitting. | | | | | |
| | |(Ref. TASK 05-56-00-200-001) | | | | | |
| | | | | | | | |
| J.| |If you find unsatisfactory | X | | | | |
| | |condition(s): | | | | | |
| | |(1) Remove the MLG, the side-stay, the | | X | | | |
| | | lockstay assembly and lockstay | | | | | |
| | | actuator for overhaul: | | | | | |
| | | (Ref. TASK 32-11-11-000-001) | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |
| | | (Ref. TASK 32-11-17-000-001) | | | | | |
| | | (Ref. TASK 32-11-21-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure) | | | | | |
| | |(2) On the aircraft, examine the | | X | | | |
| | | attachment fittings and bearings of| | | | | |
| | | the side-stay for distorsion, | | | | | |
| | | cracks and damaged paintwork. | | | | | |
| | |(3) On the aircraft, examine the | | X | | | |
| | | attachment fittings of the MLG for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | |(4) Examine the MLG actuating cylinder | | X | | | |
| | | and its attachment fitting for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - remove the actuating cylinder | | | X | | |
| | | for strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-46-000-001) | | | | | |
| | | (refer to the manufactures | | | | | |
| | | instructions for the strip-down | | | | | |
| | | inspection procedure) | | | | | |
| | | - on the aircraft, continue the | | | X | | |
EFF :
ALL 05-51-11
Page 657
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | inspection of the attachment | | | | | |
| | | fitting for damage. | | | | | |
| | |(5) Examine the gear-well for | | X | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | |(6) If you removed components, install | | | | | |
| | | serviceable components: | | | | | |
| | | - for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-31-46-400-001) | | | | | |
| | | - for the lockstay actuator | | | | | |
| | | (Ref. TASK 32-11-21-400-001) | | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-11-17-400-001) | | | | | |
| | | - for the side-stay assembly | | | | | |
| | | (Ref. TASK 32-11-16-400-001) | | | | | |
| | | - for the MLG | | | | | |
| | | (Ref. TASK 32-11-11-400-001) | | | | | |
| | | | | | | | |
| K.| |Lower the aircraft on its wheels | X | | | | |
| | |(Ref. TASK 07-11-00-586-002) | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-093
EFF :
ALL 05-51-11
Page 658
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the nacelles after | | | | | |
| | |hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Examine externally the thrust reverser | X | | | | |
| | |cowls for distortion, delamination, | | | | | |
| | |cracks, cracked or flacking paint, | | | | | |
| | |loose rivets and signs of shearing. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Open the thrust reverser cowls | | X | | | |
| | | (Ref. TASK 78-36-00-010-040) | | | | | |
| | |(2) Examine internally the thrust | | X | | | |
| | | reverser cowls for damage. | | | | | |
| | |(3) Examine all the thrust reverser | | X | | | |
| | | cowl hinge fittings for distortion | | | | | |
| | | cracks and damage. | | | | | |
| | |(4) Examine all the thrust reverser | | X | | | |
| | | cowl latches for damage and make | | | | | |
| | | sure that operation is correct. | | | | | |
| | |(5) Do an operational test of the | | X | | | |
| | | thrust reverser system. Make sure | | | | | |
| | | that the thrust reversers | | | | | |
| | | move fully and freely | | | | | |
| | | (Ref. TASK 78-31-00-710-040). | | | | | |
| | | | | | | | |
|2. | |Inspection of the nacelles after severe| | | | | |
| | |hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Do the inspection of the nacelles after| X | | | | |
| | |hard/overweight landing (Ref. item 1.) | | | | | |
| | | | | | | | |
| B.| |Examine externally the fan and air | X | | | | |
| | |intake cowls for distortion, | | | | | |
| | |delamination, cracks, cracked or | | | | | |
| | |flacking paint, loose rivets and signs | | | | | |
| | |of shearing. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Open the fan cowls | | X | | | |
| | | (Ref. TASK 71-13-00-010-040) | | | | | |
| | |(2) Examine internally the fan cowls | | X | | | |
| | | for damage. | | | | | |
| | |(3) Examine all the fan cowl hinge | | X | | | |
| | | fittings for distortion and damage.| | | | | |
| | |(4) Examine all the fan cowl latches | | X | | | |
EFF :
ALL 05-51-11
Page 659
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | for damage and make sure that | | | | | |
| | | operation is correct. | | | | | |
| | |(5) Examine the air intake cowl for | | X | | | |
| | | distortion and damage. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-094
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Examine externally the pylon secondary | X | | | | |
| | |structure and pylon box primary | | | | | |
| | |structure (all the items you can see) | | | | | |
| | |for buckling, cracks, pulled or missing| | | | | |
| | |fasteners and other damage. | | | | | |
| | |If you find damage: | | | | | |
| A.| |Open the fan and the thrust reverser | | X | | | |
| | |cowls | | | | | |
| | |(Ref. TASK 71-13-00-010-040) | | | | | |
| | |(Ref. TASK 78-36-00-010-040) | | | | | |
| B.| |Examine externally the lower spar and | | X | | | |
| | |pylon lower area (all the items you can| | | | | |
| | |see) for shearing, distortion, cracks, | | | | | |
| | |damaged paintwork and pulled or missing| | | | | |
| | |fasteners. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the pylon box access panels | | | X | | |
| | |(2) Examine internally the pylon box | | | X | | |
| | | (all the items you can see) for | | | | | |
| | | distortion, cracks, defective | | | | | |
| | | attachment or other damage: | | | | | |
| | | - lower and upper spars, | | | | | |
| | | - ribs, | | | | | |
EFF :
ALL 05-51-11
Page 660
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - side panels, | | | | | |
| | | - fire protection system (specially| | | | | |
| | | extinguishing bottles | | | | | |
| | | attachments), | | | | | |
| | | - electrical cables | | | | | |
| | | - hydraulic and fuel pipes, | | | | | |
| | | - air-bleed system components. | | | | | |
| | |(3) Remove the engine | | | X | | |
| | | (Ref. TASK 71-00-00-000-040). | | | | | |
| | |(4) Do an inspection of the attach | | | X | | |
| | | fittings at the head of rib 1 | | | | | |
| | | pyramid and under rib 3. | | | | | |
| | | Make sure that there are no signs | | | | | |
| | | of distortion, damage to the | | | | | |
| | | structure (cracks, rupture and | | | | | |
| | | signs of oxydation or burning). | | | | | |
| | |(5) Remove the center fillets at the | | | X | | |
| | | pylon-to-wing junction. | | | | | |
| | |(6) Remove the pylon-to-wing attach | | | X | | |
| | | fittings | | | | | |
| | | (Ref. TASK 54-51-17-000-001) | | | | | |
| | | (Ref. TASK 54-51-17-000-002) | | | | | |
| | |(7) Do a detailed visual inspection of:| | | X | | |
| | | - the forward attach fitting at | | | | | |
| | | at Rib 4 | | | | | |
| | | (Ref. TASK 54-51-17-200-001), | | | | | |
| | | - the spigot between ribs 4 and 5, | | | | | |
| | | - the rear attach fitting at rib 10| | | | | |
| | | (Ref. TASK 54-51-17-200-002). | | | | | |
| | | If there are signs of damage: | | | | | |
| | | (a) Defuel the wing | | | X | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (b) Get access to the internal | | | | | |
| | | structure adjacent to ribs 7 | | | X | | |
| | | and 8 | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (c) Examine the rear face of the | | | X | | |
| | | front spar, inboard of Rib 7 to| | | | | |
| | | outboard of Rib 8. | | | | | |
| | | Examine the front face of the | | | | | |
| | | rear spar, inboard of Rib 7 to | | | | | |
| | | outboard of Rib 8. | | | | | |
| | | Examine the pylon rear | | | | | |
EFF :
ALL 05-51-11
Page 661
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | attachment: | | | | | |
| | | - ribs 7 and 8, | | | | | |
| | | - the stringers and brackets. | | | | | |
| | | Make a full inspection of these| | | | | |
| | | items and make sure that there | | | | | |
| | | are no cracks or damage, the | | | | | |
| | | paint and the sealant are not | | | | | |
| | | damaged, the fasteners and | | | | | |
| | | safety devices are in the | | | | | |
| | | correct condition. | | | | | |
| | | (d) Do an inspection of all the | | | X | | |
| | | pipes and holes. Make sure that| | | | | |
| | | they are attached correctly and| | | | | |
| | | that there are no leaks. | | | | | |
| | | (e) close access doors to the wing | | | | | |
| | | tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | |(8) Install the pylon-to-wing attach | | | | | |
| | | fittings | | | | | |
| | | (Ref. TASK 54-51-17-400-001) | | | | | |
| | | (Ref. TASK 54-51-17-400-002). | | | | | |
| | |(9) Install the engine | | | | | |
| | | (Ref. TASK 71-00-00-400-040). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-095
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Examine the Engine | | | | | |
| | | | | | | | |
| A.| | Turn the fan rotor by hand. Make sure | X | | | | |
| | | that there are no bearing roughness, | | | | | |
| | | unusual noises and bindings (high | | | | | |
| | | rubbing of the seals and the shrouds | | | | | |
| | | is normal). | | | | | |
| | | | | | | | |
| B.| | Examine the primary nozzle. Make sure | X | | | | |
EFF :
ALL 05-51-11
Page 662
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | that : | | | | | |
| | | - it is correctly attached to the | | | | | |
| | | engine, | | | | | |
| | | - there are no distortion or cracks, | | | | | |
| | | no loose rivets, no signs of | | | | | |
| | | shearing or delamination. | | | | | |
| | | | | | | | |
| C.| | Examine the nose cowl attachments to | X | | | | |
| | | the fan case. Make sure that there are| | | | | |
| | | no distortion, delamination, cracks, | | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Do an inspection of the engine | | X | | | |
| | | after rough landing | | | | | |
| | | (Ref. TASK 72-00-00-200-003). | | | | | |
| | | (2) If you find seal or shroud | | X | | | |
| | | interference and you think it is | | | | | |
| | | minor : | | | | | |
| | | - the engine is serviceable after | | | | | |
| | | you do a satisfactory power | | | | | |
| | | assurance check | | | | | |
| | | (Ref. TASK 71-00-00-710-008). | | | | | |
| | | (3) After the test, examine the | | X | | | |
| | | magnetic chip detectors and the | | | | | |
| | | elements of the scavenge oil | | | | | |
| | | filter. | | | | | |
| | | Make sure that there are no sign | | | | | |
| | | of bearing distress | | | | | |
| | | (Ref. TASK 79-21-10-210-002). | | | | | |
| | | If you find damage : | | | | | |
| | | (a) Remove the engine | | | X | | |
| | | (Ref. TASK 71-00-00-000-040). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-096
EFF :
ALL 05-51-11
Page 663
Nov 01/06
R
BV
If you do not known the category, go directely to item 2.
Inspection after severe hard/overweight landing.
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the wing after | | | | | |
| | | hard/overweight landing | | | | | |
| | | | | | | | |
| A.| | Examine the wing top skin from Rib 1 | X | | | | |
| | | to Rib 10 and from Rib 18 to Rib 20, | | | | | |
| | | the shroud panel and its attachment. | | | | | |
| | | Make sure that: | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - the fasteners are in the correct | | | | | |
| | | condition. | | | | | |
| | | Carefully examine the fasteners at | | | | | |
| | | rear spar between Rib 3 and Rib 6 | | | | | |
| | | and gear rib. | | | | | |
| | | | | | | | |
| B.| | Do an inspection of the wing bottom | X | | | | |
| | | skin. Carefully examine the areas | | | | | |
| | | adjacent to: | | | | | |
| | | - the flap beams, | | | | | |
| | | - the engine pylon, | | | | | |
| | | - the MLG attachments, | | | | | |
| | | - the shroud box outboard seal and | | | | | |
| | | seal support. | | | | | |
| | | Make sure that: | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there are no fluid leaks, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - the fasteners are in the correct | | | | | |
| | | condition. | | | | | |
| | | Carefully examine the fasteners at | | | | | |
| | | rear spar between Rib 3 and Rib 6 | | | | | |
| | | and gear rib. | | | | | |
| | | | | | | | |
| | | If there are signs of damage on the | | | | | |
| | | wing top or bottom skins | | | | | |
| | | (1) Defuel the wing | | X | | | |
EFF :
ALL 05-51-11
Page 664
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the area adjacent to| | X | | | |
| | | the damage | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (3) Do an internal inspection of: | | X | | | |
| | | - the applicable ribs, the front | | | | | |
| | | and rear spars, the top and | | | | | |
| | | bottom skins, the stringers, | | | | | |
| | | the riblets, the brackets and | | | | | |
| | | the plates. | | | | | |
| | | | | | | | |
|2. | | Inspection of the wing after severe | | | | | |
| | | hard/overweight landing | | | | | |
| | | | | | | | |
| A.| | Do the inspection of the wing after | X | | | | |
| | | hard/overweight landing | | | | | |
| | | (Ref. item 1.) | | | | | |
| | | | | | | | |
| B.| | Do an inspection of the front and rear| X | | | | |
| | | spars. | | | | | |
| | | Examine: | | | | | |
| | | - the front spar at the forward pylon | | | | | |
| | | attachment area, | | | | | |
| | | - the rear spar aft face between Ribs | | | | | |
| | | 6 and 9 and the area between Ribs 7 | | | | | |
| | | and 8 and the aft pylon attachment | | | | | |
| | | fitting. | | | | | |
| | | - the inner rear spar at the MLG | | | | | |
| | | attachment fittings, | | | | | |
| | | - the shroud box. | | | | | |
| | | Make sure that: | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there is no damage, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - there are no fluid leaks, | | | | | |
| | | - the fasteners and safety devices are| | | | | |
| | | in the correct condition. | | | | | |
| | | | | | | | |
| | | If there are signs of damage on the | | | | | |
| | | front and rear spars: | | | | | |
| | | (1) Defuel the wing | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
EFF :
ALL 05-51-11
Page 665
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (2) Get access in the wing adjacent to| | X | | | |
| | | the damage | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (3) Do an internal inspection of all | | X | | | |
| | | the ribs, riblets, stringers, | | | | | |
| | | brackets and plates. | | | | | |
| | | (4) Do an inspection of all the pipes,| | X | | | |
| | | the hoses, the electrical looms | | | | | |
| | | and the raceways. | | | | | |
| | | Make sure that: | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there is no damage, | | | | | |
| | | - the paint and the sealant are | | | | | |
| | | not damaged, | | | | | |
| | | - the fasteners are in the correct| | | | | |
| | | condition. | | | | | |
| | | | | | | | |
| | | If there are indications of damage on | | X | | | |
| | | the rear spar: | | | | | |
| | | (1) Do an inspection of these items: | | | | | |
| | | - the top diagonal stiffener, | | | | | |
| | | - the MLG attachment, | | | | | |
| | | - the top edge beam, | | | | | |
| | | - the MLG pintle fitting, | | | | | |
| | | - the MLG actuator fitting, | | | | | |
| | | - the sidestay attachment fitting,| | | | | |
| | | - the MLG support rib, | | | | | |
| | | - the riblets, stringers and | | | | | |
| | | brackets. | | | | | |
| | | Make sure that: | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there is no damage, | | | | | |
| | | - the paint and the sealant are not | | | | | |
| | | damaged, | | | | | |
| | | - the fasteners are in the correct | | | | | |
| | | condition. | | | | | |
| | | | | | | | |
| C.| | Close access to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 666
Nov 01/06
R
BV
Subtask 05-51-11-210-097
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the flaps | | | | | |
| | | | | | | | |
| A.| | Do a visual inspection of the upper | X | | | | |
| | | and inner surfaces of the inner and | | | | | |
| | | outer flaps for distortion | | | | | |
| | | | | | | | |
| B.| | Do fully the operational test of the | X | | | | |
| | | flap system | | | | | |
| | | (Ref. TASK 27-54-00-710-001). | | | | | |
| | | If there are indications of damage: | | | | | |
| | | (1) Do the detailed visual inspection | | X | | | |
| | | of the transmission assembly | | | | | |
| | | (Ref. TASK 27-54-00-200-001). | | | | | |
| | | (2) Do the detailed inspection of the | | X | | | |
| | | flap attachment parts (drive arms | | | | | |
| | | and brackets). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-100
EFF :
ALL 05-51-11
Page 667
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the fuselage after | | | | | |
| | |hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Fuselage section between FR20 and FR35:| | | | | |
| | |- From the ground, examine the lower | X | | | | |
| | | skin for loose fasteners, cracked | | | | | |
| | | or flaking paint or distortion. | | | | | |
| | | | | | | | |
| B.| |Fuselage section between FR35 and FR47 | | | | | |
| | |- Examine the belly fairing panels | X | | | | |
| | | for loose fasteners, cracked or | | | | | |
| | | flaking paint, incorrect attachment | | | | | |
| | | or delamination. | | | | | |
| | |If you find damage: | | | | | |
| | |(1) Remove the panels and examine | | X | | | |
| | | internally the belly fairing for: | | | | | |
| | | - the correct attachment of all | | | | | |
| | | the components or loose rivets. | | | | | |
| | |(2) Examine the fuselage skin | | X | | | |
| | | externally below the belly fairing | | | | | |
| | | zone for: | | | | | |
| | | - buckling, loose rivets, cracked | | | | | |
| | | or flaking paint. | | | | | |
| | | | | | | | |
| C.| |Fuselage section between FR47 and FR70 | | | | | |
| | |- From the ground, examine the lower | X | | | | |
| | | skin for loose fasteners, cracked | | | | | |
| | | or flaking paint or distortion. | | | | | |
| | | | | | | | |
| 2.| |Inspection of the fuselage after severe| | | | | |
| | |hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Do the inspection of the fuselage after| X | | | | |
| | |hard/overweight landing (Ref. item 1.) | | | | | |
| | | | | | | | |
| B.| |Examine the keel beam connections to | X | | | | |
| | |the fuselage under forward cargo | | | | | |
| | |compartment at frame 35 and under aft | | | | | |
| | |cargo compartment at frame 46/47 for | | | | | |
| | |distortion and cracks. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 668
Nov 01/06
R
BV
Subtask 05-51-11-210-099
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the tail area after | | | | | |
| | |hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Do the operational test of the THS | X | | | | |
| | |(Ref. TASK 27-44-00-710-002) | | | | | |
| | |If you find unsatisfactory | | | | | |
| | |condition(s): | | | | | |
| | |(1) Do a general visual inspection of: | | X | | | |
| | | - the attachment areas of the | | | | | |
| | | horizontal stabilizer | | | | | |
| | | (Ref. TASK 55-16-00-200-001) | | | | | |
| | | - the attachment areas of the | | | | | |
| | | vertical stabilizer | | | | | |
| | | (Ref. TASK 55-36-00-210-001) | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Do a detailed visual inspection| | | X | | |
| | | of the vertical stabilizer | | | | | |
| | | center box | | | | | |
| | | (Ref. TASK 55-30-00-200-001) | | | | | |
| | | (b) Do a visual inspection of the | | | X | | |
| | | THS sparbox | | | | | |
| | | (Ref. TASK 55-10-00-210-001) | | | | | |
| | | | | | | | |
| B.| |Do the operational test of the rudder | X | | | | |
| | |and the elevators | | | | | |
| | |(Ref. TASK 27-24-00-710-001) | | | | | |
EFF :
ALL 05-51-11
Page 669
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | |(Ref. TASK 27-34-00-710-001) | | | | | |
| | |If you find unsatisfactory | | | | | |
| | |condition(s): | | | | | |
| | |(1) Examine the hinges of the elevators| | X | | | |
| | | and the rudder for cracks | | | | | |
| | | | | | | | |
|2. | |Inspection of the tail area after | | | | | |
| | |severe hard/overweight landing | | | | | |
| | | | | | | | |
| A.| |Do the inspection of the tail area | X | | | | |
| | |after hard/overweight landing | | | | | |
| | |(Ref. item 1.) | | | | | |
| | | | | | | | |
| B.| |Do a general inspection of the APU | X | | | | |
| | |compartment for leaks. | | | | | |
| | | | | | | | |
| C.| |Examine the APU for correct | X | | | | |
| | |installation. | | | | | |
| | |Examine the mountings for damage, | | | | | |
| | |distortion and signs of movement. | | | | | |
| | | | | | | | |
| D.| |Examine the container brackets and the | X | | | | |
| | |container of the APU fire extinguisher | | | | | |
| | |for damage, condition and correct | | | | | |
| | |installation. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 670
Nov 01/06
R
BV
Subtask 05-51-11-210-098
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the avionics Compartment| | | | | |
| | | | | | | | |
| A.| | Examine the attachments of rack 80VU | X | | | | |
| | | and 90VU. | | | | | |
| | | | | | | | |
| B.| | Examine the vertical rods above the | X | | | | |
| | | NLG bay between FR12 and FR20. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-11-210-101
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the water tanks | | | | | |
| | | | | | | | |
| A.| |Examine the tanks for correct | X | | | | |
| | |attachment and signs of leaks. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-11
Page 671
Nov 01/06
R
BV
Subtask 05-51-11-210-102
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the equipment/furnishings| | | | | |
| | | | | | | | |
| A.| |Examine the crew seats for correct | X | | | | |
| | |installation: | | | | | |
| | |- do a check of vertical movement (with| | | | | |
| | | and without load on the seats). | | | | | |
| | | | | | | | |
| B.| |Do a general inspection of the cockpit | X | | | | |
| | |and cabin for loose equipment | | | | | |
| | | | | | | | |
| C.| |Do a general inspection of the cargo | X | | | | |
| | |compartments for loose equipment. | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-11-410-051
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access doors and panels opened during the inspection.
R
EFF :
ALL 05-51-11
Page 672
Feb 01/07
BV
INSPECTION AFTER LANDING GEAR DOWN LIMITING SPEED EXCEEDED - INSPECTION/CHECK
_____________________________________________________________________________
TASK 05-51-12-200-001
Inspection after Landing Gear Extension at more than the Geardown Limiting
Speed
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-12
Page 601
Nov 01/00
R
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-12-860-050
(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001)
(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
EFF :
ALL 05-51-12
Page 602
Nov 01/00
BV
Subtask 05-51-12-481-050
B. Safety Precautions
(1) Make sure that the safety devices are installed on the landing gear
(Ref. TASK 32-00-00-481-001).
(2) Put a warning notice in the cockpit to tell persons not to operate
the aircraft systems.
Subtask 05-51-12-010-051
C. Get Access
(2) Open all the access panels in the main landing-gear well.
(3) Open and/or remove the access panels in the wing trailing-edge
falsework between rib1 and rib8.
Subtask 05-51-12-010-050
D. Get Access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).
Subtask 05-51-12-866-050
4. Procedure
_________
Subtask 05-51-12-869-051
A. General
NOTE : All the necessary inspections are visual unless the text gives
____
other instructions.
Operators can refer to the Non-destructive Testing Manual (NTM)
and use non-destructive test procedures.
EFF :
ALL 05-51-12
Page 603
Nov 01/00
R
BV
Subtask 05-51-12-210-051
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Fuselage | | | | | |
| | | | | | | | |
| A.| | Examine the external fuselage and the | X | | | | |
| | | skin panels for distorsion, cracks, | | | | | |
| | | pulled or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| | | If you find damage: | | | | | |
| | | - internally examine the frames, the| | X | | | |
| | | stringers and the cleats for | | | | | |
| | | buckling, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
|2. | | NLG Well | | | | | |
| | | | | | | | |
| A.| | Examine: | X | | | | |
| | | - the hinge fittings of the nose gear,| | | | | |
| | | - the attach fittings of the actuating| | | | | |
| | | cylinder, | | | | | |
| | | - the drag strut and the attach | | | | | |
| | | fittings, | | | | | |
| | | for distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine the gear well roof and the | X | | | | |
| | | forward, aft and side wall structure | | | | | |
| | | for distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - in the avionics compartment, examine| | X | | | |
| | | the nose-gear well roof and wall | | | | | |
| | | structure for distortion, cracks and| | | | | |
| | | damaged paintwork. | | | | | |
| | | | | | | | |
| C.| | Examine all the components, the hoses,| X | | | | |
| | | the pipes, the electrical looms, the | | | | | |
| | | control rods, the bellcranks and | | | | | |
| | | their mounts for: | | | | | |
EFF :
ALL 05-51-12
Page 604
Nov 01/00
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
Subtask 05-51-12-210-053
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Belly Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the aft panels of the belly | X | | | | |
| | | fairing for loose fasteners, cracked | | | | | |
| | | or flaking paint and make sure that | | | | | |
| | | the panels are correctly attached. | | | | | |
| | | | | | | | |
| B.| | Make sure that the belly fairing rods | X | | | | |
| | | are correctly attached. | | | | | |
| | | | | | | | |
| C.| | Externally examine the cover of the | X | | | | |
| | | keel beam for cracked or flaking paint| | | | | |
| | | and delamination. Make sure that it is| | | | | |
| | | correctly attached. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the panels and internally | | X | | | |
| | | examine the structure of the belly| | | | | |
| | | fairing for buckling, cracks and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove all the panels of the belly| | | X | | |
| | | fairing and examine the fuselage | | | | | |
| | | skin for: | | | | | |
| | | - buckling, | | | | | |
| | | - loose rivets, | | | | | |
| | | - cracked or flaking paint. | | | | | |
| | | (b) Examine the pipes, the ducts, the | | | X | | |
EFF :
ALL 05-51-12
Page 605
Nov 01/00
BV
Lower Part of the Center Fuselage
Figure 601/TASK 05-51-12-991-001
EFF :
ALL 05-51-12
Page 606
Nov 01/00
R
BV
Center Section
Figure 602/TASK 05-51-12-991-002
EFF :
ALL 05-51-12
Page 607
Nov 01/00
R
BV
Component Location in the Belly Fairing Structure
Figure 603/TASK 05-51-12-991-003
EFF :
ALL 05-51-12
Page 608
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
EFF :
ALL 05-51-12
Page 609
Nov 01/00
R
BV
Subtask 05-51-12-210-054
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Main Gear | | | | | |
| | | | | | | | |
| A.| | Do the inspection of the main landing | X | | | | |
| | | gear | | | | | |
| | | (Ref. TASK 32-11-00-200-00100). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-12-210-055
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Main-Gear Main Doors | | | | | |
| | | | | | | | |
| A.| | Examine the doors, their hinges and | X | | | | |
| | | the adjacent structure | | | | | |
| | | (REF. TASK 32-12-00-710-002). | | | | | |
| | | | | | | | |
| B.| | Examine the door actuating cylinders, | X | | | | |
| | | the selector valves and their hoses | | | | | |
| | | and pipes. | | | | | |
| | | | | | | | |
|2. | | Main-Gear Fixed Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the fixed fairings: | X | | | | |
| | | - Make sure that they are correctly | | | | | |
| | | attached to the main gear leg. | | | | | |
| | | | | | | | |
|3. | | Main-Gear Hinged Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the hinged fairings: | X | | | | |
| | | - Make sure that they are correctly | | | | | |
| | | attached to the main-gear leg and | | | | | |
EFF :
ALL 05-51-12
Page 610
Nov 01/00
BV
Main Gear Assembly
Figure 604/TASK 05-51-12-991-004
EFF :
ALL 05-51-12
Page 611
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | the wing. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-12-210-056
F. Inspection of the Nose Landing Gear and Nose Gear Doors (Ref. TASK 32-21-
00-200-002) (Ref. TASK 32-22-11-000-001) (Ref. TASK 32-31-16-000-001)
(Ref. TASK 32-22-13-000-001) (Ref. TASK 32-22-15-000-001)
(Ref. TASK 32-22-11-400-001) (Ref. TASK 32-31-16-400-001) (Ref. TASK 32-
22-13-400-001) (Ref. TASK 32-22-15-400-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Nose Gear Assembly | | | | | |
| | | | | | | | |
| A.| | Do the inspection of the Nose Landing | X | | | | |
| | | Gear | | | | | |
| | | (Ref. TASK 32-21-00-200-002) | | | | | |
| | | | | | | | |
|2. | | Nose-Gear Main Doors | | | | | |
| | | | | | | | |
| A.| | Examine the doors, the door hinge | X | | | | |
| | | fittings and the adjacent structure | | | | | |
| | | for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - Remove the doors | | X | | | |
| | | (Ref. TASK 32-22-11-000-001) | | | | | |
| | | (Ref. TASK 32-22-11-400-001). | | | | | |
| | | | | | | | |
| B.| | Examine the door actuating cylinder, | X | | | | |
| | | the related linkages and the sequence | | | | | |
| | | valves for leakage or damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - Remove the door actuating cylinder | | X | | | |
| | | (Ref. TASK 32-31-16-000-001) | | | | | |
| | | (Ref. TASK 32-31-16-400-001). | | | | | |
| | | | | | | | |
|3. | | Nose-Gear Aft Doors | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-12
Page 612
Nov 01/00
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
Subtask 05-51-12-210-057
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Trailing Edge Falsework | | | | | |
| | | | | | | | |
| A.| | Examine these areas for distortion, | X | | | | |
| | | cracks, torn or pulled fasteners and | | | | | |
| | | damaged paintwork: | | | | | |
| | | - the skin of the trailing edge | | | | | |
| | | falsework, | | | | | |
| | | - the inner flap, | | | | | |
| | | - the No. 1 spoiler, | | | | | |
| | | - the fixed shroud, | | | | | |
| | | - the shroud box. | | | | | |
| | | If you find damage: | | | | | |
EFF :
ALL 05-51-12
Page 613
Nov 01/00
BV
Inspection on the Wing
Figure 605/TASK 05-51-12-991-005
EFF :
ALL 05-51-12
Page 614
Nov 01/00
R
BV
Inspection on the Wing
Figure 606/TASK 05-51-12-991-006
EFF :
ALL 05-51-12
Page 615
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
EFF :
ALL 05-51-12
Page 616
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | devices. | | | | | |
| | | Make sure that they are correctly | | | | | |
| | | aligned. | | | | | |
| | | | | | | | |
|2. | | Wing skins | | | | | |
| | | | | | | | |
| A.| | Examine the external surface of the | X | | | | |
| | | wing skin panels for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, | | | | | |
| | | - pulled or torn fasteners, | | | | | |
| | | - damaged paintwork, | | | | | |
| | | - fuel leaks. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Get access to the wing tanks | | X | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (2) Examine these areas for cracks, | | X | | | |
| | | distortion, pulled or torn | | | | | |
| | | fasteners, damaged paintwork or | | | | | |
| | | sealant fillets: | | | | | |
| | | - the ribs, | | | | | |
| | | - the spars, | | | | | |
| | | - the stringers, | | | | | |
| | | - the engine pylon mountings. | | | | | |
| | | (3) Close access to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-12
Page 617
Nov 01/00
R
BV
Subtask 05-51-12-210-058
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
| A.| | Examine the engine pylon skins and the| X | | | | |
| | | panels for distortion, cracks, pulled | | | | | |
| | | or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the pylon access panels | | X | | | |
| | | adjacent to the damage. | | | | | |
| | | Examine the internal structure for| | | | | |
| | | distortion, cracks, pulled or torn| | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | (2) Examine: | | X | | | |
| | | - all the components, | | | | | |
| | | - the pipes, | | | | | |
| | | - the ducts, | | | | | |
| | | - the electrical cable looms, | | | | | |
| | | - the control cable pulleys and | | | | | |
| | | their mounts, | | | | | |
| | | - the fire protection system for | | | | | |
| | | distortion, cracks, rupture and | | | | | |
| | | breaks. | | | | | |
| | | Make sure that the safety devices | | | | | |
| | | are in the correct condition and | | | | | |
| | | that they are correctly attached. | | | | | |
| | | If you find other damage: | | | | | |
| | | - Remove all the panels, open the| | | X | | |
| | | engine cowls and examine all of| | | | | |
| | | the main structure. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-12-869-050
J. Inspection
EFF :
ALL 05-51-12
Page 618
Nov 01/00
BV
Subtask 05-51-12-410-050
K. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Install and/or close all the access doors and the panels applicable
to this inspection.
Subtask 05-51-12-210-052
(1) Make sure the flaps are retracted (Ref. TASK 27-50-00-866-009).
Subtask 05-51-12-700-050
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | If you found damage on the landing | | | | | |
| | | gear, the attached parts or the | | | | | |
| | | adjacent structure: | | | | | |
| | | - Do a functional test of the landing | | X | | | |
| | | gear | | | | | |
| | | (Ref. TASK 32-31-00-720-002). | | | | | |
| | | Make sure that it moves smoothly and| | | | | |
| | | freely. | | | | | |
| | | | | | | | |
|2. | | If you found damage on the doors, | | | | | |
| | | their attached parts or the adjacent | | | | | |
| | | structure: | | | | | |
EFF :
ALL 05-51-12
Page 619
Nov 01/00
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
5. Close-up
________
Subtask 05-51-12-942-050
A. Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 05-51-12
Page 620
Nov 01/00
R
BV
INSPECTION AFTER FLAP/SLAT LIMITING SPEED EXCEEDED - INSPECTION/CHECK
_____________________________________________________________________
TASK 05-51-13-200-001
Inspection after Flap/Slat Extension at more than the Flap/Slat Limiting Speed
1. __________________
Reason for the Job
- If the overspeed was more than 10 Kts higher than the value shown on the
VFE placard, you must do the full inspection given in this procedure.
R - If activation of the overspeed warning occurred during movement of the
R flap and slat control lever from the position 0 to the position 1, it is
R not necessary to do the inspection and the operational test of the flap
R system (steps 4.C and 4.E.1 of this procedure).
R NOTE : You can get confirmation of the slat and/or flap movement from the
____
R flight data recorder. If these data are not available, you must do
R the maintenance actions applicable to the pilots report.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-13
Page 601
May 01/02
BV
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-13
Page 602
May 01/02
R
BV
3. __________
Job Set-up
Subtask 05-51-13-869-051
A. Not Applicable
Subtask 05-51-13-481-050
B. Safety Precautions
(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
Subtask 05-51-13-010-050
C. Get Access
(1) Open the main doors of the main gear and install the safety devices
(Ref. TASK 32-12-00-010-001).
Subtask 05-51-13-866-050
(4) Put a warning notice in the cockpit to tell persons not to operate
the landing gear or the flight controls.
Subtask 05-51-13-860-050
(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).
(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
EFF :
ALL 05-51-13
Page 603
May 01/02
R
BV
Subtask 05-51-13-010-051
F. Get Access
4. Procedure
_________
Subtask 05-51-13-869-050
A. General
NOTE : All the inspections are visual unless the text gives other
____
instructions. Operators can refer to the Non-destructive Testing
Manual (NTM) and use the non-destructive procedures.
Subtask 05-51-13-210-051
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the wing leading edge | | | | | |
| | | | | | | | |
| A.| | Examine the upper and lower skin | X | | | | |
| | | panels of the leading edge for | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Get access to the other side of | | X | | | |
| | | the damaged area. | | | | | |
| | | (2) Examine internally the related | | X | | | |
| | | area for distortion and damage. | | | | | |
| | | | | | | | |
|2. | | Inspection of the wing trailing edge | | | | | |
| | | | | | | | |
| A.| | Examine the upper and lower skin | X | | | | |
| | | panels of the wing trailing edge for | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners, skin/honeycomb-core | | | | | |
| | | delamination and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Get access to the other side of | | X | | | |
| | | the damaged area. | | | | | |
| | | (2) Examine internally the related | | X | | | |
EFF :
ALL 05-51-13
Page 604
May 01/02
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | area for distortion and damage. | | | | | |
| | | | | | | | |
| B.| | Examine all the pipes, the hoses, the | | X | | | |
| | | ducts, electrical looms and mountings | | | | | |
| | | in the wing trailing edge area for | | | | | |
| | | distortion, cracks, failure and | | | | | |
| | | leakage. | | | | | |
| | | | | | | | |
|3. | | Inspection of the wing tip | | | | | |
| | | | | | | | |
| A.| | Examine the upper and lower skin | X | | | | |
| | | panels of the wing tip for distortion,| | | | | |
| | | cracks, pulled or torn fasteners and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Get access to the other side of | | X | | | |
| | | the damaged area. | | | | | |
| | | (2) Examine internally the related | | X | | | |
| | | area for distortion and damage. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-13-210-053
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the flap assemblies and | | | | | |
| | | flap transmission system | | | | | |
| | | | | | | | |
| A.| | Examine the upper and lower skin of | X | | | | |
| | | the inboard and outboard flaps for | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners, skin/honeycomb-core | | | | | |
| | | delamination and damaged paintwork. | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-13
Page 605
May 01/02
R
BV
Component Location of the Flap System
Figure 601/TASK 05-51-13-991-001
EFF :
ALL 05-51-13
Page 606
Nov 01/98
R
BV
Flap Components
Figure 602/TASK 05-51-13-991-002
EFF :
ALL 05-51-13
Page 607
Nov 01/98
R
BV
Track No. 1 Actuator
Figure 603/TASK 05-51-13-991-005
EFF :
ALL 05-51-13
Page 608
Nov 01/98
R
BV
Typical Installation of the Actuator
Figure 604/TASK 05-51-13-991-006
EFF :
ALL 05-51-13
Page 609
Nov 01/98
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| B.| | Examine the flap to carriage | X | | | | |
| | | attachmemt fittings for distortion, | | | | | |
| | | cracks and damage. | | | | | |
| | | | | | | | |
| C.| | Examine the torque limiter indicators.| X | | | | |
| | | Make sure that they are not extended. | | | | | |
| | | | | | | | |
| | | If you find damage on items A. to C.: | | | | | |
| | | (1) Examine the flap transmission | | X | | | |
| | | assy (Ref. TASK 27-54-00-200-001) | | | | | |
| | | for distortion and damage. | | | | | |
| | | If you find damage in the trans- | | | | | |
| | | mission system: | | | | | |
| | | - remove the system actuators, the| | | X | | |
| | | shafts, the bearings and the | | | | | |
| | | gear boxes for component | | | | | |
| | | maintenance. | | | | | |
| | | (2) Examine the flap tracks and | | X | | | |
| | | rollers for distortion and damage | | | | | |
| | | (Ref. TASK 27-54-46-200-001). | | | | | |
| | | | | | | | |
|2. | | Inspection of the flap track | | | | | |
| | | attachments | | | | | |
| | | | | | | | |
| A.| | Examine the attachment of the flap | X | | | | |
| | | track No.1 at the wing root and their | | | | | |
| | | attachment fittings for distortion, | | | | | |
| | | cracks and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Get access to the main gear | | X | | | |
| | | compartment and the aft cargo | | | | | |
| | | compartment. | | | | | |
| | | (2) Examine the FR45 and FR47 for | | X | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine externally (as far as | X | | | | |
| | | possible) the beam assemblies of the | | | | | |
| | | flap tracks No. 2 to No. 4 and all the| | | | | |
| | | the components installed on them for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
EFF :
ALL 05-51-13
Page 610
May 01/02
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (1) Do a detailed visual inspection of| | X | | | |
| | | the flap track No.2 to No. 4 beams| | | | | |
| | | Aft attachment (pay particular | | | | | |
| | | attention to the failsafe devices | | | | | |
| | | and the spigot pin). | | | | | |
| | | (Ref. TASK 57-26-00-200-001). | | | | | |
| | | NOTE: Make sure that the clearence| | | | | |
| | | at failsafe pins (adjacent | | | | | |
| | | to the spigot) is correct. | | | | | |
| | | (2) Do a detailed visual inspection of| | X | | | |
| | | the flap tracks No. 2 to No.4 | | | | | |
| | | beams Fwd attachment (pay | | | | | |
| | | particular attention to the | | | | | |
| | | failsafe devices and the spigot | | | | | |
| | | pin). | | | | | |
| | | (Ref. TASK 57-26-00-200-006) | | | | | |
| | | (3) Defuel the wing tank | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (4) Examine the ribs 6, 12 and 19 and | | X | | | |
| | | the rear spar for distortion, | | | | | |
| | | cracks and damaged sealant fillets| | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-13-210-054
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the slat assemblies and | | | | | |
| | | slat transmission | | | | | |
| | | | | | | | |
| A.| | Examine the slats for distortion, | X | | | | |
| | | cracks, pulled or torn fasteners, | | | | | |
| | | skin/honeycomb-core delamination and | | | | | |
| | | damaged paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine the hold-down stop-bracket and| X | | | | |
EFF :
ALL 05-51-13
Page 611
May 01/02
R
BV
R Component Location of the Slat System
R Figure 605/TASK 05-51-13-991-004
EFF :
ALL 05-51-13
Page 612
May 01/00
BV
Slat Components
Figure 606/TASK 05-51-13-991-003
EFF :
ALL 05-51-13
Page 613
May 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | attachments for distortion, cracks and| | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | | | | | | |
| C.| | Examine the anti-ice telescopic-duct | X | | | | |
| | | attachments for distortion, cracks and| | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | | | | | | |
| D.| | Examine the torque limiter indicators.| X | | | | |
| | | Make sure that they are not extended. | | | | | |
| | | | | | | | |
| | | If you find damage on items A. to D.: | | | | | |
| | | (1) Examine the slat transmission | | X | | | |
| | | system for distortion and damage | | | | | |
| | | (Ref. TASK 27-84-00-200-001). | | | | | |
| | | If you find damage in the slat | | | | | |
| | | transmission system: | | | | | |
| | | - remove the system actuators, the| | | X | | |
| | | shafts, the bearings and the | | | | | |
| | | gear boxes for component | | | | | |
| | | maintenance. | | | | | |
| | | (2) Examine the slat tracks and | | X | | | |
| | | rollers for distortion and damage | | | | | |
| | | (Ref. TASK 27-84-00-210-001). | | | | | |
| | | (3) Examine all the pipes, hoses, | | X | | | |
| | | ducts, electrical looms and | | | | | |
| | | mountings for distortion, cracks, | | | | | |
| | | failure and leaks. | | | | | |
| | | | | | | | |
|2. | | Inspection of the slat track | | | | | |
| | | attachments | | | | | |
| | | | | | | | |
| A.| | Examine the tracks No. 5 and 10 and | X | | | | |
| | | their mountings for distortion, | | | | | |
| | | cracks, pulled or torn fasteners and | | | | | |
| | | damaged paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine the rack teeth of tracks No. | X | | | | |
| | | 5 and 10 and their attachments for | | | | | |
| | | distortion, cracks and pulled or torn | | | | | |
| | | fasteners. | | | | | |
| | | | | | | | |
| | | If you find damage on items A. or B.: | | | | | |
| | | (1) Open all the access panels of the | | X | | | |
EFF :
ALL 05-51-13
Page 614
May 01/02
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | wing leading edges. | | | | | |
| | | (2) Examine the remaining tracks and | | X | | | |
| | | their mountings for distortion, | | | | | |
| | | cracks, pulled or torn fasteners | | | | | |
| | | and damaged paintwork. | | | | | |
| | | (3) Examine the rack teeth of the | | X | | | |
| | | remaining tracks and their | | | | | |
| | | attachments for distortion, cracks| | | | | |
| | | and pulled or torn fasteners. | | | | | |
| | | | | | | | |
|3. | | Slat Track Rib and Hold-Down Rib | | | | | |
| | | Structure | | | | | |
| | | | | | | | |
| A.| | Examine the ribs of tracks No. 5 and | X | | | | |
| | | 10 for distortion, cracks, pulled or | | | | | |
| | | torn fasteners, damaged paintwork and | | | | | |
| | | fuel leaks. | | | | | |
| | | | | | | | |
| B.| | Examine the hold-down stops for | X | | | | |
| | | distortion, cracks and damage. | | | | | |
| | | | | | | | |
| | | If you find damage on items A. or B.: | | | | | |
| | | (1) Open all the access panels of the | | X | | | |
| | | wing leading edges. | | | | | |
| | | (2) Examine the ribs of the remaining | | X | | | |
| | | tracks for distortion, cracks, | | | | | |
| | | pulled or torn fasteners, damaged | | | | | |
| | | paintwork and fuel leaks. | | | | | |
| | | (3) Defuel the wing tanks | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (4) Get access to the wing tanks | | X | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (5) Examine the front spar area for | | X | | | |
| | | distortion, cracks and damaged | | | | | |
| | | sealant fillets. | | | | | |
| | | (6) Close access to the wing tanks | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-13
Page 615
May 01/02
R
BV
Subtask 05-51-13-710-050
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Do an operational test of the flaps | X | | | | |
| | | (Ref. TASK 27-54-00-710-001). | | | | | |
| | | Make sure that the flaps move | | | | | |
| | | smoothly and freely. | | | | | |
| | | | | | | | |
|2. | | Do an operational test of the slats | X | | | | |
| | | (Ref. TASK 27-84-00-710-001). | | | | | |
| | | Make sure that the slats move | | | | | |
| | | smoothly and freely. | | | | | |
| | | | | | | | |
|3. | | Do an operational test of the | X | | | | |
| | | spoilers (Ref. TASK 27-64-00-710-001).| | | | | |
| | | Make sure that the spoilers move | | | | | |
| | | smoothly and freely. | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-13-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 05-51-13-866-051
EFF :
ALL 05-51-13
Page 616
May 01/02
R
BV
(3) Retract the flaps (Ref. TASK 27-50-00-866-009).
EFF :
ALL 05-51-13
Page 617
Nov 01/00
R
BV
INSPECTION OF AIRFRAME AFTER BIRD OR HAIL STRIKE - INSPECTION/CHECK
___________________________________________________________________
TASK 05-51-14-200-001
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-14
Page 601
Nov 01/06
BV
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-14
Page 602
Nov 01/06
R
BV
3. __________
Job Set-up
Subtask 05-51-14-481-050
A. Safety Precautions
R (1) Make sure that the safety devices are installed on the landing gears
R (Ref. TASK 32-00-00-481-001).
(2) Put the warning notices in the cockpit to tell persons not to operate
the systems.
Subtask 05-51-14-010-050
B. Get Access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).
Subtask 05-51-14-866-050
(1) Fully extend the flaps and the slats (Ref. TASK 27-50-00-866-008)
(Ref. TASK 27-80-00-866-004).
Subtask 05-51-14-860-050
(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).
(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
EFF :
ALL 05-51-14
Page 603
Nov 01/06
BV
4. Procedure
_________
Subtask 05-51-14-869-050
A. General
NOTE : All the necessary inspections are visual unless the text gives
____
other instructions.
Operators can refer to the Non-destructive Testing Manual (NTM)
and use non-destructive procedures.
Subtask 05-51-14-210-051
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Radome | | | | | |
| | | | | | | | |
| A.| | Examine the radome for erosion, | X | | | | |
| | | delamination and core damage, | | | | | |
| | | internally and externally | | | | | |
| | | (Ref. TASK 53-15-11-200-00100). | | | | | |
| | | | | | | | |
| B.| | Make sure that the lightning arresters| X | | | | |
| | | are in the correct condition and that | | | | | |
| | | they are correctly bonded. | | | | | |
| | | If you find damage, bond them back | | | | | |
| | | into position. | | | | | |
| | | | | | | | |
|2. | | Flight Compartment Windshields and | | | | | |
| | | Side Windows | | | | | |
| | | | | | | | |
| A.| | Examine them for cracking, | X | | | | |
EFF :
ALL 05-51-14
Page 604
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | delamination and changes in color | | | | | |
| | | (indication of damage caused by too | | | | | |
| | | much heat). | | | | | |
| | | If you find much damage (heavy bird | | | | | |
| | | strike): | | | | | |
| | | (1) Examine the windshield and the | | X | | | |
| | | internal side of the side window | | | | | |
| | | uprights and frames internally for| | | | | |
| | | distortion, cracks and pulled or | | | | | |
| | | torn fasteners. | | | | | |
| | | | | | | | |
|3. | | Passenger Compartment Windows | | | | | |
| | | | | | | | |
| A.| | Examine them for cracks, delamination | X | | | | |
| | | and crazing. | | | | | |
| | | | | | | | |
|4. | | External Fuselage Structure | | | | | |
| | | | | | | | |
| A.| | Examine the skin, the doors, the | X | | | | |
| | | fairings, the belly fairing and the | | | | | |
| | | fillets for: | | | | | |
| | | - erosion, distortion, cracks and | | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | (a) Get access to and internally | | | | | |
| | | examine: | | | | | |
| | | - all the frames, the stringers, | | X | | | |
| | | the cleats, the fittings and the | | | | | |
| | | component mounts (at and near | | | | | |
| | | the location of the damage) for: | | | | | |
| | | . distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | - all the components, the pipes, | | X | | | |
| | | the ducts, the electrical looms, | | | | | |
| | | the cables, the pulleys and the | | | | | |
| | | mechanical linkages for: | | | | | |
| | | . distortion, cracks, rupture, | | | | | |
| | | fluid leakage and breaks. | | | | | |
|B. | | Examine all the antennas, the TAT | | | | | |
EFF :
ALL 05-51-14
Page 605
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | sensor, the pitot probe, the | X | | | | |
| | | angle-of-attack sensor and the drain | | | | | |
| | | masts for: | | | | | |
| | | - cracks and damage. | | | | | |
| | | | | | | | |
|5. | | Belly Fairing | | | | | |
| | | | | | | | |
| A.| | Examine externally all the belly | X | | | | |
| | | fairing panels, specially the leading-| | | | | |
| | | edge root fairing and upper and lower | | | | | |
| | | wing fairings, for: | | | | | |
| | | - erosion, distortion, cracks and | | | | | |
| | | pulled or torn fasteners. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the damaged panel and | | X | | | |
| | | internally examine the belly | | | | | |
| | | fairing structure. | | | | | |
| | | (2) Examine all the components, pipes,| | X | | | |
| | | ducts, electrical looms and their | | | | | |
| | | mounts for distortion, cracks, | | | | | |
| | | breaks and fluid leakage. | | | | | |
| | | | | | | | |
|6. | | Nose Landing Gear | | | | | |
| | | | | | | | |
| A.| | Examine the nose landing gear. You | X | | | | |
| | | must be specially careful when you | | | | | |
| | | examine: | | | | | |
| | | - the components, the pipes, the | | | | | |
| | | electrical looms, the control rods | | | | | |
| | | and the bellcranks. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-14
Page 606
Nov 01/06
R
BV
Subtask 05-51-14-210-052
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nacelles | | | | | |
| | | | | | | | |
| A.| | Examine externally for erosion, | X | | | | |
| | | distortion, delamination, cracked or | | | | | |
| | | flaking paint, loose rivets and signs | | | | | |
| | | of shearing: | | | | | |
| | | - the air intake cowls, | | | | | |
| | | - the fan cowls, | | | | | |
| | | - the thrust reverser cowls of the | | | | | |
| | | fan. | | | | | |
| | | | | | | | |
| B.| | Examine the primary nozzle for | X | | | | |
| | | erosion, delamination, distortion, | | | | | |
| | | cracks, loose rivets and signs of | | | | | |
| | | shearing. | | | | | |
| | | If you find: | | | | | |
| | | - only erosion: | | | | | |
| | | no other inspection is necessary. | | | | | |
| | | - other damage: | | | | | |
| | | (1) Open the fan cowls | | X | | | |
| | | (Ref. TASK 71-13-00-010-040). | | | | | |
| | | (2) Open the fan thrust reverser cowls| | | | | |
| | | (Ref. TASK 78-36-00-010-040). | | | | | |
| | | Examine the cowls internally for | | | | | |
| | | signs of damage. | | | | | |
| | | (3) Examine the nose-cowl attach | | X | | | |
| | | points on the fan case for: | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
| | | torn fasteners. | | | | | |
| | | Examine the primary-nozzle attach | | | | | |
| | | points on the engine. | | | | | |
| | | (4) Examine all the cowl attach points| | X | | | |
| | | on the pylon and all the cowl | | | | | |
| | | hinge fittings. | | | | | |
| | | (5) Examine all the cowl latches for | | X | | | |
| | | damage and make sure that their | | | | | |
| | | operation is satisfactory. | | | | | |
EFF :
ALL 05-51-14
Page 607
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
|2. | | Engines | | | | | |
| | | | | | | | |
| A.| | Examine the engines for foreign objet | X | | | | |
| | | damage | | | | | |
| | | (Ref. TASK 72-00-00-200-001). | | | | | |
| | | | | | | | |
|3. | | Pylons | | | | | |
| | | | | | | | |
| A.| | Examine the pylons externally for | X | | | | |
| | | erosion, distortion, cracks, pulled | | | | | |
| | | or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | X | | | |
| | | - examine the pylon internally for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | - examine the components, the | | X | | | |
| | | pipes, the ducts, the electrical | | | | | |
| | | looms and their mounts for: | | | | | |
| | | . distortion, cracks, rupture | | | | | |
| | | breaks and fluid leakage. | | | | | |
| | | | | | | | |
| B.| |Do the inspection of the Fan Air Valve | | | | | |
| | |and Bleed-air Precooler Exchanger. | X | | | | |
| | |(Ref. TASK 36-11-00-200-002) | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-14
Page 608
Nov 01/06
R
BV
Subtask 05-51-14-210-053
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Vertical Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine the dorsal fin, the leading | X | | | | |
| | | edge and the tip fairing externally | | | | | |
| | | for: | | | | | |
| | | - erosion, distortion, cracks, pulled | | | | | |
| | | or torn fasteners, honeycomb | | | | | |
| | | delamination and core damage. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | (a) Examine internally at and near the| | X | | | |
| | | damage for: | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
| | | torn fasteners, honeycomb | | | | | |
| | | delamination or core damage and | | | | | |
| | | damaged paintwork. | | | | | |
| | | | | | | | |
| B. | | Examine the spar box of the vertical | X | | | | |
| | | stabilizer for erosion and scores. | | | | | |
| | | | | | | | |
| C. | | Examine the rudder and the trailing- | X | | | | |
| | | edge access doors externally for: | | | | | |
| | | - erosion, distortion, cracks, pulled | | | | | |
| | | or torn fasteners, honeycomb | | | | | |
| | | delamination and core damage. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | - examine the rudder hinge and the | | X | | | |
| | | actuator attach fittings for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
|2. | | Horizontal Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine the leading edge and the tip | X | | | | |
EFF :
ALL 05-51-14
Page 609
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | fairing externally for: | | | | | |
| | | - erosion, distortion, cracks, pulled | | | | | |
| | | or torn fasteners, honeycomb | | | | | |
| | | delamination and core damage. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | - examine internally for cracks, | | X | | | |
| | | distortion, pulled, or torn | | | | | |
| | | fasteners and damaged paint- | | | | | |
| | | work. | | | | | |
| | | | | | | | |
| B.| | Examine the spar box of the | X | | | | |
| | | horizontal stabilizer for erosion | | | | | |
| | | and scores. | | | | | |
| | | | | | | | |
| C.| | Examine the elevators and the | X | | | | |
| | | trailing-edge access doors externally | | | | | |
| | | for: | | | | | |
| | | - erosion, distortion, cracks, pulled | | | | | |
| | | or torn fasteners, honeycomb | | | | | |
| | | delamination and core damage. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | - examine the elevator hinge and | | X | | | |
| | | the actuator fittings for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-14
Page 610
Nov 01/06
R
BV
Subtask 05-51-14-210-054
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Leading Edge, Fillets and Slats | | | | | |
| | | | | | | | |
| A.| | Examine for erosion, distortion, | X | | | | |
| | | cracks and pulled or torn fasteners. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | - examine the leading edge | | X | | | |
| | | section internally at and near | | | | | |
| | | the damage, for distortion, | | | | | |
| | | cracks and pulled or torn | | | | | |
| | | fasteners, | | | | | |
| | | - examine the ducts and the related| | X | | | |
| | | attach points for damage, | | | | | |
| | | - examine the slat section for | | X | | | |
| | | distortion, cracks, pulled | | | | | |
| | | or torn fasteners and damaged | | | | | |
| | | paintwork, | | | | | |
| | | - examine the actuators, the slat | | X | | | |
| | | tracks and the slat-track attach | | | | | |
| | | points for damage, | | | | | |
| | | - examine the slat tracks for | | X | | | |
| | | brinelling on the roller tracks. | | | | | |
| | | - examine the aileron servo- | | X | | | |
| | | controls and the hinge fittings | | | | | |
| | | for damage, | | | | | |
| | | - examine the spoiler actuators | | X | | | |
| | | and the hinge fittings for | | | | | |
| | | damage. | | | | | |
| | | | | | | | |
|2. | | Wing Tip Fairings and Navigation | | | | | |
| | | Lights | | | | | |
| | | | | | | | |
| A.| | Examine for erosion, distortion, | X | | | | |
| | | cracks, and pulled or torn fasteners. | | | | | |
| | | | | | | | |
|3. | | Main Landing Gear (MLG) and Doors | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-14
Page 611
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If the MLG was extended during the | | | | | |
| | | bird or hail strike: | | | | | |
| | | - examine the MLG. Examine the doors, | X | | | | |
| | | the components, the pipes, the | | | | | |
| | | cables, the pulleys and the | | | | | |
| | | electrical looms installed on the | | | | | |
| | | MLG | | | | | |
| | | (Ref. TASK 32-11-00-200-001). | | | | | |
| | | | | | | | |
| B.| | If the MLG was retracted during the | | | | | |
| | | bird or hail strike: | | | | | |
| | | - examine the MLG doors for damage. | X | | | | |
| | | | | | | | |
|4. | | Main Structure of the Wing | | | | | |
| | | | | | | | |
| A.| | Examine for erosion and scores. | X | | | | |
| | | | | | | | |
|5. | | Trailing Edge Falsework, Flaps, | | | | | |
| | | Ailerons and Spoilers | | | | | |
| | | | | | | | |
| A.| | Examine externally the control | X | | | | |
| | | surfaces for erosion, signs of impact,| | | | | |
| | | damaged paintwork, abrasions, | | | | | |
| | | scratches or dents, distortion, cracks| | | | | |
| | | and pulled and torn fasteners. | | | | | |
| | | If you find: | | | | | |
| | | (1) Only erosion: | | | | | |
| | | - no other inspection is necessary.| | | | | |
| | | (2) Other damage: | | | | | |
| | | - examine the falsework internally | | X | | | |
| | | at and near the damage for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork, | | | | | |
| | | - examine the flap carriages and | | X | | | |
| | | the fairing for distortion and | | | | | |
| | | cracks, | | | | | |
| | | - examine the flap tracks for | | X | | | |
| | | brinelling and damage. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-14
Page 612
Nov 01/06
R
BV
Subtask 05-51-14-410-050
F. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close all the panels and doors that where open for this inspection.
Subtask 05-51-14-866-051
Subtask 05-51-14-710-050
EFF :
ALL 05-51-14
Page 613
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | NOTE : The tests below are only | | | | | |
| | | necessary if: | | | | | |
| | | - you did work on the system | | | | | |
| | | subsequent to the inspection | | | | | |
| | | for damage, | | | | | |
| | | - you found damage on the | | | | | |
| | | structure adjacent to a | | | | | |
| | | flight control surface. | | | | | |
| | | | | | | | |
|1. | | Operate the ailerons 3 times. Make | | X | | | |
| | | sure that the travel is full and that | | | | | |
| | | the ailerons move freely | | | | | |
| | | (Ref. TASK 27-14-00-710-001). | | | | | |
| | | | | | | | |
|2. | | Operate the rudder 3 times. Make sure | | X | | | |
| | | that the travel is full and that the | | | | | |
| | | rudder moves freely | | | | | |
| | | (Ref. TASK 27-24-00-710-002). | | | | | |
| | | | | | | | |
|3. | | Operate the elevator 3 times. Make | | X | | | |
| | | sure that the travel is full and that | | | | | |
| | | the elevator moves freely | | | | | |
| | | (Ref. TASK 27-34-00-710-001). | | | | | |
| | | | | | | | |
|4. | | Operate the trimmable horizontal | | X | | | |
| | | stabilizer 3 times. Make sure that the| | | | | |
| | | travel is full and that the trimmable | | | | | |
| | | horizontal stabilizer moves freely | | | | | |
| | | (Ref. TASK 27-44-00-710-001). | | | | | |
| | | | | | | | |
|5. | | Operate the spoilers 3 times. Make | | X | | | |
| | | sure that the travel is full and that | | | | | |
| | | the spoilers move freely | | | | | |
| | | (Ref. TASK 27-64-00-710-001). | | | | | |
| | | | | | | | |
|6. | | Operate the flaps and the slats 3 | | X | | | |
| | | times. Make sure that the travel is | | | | | |
| | | full and that these control surfaces | | | | | |
| | | move freely | | | | | |
| | | (Ref. TASK 27-54-00-710-001) | | | | | |
| | | (Ref. TASK 27-84-00-710-001). | | | | | |
| | | | | | | | |
| | | NOTE : The tests below are necessary | | | | | |
EFF :
ALL 05-51-14
Page 614
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | only if: | | | | | |
| | | - you did work on the system | | | | | |
| | | subsequent to the inspection | | | | | |
| | | for damage, | | | | | |
| | | - you found damage on the | | | | | |
| | | structure adjacent to a | | | | | |
| | | landing gear doors. | | | | | |
|7. | | Retract and extend the landing gear 3 | | X | | | |
| | | times | | | | | |
| | | (Ref. TASK 32-30-00-867-001) | | | | | |
| | | (Ref. TASK 32-30-00-867-002). | | | | | |
| | | Make sure that the landing gear and | | | | | |
| | | the doors move smoothly and freely. | | | | | |
| | | | | | | | |
| | | NOTE : If you find damage only on the | | | | | |
| | | main doors of the main gear or | | | | | |
| | | only on the fuselage structure | | | | | |
| | | adjacent to the main doors: | | | | | |
| | | - do a test of the main doors | | | | | |
| | | only. | | | | | |
| | | Use the circuit which | | | | | |
| | | opens/closes the doors when | | | | | |
| | | the aircraft is on the ground. | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
EFF :
ALL 05-51-14
Page 615
Nov 01/06
BV
R _____________________________________________________________
INSPECTION AFTER A TIRE BURST OR TREAD THROW OR WHEEL FAILURE
R ________________
INSPECTION/CHECK
TASK 05-51-15-200-001
WARNING : LET THE BRAKES AND THE WHEELS BECOME COOL BEFORE YOU GO NEAR THE
_______
LANDING GEAR. DO NOT APPLY A LIQUID OR GAS FIRE EXTINGUISHER DIRECTLY
ON A HOT WHEEL OR BRAKE UNIT. THIS COULD CAUSE AN EXPLOSION.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-15
Page 601
May 01/05
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-15-481-050
A. Safety Precautions
(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
Subtask 05-51-15-010-050
B. Get Access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).
Subtask 05-51-15-866-050
(1) Fully extend the flaps and the slats (Ref. TASK 27-50-00-866-008),
(Ref. TASK 27-80-00-866-004).
EFF :
ALL 05-51-15
Page 602
May 01/06
BV
Subtask 05-51-15-860-050
(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).
(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
(3) Put the warning notices in position in the cockpit to tell persons
not to operate the systems.
4. Procedure
_________
Subtask 05-51-15-210-051
A. General
NOTE : All the necessary inspections are visual unless the text gives
____
other instructions.
Operators can refer to the Non-destructive Testing Manual (NTM)
and use non-destructive procedures.
(4) If a tire burst occurs when the landing gear is fully retracted, then
only examine the items of equipment below:
- the landing gear well,
- the landing gear doors,
- the landing gear assemblies,
- the hydraulic bay compartment.
EFF :
ALL 05-51-15
Page 603
May 01/06
R
BV
Subtask 05-51-15-210-055
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | | Fuselage Lower Surface. This includes | | | | | |
R | | | cargo doors. | | | | | |
| | | | | | | | |
| A.| | Examine the skin panels for | X | | | | |
| | | distortion, pulled or torn fasteners | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the floor panels of the | | X | | | |
| | | avionics and/or forward cargo | | | | | |
| | | compartment and examine: | | | | | |
| | | - the frames | | | | | |
| | | - the stringers | | | | | |
| | | - the cleats | | | | | |
| | | - the fittings | | | | | |
| | | for distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork adjacent to the damaged | | | | | |
| | | area. | | | | | |
| | | (2) Examine: | | X | | | |
| | | - the components | | | | | |
| | | - the pipes | | | | | |
| | | - the ducts | | | | | |
| | | - the electrical looms | | | | | |
| | | - the control cables | | | | | |
| | | - the pulleys | | | | | |
| | | - the mounts | | | | | |
| | | for cracks, rupture, fluid | | | | | |
| | | leakage. | | | | | |
| | | Also examine the condition of the | | | | | |
| | | safety devices. | | | | | |
| | | | | | | | |
| B.| | In the nose landing-gear well, | X | | | | |
| | | examine: | | | | | |
| | | - the structure | | | | | |
| | | - the components | | | | | |
| | | - the pipes | | | | | |
EFF :
ALL 05-51-15
Page 604
May 01/06
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the ducts | | | | | |
| | | - the electrical looms | | | | | |
| | | - the control cables | | | | | |
| | | - the pulleys | | | | | |
| | | - the mounts | | | | | |
| | | for distortion, rupture, fluid | | | | | |
| | | leakage. | | | | | |
| | | Also examine the condition of the | | | | | |
| | | safety devices. | | | | | |
| | | | | | | | |
R | C.| | Examine: | X | | | | |
| | | - the nose landing-gear doors | | | | | |
| | | - the hinges | | | | | |
| | | - the attachments of the actuating | | | | | |
| | | cylinder | | | | | |
| | | for distortion, cracks, pulled or torn| | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | | | | | | |
| D.| | Examine the nose landing-gear and | X | | | | |
R | | | specially: | | | | | |
| | | - the components | | | | | |
| | | - the pipes | | | | | |
| | | - the electrical looms | | | | | |
| | | - the control cables | | | | | |
| | | - the pulleys | | | | | |
| | | - the linkages | | | | | |
| | | - the mount. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-15
Page 605
May 01/05
BV
Subtask 05-51-15-210-052
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Belly Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the belly fairing panels for | X | | | | |
| | | holes, delamination, cracked or | | | | | |
| | | flaking paint and loose fasteners. | | | | | |
| | | Make sure that the panels are | | | | | |
| | | correctly attached. | | | | | |
R | | | If you find damage: | | | | | |
| | | (1) Remove the panels and internally | | X | | | |
| | | examine the belly fairing | | | | | |
| | | structure for buckling, cracks and| | | | | |
| | | damaged paintwork. | | | | | |
R | | | (2) Examine: | | X | | | |
| | | - the pipes | | | | | |
| | | - the ducts | | | | | |
| | | - the electrical looms | | | | | |
| | | - the mounts | | | | | |
| | | for fluid leakage, distortion, | | | | | |
| | | rupture, breaks, cracks. | | | | | |
| | | Make sure that the components are | | | | | |
| | | correctly attached and examine the | | | | | |
| | | condition of the safety devices. | | | | | |
| | | | | | | | |
|2. | | Main Landing-Gear Well | | | | | |
| | | | | | | | |
| A.| | In the main landing-gear well, examine| X | | | | |
| | | the protective panels and the | | | | | |
| | | structure for distortion, cracks, | | | | | |
| | | pulled or torn fasteners, honeycomb | | | | | |
| | | delamination, core damage. | | | | | |
| | | | | | | | |
| B.| | Examine the main landing gear and | X | | | | |
R | | | specially: | | | | | |
| | | - the pipes | | | | | |
| | | - the ducts | | | | | |
| | | - the electrical looms | | | | | |
| | | - the mounts | | | | | |
| | | - the control actuators | | | | | |
EFF :
ALL 05-51-15
Page 606
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | for fluid leakage, distortion, | | | | | |
| | | rupture, breaks, cracks. | | | | | |
| | | Make sure that the components are | | | | | |
| | | correctly attached and examine the | | | | | |
| | | condition of the safety devices | | | | | |
| | | (Ref. TASK 32-11-00-200-001). | | | | | |
| | | | | | | | |
| 3. | | Main Landing-Gear Main-Doors | | | | | |
| | | | | | | | |
R | A.| | Examine: | X | | | | |
| | | - the door | | | | | |
| | | - the hinges | | | | | |
| | | - the actuating cylinder attachments | | | | | |
| | | - the sequence valve mounts | | | | | |
| | | - the linkage | | | | | |
| | | for distortion, cracks, pulled or torn| | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | | | | | | |
| B.| | Examine the actuating cylinder, the | X | | | | |
| | | sequence valve, the hoses and the | | | | | |
| | | pipes for distortion, cracks, rupture | | | | | |
| | | and fluid leakage. Also examine the | | | | | |
| | | condition of the safety devices. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-15-210-053
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nacelles and Engine | | | | | |
| | | | | | | | |
| A.| | Externally examine the nacelle and the| X | | | | |
R | | | primary nozzle for: | | | | | |
| | | distortion, cracks, delamination, | | | | | |
| | | cracked or flaking paint, loose rivets| | | | | |
| | | and signs of shearing. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Open the cowls and internally | | X | | | |
EFF :
ALL 05-51-15
Page 607
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R | | | examine them for distortion, | | | | | |
| | | cracks, pulled or torn fasteners | | | | | |
| | | and damaged paintwork | | | | | |
| | | (Ref. TASK 71-13-11-200-040). | | | | | |
| | | (2) Examine the components, the ducts,| | X | | | |
| | | the cables and the looms in the | | | | | |
| | | cowls for distortion, cracks and | | | | | |
| | | rupture. | | | | | |
| | | | | | | | |
| B.| | If the tire burst occurred during | X | | | | |
| | | thrust reverser operation, do a | | | | | |
| | | functional test of the thrust reverser| | | | | |
| | | system (Refer to the Test paragraph). | | | | | |
| | | Make sure that the travel is full and | | | | | |
| | | that the related controls do not catch| | | | | |
| | | or become blocked. Internally examine | | | | | |
| | | the doors for damage. | | | | | |
| | | | | | | | |
|2. | | Engines | X | | | | |
| | | | | | | | |
| A.| | Examine the engines for possible | X | | | | |
| | | foreign object damage | | | | | |
| | | (Ref. TASK 72-00-00-200-001). | | | | | |
| | | | | | | | |
|3. | | Pylons | | | | | |
| | | | | | | | |
| A.| | Externally examine the pylons for | X | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
R | | | If you find damage: | | | | | |
| | | (1) Internally examine the structure | | X | | | |
| | | for distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | (2) Examine the components, the pipes,| | X | | | |
| | | the ducts, the looms, the cables, | | | | | |
| | | the pulleys and the mounts for | | | | | |
| | | distortion, cracks, rupture, fluid| | | | | |
| | | leakage. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-15
Page 608
May 01/05
BV
Subtask 05-51-15-210-054
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Skin panels | | | | | |
| | | | | | | | |
| A.| | Examine the skin panels, specially | X | | | | |
| | | on the bottom surface of the wings, | | | | | |
R | | | for: | | | | | |
| | | - damage to the paint | | | | | |
| | | - distortion | | | | | |
| | | - cracks | | | | | |
| | | - tears | | | | | |
| | | - fuel leaks. | | | | | |
R | | | If you find damage or fuel leaks: | | | | | |
| | | (1) Defuel the tanks | | X | | | |
R | | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (3) Examine the front and rear spars, | | X | | | |
| | | the internal structure and the | | | | | |
| | | fasteners for distortion, cracks, | | | | | |
| | | pulled fasteners. | | | | | |
| | | Make sure that the condition of | | | | | |
| | | the sealant beads is good. | | | | | |
| | | (4) Examine the ducts, the cables, | | X | | | |
| | | the electrical looms, the pipes, | | | | | |
| | | the mechanical linkages and their | | | | | |
| | | installations for damage, | | | | | |
| | | distortion, cracks, fluid leaks. | | | | | |
| | | Make sure that the components are | | | | | |
| | | correctly attached. | | | | | |
| | | | | | | | |
| | | (5) Close access to the wing tanks | | | | | |
R | | | (Ref Task 28-10-00-910-002). | | | | | |
| | | | | | | | |
|2. | | Flaps and Slats | | | | | |
| | | | | | | | |
| A.| | Examine the slats, the flaps, and the | X | | | | |
| | | fairings for distortion, cracks or | | | | | |
| | | pulled fasteners and signs of impact. | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-15
Page 609
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|3. | | Ailerons | | | | | |
| | | | | | | | |
| A.| | Examine the ailerons for: | X | | | | |
| | | - damaged paintwork | | | | | |
| | | - distortion | | | | | |
| | | - cracks | | | | | |
| | | - pulled fasteners | | | | | |
| | | - signs of impact. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine the hinges and the | | | | | |
| | | actuators for damage, distortion and | | | | | |
| | | cracks. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-15-410-050
F. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the panels and the doors that were open for the inspection.
(5) Close the main doors of the main gear (Ref. TASK 32-12-00-410-001).
(6) Close the doors of the nose gear (Ref. TASK 32-22-00-410-001).
Subtask 05-51-15-710-050
EFF :
ALL 05-51-15
Page 610
May 01/06
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | NOTE : The subsequent tests are | | | | | |
| | | applicable only if the | | | | | |
| | | inspection showed damage to a | | | | | |
| | | flight control surface, the | | | | | |
| | | landing gears or doors or the | | | | | |
| | | adjacent structure. | | | | | |
| A. | | Do an operational test of the thrust | X | | | | |
| | | reverser system as specified in the | | | | | |
| | | inspection procedure | | | | | |
| | | (Ref. TASK 78-31-00-710-040). | | | | | |
| | | | | | | | |
| B.| | Do an operational test of the aileron.| | X | | | |
| | | Make sure that the travel is full and | | | | | |
| | | that the related controls do not catch| | | | | |
| | | or become blocked | | | | | |
| | | (Ref. TASK 27-14-00-710-001). | | | | | |
| | | | | | | | |
| C.| | Do an operational test of the flaps | | X | | | |
| | | and the slats. Make sure that the | | | | | |
| | | travel is full and that the related | | | | | |
| | | controls do not catch or become | | | | | |
| | | blocked | | | | | |
| | | (Ref. TASK 27-54-00-710-001) | | | | | |
| | | (Ref. TASK 27-84-00-710-001). | | | | | |
| | | | | | | | |
| D.| | Do an operational test of the | | X | | | |
| | | spoilers. | | | | | |
| | | Make sure that the travel is full and | | | | | |
| | | that the related controls do not catch| | | | | |
| | | or become blocked | | | | | |
R | | | (Ref. TASK 27-64-00-710-001). | | | | | |
| | | | | | | | |
| E.| | Do a retraction test of the landing | | X | | | |
| | | gear. Make sure that the travel is | | | | | |
| | | smooth and that the related controls | | | | | |
| | | do not catch or become blocked | | | | | |
R | | | (Ref. TASK 32-30-00-867-001) | | | | | |
| | | (Ref. TASK 32-30-00-867-002). | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-15
Page 611
May 01/05
BV
INSPECTION AFTER BRAKE EMERGENCY APPLICATION OR OVERHEAT - INSPECTION/CHECK
___________________________________________________________________________
TASK 05-51-16-200-001
WARNING : DO NOT GO NEAR A HOT WHEEL FOR ONE HOUR AFTER A BRAKE OVERHEAT IF THE
_______
TIRE IS INFLATED, EXCEPT TO PUT THE WHEEL CHOCKS IN POSITION. IF YOU
MUST GO NEAR THE WHEEL, GO FROM THE FRONT OR THE REAR BUT NOT FROM
THE SIDE OF THE WHEEL. THERE IS A RISK OF A TIRE BURST.
WARNING : LET THE BRAKES AND THE WHEELS BECOME COOL BEFORE YOU GO NEAR THE
_______
LANDING GEAR. DO NOT APPLY A LIQUID OR GAS FIRE EXTINGUISHER DIRECTLY
ON A HOT WHEEL OR BRAKE UNIT. THIS COULD CAUSE AN EXPLOSION.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
EFF :
ALL 05-51-16
Page 601
Nov 01/06
BV
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-16-941-050
R A. Safety Precautions
(a) To prevent movement of the aircraft, you can moor the aircraft
(Ref. TASK 10-20-00-556-001) or let the aircraft stay attached to
the towing tractor.
EFF :
ALL 05-51-16
Page 602
Nov 01/06
BV
R (b) Unless there is a fire, do not apply the extinguishing agent
R (liquid, water, mist, foam, etc.) with a spray gun on a hot tire
R if it is inflated.
Do not apply the extinguishing agent directly into the heat pack
of the brake or into the wheel. This can cause thermal shock to
R the stressed parts. Specially, do not use CO2 as this has a
R strong cooling effect which is not the same in all areas. It can
cause an explosion in the stressed parts.
Extinguishant on hot wheels can:
- increase the time necessary for the fuse(s) to melt, or
- prevent operation of the fuse(s).
R If the fuse plugs are not melted, you must let the brake get cool
R for at least one hour with no external cooling devices (you can
R use brake cooling fans, if installed).
R (d) Do not set the parking brake ON when BRAKES HOT warning is
R shown on the upper ECAM DU.
R (f) If a tire is inflated, do not go near the area around the wheel
R for approximately one hour.
(g) Put the wheel chocks in position when there is no risk of tire
burst.
EFF :
ALL 05-51-16
Page 603
Nov 01/05
BV
4. Procedure
_________
Subtask 05-51-16-210-053
Subtask 05-51-16-210-051
CAUTION : DO NOT TRY TO APPLY PRESSURE TO THE BRAKES WHEN THE ROTORS ARE
_______
NOT ALIGNED.
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R | A.| |Inspection after the melting of the | | | | | |
R | | |183 deg.C (361.4 deg.F) fuse plug(s) | | | | | |
R | | |and the reported cockpit indication of | | | | | |
R | | |the brakes temperature not more than | | | | | |
R | | |900 deg.C (1652 deg.F) | | | | | |
| | | | | | | | |
| | |(1) Remove the related wheel and the | X | | | | |
R | | | adjacent wheel for overhaul | | | | | |
R | | | (Ref. TASK 32-41-11-000-006). | | | | | |
R | | | (Refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | |(2) Examine the brake unit for damage | X | | | | |
R | | | or distortion | | | | | |
R | | | (Ref. TASK 32-42-27-210-006). | | | | | |
R | | | (a) Make sure that there is no | | | | | |
R | | | hydraulic fluid leakage at the | | | | | |
R | | | piston, liners, supply lines, | | | | | |
R | | | self-blanking unions and bleed | | | | | |
R | | | screws. | | | | | |
R | | | (b) Clean the piston housing with | | | | | |
R
EFF :
ALL 05-51-16
Page 604
Nov 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | a cloth and make sure it is in | | | | | |
| | | the correct condition (no | | | | | |
| | | separation, no blisters). | | | | | |
R | | | (c) Make sure that the heat pack is| | | | | |
| | | serviceable: | | | | | |
| | | - carbon integrity | | | | | |
| | | - free movement of the rotor | | | | | |
R | | | discs | | | | | |
| | | - cracks or signs of oxidation | | | | | |
R | | | on the part of the rotor | | | | | |
R | | | discs you can see. | | | | | |
R | | | NOTE: Be careful with the | | | | | |
| | | discs to prevent damage| | | | | |
| | | to the protective | | | | | |
| | | finish (anti-oxidation | | | | | |
R | | | paint). | | | | | |
| | |If you find damage: | | | | | |
R | | |- Remove the damaged brake unit for | | X | | | |
R | | | overhaul | | | | | |
R | | | (Ref. TASK 32-42-27-000-001). | | | | | |
R | | | (Refer to the manufacturers | | | | | |
R | | | instructions for the overhaul | | | | | |
R | | | procedure). | | | | | |
| | |(3) Installation of the removed | | | | | |
| | | components | | | | | |
R | | | (a) Install serviceable components:| | | | | |
| | | - for the wheels | | | | | |
| | | (Ref. TASK 32-41-11-400-006) | | | | | |
| | | - for the brakes | | | | | |
R | | | (Ref. TASK 32-42-27-400-001). | | | | | |
| | | | | | | | |
R | B.| |Inspection after the melting of the | | | | | |
R | | |183 deg.C (361.4 deg.F) or 300 deg.C | | | | | |
R | | |(572 deg.F) fuse plug(s) and/or the | | | | | |
R | | |reported cockpit indication of the | | | | | |
R | | |brakes temperature equal to or more | | | | | |
R | | |than 900 deg.C (1652 deg.F) | | | | | |
| | | | | | | | |
| | |(1) Remove the related wheel for | X | | | | |
| | | overhaul | | | | | |
R | | | (Ref. TASK 32-41-11-000-006). | | | | | |
R | | | (Refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
EFF :
ALL 05-51-16
Page 605
Nov 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | procedure). | | | | | |
R | | | NOTE: If fuse plug is melted, also | | | | | |
| | | remove the adjacent wheel for| | | | | |
| | | overhaul. | | | | | |
| | |(2) Remove the brake for overhaul | X | | | | |
R | | | (Ref. TASK 32-42-27-000-001). | | | | | |
R | | | (Refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | |(3) Remove the axle sleeve | X | | | | |
R | | | (Ref. TASK 32-42-71-000-001). | | | | | |
| | |(4) Do the Inspection of the MLG Axles | X | | | | |
| | | after Brake Overheat | | | | | |
R | | | (Ref. TASK 32-11-00-200-007). | | | | | |
| | |(5) Examine the axle sleeve for | X | | | | |
R | | | distortion and damaged surface. | | | | | |
| | |(6) Installation of the removed | | | | | |
R | | | components | | | | | |
| | | (a) Install serviceable components:| | | | | |
| | | - for the axle sleeve | | | | | |
| | | (Ref. TASK 32-42-71-400-001) | | | | | |
| | | - for the brakes | | | | | |
| | | (Ref. TASK 32-42-27-400-001) | | | | | |
| | | - for the wheels | | | | | |
R | | | (Ref. TASK 32-41-11-400-006). | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-16-710-050
R (1) Do an operational test of the normal braking system (Ref. TASK 32-42-
00-710-001).
R (2) Do an operational test of the alternate braking system (Ref. TASK 32-
43-00-710-001).
EFF :
ALL 05-51-16
Page 606
Nov 01/05
BV
Subtask 05-51-16-942-051
(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 05-51-16
Page 607
Nov 01/05
R
BV
_______________________________________________________________________
INSPECTION AFTER FLIGHT IN EXCESSIVE TURBULENCE OR IN EXCESS OF VMO/MMO
________________
INSPECTION/CHECK
TASK 05-51-17-200-001
1. __________________
Reason for the Job
To examine the aircraft for structural damage after a flight where excessive
load factors occurred. Such load factors can be caused by high turbulence,
maneuvers not in the usual limits, or VMO/MMO values that are more than the
specified limits.
Refer to Para. 3. A. for the conditions in which an inspection is necessary.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-17
Page 601
Nov 01/99
R
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-17-941-053
A. Inspection Requirements
(1) Do this inspection if the flight crew report and/or the data from the
Digital Flight Recording System (DFDRS) and/or the data from the QAR
(if installed) show:
EFF :
ALL 05-51-17
Page 602
Nov 01/05
BV
(d) Speeds that were more than VMO or MMO and at which there was a
vertical load factor equal to or more than +2 g or 0 g.
R (2) Also do this inspection if a DMU load report 15 was generated. This
R report shows that excessive vertical acceleration occurred during the
R flight (Ref. TASK 31-37-00-200-001).
Subtask 05-51-17-941-052
B. Not Applicable
Subtask 05-51-17-010-050
C. Get Access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
Subtask 05-51-17-481-050
D. Safety Precautions
(1) Make sure that the safety devices are installed on the main landing
gear (Ref. TASK 32-00-00-481-001).
Subtask 05-51-17-866-050
EFF :
ALL 05-51-17
Page 603
May 01/06
BV
Subtask 05-51-17-860-050
(1) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).
(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
(3) Put the warning notices in the cockpit to tell persons not to operate
the aircraft systems.
4. Procedure
_________
Subtask 05-51-17-210-051
A. General
NOTE : All these inspections are visual unless the text gives other
____
instructions.
You can do non-destructive tests (refer to the Aircraft
Non-destructive Test Manual - NTM) if:
- You think it is necessary;
- Your airworthiness authority tells you to.
If, because of the inspection, you must disconnect or remove
components, pipes, ducts, cables, electrical connectors or
mechanical linkages, you must then do a functional test of the
related system(s).
EFF :
ALL 05-51-17
Page 604
May 01/06
R
BV
Subtask 05-51-17-210-063
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Belly fairing | | | | | |
| | | | | | | | |
| A.| | Examine externally all the belly | X | | | | |
| | | fairing panels, specially the leading-| | | | | |
| | | edge roof fairing and upper and lower | | | | | |
| | | wing fairings, for : | | | | | |
| | | - correct attachment, delamination, | | | | | |
| | | damaged paintwork, pulled or torn | | | | | |
| | | fasteners. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Remove the damaged panel and | | X | | | |
| | | internally examine the belly | | | | | |
| | | fairing structure. | | | | | |
| | | (2) Examine all the components, pipes,| | X | | | |
| | | ducts, electrical looms and their | | | | | |
| | | mounts, for distortion, cracks, | | | | | |
| | | breaks and fluid leakage. | | | | | |
| | | | | | | | |
|2. | | Fuselage (FR36 to FR46) | | | | | |
| | | | | | | | |
| A.| | At the joint of the wing spar box with| X | | | | |
| | | the wing, rib1, examine : | | | | | |
| | | - the rear-spar web splice, | | | | | |
| | | - the fuselage skin panels, | | | | | |
| | | - the panel splices. | | | | | |
| | | For distortion, cracks, pulled or torn| | | | | |
| | | fasteners, damaged paintwork. | | | | | |
| | | | | | | | |
| B.| | At and around FR46, examine the lower | X | | | | |
| | | skin panel of the fuselage between the| | | | | |
| | | R stringer 41RH and the L stringer | | | | | |
| | | 41LH for : | | | | | |
| | | - distortion, cracks, pulled or torn | | | | | |
| | | fasteners, damaged paintwork. | | | | | |
| | | | | | | | |
|3. | | Fuselage (FR29 to FR70) | | | | | |
| | | If you find damage (refer to 1 or 2 | | | | | |
| | | above): | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-17
Page 605
May 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | From FR26 to FR35 : | | X | | | |
| | | - externally examine the skin panels, | | | | | |
| | | the splicing and the riveting for | | | | | |
| | | distorsion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Remove the forward cargo- | | | X | | |
| | | compartment panels and examine the| | | | | |
| | | floor support structure, frames, | | | | | |
| | | skin panels, splicing, rivets and | | | | | |
| | | stringers for: | | | | | |
| | | - distortion, cracks, pulled and | | | | | |
| | | torn fasteners, damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| B.| | At FR35, examine the top of the joint | | | | | |
| | | between the R stringer 6 and the L | | | | | |
| | | stringer 6 for: | | | | | |
| | | - distortion, cracks, pulled or torn | | | | | |
| | | fasteners, damaged paintwork. | | | | | |
| | | | | | | | |
| C.| | From FR35 to FR47: | | | | | |
| | | - in the main landing-gear well and on| | X | | | |
| | | the upper fuselage section (exter- | | | | | |
| | | nal): | | | | | |
| | | - examine the frames, skin panels, | | | | | |
| | | splices, stringers and riveting for | | | | | |
| | | distortion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Examine the upper fuselage section| | | X | | |
| | | internally (the frames, stringers,| | | | | |
| | | cleats, and splices) for : | | | | | |
| | | - distortion, cracks pulled or | | | | | |
| | | torn fasteners, damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| D.| | From FR47 to FR70 : | | | | | |
| | | - examine the frames, skin panels, | | | | | |
| | | splices, stringers and rivets for: | | | | | |
| | | - distortion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-17
Page 606
May 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| E.| | Examine the cut-out corners and rivets| | | | | |
| | | of the emergency-exit surround panel | | | | | |
| | | for : | | | | | |
| | | - distortion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | | | | | | |
| F.| | Examine the hinge fittings of the bulk| | X | | | |
| | | cargo-compartment door for cracks, | | | | | |
| | | pulled or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | | | | | | |
| G.| | Examine the cut-out corner and rivet | | X | | | |
| | | areas of the surround panel of the | | | | | |
| | | bulk cargo-compartment door for : | | | | | |
| | | - distortion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | | | | | | |
|4. | | Horizontal stabilizer cut-out | | | | | |
| | | | | | | | |
| A.| | Examine the cut-out corners for | X | | | | |
| | | cracks. | | | | | |
| | | If you find damage : | | | | | |
| | | Examine the cut-out edges of the top | | X | | | |
| | | and bottom stringers for : | | | | | |
| | | - distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | NOTE: Do these inspections together, | | | | | |
| | | with the horizontal stabilizer | | | | | |
| | | inspection. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-17
Page 607
May 01/06
R
BV
Subtask 05-51-17-210-052
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Pylons | | | | | |
| | | | | | | | |
| A.| | Examine for distortion and cracks the | X | | | | |
| | | pylon lateral panels around the access| | | | | |
| | | door cut-outs between : | | | | | |
| | | - ribs 2 and 3, | | | | | |
| | | - ribs 5 and 6. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Open the engine cowlings and | | X | | | |
| | | examine the main frame, the lower | | | | | |
| | | spar, and the rib-to-panel | | | | | |
| | | attachments for: | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
| | | torn fasteners. | | | | | |
| | | (2) Examine all the ducts, lines, | | X | | | |
| | | electrical looms and their mounts | | | | | |
| | | for distortion, cracks, rupture | | | | | |
| | | and fluid leakage. | | | | | |
| | | | | | | | |
|2. | | Nacelles | | | | | |
| | | | | | | | |
| A.| | Examine the nacelle and the primary | X | | | | |
| | | nozzle externally for : | | | | | |
| | | - distortion, cracks, delamination, | | | | | |
R | | | cracked or flaking paint, loose | | | | | |
R | | | rivets, signs of shearing. | | | | | |
| | | If you fing damage : | | | | | |
| | | (1) Open the fan cowl doors | | X | | | |
| | | (Ref. TASK 71-13-00-010-040). | | | | | |
| | | (2) Open the thrust reverser doors | | | | | |
| | | (Ref. TASK 78-36-00-010-040). | | | | | |
| | | Examine internally for signs of | | | | | |
| | | damage. | | | | | |
| | | (3) Examine the attachments of the air| | X | | | |
| | | intake cowl to the fan case for | | | | | |
| | | distortion, cracks, and pulled or | | | | | |
| | | torn fasteners. Examine the | | | | | |
EFF :
ALL 05-51-17
Page 608
Nov 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | attachments of the primary nozzle | | | | | |
| | | to the engine. | | | | | |
| | | (4) Examine all the cowl attachment | | X | | | |
| | | points on the pylon. Examine all | | | | | |
| | | the cowl hinge fittings. | | | | | |
| | | (5) Visually examine the engine | | X | | | |
| | | equipment, support, fasteners, | | | | | |
| | | brackets and pipes for damage. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-17-210-053
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Wing center box (rib 3) | | | | | |
| | | | | | | | |
| A.| | Examine the top and bottom skin panels| X | | | | |
| | | and actuator fittings, the ribs and | | | | | |
| | | the spar rivets for : | | | | | |
R | | | - distortion, cracks, pulling, tears | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Examine the rear spar web on each | | X | | | |
| | | side of the pivot bearing fittings| | | | | |
| | | for : | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
R | | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | (2) Examine the hydraulic lines, | | X | | | |
| | | mechanical linkages electrical | | | | | |
| | | looms and their mounts for : | | | | | |
R | | | - distortion, cracks, rupture | | | | | |
| | | and fluid leakage. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-17
Page 609
Nov 01/05
BV
Subtask 05-51-17-210-054
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Primary Structure of the Vertical | | | | | |
| | | Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine the primary structure | X | | | | |
| | | externally for distortion, cracks, | | | | | |
| | | pulled or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Open the access panels and examine| | X | | | |
| | | the attachment fittings and their | | | | | |
| | | adjacent structure for : | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
R | | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | (2) Examine the front and rear spar | | X | | | |
| | | webs for : | | | | | |
| | | - distortion, cracks, pulled or | | | | | |
R | | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | (3) On the rear spar, examine the | | X | | | |
| | | hydraulic lines, mechanical | | | | | |
R | | | linkages, electrical looms and | | | | | |
| | | their mounts for : | | | | | |
R | | | - distortion, cracks, rupture and | | | | | |
| | | fluid leakage. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-17
Page 610
Nov 01/05
BV
Subtask 05-51-17-210-055
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Skin Panels | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the skin panels : | X | | | | |
| | | - make sure that there is (are) no : | | | | | |
| | | - distortion or damage, | | | | | |
| | | - cracks, tears or fuel leaks. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Defuel the tanks | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the wing tanks | | X | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (3) Examine the front spar, the rear | | X | | | |
| | | spar, the ribs, the skin panels | | | | | |
| | | and the skin panel joints. | | | | | |
| | | Make sure that : | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, the skin | | | | | |
| | | panels are correctly attached. | | | | | |
| | | (4) Examine the internal structure and| | X | | | |
| | | the fasteners. | | | | | |
| | | Make sure that : | | | | | |
| | | - there is no damage or | | | | | |
R | | | distortion, | | | | | |
| | | - the sealant beads are in good | | | | | |
| | | condition, | | | | | |
| | | - there are no pulled fasteners. | | | | | |
| | | (5) Examine the attachment fittings of| | X | | | |
| | | the engine pylon. | | | | | |
| | | Make sure that : | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - the components are correctly | | | | | |
| | | attached. | | | | | |
| | | (6) On the front and rear spars, | | X | | | |
| | | examine the ducts, lines, cables, | | | | | |
R | | | mechanical linkages and their | | | | | |
| | | installation. | | | | | |
EFF :
ALL 05-51-17
Page 611
Nov 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | Make sure that : | | | | | |
| | | - there is no distortion, | | | | | |
| | | - there are no cracks, | | | | | |
| | | - there are no leaks, | | | | | |
| | | - the components are correctly | | | | | |
| | | attached. | | | | | |
| | | | | | | | |
| | | (7) Close access to the wing tanks | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | | | | | | |
|2. | | Flaps and Slats | | | | | |
| | | | | | | | |
| A.| | Examine the slats, flaps and fairing. | X | | | | |
| | | Make sure that there is (are) no : | | | | | |
| | | - distortion, | | | | | |
| | | - cracks or pulled fasteners, | | | | | |
| | | - damage. | | | | | |
| | | | | | | | |
|3. | | Ailerons | | | | | |
| | | | | | | | |
| A.| | Examine the ailerons. | X | | | | |
| | | Make sure that there is (are) no : | | | | | |
| | | - damage or distortion, | | | | | |
| | | - cracks or pulled fasteners. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Examine the aileron hinges and | | X | | | |
| | | actuator : | | | | | |
| | | Make sure that there is (are) no: | | | | | |
| | | - cracks, | | | | | |
| | | - damage or distortion. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-17-869-050
EFF :
ALL 05-51-17
Page 612
May 01/04
R
BV
Subtask 05-51-17-410-050
H. Close Access
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Close all the panels and doors that you opened for the inspection.
Subtask 05-51-17-866-052
Subtask 05-51-17-710-050
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | NOTE: You must do these tests only if | | | | | |
| | | during the inspection you found | | | | | |
| | | damage on the structure adjacent| | | | | |
| | | to: | | | | | |
| | | - a flight control surface, | | | | | |
| | | - a cowl. | | | | | |
|1. | | Do an operational test of the ailerons| | X | | | |
| | | | | | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-14-00-710-001). | | | | | |
EFF :
ALL 05-51-17
Page 613
May 01/04
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
|2. | | Do an operational test of the rudder. | | X | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-24-00-710-001). | | | | | |
| | | | | | | | |
|3. | | Do an operational test of the | | X | | | |
| | | elevators. | | | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-34-00-710-001). | | | | | |
| | | | | | | | |
|4. | | Do an operational test of the | | X | | | |
| | | trimmable horizontal stabilizer. | | | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-44-00-710-002). | | | | | |
| | | | | | | | |
|5. | | Do an operational test of the flaps. | | X | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling and | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-54-00-710-001). | | | | | |
| | | | | | | | |
|6. | | Do an operational test of the spoilers| | X | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-64-00-710-001). | | | | | |
| | | | | | | | |
|7. | | Do an operational test of the slats. | | X | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling and | | | | | |
| | | binding) | | | | | |
| | | (Ref. TASK 27-84-00-710-001). | | | | | |
| | | | | | | | |
|8. | | Do an operational test of the thrust | | X | | | |
| | | reverser system. | | | | | |
| | | Make sure that the movement is full | | | | | |
| | | and free (there is no fouling or | | | | | |
EFF :
ALL 05-51-17
Page 614
May 01/04
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | binding) | | | | | |
| | | (Ref. TASK 78-31-00-710-04000). | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-17
Page 615
May 01/04
R
BV
INSPECTION AFTER LIGHTNING STRIKE - INSPECTION/CHECK
____________________________________________________
TASK 05-51-18-200-001
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-18
Page 601
Nov 01/04
BV
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-18
Page 602
Nov 01/04
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-18
Page 603
Nov 01/06
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-18-941-052
A. Not Applicable
Subtask 05-51-18-210-077
B. General
(1) Lightning
(a) Lightning always has two or more attachment points (one entry and
one exit) on the aircraft skin.
(b) Lightning moves back along the surface of the aircraft (swept
stroke zone) between the entry and exit point. This can cause a
chain of scattered attachment points along a line in the
direction of travel of the aircraft.
1
_ Zone 1:
- surfaces where there is a high probability of initial
lightning attachment (entry or exit).
2
_ Zone 2:
- surfaces where there is a high probability of a swept
stroke zone. The lightning strike has its initial point of
attachment in Zone 1 and moves into Zone 2.
EFF :
ALL 05-51-18
Page 604
Nov 01/06
R
BV
R Lightning Strike Inspection Areas
R Figure 601/TASK 05-51-18-991-001
EFF :
ALL 05-51-18
Page 605
Nov 01/97
BV
R 3
_ Zone 3:
R - this zone includes all of the aircraft surfaces that are not
R in Zone 1 and 2. In Zone 3 there is a low probability of
R attachment of a lightning strike. However, high lightning
R currents can go through Zone 3 by direct conduction between
R 2 attachment points. Zone 3 currents will also go into Zones
R 1 and 2.
R (b) Zones 1 and 2 are divided into A and B areas related to the
R probability of continued attachment of the arc (hang on).
R The probability of arc hang on is low in A areas and high in B
R areas.
R 1
_ Zone 1A:
R - area where there is a high probability of initial attachment
R and low probability of arc hang on, such as the
R forward-mounted pitot probes, the radome diverter strips and
R the nacelle leading edges.
R 2
_ Zone 1B:
R - area where there is a high probability of initial attachment
R and high probability of arc hang on, such as the wing,
R stabilizers and fin tips and some trailing edge areas.
R 3
_ Zone 2A:
R - a swept stroke zone with low probability of arc hang on,
R such as mid-chord regions of the wing surface, aft of an
R engine and the total fuselage surface.
R 4
_ Zone 2B:
R - a swept stroke zone with high probability of arc hang on,
R such as the wing trailing edge aft of Zone 2A.
R 1
_ Electromagnetic fields:
R - the electromagnetic fields related to the lightning
R attachment can cause unwanted transient voltages and
R currents in the aircraft wiring and systems.
R In some conditions (low intensity strike, high protection),
R the effect on the systems can be temporary and the systems
R can operate correctly again after the strike.
EFF :
ALL 05-51-18
Page 606
Nov 01/97
BV
R In other conditions (low protection, no circuit protection
R devices), the damage can be permanent and it will be
R necessary to replace parts.
R 1
_ Pitting/meltthrough:
R - this is the action of the electrical arc formed when a
R lightning stroke attaches to the aircraft (arc root damage
R at the attachment points or damage caused by current flow
R which can appear also far from the attachment points).
R - signs of a lightning attachment are pitting and scorch marks
R and paint discoloration.
R On composite components, in addition to paint discoloration
R and skin puncturing, some delamination of the fibers can
R occur. If there is skin puncturing, there can be damage to
R the grounded equipment below composite material fairings.
R - you must always compare the damage you find with the limits
R given in the Structural Repair Manual (SRM).
R 2
_ Magnetic force:
R - the damage usually occurs where a small area causes the
R density of the current to be high (e.g. a bonding lead
R installed at a control surface hinge).
R 3
_ Resistive heating:
R - when lightning currents flow through an aircraft structure,
R energy is changed to heat along its path.
R - resistive heating usually causes marks of the weld type,
R specially where the lightning current flows for some time.
R 4
_ Acoustic shock wave:
R - When a lightning strike occurs, there is an acoustic shock
R wave. If the intensity of this shock wave is high, it can
R cause deformation of thin metal skins or rupture of thin
R composite skins.
EFF :
ALL 05-51-18
Page 607
Nov 01/97
BV
(b) It is not possible to accurately know where the attachment will
occur but Zone 1 and Zone 2 show the most probable areas of
lightning attachment.
(c) Lightning strikes do not always give the same quantity of damage.
The quantity of damage comes from the intensity of the lightning
strike.
Subtask 05-51-18-210-078
R C. Inspection Preparation
(1) Before you start, we recommend that you get information from the crew
about the flight condition
(2) Make sure that you have the related aircraft Post Flight Report
(PFR).
(3) All events reported by the crew or by the PFR must be checked in
addition/ conjunction with this inspection.
Subtask 05-51-18-481-050
R D. Safety Precautions
Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
EFF :
ALL 05-51-18
Page 608
May 01/99
BV
Subtask 05-51-18-866-050
Subtask 05-51-18-010-050
F. Get Access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
R (2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).
Subtask 05-51-18-860-050
(1) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
(2) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).
(3) Put warning notices in the cockpit to tell persons not to operate the
systems.
4. Procedure
_________
Subtask 05-51-18-210-089-A
NOTE : All the necessary inspections are visual unless the text gives
____
other instructions.
Operators can refer to the Non-destructive Testing Manual (NTM)
and use non-destructive procedures.
EFF :
ALL 05-51-18
Page 609
Nov 01/04
BV
R Location of the Antennas, Probes and Sensors and Exterior Lights
Figure 602/TASK 05-51-18-991-002- 12 (SHEET 1)
EFF :
ALL 05-51-18
Page 610
May 01/99
BV
R Location of the Antennas, Probes and Sensors and Exterior Lights
Figure 602/TASK 05-51-18-991-002- 22 (SHEET 2)
EFF :
ALL 05-51-18
Page 611
May 01/99
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the Radome | | | | | |
| | | | | | | | |
| A.| | Examine visually the radome external | X | | | | |
| | | skin and the lightning diverters for | | | | | |
| | | burn marks, change of color, | | | | | |
| | | puncturing and other damage. | | | | | |
| | | | | | | | |
|2. | | Inspection of the Windshield, Fixed | | | | | |
R | | | Windows, Sliding Windows, Window | | | | | |
R | | | Frames and Attaching Fasteners. | | | | | |
| | | | | | | | |
R | A.| | Examine visually: | X | | | | |
R | | | - the windshield, | | | | | |
R | | | - the fixed windows, | | | | | |
R | | | - the sliding windows, | | | | | |
R | | | - the window frames, | | | | | |
R | | | - the attaching fasteners | | | | | |
R | | | for burn marks, change of color and | | | | | |
R | | | other damage. | | | | | |
| | | | | | | | |
R |3. | | Inspection of the Nose and Main | | | | | |
| | | Landing Gear Doors. | | | | | |
| | | | | | | | |
| A.| | Examine the skin of the nose and the | X | | | | |
| | | main landing gear doors for burn | | | | | |
| | | marks, change of color, puncturing and| | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
| B.| | Examine the electrical bonding leads | X | | | | |
| | | for breakage and defective attachment.| | | | | |
| | | | | | | | |
|4. | | Inspection of the Nose and the Main | | | | | |
| | | Landing Gears. | | | | | |
| | | | | | | | |
| | | NOTE: Do these checks if the lightning| | | | | |
| | | strike occurred: | | | | | |
| | | - when the LG was extended and locked | | | | | |
| | | down, | | | | | |
| | | - during the extension of the LG. | | | | | |
| | | and when you find a through hole | | | | | |
| | | during the inspection of the landing | | | | | |
| | | gears doors. | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-18
Page 612
Nov 01/04
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Examine the nose landing gear and the | X | | | | |
| | | main landing gear: | | | | | |
| | | (1) Examine the LG structure and the | | | | | |
| | | points where it is attached for | | | | | |
| | | change of color, burn marks and | | | | | |
| | | other damage. | | | | | |
| | | (2) Examine the shock absorber for | | | | | |
| | | change of color and burn marks. | | | | | |
| | | (3) Examine all the components | | | | | |
| | | attached to the landing gear and | | | | | |
| | | fully examine the electrical looms| | | | | |
| | | and components for a change of | | | | | |
| | | color and burn marks. | | | | | |
| | | | | | | | |
|5. | | Inspection of the Belly Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the belly fairing panels | X | | | | |
| | | (including the wing-to-fuselage | | | | | |
| | | fairings) for change of color, burn | | | | | |
| | | marks, puncturing and delamination. | | | | | |
| | | Examine fairing screws and fasteners | X | | | | |
| | | for burn marks. | | | | | |
| | | | | | | | |
|6. | | Inspection of the Fuselage | | | | | |
| | | | | | | | |
R | A.| | Examine externally all of the fuselage| X | | | | |
R | | | skin with rivets and screws for | | | | | |
| | | change of color, burns marks and | | | | | |
| | | small holes. | | | | | |
| | | | | | | | |
| B.| | Examine all the probes, sensors and | X | | | | |
| | | drain masts and the adjacent area for | | | | | |
| | | burn marks and change of color. | | | | | |
| | | | | | | | |
| C.| | Examine carefully all the | X | | | | |
| | | communication and navigation antennas | | | | | |
| | | and the adjacent area for burn marks, | | | | | |
| | | change of color, puncturing and | | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
| D.| | Examine all exterior lights and | X | | | | |
| | | adjacent area for burn marks and other| | | | | |
| | | damage. | | | | | |
EFF :
ALL 05-51-18
Page 613
Nov 01/04
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| E.| | Examine the APU exhaust for burn marks| X | | | | |
| | | and change of color. | | | | | |
| | | | | | | | |
|7. | | Inspection of the Wings | | | | | |
| | | | | | | | |
| A.| | Examine the top and bottom skin of the| X | | | | |
| | | wings and the leading and trailing | | | | | |
R | | | edges for burn marks, change of color.| | | | | |
| | | | | | | | |
| B.| | Examine the slats for burn marks and | X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| C.| | Examine the flap track fairings for | X | | | | |
| | | burn marks, change of color, | | | | | |
| | | puncturing and other damage. | | | | | |
| | | | | | | | |
| D.| | Examine the flaps for burn marks, | X | | | | |
| | | change of color, puncturing and | | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
| E.| | Examine the spoilers for burn marks, | X | | | | |
| | | change of color, puncturing and | | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
| F.| | Examine the ailerons for burn marks, | X | | | | |
| | | change of color, puncturing and | | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
| G.| | Examine all the static dischargers for| X | | | | |
| | | burn marks, damaged tip and breakage. | | | | | |
| | | | | | | | |
| H.| | Examine the wing tip for burn marks | X | | | | |
| | | and burn holes. | | | | | |
| | | | | | | | |
| I.| | Examine the lights on the wing tip for| X | | | | |
| | | burn marks and other damage. | | | | | |
| | | | | | | | |
|8. | | Inspection of the Engine Nacelles and | | | | | |
| | | the Pylons. | | | | | |
| | | | | | | | |
R | A.| | Examine each air-intake, inlet-cowl, | X | | | | |
R | | | fan-cowl, thrust-reverser, exhaust | | | | | |
EFF :
ALL 05-51-18
Page 614
Nov 01/04
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | nozzle and the pylon for burn marks, | | | | | |
| | | change of color, puncturing and | | | | | |
| | | delamination. | | | | | |
| | | | | | | | |
|9. | | Inspection of the Vertical Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | burn marks, damaged tip and breakage. | | | | | |
| | | | | | | | |
R | B.| | Examine:the skin of the vertical | X | | | | |
R | | | - the skin of the vertical stabilizer | | | | | |
R | | | and the rudder (specially the | | | | | |
R | | | leading and the trailing edges, | | | | | |
R | | | the rudder surface in the hinge area| | | | | |
R | | | and the antenna fairings), | | | | | |
R | | | - the fin tip cap, | | | | | |
R | | | - the fin and rudder tip cap | | | | | |
R | | | - lightning diverters | | | | | |
R | | | for burn marks, change of color, | | | | | |
R | | | puncturing, delamination and other | | | | | |
R | | | damage. | | | | | |
| | | | | | | | |
|10. | | Inspection of the Horizontal | | | | | |
| | | Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | burn marks, damaged tip and breakage. | | | | | |
| | | | | | | | |
| B.| | Examine the skin of the horizontal | X | | | | |
| | | stabilizer and elevators (specially | | | | | |
| | | the leading and the trailing edges, | | | | | |
| | | the elevator surface in the hinge | | | | | |
| | | area and the tip) for burn marks, | | | | | |
| | | change of color, puncturing, | | | | | |
| | | delamination and other damage. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-18
Page 615
Nov 01/04
BV
R Subtask 05-51-18-710-050
R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R | A.| | Do the operational test of the HF | X | | | | |
R | | | system (Ref. TASK 23-11-00-710-001). | | | | | |
R -------------------------------------------------------------------------------
Subtask 05-51-18-210-051
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (1) Do the detailed inspection of the | | X | | | |
| | | radome: | | | | | |
| | | (Ref. TASK 53-15-11-200-001) | | | | | |
| | | If you find a through hole: | | | | | |
| | | (a) Examine the weather radar and | | | X | | |
| | | the WR antenna drive for burn | | | | | |
| | | marks, pitting and other | | | | | |
| | | damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - if you find damage on the | | | X | | |
| | | flat plate antenna, replace | | | | | |
| | | it: | | | | | |
| | | (Ref. TASK 34-41-11-000-004)| | | | | |
| | | (Ref. TASK 34-41-11-400-005)| | | | | |
| | | - do the BITE test of the | | | X | | |
| | | weather radar: | | | | | |
| | | (Ref. TASK 34-41-00-740-002)| | | | | |
| | | - do the system test of the | | | X | | |
| | | weather radar. | | | | | |
| | | (Ref. TASK 34-41-00-730-001)| | | | | |
| | | (b) Examine the localizer antenna | | | X | | |
EFF :
ALL 05-51-18
Page 616
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | and the glide/slope antenna | | | | | |
| | | for burn marks, pitting and | | | | | |
| | | other damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - Do the functional test of | | | X | | |
| | | the ILS: | | | | | |
| | | (Ref. TASK 34-36-00-720-001)| | | | | |
| | | NOTE: If an ILS ground test unit is | | | | | |
| | | not available, do an operational| | | | | |
| | | test of the ILS | | | | | |
| | | (Ref. TASK 34-36-00-710-001) | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-052
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (1) Do the inspection of the related | | X | | | |
| | | component: | | | | | |
| | | (a) for the windshield | | | | | |
| | | (Ref. TASK 56-11-11-200-001) | | | | | |
| | | (b) for the fixed windows | | | | | |
| | | (Ref. TASK 56-11-12-200-001) | | | | | |
| | | (c) for the sliding windows | | | | | |
| | | (Ref. TASK 56-12-11-200-001) | | | | | |
| | | (d) for the attaching fasteners: | | | | | |
| | | - if you find damage, remove | | | | | |
| | | the windshield, the fixed | | | | | |
| | | windows or the sliding | | | | | |
| | | windows | | | | | |
| | | (Ref. TASK 56-11-11-000-001)| | | | | |
| | | (Ref. TASK 56-11-12-000-001)| | | | | |
EFF :
ALL 05-51-18
Page 617
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 56-12-11-000-001)| | | | | |
| | | - do the inspection of the | | | | | |
| | | window bearing surface | | | | | |
| | | (fuselage side) for damage. | | | | | |
| | | (2) Do the operational test of the | | X | | | |
| | | windshield anti-icing and | | | | | |
| | | defogging | | | | | |
| | | (Ref. TASK 30-42-00-710-001). | | | | | |
| | | (3) Do the operational test of the | | X | | | |
| | | standby compass | | | | | |
| | | (Ref. TASK 34-22-00-710-001). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-055
R E. Check after Damage on the Nose and/or the Main Landing Gear Doors
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM). | | | | | |
| | | (2) If you find a through hole: | | X | | | |
| | | - examine internally the adjacent | | | | | |
| | | and underneath area including | | | | | |
| | | all the components (pipes, items| | | | | |
| | | of equipment, electrical | | | | | |
| | | harnesses...) for damage. | | | | | |
| | | if you find damage: | | | | | |
| | | - replace or repair the | | | X | | |
| | | the related component | | | | | |
| | | | | | | | |
| B.| | If you find damage on the electrical | | | | | |
| | | bonding leads during the inspection: | | | | | |
| | | (1) Replace the electrical bonding | | X | | | |
| | | lead and/or the defective | | | | | |
EFF :
ALL 05-51-18
Page 618
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | attachment. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-053
R F. Check after Damage on the Nose and/or the Main Landing Gear
(Ref. TASK 32-21-00-200-002) (Ref. TASK 32-11-00-200-001) (Ref. TASK 32-
69-00-740-001) (Ref. TASK 32-46-00-740-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on the nose and/or | | | | | |
| | | the main landing gear during the | | | | | |
| | | inspection: | | | | | |
| | | (1) do the inspection of the LG: | | | | | |
| | | (a) For the NLG: | | X | | | |
| | | - (Ref. TASK 32-21-00-200-002)| | | | | |
| | | (b) For the MLG: | | X | | | |
| | | - (Ref. TASK 32-11-00-200-001)| | | | | |
| | | (2) Do a BITE test of the landing gear| | X | | | |
| | | (Ref. TASK 32-69-00-740-001) | | | | | |
| | | (3) Do a BITE test of the BSCU | | X | | | |
| | | (Ref. TASK 32-46-00-740-001) | | | | | |
| | | | | | | | |
| B.| | If you find damage on the components | | | | | |
| | | attached to the landing gear: | | | | | |
| | | (1) Examine the electrical components | | X | | | |
| | | internally. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-054-A
EFF :
ALL 05-51-18
Page 619
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (1) Refer to the allowable damage and | | X | | | |
| | | repair (Ref. SRM). | | | | | |
| | | (2) If you find a through hole: | | | | | |
| | | (a) Get access internally and | | X | | | |
| | | examine the adjacent and | | | | | |
| | | underneath area to do a check | | | | | |
| | | of all the components (pipes, | | | | | |
| | | items of equpment, electrical | | | | | |
| | | harnesses...) for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - replace or repair the | | | X | | |
| | | related component. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-079
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Pitot probes | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (a) do the inspection/check of the| | X | | | |
| | | pitot probes | | | | | |
| | | (Ref. TASK 34-11-15-200-001). | | | | | |
| | | (b) If you find damage on the | | | | | |
| | | adjacent area: | | | | | |
| | | - refer to the allowable | | X | | | |
| | | damage and repair (Ref. SRM)| | | | | |
| | | | | | | | |
EFF :
ALL 05-51-18
Page 620
Nov 01/06
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| B.| | Static probes | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
R | | | (a) refer to the allowable damage | | X | | | |
R | | | and repair (Ref. SRM) | | | | | |
| | | | | | | | |
| C.| | TAT sensors | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
R | | | (a) do the inspection/check of the| | X | | | |
| | | TAT sensors | | | | | |
R | | | (Ref. TASK 34-11-18-200-002). | | | | | |
| | | (b) If you find damage on the | | | | | |
| | | adjacent area: | | | | | |
| | | - refer to the allowable | | X | | | |
| | | damage and repair (Ref. SRM)| | | | | |
| | | | | | | | |
| D.| | AOA sensors | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (a) Do the operational test of | | X | | | |
| | | the AOA warning | | | | | |
| | | (Ref. TASK 34-10-00-710-007) | | | | | |
R | | | (b) Manually turn the AOA | | X | | | |
| | | sensors to the full up | | | | | |
| | | position then to the full down| | | | | |
| | | position and make sure that | | | | | |
| | | there is no hard point. | | | | | |
| | | If you find a hard point: | | | | | |
| | | - replace the related AOA | | | X | | |
| | | sensor | | | | | |
| | | (Ref. TASK 34-11-19-000-001)| | | | | |
| | | (Ref. TASK 34-11-19-400-001)| | | | | |
| | | (c) If you find damage on the | | | | | |
| | | adjacent area: | | | | | |
| | | - refer to the allowable | | X | | | |
| | | damage and repair (Ref. SRM)| | | | | |
| | | | | | | | |
R | E.| | If you find damage on the AOA, TAT, | | | | | |
R | | | static or pitot probes: | | | | | |
| | | (1) Do the operational test of the | | X | | | |
| | | probe ice protection system | | | | | |
| | | (Ref. TASK 30-31-00-710-001). | | | | | |
EFF :
ALL 05-51-18
Page 621
Nov 01/06
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (2) Do an operational test of the AIR | | X | | | |
| | | DATA switching function | | | | | |
| | | (Ref. TASK 34-13-00-710-001) | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-080
R J. Not Applicable
Subtask 05-51-18-210-081
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Drain masts | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (a) Do the operational test of the| | X | | | |
| | | drain mast ice protection | | | | | |
| | | (Ref. TASK 30-71-00-710-001). | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-18
Page 622
May 01/05
BV
Subtask 05-51-18-210-082
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on exterior lights:| | | | | |
| | | (1) Do the operational test of the | | X | | | |
| | | related system: | | | | | |
| | | (a) For the navigation lights: | | | | | |
| | | - (Ref. TASK 33-41-00-710-001)| | | | | |
| | | (b) For the landing lights: | | | | | |
| | | - (Ref. TASK 33-42-00-710-001)| | | | | |
| | | (c) For the logo lights: | | | | | |
| | | - (Ref. TASK 33-47-00-710-002)| | | | | |
| | | (d) For the anti-collision/strobe | | | | | |
| | | lightning: | | | | | |
| | | - (Ref. TASK 33-48-00-710-002)| | | | | |
| | | (e) For the wing and engine scan | | | | | |
| | | lightning: | | | | | |
| | | - (Ref. TASK 33-49-00-710-001)| | | | | |
| | | (f) For the emergency overwing | | | | | |
| | | lights: | | | | | |
| | | - do the test given in the | | | | | |
| | | installation of the | | | | | |
| | | emergency overwing lights | | | | | |
| | | (Ref. TASK 33-51-15-400-001)| | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-083
R M. Not Applicable
Subtask 05-51-18-210-084
EFF :
ALL 05-51-18
Page 623
May 01/05
BV
(Ref. TASK 23-12-00-710-001) (Ref. TASK 23-11-00-710-001) (Ref. TASK 55-
32-11-000-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | VHF antennas | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (a) Do the operational test of the| | X | | | |
| | | VHF system | | | | | |
| | | (Ref. TASK 23-12-00-710-001). | | | | | |
| B.| | HF fairing | | | | | |
| | | (1) If you find damage on the HF | | | | | |
| | | fairing: | | | | | |
| | | - refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) If you find a through hole on the | | | | | |
| | | HF fairing during the inspection: | | | | | |
| | | (a) Remove the HF fairing | | X | | | |
| | | (Ref. TASK 55-32-11-000-001) | | | | | |
| | | (b) Examine the HF antenna for | | X | | | |
| | | signs of arc attachment | | | | | |
| | | (c) Do the operational test of the| | X | | | |
| | | HF system | | | | | |
| | | (Ref. TASK 23-11-00-710-001). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-085-A
EFF :
ALL 05-51-18
Page 624
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | DME antennas | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | - do the operational test of the | | X | | | |
| | | DME | | | | | |
| | | (Ref. TASK 34-51-00-710-001). | | | | | |
| | | | | | | | |
| B.| | Radio altimeter antennas | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | - do the BITE test of the radio | | X | | | |
| | | altimeter | | | | | |
| | | (Ref. TASK 34-42-00-740-002). | | | | | |
| | | | | | | | |
| C.| | ADF antenna(s) | | | | | |
| | | (1) If you find a through hole during | | | | | |
| | | the inspection: | | | | | |
| | | - do the operational test of the | | X | | | |
| | | ADF | | | | | |
| | | (Ref. TASK 34-53-00-710-002). | | | | | |
| | | | | | | | |
| D.| | ATC antenna(s) | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | - do the BITE test of the ATC | | X | | | |
| | | (Ref. TASK 34-52-00-740-004). | | | | | |
| | | | | | | | |
| E.| | TCAS antennas | | | | | |
| | | (1) If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | - do the BITE test of the TCAS | | X | | | |
| | | (Ref. TASK 34-43-00-740-001). | | | | | |
| | | | | | | | |
| F.| | VOR/MKR antennas | | | | | |
| | | (1) If you find damage on the fin tip | | | | | |
| | | cap (VOR fairing): | | | | | |
| | | - refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | If you find a through hole on the | | | | | |
| | | fin tip cap: | | | | | |
| | | - remove the fin tip cap | | X | | | |
| | | (Ref. TASK 55-34-11-000-001) | | | | | |
| | | - examine the VOR antenna for | | X | | | |
EFF :
ALL 05-51-18
Page 625
Nov 01/04
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | signs of arc attachment | | | | | |
| | | (2) If you find damage on the MKR | | | | | |
| | | antenna and/or a through hole on | | | | | |
| | | the fin tip cap: | | | | | |
| | | - do the operational test of the | | X | | | |
| | | VOR/MKR system | | | | | |
| | | (Ref. TASK 34-55-00-710-001). | | | | | |
| | | | | | | | |
| G.| | GPWS system | | | | | |
| | | (1) If you find damage on the radio | | | | | |
| | | altimeter antennas and/or ILS | | | | | |
| | | antennas (glide and/or localizer):| | | | | |
| | | - do the operational test of the | | X | | | |
| | | GPWS | | | | | |
| | | (Ref. TASK 34-48-00-710-001). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-086
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage during the | | | | | |
| | | inspection: | | | | | |
| | | (1) Refer to the flow chart for the | | X | | | |
| | | allowable damage and repair | | | | | |
| | | (Ref. SRM). | | | | | |
| | | (2) If you find a through hole: | | X | | | |
| | | (a) Examine internally the | | | | | |
| | | adjacent area of the damage | | | | | |
| | | specially the components, the | | | | | |
| | | pipes and the electrical looms| | | | | |
| | | for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - repair or replace the | | | X | | |
| | | related component. | | | | | |
EFF :
ALL 05-51-18
Page 626
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
-------------------------------------------------------------------------------
Subtask 05-51-18-210-087
R R. Check of the APU after Damage on the APU Exhaust (Ref. TASK 49-00-00-710-
004)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on the APU exhaust | | | | | |
| | | during the inspection: | | | | | |
| | | (1) Do the operational test of the | | X | | | |
| | | APU | | | | | |
| | | (Ref. TASK 49-00-00-710-004). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-088
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on the top or | | | | | |
| | | bottom of the wings: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | | | | | | |
| B.| | If you find damage on the slats: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Do the operational test of the | | X | | | |
EFF :
ALL 05-51-18
Page 627
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | slats | | | | | |
| | | (Ref. TASK 27-84-00-710-001). | | | | | |
| | | | | | | | |
| C.| | If you find damage on the flap track | | | | | |
| | | fairings: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | | | | | | |
| D.| | If you find damage on the flaps: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Examine the bonding leads (on the | | X | | | |
| | | hinges) of the related damaged | | | | | |
| | | flap for breakage and defective | | | | | |
| | | attachment. | | | | | |
| | | If you find damage: | | | | | |
| | | - replace the bonding lead and/or | | | X | | |
| | | the defective attachment | | | | | |
| | | (3) Do the operational test of the | | X | | | |
| | | flaps | | | | | |
| | | (Ref. TASK 27-54-00-710-001). | | | | | |
| | | | | | | | |
| E.| | If you find damage on the spoilers: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Examine the bonding leads (on the | | X | | | |
| | | hinges) of the related damaged | | | | | |
| | | spoiler for breakage and | | | | | |
| | | defective attachment. | | | | | |
| | | If you find damage: | | | | | |
| | | - replace the bonding lead and/or | | | X | | |
| | | the defective attachment | | | | | |
| | | (3) Do the operational test of the | | X | | | |
| | | spoilers | | | | | |
| | | (Ref. TASK 27-64-00-710-001). | | | | | |
| | | | | | | | |
| F.| | If you find damage on the ailerons: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Examine all the bonding leads of | | X | | | |
| | | the aileron hinges and | | | | | |
| | | servocontrols of the related | | | | | |
| | | damaged aileron for breakage and | | | | | |
EFF :
ALL 05-51-18
Page 628
Nov 01/04
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | defective attachment.
| | | If you find damage: | | | | | |
| | | - replace the bonding lead and/or | | | X | | |
| | | the defective attachment | | | | | |
| | | (3) Examine the piston rod of each | | X | | | |
| | | servocontrol (it must be fully | | | | | |
| | | extended) of the related damaged | | | | | |
| | | aileron for burn marks, damage and| | | | | |
| | | leaks. | | | | | |
| | | If you find a leak or damage: | | | | | |
| | | (a) replace the related aileron | | | X | | |
| | | servocontrol | | | | | |
| | | (Ref. TASK 27-14-51-000-001) | | | | | |
| | | (Ref. TASK 27-14-51-400-001) | | | | | |
| | |NOTE: If you are at a line station and | | | | | |
| | | you cannot do the inspection of | | | | | |
| | | the piston rod, do this check: | | | | | |
| | | - operate the ailerons 10 times | | | | | |
| | | fully in each direction then | | | | | |
| | | make sure from the ground that | | | | | |
| | | there are no leaks below the | | | | | |
| | | aileron servocontrols. | | | | | |
| | | You must do this check before | | | | | |
| | | each flight until the return to| | | | | |
| | | the main base. you can do the | | | | | |
| | | check before each flight for a | | | | | |
| | | maximum of 3 days or 10 flights| | | | | |
| | | - at the first return to the main| | | | | |
| | | base, you must do the | | | | | |
| | | inspection of the piston rods. | | | | | |
| | | (4) Do the operational test of the | | X | | | |
| | | ailerons | | | | | |
| | | (Ref. TASK 27-14-00-710-001). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-056
EFF :
ALL 05-51-18
Page 629
May 01/06
BV
(Ref. TASK 78-31-00-710-040) (Ref. TASK 73-29-00-710-040) (Ref. TASK 73-
21-60-720-040) (Ref. TASK 24-22-51-200-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on the air intake, | | | | | |
| | | inlet cowl, fan cowl, thrust reverser,| | | | | |
| | | exhaust nozzle or the pylon: | | | | | |
| | | (1) Refer to the allowable damage and | | X | | | |
R | | | repair (Ref. SRM and/or applicable| | | | | |
R | | | Nacelle SRM). | | | | | |
| | | (2) At the first return to the main | | X | | | |
| | | base, do the inspection of the | | | | | |
R | | | lightning protection module. | | | | | |
| | | (Ref. TASK 24-22-51-200-001) | | | | | |
| | | (3) If you find damage on the thrust | | | | | |
| | | reverser: | | | | | |
| | | (a) Do an operational test of the | | X | | | |
| | | thrust reverser system | | | | | |
| | | (Ref. TASK 78-31-00-710-040). | | | | | |
| | | (4) If you find a through hole | | | | | |
| | | on the fan cowl: | | | | | |
| | | (a) Do a ground test of the FADEC | | X | | | |
| | | (Ref. TASK 73-29-00-710-040) | | | | | |
| | | (b) Do a ground test of the ECU | | X | | | |
| | | (Ref.TASK 73-21-60-720-040). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-18-210-090-A
EFF :
ALL 05-51-18
Page 630
May 01/06
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage during the | | | | | |
| | | inspection on the skin of the vertical| X | | | | |
| | | stabilizer and the rudder, the fin | | | | | |
| | | tip cap, the fin and rudder tip cap | | | | | |
| | | lightning diverters: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Examine all the electrical bonding| | X | | | |
| | | leads of the rudder hinges and | | | | | |
| | | servocontrols for breakage and | | | | | |
| | | defective attachment. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) replace the electrical bonding| | | X | | |
| | | lead and/or the defective | | | | | |
| | | attachment | | | | | |
| | | (3) At the first return to the main | | X | | | |
| | | base, examine the piston rod of | | | | | |
| | | each rudder servocontrol (it must | | | | | |
| | | be fully extended) for damage and | | | | | |
| | | burn marks and make sure that | | | | | |
| | | there are no leaks. | | | | | |
| | | If you find a leak or damage: | | | | | |
| | | - replace the related rudder | | | X | | |
| | | servocontrol | | | | | |
| | | (Ref. TASK 27-24-51-000-001) | | | | | |
| | | (Ref. TASK 27-24-51-400-001). | | | | | |
| | | (4) Do an operational test of the | | X | | | |
| | | rudder | | | | | |
| | | (Ref. TASK 27-24-00-710-001). | | | | | |
| | | | | | | | |
| B.| | If you find damage during the | | | | | |
| | | inspection of the horizontal | | | | | |
| | | stabilizer and elevators: | | | | | |
| | | (1) Refer to allowable damage and | | X | | | |
| | | repair (Ref. SRM) | | | | | |
| | | (2) Examine all the electrical bonding| | X | | | |
| | | leads of the elevator hinges and | | | | | |
| | | servocontrols of the related | | | | | |
| | | damaged elevator for breakage and | | | | | |
| | | defective attachment. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) replace the electrical bonding| | | X | | |
| | | lead and/or the defective | | | | | |
EFF :
ALL 05-51-18
Page 631
Nov 01/04
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | attachment. | | | | | |
| | | (3) Examine the piston rod of each | | X | | | |
| | | elevator servocontrol (it must be | | | | | |
| | | fully extended) of the related | | | | | |
| | | damaged elevator for burn marks, | | | | | |
| | | damage and leaks. | | | | | |
| | | If you find a leak or damage: | | | | | |
| | | (a) replace the related elevator | | | X | | |
| | | servocontrol | | | | | |
| | | (Ref. TASK 27-34-51-000-001) | | | | | |
| | | (Ref. TASK 27-34-51-400-001). | | | | | |
| | |NOTE: If you are at a line station and | | | | | |
| | | you cannot do the inspection of | | | | | |
| | | the piston rod, do this check: | | | | | |
| | | - operate the elevators 10 times | | | | | |
| | | fully in each direction then | | | | | |
| | | make sure from the ground that | | | | | |
| | | there are no leaks below the | | | | | |
| | | elevator servocontrols. | | | | | |
| | | You must do this check before | | | | | |
| | | each flight until the return to| | | | | |
| | | the main base. You can do the | | | | | |
| | | check before each flight for a | | | | | |
| | | maximum of 3 days or 10 flights| | | | | |
| | | - at the first return to the main| | | | | |
| | | base, you must do the | | | | | |
| | | inspection of the piston rods. | | | | | |
| | | (4) Do an operational test of the | | X | | | |
| | | elevators | | | | | |
| | | (Ref. TASK 27-34-00-710-001). | | | | | |
| | | (5) Do an operational test of the THS | | X | | | |
| | | (Ref. TASK 27-44-00-710-001). | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-18
Page 632
Nov 01/04
R
BV
Subtask 05-51-18-210-091
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | If you find damage on the static | | | | | |
| | | dischargers of the wing or vertical | | | | | |
| | | and horizontal stabilizer. | | | | | |
| | | (1) Do a check of the related static | | X | | | |
| | | discharger | | | | | |
| | | (Ref. TASK 23-61-00-200-001). | | | | | |
| | | NOTE: (Ref. CDL 6.01.23 P01): | | | | | |
| | | - 2 static dischargers can be i | | | | |
| | | missing on each wing tip zone | | | | | |
| | | including the aileron. | | | | | |
| | | - 1 static discharger can be i | | | | |
| | | missing on each horizontal | | | | | |
| | | stabilizer tip zone including | | | | | |
| | | the elevator. | | | | | |
| | | - 1 static discharger can be i | | | | |
| | | missing on the fin and the | | | | | |
| | | rudder. | | | | | |
| | | - 1 static discharger can be i | | | | |
| | | missing on each wing on the | | | | | |
| | | flap track fairings. | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-18-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Close the access doors and panels opened during the inspection.
EFF :
ALL 05-51-18
Page 633
May 01/05
BV
(6) Remove the warning notice(s).
EFF :
ALL 05-51-18
Page 634
Nov 01/04
R
BV
INSPECTION AFTER ENGINE BIRD STRIKE OR SLUSH INGESTION - INSPECTION/CHECK
_________________________________________________________________________
TASK 05-51-19-200-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-19-941-050
A. Not Applicable
EFF :
ALL 05-51-19
Page 601
Nov 01/06
BV
4. Procedure
_________
Subtask 05-51-19-210-068
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Do the inspection for Foreign Object | X | | | | |
| | | Damage (FOD). | | | | | |
| A.| | (Ref. TASK 72-00-00-200-00100) | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-19
Page 602
Nov 01/06
BV
INSPECTION AFTER TAIL RUNWAY IMPACT - INSPECTION/CHECK
______________________________________________________
TASK 05-51-21-200-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-21-010-050
A. Get Access
EFF :
ALL 05-51-21
Page 601
Feb 01/96
BV
4. Procedure
_________
Subtask 05-51-21-210-050
NOTE : All inspections are visual unless the text gives other
____
instructions.
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Fuselage | | | | | |
| | | | | | | | |
| A.| | Examine the skin panels, the splices | X | | | | |
| | | and the rivets for distortion, cracks,| | | | | |
| | | pulled or torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Internally examine the frames, the| | X | | | |
| | | cleats and the stringers for | | | | | |
| | | distortion, cracks, pulled and | | | | | |
| | | torn fasteners. | | | | | |
| | | (2) Internally examine the lower part | | X | | | |
| | | of the pressure bulkhead FR70, on | | | | | |
| | | the forward and the aft face, in | | | | | |
| | | the area below the | | | | | |
| | | passenger-compartment floor level,| | | | | |
| | | between the L STGR28 and R STGR28,| | | | | |
| | | the pressure dome, the frame | | | | | |
| | | segment and the vertical cross | | | | | |
| | | beam at the aircraft center line | | | | | |
| | | for: | | | | | |
| | | - distorsion, cracks and dents. | | | | | |
| | | | | | | | |
|2. | | APU Air Intake and Tail Cone | | | | | |
| | | Attachment Fittings | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-21
Page 602
Nov 01/00
BV
Tailcone Equipment (L Side)
Figure 601/TASK 05-51-21-991-001
EFF :
ALL 05-51-21
Page 603
Feb 01/96
BV
APU Installation (R side)
Figure 602/TASK 05-51-21-991-002
EFF :
ALL 05-51-21
Page 604
Feb 01/96
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Examine the APU diverter, intake flap,| X | | | | |
| | | intake nose and drain mast for | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork | | | | | |
| | | (Ref. TASK 49-16-00-210-001). | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Internally examine the diverter | | X | | | |
| | | system, the ball bearing control | | | | | |
| | | and the flap actuator for | | | | | |
| | | distortion. | | | | | |
| | | Make sure that they are correctly | | | | | |
| | | attached. | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-21-410-050
A. Close Access
Subtask 05-51-21-942-050
(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 05-51-21
Page 605
Feb 01/96
BV
INSPECTION AFTER NLG TOWING OVERLOAD OR OVERRUN - INSPECTION/CHECK
__________________________________________________________________
TASK 05-51-22-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-22
Page 601
May 01/02
BV
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-22-481-050
A. Safety Precautions
R (1) Make sure that the safety devices are installed on the landing gears
R (Ref. TASK 32-00-00-481-001).
(2) Put the warning notices in position to tell persons not to operate
the nose landing gear.
Subtask 05-51-22-010-050
B. Get Access
EFF :
ALL 05-51-22
Page 602
May 01/02
BV
4. Procedure
_________
Subtask 05-51-22-210-051
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nose Landing-Gear Well | | | | | |
| | | (FR 9 to FR20) | | | | | |
| | | | | | | | |
| A.| | Examine the attachment fittings of | X | | | | |
| | | the drag strut assembly and the | | | | | |
| | | bearings. Make sure that there are | | | | | |
| | | no distortion, cracks or damaged | | | | | |
| | | paint. | | | | | |
| | | | | | | | |
| B.| | Examine the attachment fittings of | X | | | | A |
| | | the lockstay assembly. Make sure that | | | | | |
| | | there are no distortion, cracks or | | | | | |
| | | damaged paint. | | | | | |
| | | | | | | | |
| C.| | Examine the attach fittings of the | X | | | | B |
| | | nose-gear actuating cylinder. Make | | | | | |
| | | sure that there are no distortion, | | | | | |
| | | cracks, pulled or torn fasteners or | | | | | |
| | | damaged paint. | | | | | |
| | | | | | | | |
| | | If you find damage: | | X | | | |
| | | - Remove the gear actuating cylinder. | | | | | |
| | | Obey the overhaul instructions of | | | | | |
| | | the manufacturer to make a strip | | | | | |
| | | down inspection | | | | | |
| | | (Ref. TASK 32-31-22-000-001). | | | | | |
| | | | | | | | |
| D.| | Examine the attach fittings and | X | | | | C |
| | | the side plates of the nose gear. | | | | | |
| | | Make sure that there are no | | | | | |
| | | distortion, cracks or damaged paint. | | | | | |
| | | | | | | | |
|2. | | Avionics Compartment | | | | | |
| | | | | | | | |
| A.| | Examine the gear well roof, the | X | | | | |
EFF :
ALL 05-51-22
Page 603
May 01/02
R
BV
Nose Landing-Gear Well
Figure 601/TASK 05-51-22-991-001
EFF :
ALL 05-51-22
Page 604
Feb 01/96
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | roof-to-sidewall joint and the attach | | | | | |
| | | fittings of the floor support strut. | | | | | |
| | | Make sure that there are no | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners or damaged paint. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-22-210-052
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nose Landing Gear | | | | | |
| | | | | | | | |
| A.| | Examine the shock absorber, the | X | | | | |
| | | wheels, the tires and the torque link | | | | | |
| | | hinges. make sure that there is | | | | | |
| | | no damage caused by the towbar or the | | | | | |
| | | towbarless tractor. | | | | | |
| | | NOTE : Do a special inspection of the | | | | | |
| | | towing lug if you tow with a | | | | | |
| | | towbar. | | | | | |
| | | | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Obey the overhaul instructions of | | X | | | |
| | | the manufacturer to repair or | | | | | |
| | | replace the damaged part. | | | | | |
| | | | | | | | |
| B.| | Examine the steering actuator. | X | | | | |
| | | Make sure that there is no hydraulic | | | | | |
| | | leaks or distortion on the actuator | | | | | |
| | | end caps. | | | | | |
| | | If you find damage: | | | | | |
| | | Remove the nose landing gear | | X | | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
------------------------------------------------------------------------------
EFF :
ALL 05-51-22
Page 605
May 01/02
R
BV
Subtask 05-51-22-210-053
Subtask 05-51-22-410-050
D. Close Access
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 05-51-22-720-050
E. Test of the Nose Landing Gear (Ref. TASK 07-11-00-581-001) (Ref. TASK 32-
30-00-867-001) (Ref. TASK 32-30-00-867-002)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Lift the aircraft with jacks | | | | | |
| | | (Ref. TASK 07-11-00-581-001). | | | | | |
| | | | | | | | |
|2. | | Retract/extend the nose landing gear | | X | | | |
| | | 3 times. Make sure that it moves | | | | | |
| | | smoothly. Make sure that the | | | | | |
| | | fittings and the structure do not | | | | | |
| | | prevent the movement of the parts | | | | | |
| | | that move. | | | | | |
| | | (Ref. TASK 32-30-00-867-001) | | | | | |
| | | (Ref. TASK 32-30-00-867-002). | | | | | |
| | | NOTE: This check is necessary only | | | | | |
| | | if you found damage on the | | | | | |
| | | attachments of the landing gear| | | | | |
| | | or the adjacent structure. | | | | | |
| | | | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-22
Page 606
May 01/02
R
BV
INSPECTION AFTER NLG STEERING ANGLE EXCEEDED - INSPECTION/CHECK
_______________________________________________________________
TASK 05-51-23-200-001
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
R NOTE : If the 95 deg. NLG steering angle was exceeded by a large value (a
____
R maximum of 180 deg. for example when tow vehicle control is not kept
R in icy conditions), it is possible that damage occurred not only to
R the NLG but also to its attachment structure. If this occurs, do the
R NLG well inspection after NLG towing overload or overrun (Ref. TASK
R 05-51-22-200-00100).
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-23
Page 601
Nov 01/06
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-23-481-050
A. Safety Precautions
(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
Subtask 05-51-23-860-050
(1) On the panel 400VU, make sure that the landing-gear control lever is
in the DOWN position.
(2) On the panel 110VU, make sure that the free-fall control handle is in
the usual position.
(3) On the nose gear leg, on the electrical box (5CG), make sure that the
towing lever is in the towing position (disengaged position).
(4) Lift the aircraft at the forward jacking point (Ref. TASK 07-11-00-
581-003).
(5) Make sure that the Green hydraulic system is depressurized (Ref. TASK
29-10-00-863-001).
EFF :
ALL 05-51-23
Page 602
Feb 01/07
BV
(7) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
Subtask 05-51-23-010-050
C. Get Access
(1) Open the NLG doors and install the safety devices (Ref. TASK 32-22-
00-010-001).
(2) Put the warning notices in position to tell persons not to close the
NLG doors.
4. Procedure
_________
Subtask 05-51-23-210-050
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nose Landing Gear | | | | | |
| | | | | | | | |
| A.| | Examine the proximity sensors and | X | | | | |
| | | their electrical harnesses for impact | | | | | |
| | | damage (such as breaks). | | | | | |
| | | | | | | | |
| B. | |Examine the steering system | | | | | |
| | |NOTE: Remove the NLG | | | | | |
| | | (Ref. TASK 32-21-11-000-002) and | | | | | |
| | | send it to the overhaul shop at | | | | | |
| | | the first fault you find on the | | | | | |
| | | steering system. | | | | | |
| | | | | | | | |
| | |(1) Examine the steering actuator body | X | | | | |
| | | for damaged paint and deformation. | | | | | |
| | |(2) Measure the diameter of the | X | | | | |
| | | steering actuator body at its ends:| | | | | |
| | | - make sure that the diameter is | | | | | |
EFF :
ALL 05-51-23
Page 603
Feb 01/07
BV
Inspection of the Nose Landing Gear
Figure 601/TASK 05-51-23-991-001
EFF :
ALL 05-51-23
Page 604
Feb 01/96
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | not more than 88.3 mm (3.476 in.)| | | | | |
| | |(3) Disconnect the torque link at its | X | | | | |
| | | apex point | | | | | |
| | | (Ref. TASK 32-21-27-000-001). | | | | | |
| | |(4) Manually move the upper torque link| X | | | | |
| | | to turn the rotating tube: | | | | | |
| | | - make sure that the rotating tube | | | | | |
| | | turns freely. | | | | | |
| | |(5) Connect the torque link | | | | | |
| | | (Ref. TASK 32-21-27-400-001). | | | | | |
| | |(6) Remove the NLG steering actuator | X | | | | |
| | | (Ref. TASK 32-51-42-000-001): | | | | | |
| | | (a) Examine the steering piston | X | | | | |
| | | seals, the cylinders and the | | | | | |
| | | piston attachment for: | | | | | |
| | | - cracks, damaged paint and | | | | | |
| | | deformation. | | | | | |
R | | |(7) Install the NLG Steering Actuator | | | | | |
R | | | (Ref. TASK 32-51-42-400-001) | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-23-720-050
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Do the test of normal extension and | X | | | | |
| | | retraction of the NLG. | | | | | |
| | | (Ref. TASK 32-31-00-720-003) | | | | | |
| | | | | | | | |
|2. | | Do a functional test of the nose wheel| X | | | | |
| | | steering | | | | | |
| | | (Ref. TASK 32-51-00-720-003). | | | | | |
| | | If you hear an unusual noise: | | | | | |
| | | - Remove the NLG leg for overhaul. | | X | | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-23
Page 605
Feb 01/07
BV
Subtask 05-51-23-410-052
C. Close Access
5. Close-up
________
Subtask 05-51-23-942-052
A. Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 05-51-23
Page 606
Nov 01/06
BV
INSPECTION AFTER LEAVING RUNWAY OR TAXIWAY - INSPECTION/CHECK
_____________________________________________________________
TASK 05-51-24-200-001
1. __________________
Reason for the Job
When an aircraft goes off a runway or taxiway, the loads on the landing gear
R and the structure can change. The inspection that is necessary must be a
function of all the different possible causes of these load changes:
- the speed of the aircraft,
- the weight of the aircraft,
- the type of the ground (soft or hard),
- the distance the landing gear goes into the ground.
Thus, when this incident occurs, you must always do this full inspection
before the aircraft can do more flights.
You must tell Airbus Industrie all the details of the incident immediately.
Airbus Industrie will give you the data and the aid to help you get the
aircraft safely back into operation.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-24
Page 601
May 01/06
BV
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-24
Page 602
May 01/05
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-24
Page 603
May 01/05
BV
3. __________
Job Set-up
Subtask 05-51-24-481-050
R A. Safety Precautions
R (1) Make sure that the safety devices are installed on the landing gears
R (Ref. TASK 32-00-00-481-001).
(2) Put the warning notices in the cockpit to tell persons not to operate
the aircraft systems.
Subtask 05-51-24-860-050
(1) Make sure that the Hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).
(2) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
Subtask 05-51-24-010-050
C. Get Access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).
Subtask 05-51-24-866-050
EFF :
ALL 05-51-24
Page 604
May 01/05
BV
4. Procedure
_________
Subtask 05-51-24-210-050
A. General
Subtask 05-51-24-210-053
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | | Fuselage bottom-surface. This includes| | | | | |
R | | | cargo doors. | | | | | |
| | | | | | | | |
| A.| | Externally examine all the bottom- | X | | | | |
| | | surface of the fuselage for dents, | | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Internally examine at and adjacent| | X | | | |
| | | to the damaged area, all the | | | | | |
| | | frames, stringers, joints and | | | | | |
| | | cleats for damage. | | | | | |
| | | (2) Inspect all the components, pipes,| | X | | | |
| | | ducts and cables adjacent to the | | | | | |
| | | damaged area for damage or | | | | | |
| | | leakage. | | | | | |
| | | | | | | | |
|2. | | NLG Doors | | | | | |
| | | | | | | | |
| A.| | Examine the NLG doors for holes, | X | | | | |
| | | delamination, cracked or flaking | | | | | |
| | | paint, loose fasteners and correct | | | | | |
| | | attachment. | | | | | |
| | | | | | | | |
|3. | | MLG Doors | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-24
Page 605
May 01/06
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Examine the MLG doors for holes, | X | | | | |
| | | delamination, cracked or flaking | | | | | |
| | | paint, loose fasteners and correct | | | | | |
| | | attachment. | | | | | |
| | | | | | | | |
|4. | | Belly Fairing | | | | | |
| | | | | | | | |
| A.| | Examine the belly fairing panels for | X | | | | |
| | | holes, delamination, cracked or | | | | | |
| | | flaking paint, loose fasteners and | | | | | |
| | | correct attachment. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove the panels and internally | | X | | | |
| | | examine the belly fairing | | | | | |
R | | | structure for buckling, cracks | | | | | |
| | | and damaged paintwork. | | | | | |
| | | (2) Examine the pipes, ducts, | | X | | | |
| | | electrical looms and their | | | | | |
| | | supports for: | | | | | |
| | | - fluid leakage, distortion, | | | | | |
| | | rupture, breaks, cracks, correct | | | | | |
| | | attachment and the condition of | | | | | |
| | | the safety devices. | | | | | |
| | | | | | | | |
| B.| | Examine the air-conditioning pack | X | | | | |
| | | intakes for unwanted material and | | | | | |
| | | damage from hits. | | | | | |
| | | | | | | | |
|5. | | APU Intake | | | | | |
| | | | | | | | |
| A.| | Examine the APU intake for unwanted | X | | | | |
| | | material and damage from hits. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-24-210-054
EFF :
ALL 05-51-24
Page 606
May 01/06
BV
(Ref. TASK 32-41-12-400-001) (Ref. TASK 32-41-12-000-002) (Ref. TASK 32-
41-12-400-002) (Ref. TASK 32-21-13-000-001)
(Ref. TASK 32-21-13-400-001) (Ref. TASK 32-21-00-200-006) (Ref. TASK 07-
11-00-581-001) (Ref. TASK 07-11-00-586-002) (Ref. TASK 32-11-00-200-003)
(Ref. TASK 32-11-00-200-005) (Ref. TASK 32-31-00-720-002) (Ref. TASK 32-
33-00-720-001) (Ref. TASK 32-11-11-000-001)
(Ref. TASK 32-11-11-400-001) (Ref. TASK 32-11-16-000-001) (Ref. TASK 32-
11-16-400-001) (Ref. TASK 32-11-17-000-001) (Ref. TASK 32-11-17-400-001)
(Ref. TASK 32-11-21-000-001) (Ref. TASK 32-11-21-400-001) (Ref. TASK 32-
31-46-000-001) (Ref. TASK 32-31-46-400-001)
(Ref. TASK 32-11-00-200-006) (Ref. TASK 05-51-16-200-001) (Ref. TASK 32-
11-13-000-001) (Ref. TASK 32-11-13-400-001) (Ref. TASK 32-11-00-220-004)
R NOTE : You must do the inspection of the landing gear which went off the
____
R runway.
R This inspection contains four inspection procedures;
To know which inspections to do, you must know if:
- the landing gear wheels sank into the ground
- the landing gear found an obstacle on its path.
When you know this information, go directly to the necessary
inspections.
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
|1. | | Inspection of the NLG after the air- | | | | | |
R | | | craft went off the runway and the NLG | | | | | |
| | | wheels sank into the ground and/or the| | | | | |
| | | NLG found an obstacle on its path. | | | | | |
| | | | | | | | |
| A.| | Initial Inspection | | | | | |
| | | | | | | | |
| | | (1) Lift the aircraft at forward | X | | | | |
| | | jacking point: | | | | | |
| | | (Ref. TASK 07-11-00-581-003) | | | | | |
| | | - make sure that extension of the | X | | | | |
| | | shock absorber is smooth and | | | | | |
| | | full. | | | | | |
| | | - examine the sliding rod (the | X | | | | |
| | | part you can see) for blue | | | | | |
| | | color, signs of bronze or chrome| | | | | |
| | | damage. | | | | | |
| | | (2) Do a check of the pressure in the | X | | | | |
| | | NLG shock absorber. | | | | | |
| | | (Ref. TASK 12-14-32-614-004) | | | | | |
EFF :
ALL 05-51-24
Page 607
May 01/06
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (3) Examine the shock absorber for | X | | | | |
| | | external oil leakage. | | | | | |
| | | (4) Do the inspection of the NLG | X | | | | |
| | | (Ref. TASK 32-21-00-200-005) for: | | | | | |
| | | - out-of-roundness of the shock | | | | | |
| | | absorber sliding-rod. | | | | | |
| | | - cracks, damaged paintwork and | | | | | |
| | | deformation on the steering ac- | | | | | |
| | | tuator body (measure the bottom | | | | | |
| | | of actuator body). | | | | | |
| | | - free rotation of the rotating | | | | | |
| | | tube. | | | | | |
| | | (5) Do the functional test of the | X | | | | |
| | | Extension/Retraction of the NLG | | | | | |
| | | (REF. TASK 32-31-00-720-003). | | | | | |
| | | | | | | | |
| B.| | Subsequent Inspection | | | | | |
| | | | | | | | |
| | | (1) If the initial inspection shows no| | | | | |
| | | unsatisfactory condition: | | | | | |
| | | (a) Do the inspection given in | X | | | | |
| | | item 2. (inspection of the | | | | | |
R | | | NLG after the aircraft went | | | | | |
| | | off the runway but the NLG | | | | | |
| | | wheels did not sink into the | | | | | |
| | | ground and the NLG did not | | | | | |
| | | find an obstacle on its path).| | | | | |
| | | (2) If the initial inspection shows | | | | | |
| | | unsatisfactory condition(s): | | | | | |
| | | (a) Remove the NLG, the lockstay | | X | | | |
| | | assembly and drag strut assem-| | | | | |
| | | bly for overhaul: | | | | | |
| | | (Ref. TASK 32-21-11-000-002) | | | | | |
| | | (Ref. TASK 32-21-17-000-001) | | | | | |
| | | (Ref. TASK 32-21-16-000-002) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure) | | | | | |
| | | (b) On the aircraft, examine the | | X | | | |
| | | attachment fittings and the | | | | | |
| | | bearings of the drag strut | | | | | |
| | | assembly for distortion, | | | | | |
| | | cracks and damaged paintwork. | | | | | |
EFF :
ALL 05-51-24
Page 608
May 01/06
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (c) On the aircraft, examine the | | X | | | |
| | | attachment fittings of the | | | | | |
| | | NLG for distortion, cracks and| | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (d) Examine the NLG actuating | | X | | | |
| | | cylinder and its attachment | | | | | |
| | | fitting for distortion, cracks| | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - remove actuating cylinder | | | X | | |
| | | for a strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-22-000-001)| | | | | |
| | | (refer to the manufacturers| | | | | |
| | | instructions for strip-down | | | | | |
| | | inspection procedure). | | | | | |
| | | - on the aircraft, continue | | | X | | |
| | | the inspection of the | | | | | |
| | | attachment fitting for da- | | | | | |
| | | mage | | | | | |
| | | If you find damage: | | | | | |
| | | . tell Airbus Industrie | | | | | |
| | | about the results. | | | | | |
| | | (e) In the avionics compartment, | | X | | | |
| | | examine: | | | | | |
| | | - the gear-well roof, | | | | | |
| | | - roof-to-sidewall joint | | | | | |
| | | - the floor support-strut | | | | | |
| | | attach-fitting for distor- | | | | | |
| | | tion, cracks, pulled or torn| | | | | |
| | | fasteners and damaged paint-| | | | | |
| | | work. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (f) If you removed components, | | X | | | |
| | | install serviceable compo- | | | | | |
| | | nents: | | | | | |
| | | - for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-31-22-400-001)| | | | | |
| | | - for the drag strut assembly | | | | | |
| | | (Ref. TASK 32-21-16-400-002)| | | | | |
| | | - for the lockstay assembly | | | | | |
EFF :
ALL 05-51-24
Page 609
May 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 32-21-17-400-001)| | | | | |
| | | - for the NLG | | | | | |
| | | (Ref. TASK 32-21-11-400-002)| | | | | |
| | | (g) Lower the aircraft on its | X | | | | |
| | | wheels | | | | | |
| | | (Ref. TASK 07-11-00-586-001) | | | | | |
| | | | | | | | |
|2. | | Inspection of the NLG after the air- | | | | | |
R | | | craft went off the runway and the | | | | | |
| | | NLG wheels did not sink into the | | | | | |
| | | ground and the NLG did not find an | | | | | |
| | | obstacle on its path. | | | | | |
| | | NOTE: You can do this inspection with | | | | | |
| | | the aircraft on its wheels. | | | | | |
| | | | | | | | |
| A.| | Inspection | | | | | |
| | | | | | | | |
| | | (1) Do a check of the pressure in the | X | | | | |
R | | | shock absorber. | | | | | |
| | | (Ref. TASK 12-14-32-614-004) | | | | | |
| | | (2) Do a visual inspection of the | X | | | | |
| | | wheels for distortion, cracks and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the wheels | | X | | | |
| | | (Ref. TASK 32-41-12-000-001) | | | | | |
| | | (b) Remove the axle sleeve | | X | | | |
| | | (Ref. TASK 32-41-12-000-002) | | | | | |
| | | (c) Do a visual inspection of the | | X | | | |
| | | axle and sleeve for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (3) Examine: | X | | | | |
| | | - the nose landing gear and all | | | | | |
| | | the components installed on it | | | | | |
| | | for cracks, scores, tears, rup- | | | | | |
| | | ture, leakage and damaged | | | | | |
| | | paintwork, | | | | | |
| | | - the attachment fittings of the | | | | | |
| | | nose landing gear. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | | (4) Examine the shock absorber (the | X | | | | |
| | | part you can see) sliding rod for | | | | | |
EFF :
ALL 05-51-24
Page 610
May 01/06
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
EFF :
ALL 05-51-24
Page 611
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | procedure). | | | | | |
| | | (b) On the aircraft, inspect the | | X | | | |
| | | attachment fittings for damage| | | | | |
| | | if you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results | | | | | |
| | | (7) Examine the NLG actuating cylinder| X | | | | |
| | | and its attachment fittings for | | | | | |
| | | distortion, cracks, pulled or torn| | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the actuating cylinder | | X | | | |
| | | for strip-down inspection | | | | | |
| | | (Ref. TASK 32-21-22-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the | | | | | |
| | | strip-down inspection). | | | | | |
| | | (b) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (8) In the avionics compartment, | X | | | | |
| | | examine: | | | | | |
| | | - the gear-well roof, | | | | | |
| | | - the roof-to-sidewall joint, | | | | | |
| | | - the floor support-strut | | | | | |
| | | attach-fittings for distortion, | | | | | |
| | | cracks, pulled or torn fasteners| | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | | (9) If you removed components, install| X | | | | |
| | | serviceable components: | | | | | |
| | | - for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-21-22-400-001) | | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-21-17-400-001) | | | | | |
| | | - for the NLG | | | | | |
| | | (Ref. TASK 32-21-11-400-002) | | | | | |
EFF :
ALL 05-51-24
Page 612
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
EFF :
ALL 05-51-24
Page 613
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | disconnected). | | | | | |
| | | - distortion of torque link pin. | | | | | |
| | | - detailed visual inspection of | | | | | |
| | | the barrel in the drag stay | | | | | |
| | | blend area | | | | | |
| | | - detailed visual inspection of | | | | | |
| | | the barrel forward pintle-pin | | | | | |
| | | area | | | | | |
| | | - detailed visual inspection of | | | | | |
| | | the rear pintle pin mounting | | | | | |
| | | (5) Do the functional test of the | X | | | | |
| | | Normal Extension/Retraction of the| | | | | |
| | | landing gear | | | | | |
| | | (Ref. TASK 32-31-00-720-002) | | | | | |
| | | - with the MLG door open and the | | | | | |
| | | safety lock installed, make sure| | | | | |
| | | that the MLG is correctly | | | | | |
| | | engaged in the MLG uplock (MLG | | | | | |
| | | centered in uplock). | | | | | |
| | | (6) Do the functional test of the free| X | | | | |
| | | fall extension of the landing gear| | | | | |
| | | (Ref. TASK 32-33-00-720-001) | | | | | |
| | | | | | | | |
| B.| | Subsequent inspection | | | | | |
| | | | | | | | |
| | | (1) If the initial inspection shows no| | | | | |
| | | unsatisfactory condition: | | | | | |
| | | (a) Do the inspection given in | X | | | | |
| | | item 4. (inspection of the MLG| | | | | |
| | | after the aircraft goes off | | | | | |
| | | the runway but the MLG wheels | | | | | |
| | | did not sink into the ground | | | | | |
| | | and the MLG did not find an | | | | | |
| | | obstacle on its path). | | | | | |
| | | (2) If the initial inspection shows | X | | | | |
| | | unsatisfactory condition(s): | | | | | |
| | | (a) Remove the MLG, the side-stay,| | X | | | |
| | | lockstay assembly and lockstay| | | | | |
| | | actuator for overhaul: | | | | | |
| | | (Ref. TASK 32-11-11-000-001) | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |
| | | (Ref. TASK 32-11-17-000-001) | | | | | |
EFF :
ALL 05-51-24
Page 614
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
EFF :
ALL 05-51-24
Page 615
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
EFF :
ALL 05-51-24
Page 616
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
EFF :
ALL 05-51-24
Page 617
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
EFF :
ALL 05-51-24
Page 618
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | instructions for the | | | | | |
| | | strip-down procedure). | | | | | |
| | | (b) On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (9) Examine the MLG well (all the | X | | | | |
| | | items you can see) for distortion,| | | | | |
| | | cracks, pulled or torn fasteners | | | | | |
| | | and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | |(10) If you removed components, install| X | | | | |
| | | serviceable components: | | | | | |
| | | - for the retraction actuator | | | | | |
| | | (Ref. TASK 32-31-46-400-001) | | | | | |
| | | - for the lockstay actuator | | | | | |
| | | (Ref. TASK 32-11-21-400-001) | | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-11-17-400-001) | | | | | |
| | | - for the MLG | | | | | |
| | | (Ref. TASK 32-11-11-400-001) | | | | | |
| | | - for the side-stay assembly | | | | | |
| | | (Ref. TASK 32-11-16-400-001) | | | | | |
| | | - for the shock absorber | | | | | |
| | | (Ref. TASK 32-11-13-400-001) | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-24
Page 619
May 01/05
R
BV
Subtask 05-51-24-210-051
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Wings | | | | | |
| | | | | | | | |
| A.| | Examine the skin panels for: | X | | | | |
| | | - damage to the paint, | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, tears or fuel leaks. | | | | | |
| | | If you find damage : | | | | | |
| | | (1) Defuel the tanks. | | X | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the wing tanks | | X | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (3) Examine the front and rear spars, | | X | | | |
| | | the internal structure and the | | | | | |
| | | fasteners for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, | | | | | |
| | | - the condition of the sealant | | | | | |
| | | beads, | | | | | |
| | | - pulled fasteners. | | | | | |
| | | (4) Close access to the wings tanks | | X | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | (5) Examine the ducts, lines, pipes, | | X | | | |
| | | mechanical linkages and their | | | | | |
| | | supports for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks or leaks of fluid, | | | | | |
| | | - the correct attachment of | | | | | |
| | | components, | | | | | |
| | | - damage. | | | | | |
| | | | | | | | |
|2. | | Flaps and flap track fairings | | | | | |
| | | | | | | | |
| A.| | Examine the flaps and the bottom flap | X | | | | |
| | | track fairings for: | | | | | |
| | | - distortion, | | | | | |
| | | - dents, cracks, pulled or torn | | | | | |
| | | fasteners, | | | | | |
| | | - damage to the paint. | | | | | |
EFF :
ALL 05-51-24
Page 620
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| B.| | At rib 6, examine the flap track | X | | | | |
| | | fairing and the adjacent structure | | | | | |
| | | for: | | | | | |
| | | - damage, | | | | | |
| | | - cracks, pulled or torn fasteners, | | | | | |
| | | - distortion. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine the flap and carriages and| | X | | | |
| | | tracks/beams for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, | | | | | |
| | | - damage. | | | | | |
| | | (2) Examine the adjacent structure | | X | | | |
| | | for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, pulled or torn fasteners, | | | | | |
| | | - damage. | | | | | |
| | | (3) Examine wing internal structure | | X | | | |
| | | adjacent to the front and aft | | | | | |
| | | mountings of the flap beams for: | | | | | |
| | | - distortion, | | | | | |
| | | - cracks, | | | | | |
| | | - damage to the sealant. | | | | | |
| | | (4) Examine the area where the MLG is | | X | | | |
| | | attached and the adjacent | | | | | |
| | | structure for: | | | | | |
| | | - cracks or leaks of fuel, | | | | | |
| | | - distortion. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-24-210-052
EFF :
ALL 05-51-24
Page 621
May 01/05
R
BV
Engine Nacelle
Figure 601/TASK 05-51-24-991-002
EFF :
ALL 05-51-24
Page 622
Nov 01/00
R
BV
Engine Mounts
Figure 602/TASK 05-51-24-991-003
EFF :
ALL 05-51-24
Page 623
Nov 01/00
R
BV
Access Doors of the Pylon Box
Figure 603/TASK 05-51-24-991-004
EFF :
ALL 05-51-24
Page 624
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Nacelles | | | | | |
| | | | | | | | |
| A.| | Examine externally for distortion, | X | | | | |
| | | delamination, cracks, cracked or | | | | | |
| | | flaking paint, loose rivets and signs | | | | | |
| | | of shearing: | | | | | |
| | | - the air intake cowls, | | | | | |
| | | - the fan cowls, | | | | | |
| | | - the fan thrust-reverser cowls. | | | | | |
| | | | | | | | |
| B.| | Open the fan cowl doors and the thrust| X | | | | |
| | | reverser doors. | | | | | |
| | | (Ref. TASK 71-13-00-010-040). | | | | | |
| | | (Ref. TASK 78-36-00-010-040). | | | | | |
| | | | | | | | |
| | | (1)Examine them internally for cracks,| X | | | | |
| | | distortions, pulled or torn fasteners | | | | | |
| | | and damaged paintwork. | | | | | |
| | | | | | | | |
| C.| | Examine the primary nozzle for correct| X | | | | |
| | | attachment to the engine, distortion, | | | | | |
| | | delamination, cracks, loose rivets, | | | | | |
| | | and signs of shearing. | | | | | |
| | | | | | | | |
| D.| | Examine the attachment of the nose | X | | | | |
| | | cowl to the fan case for distortion, | | | | | |
| | | cracks, pulled or torn fasteners. | | | | | |
| | | | | | | | |
| E.| | Examine all the cowl attachment | X | | | | |
| | | points on the pylon and all the cowl | | | | | |
| | | hinge fittings. | | | | | |
| | | | | | | | |
| F.| | Examine all the cowl latches for | X | | | | |
| | | damage and make sure that operation is| | | | | |
| | | satisfactory. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) If the inspection has shown damage| | X | | | |
| | | to thrust reverser cowls, do an | | | | | |
| | | operational test of the thrust | | | | | |
| | | reverser system. | | | | | |
| | | Make sure that the movement is | | | | | |
| | | free of fouling or binding | | | | | |
| | | (Ref. TASK 78-31-00-710-040). | | | | | |
EFF :
ALL 05-51-24
Page 625
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
|2. | | Engines | | | | | |
| | | | | | | | |
| A.| | Do an inspection of the engines | | | | | |
| | | | | | | | |
| | | (1) Examine the engines for possible | X | | | | |
| | | foreign object damage (FOD) | | | | | |
| | | (Ref. TASK 72-00-00-200-001) | | | | | |
| | | | | | | | |
| | | (2) Examine the engines and the engine| X | | | | |
| | | equipment for distortion, damage, | | | | | |
| | | and signs of impact. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the engine | | X | | | |
| | | (Ref. TASK 71-00-00-000-040). | | | | | |
| | | (b) Examine the engine-to-pylon | | X | | | |
| | | attachment fittings. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about the | | | X | | |
| | | results. | | | | | |
| | | (c) Install the engine | | X | | | |
| | | (Ref. TASK 71-00-00-400-040). | | | | | |
| | | | | | | | |
| B.| | Close the thrust reverser doors and | X | | | | |
| | | the fan cowl doors | | | | | |
| | | (Ref. TASK 78-36-00-410-040) | | | | | |
| | | (Ref. TASK 71-13-00-410-040). | | | | | |
| | | | | | | | |
|3. | | Pylons | | | | | |
| | | | | | | | |
| A.| | Examine the pylons externally for | X | | | | |
| | | distortion, cracks, pulled or torn | | | | | |
| | | fasteners and damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine the structure externally | | X | | | |
| | | for distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | (2) Examine the components, pipes, | | X | | | |
| | | ducts, looms, cables, pulleys and | | | | | |
| | | mounts for distortion, cracks, | | | | | |
| | | rupture and fluid leakage. | | | | | |
| | | (3) Examine the pylon-to-wing | | X | | | |
EFF :
ALL 05-51-24
Page 626
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | mountings, the skin and the wing | | | | | |
| | | internal structure adjacent to the| | | | | |
| | | pylon mounts for: | | | | | |
| | | - Distortion and cracks. | | | | | |
| | | If you find more damage: | | | X | | |
| | | - Airbus Industrie will give you more | | | | | |
| | | instructions for structural | | | | | |
| | | inspection. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-24-869-050
(1) If you find phase 1 damage to the attachment structure of the landing
gear or to the adjacent structure:
- do a measurement and alignment check of the landing gear (Ref. TASK
05-56-00-200-001).
5. Close-up
________
Subtask 05-51-24-866-051
Subtask 05-51-24-410-050
B. Close Access
(1) Close all the access panels which were open for the inspection.
(2) Close the doors of the main gear (Ref. TASK 32-12-00-410-001).
(3) Close the doors of the nose gear (Ref. TASK 32-22-00-410-001).
(6) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 05-51-24
Page 627
May 01/05
R
BV
_______________________________________________________________________________
INSPECTION AFTER FLIGHT THROUGH DUST STORM/VOLCANIC ASH OR SEVERE CONDITIONS ON
GROUND - INSPECTION/CHECK
_________________________
TASK 05-51-25-200-002
1. __________________
Reason for the Job
Do this inspection after flight in a very bad dust storm or after dust
contamination on ground.
NOTE : If the dust contamination occurred when the aircraft was on ground
____
with applicable protection by covers and blankets (Ref. AMM
10-11-00), and if there is no dust behind the covers, the inspections
specified in para. 4.D.(Inspection of the probes and sensors) and in
para.4.F.(Inspection of the nacelles and engines) are not necessary.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 601
Feb 01/07
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 602
Feb 01/07
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-25-941-051
A. General
(b) All the necessary inspections are visual unless the text gives
other instructions. Operators can refer to the Non-destructive
Testing Manual (NTM) and use non-destructive procedures.
EFF :
ALL 05-51-25
Page 603
May 01/05
BV
Subtask 05-51-25-210-063
B. Inspection Preparation
(a) Before you start, we recommend that you get information from the
crew about the flight conditions.
(b) Make sure that you have the related aircraft Post Flight Report
(PFR).
(c) Do a check of all the events reported by the crew or by the PFR
in addition/conjunction with this inspection.
Subtask 05-51-25-481-051
C. Safety Precautions
(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
Subtask 05-51-25-866-052
Subtask 05-51-25-010-051
E. Get Access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).
EFF :
ALL 05-51-25
Page 604
May 01/05
BV
Subtask 05-51-25-860-051
(3) Put warning notices in the cockpit to tell persons not to operate the
systems.
(4) Put an adjustable access platform in position near the area you must
examine.
4. Procedure
_________
Subtask 05-51-25-160-051
CAUTION : DO NOT RUB THE SURFACE WHEN YOU REMOVE THE DUST FROM THE
_______
AIRCRAFT. IF YOU RUB THE SURFACE, YOU CAN CAUSE EROSION/
ABRASION.
(1) If there is a layer of dust on the aircraft surfaces, remove the dust
with a vacuum cleaner, an air blower, a soft cloth or a soft brush.
EFF :
ALL 05-51-25
Page 605
Feb 01/07
BV
Subtask 05-51-25-210-064
B. Internal Inspection
(Ref. TASK 35-12-41-100-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the cabin area | | | | | |
| | | | | | | | |
| A.| |Examine the cabin area for dust | X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
R | | |(1) Clean all the surfaces that have | | X | | | |
R | | | contamination. | | | | | |
| | | | | | | | |
| B.| |Examine the cockpit for dust | X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
R | | |(1) Clean all the surfaces that have | | X | | | |
R | | | contamination. | | | | | |
| | |(2) Examine the oxygen full face | | X | | | |
| | | masks for contamination. | | | | | |
| | | If you find contamination : | | | | | |
| | | (a) Clean the oxygen full face | | | X | | |
| | | masks | | | | | |
| | | (Ref. TASK 35-12-41-100-001). | | | | | |
| | | | | | | | |
| C.| |Examine the avionics compartment (all | X | | | | |
| | |the items you can see), specially: | | | | | |
| | |- around the ventilated components | | | | | |
| | |- the plugs | | | | | |
| | |- the equipment | | | | | |
| | |for dust contamination. | | | | | |
| | |If you find contamination: | | | | | |
R | | |(1) Clean all the surfaces that have | | X | | | |
R | | | contamination. | | | | | |
| | | | | | | | |
| D.| |Examine the cargo compartments for dust| X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
R | | |(1) Clean all the surfaces that have | | X | | | |
R | | | contamination | | | | | |
R | | | (specially the PDU sensors). | | | | | |
| | |(2) Examine the cargo drainage system | | X | | | |
| | | (if installed) for dust | | | | | |
EFF :
ALL 05-51-25
Page 606
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Replace the filters of the | | | X | | |
| | | drain funnels. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-25-210-065
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the fuselage | | | | | |
| | | | | | | | |
| A.| | Examine the radome skin for damage | X | | | | |
| | | (Ref. TASK 53-15-11-200-001). | | | | | |
| | | | | | | | |
| B.| | Examine the windshield, the fixed | X | | | | |
| | | windows and the sliding windows for | | | | | |
| | | damage: | | | | | |
| | | - for the windshield | | | | | |
| | | (Ref. TASK 56-11-11-200-001) | | | | | |
| | | - for the fixed windows | | | | | |
| | | (Ref. TASK 56-11-12-200-001) | | | | | |
| | | - for the sliding windows | | | | | |
| | | (Ref. TASK 56-12-11-200-001) | | | | | |
| | | | | | | | |
| C.| | Examine the passenger cabin windows | X | | | | |
| | | the passenger/crew doors and | | | | | |
| | | the emergency exit windows for | | | | | |
| | | damage | | | | | |
| | | (Ref. TASK 56-21-13-200-001) | | | | | |
| | | (Ref. TASK 56-31-00-210-001). | | | | | |
| | | | | | | | |
| D.| | Examine all of the fuselage skin, the | X | | | | |
| | | belly fairing and the wing-to-fuselage| | | | | |
| | | fairings for damage. | | | | | |
EFF :
ALL 05-51-25
Page 607
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| E.| | Examine the ram air inlet and outlet, | X | | | | |
| | | the air inlet and outlet flaps for | | | | | |
| | | damage. | | | | | |
| | | | | | | | |
|2. | | Inspection of the Wings | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the top and bottom skin of the| X | | | | |
| | | wings for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the flap track fairings for | X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| D.| | Examine the skin of all the control | X | | | | |
| | | surfaces (slats, flaps, ailerons | | | | | |
| | | and spoilers), specially the leading | | | | | |
| | | and the trailing edges, for damage. | | | | | |
| | | | | | | | |
| E.| | Examine the hinge areas of the | X | | | | |
| | | spoilers and the ailerons for | | | | | |
| | | contamination. | | | | | |
| | | | | | | | |
| F.| | Examine the flap tracks, flap inter | X | | | | |
| | | connecting strut, track 4 sensor, | | | | | |
| | | roller mechanisms, steady bearings and| | | | | |
| | | universal joints for contamination. | | | | | |
R | | | Make sure that there are no dust | | | | | |
R | | | particles on the roller stops. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean and lubricate the related | | X | | | |
| | | components | | | | | |
R | | | (Ref. AMM 12-22-27 PB 301). | | | | | |
| | | | | | | | |
| G.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the ailerons and the | | | | | |
| | | spoilers for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-25
Page 608
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|3. | | Inspection of the Vertical Stabilizer | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the skin of the vertical | X | | | | |
| | | stabilizer and the rudder, specially | | | | | |
| | | the leading and the trailing edges, | | | | | |
| | | for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the hinge areas of the rudder | X | | | | |
| | | for contamination. | | | | | |
| | | | | | | | |
| D.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the rudder for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |
|4. | | Inspection of the Horizontal | | | | | |
| | | Stabilizers | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the skin of the horizontal | X | | | | |
| | | stabilizers and the elevators, | | | | | |
| | | specially the leading and the trailing| | | | | |
| | | edges, for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the hinge areas of the | X | | | | |
| | | elevators for contamination. | | | | | |
| | | | | | | | |
| D.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the elevators for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |
|5. | | Inspection of the external lights | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-25
Page 609
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| A.| | Examine all the external lights for | X | | | | |
| | | damage. | | | | | |
| | | If you find damage: | | | | | |
R | | | (1) Replace the related component(s). | | X | | | |
| | | | | | | | |
|6. | | Inspection of the antennas and the | | | | | |
| | | drain masts | | | | | |
| | | | | | | | |
| A.| | Examine all the antennas and the drain| X | | | | |
| | | masts for damage. | | | | | |
| | | If you find damage: | | | | | |
R | | | (1) Replace the related component(s). | | X | | | |
-------------------------------------------------------------------------------
Subtask 05-51-25-210-066
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the sensors and probes | | | | | |
| | | | | | | | |
R | A.| | Examine all the probes and sensors | X | | | | |
| | | | | | | | |
| | |(1) Examine all the probes and sensors | | | | | |
| | | for damage and contamination (not | | | | | |
| | | clogged): | | | | | |
| | | - the pitot probes | | | | | |
EFF :
ALL 05-51-25
Page 610
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the static probes | | | | | |
| | | - the TAT sensors | | | | | |
| | | - the AOA sensors | | | | | |
| | | - the ice detector probes | | | | | |
| | | (if installed) | | | | | |
| | |NOTE: Make sure that the AOA sensors | | | | | |
| | | move freely and that the drain | | | | | |
| | | holes of the pitot probes are not| | | | | |
| | | clogged. | | | | | |
| | | | | | | | |
| | |(2) Drain the standby static pressure | X | | | | |
| | | lines and make sure that there | | | | | |
| | | are no signs of dust. | | | | | |
| | | (Ref. TASK 12-24-34-600-001) | | | | | |
| | | If you find contamination: | | | | | |
R | B.| | Flush all the pressure lines. | | X | | | |
| | | (Ref. TASK 34-10-00-170-001) | | | | | |
| | | (Ref. TASK 34-10-00-170-002) | | | | | |
| | | (Ref. TASK 34-10-00-170-003) | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-25-210-067
E. Inspection of the Landing Gear Doors, the Landing Gears and the Landing
Gear Wells (Ref. AMM 122232 PB 301)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the landing gear doors, | | | | | |
| | |the landing gears and the landing gear | | | | | |
| | |wells. | | | | | |
| | |NOTE: If you find contamination, you | | | | | |
| | | must: | | | | | |
| | | (a) Remove the contamination from | | | | | |
| | | surface, the moving joints | | | | | |
| | | and the chromed areas of | | | | | |
| | | shock absorbers and actuators | | | | | |
R | | | before the subsequent flight. | | | | | |
| | | (b) Do a full lubrication of | | | | | |
| | | the landing gears before a | | | | | |
| | | maximum of 10 flight cycles. | | | | | |
EFF :
ALL 05-51-25
Page 611
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. AMM 12-22-32, PB 301) | | | | | |
| | | | | | | | |
| A.| |Inspection of the doors | | | | | |
| | |(1) Examine all the doors for damage | X | | | | |
| | | and/or contamination, specially on:| | | | | |
| | | - the door skin | | | | | |
| | | - the door hinges | | | | | |
| | | - the proximity sensors | | | | | |
| | | - the actuator bare rods. | | | | | |
| | | | | | | | |
| B.| |Inspection of the landing gears | | | | | |
| | |(1) Examine all the landing gear | X | | | | |
| | | structures and the components | | | | | |
| | | installed on them for damage and/or| | | | | |
| | | contamination, specially on: | | | | | |
| | | - the attachment points of the | | | | | |
| | | landing gears | | | | | |
| | | - the proximity sensors | | | | | |
| | | - the actuator rods | | | | | |
| | | - the chromed area of the shock | | | | | |
| | | absorbers | | | | | |
| | | - the mechanical linkages and the | | | | | |
| | | moving joints. | | | | | |
| | | | | | | | |
| C.| |Inspection of the landing gear wells | | | | | |
| | |(1) Examine all the landing gear wells | X | | | | |
| | | and the components installed in | | | | | |
| | | them for damage and/or | | | | | |
| | | contamination. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-25-210-068
NOTE : If the aircraft was on the ground with the applicable protective
____
covers/devices installed when the dust contamination occurred,
this inspection is not necessary if there is no dust behind the
covers.
EFF :
ALL 05-51-25
Page 612
May 01/05
BV
R you use the bleed air systems. This is to make sure that the
R engines blow out remaining particles.
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the nacelles and engines | | | | | |
| | | | | | | | |
| A.| |Inspection of the nacelles | | | | | |
| | |(1) Examine the air intake cowl for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 71-11-00-210-040) | | | | | |
| | |(2) Examine the fan cowl doors for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 71-13-11-200-040) | | | | | |
| | |(3) Examine the thrust reversers for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 78-32-11-210-040) | | | | | |
| | | | | | | | |
| B.| |Inspection of the engines | | | | | |
| | |(1) Examine the fire extinguisher | X | | | | |
| | | outlets for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Do a check of the | | X | | | |
| | | distribution piping for | | | | | |
R | | | blockage. | | | | | |
| | | (Ref. TASK 26-21-00-720-003) | | | | | |
| | |(2) Do the inspection/check of the | X | | | | |
R | | | engines after dust ingestion.||||||
| | | (Ref. TASK 72-00-00-200-041) | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 613
May 01/05
BV
R Subtask 05-51-25-210-069
R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | |Inspection of the APU | | | | | |
R | | | | | | | | |
R | A.| |Examine the APU intake and exhaust for | X | | | | |
R | | |contamination and/or damage | | | | | |
R | | |(Ref. TASK 49-16-00-210-001) | | | | | |
R | | |If you find contamination: | | | | | |
R | | |(1) If the APU was not in operation | | | | | |
R | | | during dust contamination: | | | | | |
R | | | (a) Clean the APU air intake and | | X | | | |
R | | | exhaust | | | | | |
R | | | (Ref. TASK 49-16-00-100-001) | | | | | |
R | | |(2) If the APU was in operation during | | | | | |
R | | | dust contamination: | | | | | |
R | | | (a) Clean the APU air intake and | | X | | | |
R | | | exhaust | | | | | |
R | | | (Ref. TASK 49-16-00-100-001) | | | | | |
R | | | (b) Examine the oil cooler for | | X | | | |
R | | | contamination | | | | | |
R | | | (Ref. TASK 49-91-44-000-001) | | | | | |
R | | | (Ref. TASK 49-91-44-400-001) | | | | | |
R | | | If you find contamination: | | | | | |
R | | | - do an APU inspection/check | | | X | | |
R | | | (Ref. TASK 49-20-00-200-001) | | | | | |
R | | | NOTE: We recommend that you | | | | | |
R | | | replace the APU if you | | | | | |
R | | | find large contamination | | | | | |
R | | | in the oil cooler. | | | | | |
R | | | (c) Examine the fire extinguisher | | X | | | |
R | | | outlets for contamination | | | | | |
R | | | (Ref. TASK 26-22-00-210-001) | | | | | |
R -------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 614
May 01/03
BV
Subtask 05-51-25-210-070
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the hydraulic system | | | | | |
| | | | | | | | |
| A.| |Examine the filters for contamination | X | | | | |
| | |(clogging indicators and filter | | | | | |
| | |elements). | | | | | |
| | |(Ref. TASK 29-10-00-200-004) | | | | | |
| | |(Ref. TASK 29-10-00-200-007) | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Replace the filter elements. | | X | | | |
R | | |(2) Get a sample of fluid and make | | X | | | |
| | | sure that contamination is in | | | | | |
| | | the permitted limits | | | | | |
| | | (Ref. TASK 12-32-29-281-001) | | | | | |
| | | | | | | | |
| B.| |Examine the RAT for contamination | X | | | | |
| | |and/or damage. | | | | | |
| | | | | | | | |
| C.| |Examine the compensated slides (1010GM | X | | | | |
| | |and 3010GM) for contamination. | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Clean the compensated slides | | X | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 615
May 01/05
BV
Subtask 05-51-25-210-071
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the fuel system | | | | | |
| | | | | | | | |
R | A.| | Examine the NACA vent intakes for | X | | | | |
| | | contamination | | | | | |
| | | (Ref. TASK 28-12-47-200-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Get a sample of fuel from the | X | | | | |
| | | water drain valves and do a check | | | | | |
| | | for particle contamination | | | | | |
| | | (Ref. TASK 12-32-28-281-003). | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Clean the fuel tanks. | | X | | | |
| | | | | | | | |
| B.| | Examine the Refuel/Defuel control | X | | | | |
| | | panel for contamination. | | | | | |
R | | | If you find contamination: | | | | | |
| | | (1) Clean the panel. | | X | | | |
| | | | | | | | |
| C.| | Examine the refuel/defuel coupling and| X | | | | |
| | | the refuel/defuel coupling cap for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the refuel/defuel coupling | | X | | | |
| | | and the refuel/defuel coupling | | | | | |
| | | cap. | | | | | |
| | | | | | | | |
| D.| | Examine the overwing refuel adaptor | X | | | | |
| | | /cap for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the adaptor/cap. | | X | | | |
| | | | | | | | |
| E.| | Examine the fuel drain mast for | X | | | | |
| | | contamination. | | | | | |
| | | (Ref. TASK 28-13-00-200-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the fuel drain mast. | | X | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 616
May 01/05
BV
Subtask 05-51-25-210-072
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the anti-ice system | | | | | |
| | | | | | | | |
| A.| | Do an operational test of the wing | X | | | | |
| | | anti-ice system : | | | | | |
| | | (Ref. TASK 30-11-00-710-001). | | | | | |
| | | If the valve response time is | | | | | |
| | | incorrect : | | | | | |
| | | (1) Clean the valve and replace the | | X | | | |
| | | valve filter : | | | | | |
| | | (Ref. TASK 30-11-51-000-002) | | | | | |
| | | (Ref. TASK 30-11-51-400-002) | | | | | |
-------------------------------------------------------------------------------
R Subtask 05-51-25-210-089
R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | | Inspection of the bleed air system | | | | | |
R | | | | | | | | |
R | A.| | Do an operational test of the bleed | X | | | | |
R | | | air system : | | | | | |
R | | | (Ref. TASK 36-11-00-710-003). | | | | | |
R | | | If you find contamination: | | | | | |
R | | | (1) Clean the bleed air system. | | X | | | |
R -------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 617
May 01/05
BV
R Subtask 05-51-25-210-090
R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | | Inspection of the ECS | | | | | |
R | | | | | | | | |
R | A.| | Examine the ECS for contamination. | X | | | | |
R | | | If you find contamination: | | | | | |
R | | | (1) Remove the contamination from | | X | | | |
R | | | the ECS: | | | | | |
R | | | (Ref. TASK 21-00-00-615-005). | | | | | |
R -------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-25-866-053
Subtask 05-51-25-410-052
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Close all the access doors, and the access panels opened during the
inspection procedure.
EFF :
ALL 05-51-25
Page 618
May 01/05
BV
Subtask 05-51-25-860-052
EFF :
ALL 05-51-25
Page 619
May 01/05
R
BV
TASK 05-51-25-200-003
1. __________________
Reason for the Job
NOTE : If the volcanic ash contamination occurred when the aircraft was on
____
ground with applicable protection by covers and blankets (Ref. AMM
10-11-00), and if there is no ash behind the covers, the inpections
specified in para. 4.D. (Inspection of the probes and sensors) and in
para. 4.F. (Inspection of the nacelles and engines ) are not
necessary.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 620
May 01/05
R
BV
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 621
Feb 01/07
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 622
Feb 01/07
R
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-25-210-074
A. General
WARNING : DO NOT BREATHE VOLCANIC ASH. DO NOT GET VOLCANIC ASH IN YOUR
_______
EYES. PUT ON PROTECTIVE CLOTHES, EYE GOGGLES AND A RESPIRATOR
MASK. MAKE SURE THAT THE RESPIRATOR MASK CAN REMOVE VOLCANIC
ASH FROM THE AIR. VOLCANIC ASH CAN CAUSE EYE IRRITATION AND
INJURY TO THE RESPIRATORY SYSTEM.
(a) Volcanic ash is hard, very abrasive and acid (pH between 2 and
neutral).
It can cause erosion/abrasion, etching or shot-peening on the
surfaces and can remove the finishes/protection and thus cause
damage/corrosion.
EFF :
ALL 05-51-25
Page 623
Feb 01/07
BV
(b) The ash particles can be of different sizes but the texture of
volcanic ash is almost the same as talcum powder and can enter
all orifices and go through many seals. Volcanic ash will stay:
- on bare and lubricated surfaces
- in all corners
- in bottom places.
It can cause unusual wear and contamination of many aircraft
systems and filter elements.
(c) The volcanic ash will melt when it goes through the combustion
chamber of the engines.
The melted ash has very high adhesive qualities and bonds to
engine parts and thus decreases engine performance. It may
obstruct the fuel injectors and can cause an engine shutdown.
(b) All the necessary inspections are visual unless the text gives
other instructions.
Operators can refer to the Non-destructive Testing Manual (NTM)
and use non-destructive procedures.
EFF :
ALL 05-51-25
Page 624
May 01/05
R
BV
Subtask 05-51-25-210-075
B. Inspection Preparation
(a) Before you start, we recommend that you get information from the
crew about the flight conditions.
(b) Make sure that you have the related aircraft Post Flight Report
(PFR).
(c) Do a check of all the events reported by the crew or by the PFR
in addition/conjunction with this inspection.
Subtask 05-51-25-481-052
C. Safety Precautions
(1) Install the safety devices on the landing gears (Ref. TASK 32-00-00-
481-001).
Subtask 05-51-25-866-054
Subtask 05-51-25-010-052
E. Get Access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).
EFF :
ALL 05-51-25
Page 625
May 01/05
R
BV
Subtask 05-51-25-860-053
(3) Put warning notices in the cockpit to tell persons not to operate the
systems.
(4) Put an adjustable access platform in position near the area you must
inspect.
4. Procedure
_________
Subtask 05-51-25-160-052
CAUTION : DO NOT RUB THE SURFACE WHEN YOU REMOVE THE ASH FROM THE
_______
AIRCRAFT. IF YOU RUB THE SURFACE, YOU CAN CAUSE
EROSION/ABRASION.
CAUTION : DO NOT USE FLUIDS TO REMOVE THE ASH. IF THERE IS A LAYER OF ASH
_______
ON THE AIRCRAFT SURFACES, REMOVE THE ASH WITH A VACUUM CLEANER
(OR, IF YOU CANNOT USE A VACUUM CLEANER, USE AN AIR BLOWER, A
SOFT CLOTH OR A HAND BRUSH). FLUIDS CAN MIX WITH THE ASH AND
MAKE A PASTE THAT CAN CAUSE EROSION/ABRASION. THIS PASTE CAN GO
INTO AREAS THAT ARE NOT EASY TO CLEAN.
(1) If there is a layer of ash on the aircraft surfaces, remove the ash
with a vacuum cleaner, an air blower, a soft cloth or a soft brush.
EFF :
ALL 05-51-25
Page 626
Feb 01/07
BV
Subtask 05-51-25-210-076
B. Internal Inspection
(Ref. TASK 35-12-41-100-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the cabin area | | | | | |
| | | | | | | | |
| A.| |Examine the cabin area for ash | X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Clean all the contaminated surfaces| | X | | | |
| | | | | | | | |
| B.| |Examine the cockpit for ash | X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Clean all the contaminated surfaces| | X | | | |
| | |(2) Examine the oxygen full face | | X | | | |
| | | masks for contamination. | | | | | |
| | | If you find contamination : | | | | | |
| | | (a) Clean the oxygen full face | | | X | | |
| | | masks | | | | | |
| | | (Ref.TASK 35-12-41-100-001) | | | | | |
| | | | | | | | |
| C.| |Examine the avionics compartment (all | X | | | | |
| | |the items you can see), specially: | | | | | |
| | |- around the ventilated components | | | | | |
| | |- the plugs | | | | | |
| | |- the equipment | | | | | |
| | |for ash contamination. | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Clean all the contaminated surfaces| | X | | | |
| | |NOTE : If the crew report shows a very | | | | | |
| | | dense cloud of volcanic ashes, | | | | | |
| | | clean the computers in the | | | | | |
| | | workshop. | | | | | |
| | | | | | | | |
| D.| |Examine the cargo compartments for ash | X | | | | |
| | |contamination. | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) Clean all the contaminated surfaces| | X | | | |
| | | (specially the PDU sensors). | | | | | |
| | |(2) Examine the cargo drainage system | | X | | | |
| | | (if installed) for ash | | | | | |
EFF :
ALL 05-51-25
Page 627
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Replace the filters of the | | | X | | |
| | | drain funnels. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-25-210-077
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the fuselage | | | | | |
| | | | | | | | |
| A.| | Examine the radome skin for damage | X | | | | |
| | | (Ref. TASK 53-15-11-200-001). | | | | | |
| | | | | | | | |
| B.| | Examine the windshield, the fixed | X | | | | |
| | | windows and the sliding windows for | | | | | |
| | | damage : | | | | | |
| | | - for the windshield | | | | | |
| | | (Ref. TASK 56-11-11-200-001) | | | | | |
| | | - for the fixed windows | | | | | |
| | | (Ref. TASK 56-11-12-200-001) | | | | | |
| | | - for the sliding windows | | | | | |
| | | (Ref. TASK 56-12-11-200-001) | | | | | |
| | | | | | | | |
| C.| | Examine the passenger cabin windows, | X | | | | |
| | | the passenger/crew doors and | | | | | |
| | | the emergency exit windows for damage | | | | | |
| | | (Ref. TASK 56-21-13-200-001) | | | | | |
| | | (Ref. TASK 56-31-00-210-001). | | | | | |
| | | | | | | | |
| D.| | Examine all of the fuselage skin, the | X | | | | |
| | | belly fairing and the wing-to-fuselage| | | | | |
| | | fairings for damage. | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-25
Page 628
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| E.| | Examine the ram air inlet and outlet, | X | | | | |
| | | the air inlet and outlet flaps for | | | | | |
| | | damage. | | | | | |
| | | | | | | | |
|2. | | Inspection of the Wings | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the top and bottom skin of the| X | | | | |
| | | wings for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the flap track fairings for | X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| D.| | Examine the skin of all the control | X | | | | |
| | | surfaces (slats, flaps, ailerons and | | | | | |
| | | spoilers), specially the leading and | | | | | |
| | | the trailing edges, for damage. | | | | | |
| | | | | | | | |
| E.| | Examine the hinge areas of the | X | | | | |
| | | spoilers and the ailerons for | | | | | |
| | | contamination. | | | | | |
| | | | | | | | |
| F.| | Examine the flap tracks, flap inter | X | | | | |
| | | connecting strut, track 4 sensor, | | | | | |
| | | roller mechanisms, steady bearings and| | | | | |
| | | universal joints for contamination. | | | | | |
| | | Make sure that there is no ash deposit| | | | | |
| | | on the roller stops. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean and lubricate the related | | X | | | |
| | | components | | | | | |
| | | (Ref. AMM 12-22-27 PB 301). | | | | | |
| | | | | | | | |
| G.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the ailerons and the | | | | | |
| | | spoilers for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |
|3. | | Inspection of the Vertical Stabilizer | | | | | |
EFF :
ALL 05-51-25
Page 629
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the skin of the vertical | X | | | | |
| | | stabilizer and the rudder, specially | | | | | |
| | | the leading and the trailing edges, | | | | | |
| | | for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the hinge areas of the rudder | X | | | | |
| | | for contamination. | | | | | |
| | | | | | | | |
| D.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the rudder for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |
|4. | | Inspection of the Horizontal | | | | | |
| | | Stabilizers | | | | | |
| | | | | | | | |
| A.| | Examine all the static dischargers for| X | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| B.| | Examine the skin of the horizontal | X | | | | |
| | | stabilizers and the elevators, | | | | | |
| | | specially the leading and the trailing| | | | | |
| | | edges, for damage. | | | | | |
| | | | | | | | |
| C.| | Examine the hinge areas of the | X | | | | |
| | | elevators for contamination. | | | | | |
| | | | | | | | |
| D.| | Examine the piston rod of each | X | | | | |
| | | servocontrol of the elevators for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the piston rod of the | | X | | | |
| | | servocontrols. | | | | | |
| | | | | | | | |
|5. | | Inspection of the external lights | | | | | |
| | | | | | | | |
| A.| | Examine all the external lights for | X | | | | |
EFF :
ALL 05-51-25
Page 630
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | damage. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Replace the related component(s). | | X | | | |
| | | | | | | | |
|6. | | Inspection of the antennas and the | | | | | |
| | | drain masts | | | | | |
| | | | | | | | |
| A.| | Examine all the antennas and the drain| X | | | | |
| | | masts for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Replace the related component(s). | | X | | | |
-------------------------------------------------------------------------------
Subtask 05-51-25-210-078
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the sensors and probes | | | | | |
| | | | | | | | |
| A.| | Inspect all the probes and sensors | X | | | | |
| | | | | | | | |
| | |(1) Examine all the probes and sensors | | | | | |
| | | for damage and contamination (not | | | | | |
| | | clogged): | | | | | |
| | | - the pitot probes | | | | | |
| | | - the static probes | | | | | |
EFF :
ALL 05-51-25
Page 631
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | - the TAT sensors | | | | | |
| | | - the AOA sensors | | | | | |
| | | - the ice detector probes | | | | | |
| | | (if installed) | | | | | |
| | |NOTE: Make sure that the AOA sensors | | | | | |
| | | move freely and that the drain | | | | | |
| | | holes of the pitot probes are not| | | | | |
| | | clogged. | | | | | |
| | | | | | | | |
| | |(2) Drain the standby static pressure | X | | | | |
| | | lines and make sure that there are | | | | | |
| | | no signs of ash. | | | | | |
| | | (Ref. TASK 12-24-34-600-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Flush all the pressure lines | | X | | | |
| | | (Ref. TASK 34-10-00-170-001) | | | | | |
| | | (Ref. TASK 34-10-00-170-002) | | | | | |
| | | (Ref. TASK 34-10-00-170-003) | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-25-210-079
E. Inspection of the Landing Gear Doors, the Landing Gears and the Landing
Gear Wells (Ref. AMM 122232 PB 301)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the landing gear doors, | | | | | |
| | |the landing gears and the landing gear | | | | | |
| | |wells. | | | | | |
| | |NOTE: If you find contamination, you | | | | | |
| | | must: | | | | | |
| | | (a) Remove the contamination from| | | | | |
| | | surface, the moving joints | | | | | |
| | | and the chromed areas of | | | | | |
| | | shock absorbers and actuators| | | | | |
| | | before the next flight. | | | | | |
| | | (b) Do a full lubrication of the | | | | | |
| | | landing gears before a | | | | | |
| | | maximum of 10 flight cycles. | | | | | |
| | | (Ref. AMM 12-22-32, PB 301) | | | | | |
EFF :
ALL 05-51-25
Page 632
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| A.| |Inspection of the doors | | | | | |
| | |(1) Examine all the doors for damage | X | | | | |
| | | and/or contamination, specially on:| | | | | |
| | | - the door skin | | | | | |
| | | - the door hinges | | | | | |
| | | - the proximity sensors | | | | | |
| | | - the actuator bare rods. | | | | | |
| | | | | | | | |
| B.| |Inspection of the landing gears | | | | | |
| | |(1) Examine all the landing gear | X | | | | |
| | | structures and the components | | | | | |
| | | installed on them for damage and/or| | | | | |
| | | contamination, specially on: | | | | | |
| | | - the attachment points of the | | | | | |
| | | landing gears | | | | | |
| | | - the proximity sensors | | | | | |
| | | - the actuator rods | | | | | |
| | | - the chromed area of the shock | | | | | |
| | | absorbers | | | | | |
| | | - the mechanical linkages and the | | | | | |
| | | moving joints. | | | | | |
| | | | | | | | |
| C.| |Inspection of the landing gear wells | | | | | |
| | |(1) Examine all the landing gear wells | X | | | | |
| | | and the components installed in | | | | | |
| | | them for damage and/or | | | | | |
| | | contamination. | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-25-210-080
NOTE : If the aircraft was on the ground with the applicable protective
____
covers/devices installed when the volcanic ash contamination
occurred, this inspection is not necessary if there is no ash
behind the covers.
EFF :
ALL 05-51-25
Page 633
May 01/05
R
BV
you use the bleed air systems. This is to make sure that the
engines blow out remaining particles.
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the nacelles and engines | | | | | |
| | | | | | | | |
| A.| |Inspection of the nacelles | | | | | |
| | |(1) Examine the air intake cowl for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 71-11-00-210-040) | | | | | |
| | |(2) Examine the fan cowl doors for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 71-13-11-200-040) | | | | | |
| | |(3) Examine the thrust reversers for | X | | | | |
| | | damage. | | | | | |
| | | (Ref. TASK 78-32-11-210-040) | | | | | |
| | | | | | | | |
| B.| |Inspection of the engines | | | | | |
| | |(1) Examine the fire extinguisher | X | | | | |
| | | outlets for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Do a check of the | | X | | | |
| | | distribution piping for | | | | | |
| | | obstruction | | | | | |
| | | (Ref. TASK 26-21-00-720-003) | | | | | |
| | |(2) Do the inspection/check of the | X | | | | |
| | | engines after volcanic ash | | | | | |
| | | ingestion | | | | | |
| | | (Ref. TASK 72-00-00-200-041) | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 634
May 01/05
R
BV
Subtask 05-51-25-210-087
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | |Inspection of the APU | | | | | |
| | | | | | | | |
| A.| |Examine the APU intake and exhaust for | X | | | | |
| | |contamination and/or damage | | | | | |
| | |(Ref. TASK 49-16-00-210-001) | | | | | |
| | |If you find contamination: | | | | | |
| | |(1) If the APU was not in operation | | | | | |
| | | during volcanic ash | | | | | |
| | | contamination : | | | | | |
| | | (a) Clean the APU air intake and | | X | | | |
| | | exhaust | | | | | |
| | | (Ref. TASK 49-16-00-100-001) | | | | | |
| | |(2) If the APU was in operation during | | | | | |
| | | volcanic ash contamination: | | | | | |
| | | (a) Clean the APU air intake and | | X | | | |
| | | exhaust | | | | | |
| | | (Ref. TASK 49-16-00-100-001) | | | | | |
| | | (b) Examine the oil cooler for | | X | | | |
| | | contamination | | | | | |
| | | (Ref. TASK 49-91-44-000-001) | | | | | |
| | | (Ref. TASK 49-91-44-400-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | - do an APU inspection/check | | | X | | |
| | | (Ref. TASK 49-20-00-200-001) | | | | | |
| | | NOTE: We recommend that you | | | | | |
| | | replace the APU if you | | | | | |
| | | find large contamination | | | | | |
| | | in the oil cooler. | | | | | |
| | | (c) Examine the fire extinguisher | | X | | | |
| | | outlets for contamination | | | | | |
| | | (Ref. TASK 26-22-00-210-001) | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 635
May 01/05
R
BV
Subtask 05-51-25-210-082
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the fuel system | | | | | |
| | | | | | | | |
| A.| | Inspect the NACA vent intakes for | X | | | | |
| | | contamination | | | | | |
| | | (Ref. TASK 28-12-47-200-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Get a sample of fuel from the | X | | | | |
| | | water drain valves and do a check | | | | | |
| | | for particle contamination | | | | | |
| | | (Ref. TASK 12-32-28-281-003). | | | | | |
| | | If you find contamination: | | | | | |
| | | (a) Clean the fuel tanks. | | X | | | |
| | | | | | | | |
| B.| | Examine the Refuel/Defuel control | X | | | | |
| | | panel for contamination. | | | | | |
| | | If you find contamination : | | | | | |
| | | (1) Clean the panel. | | X | | | |
| | | | | | | | |
| C.| | Examine the refuel/defuel coupling and| X | | | | |
| | | the refuel/defuel coupling cap for | | | | | |
| | | contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the refuel/defuel coupling | | X | | | |
| | | and the refuel/defuel coupling | | | | | |
| | | cap. | | | | | |
| | | | | | | | |
| D.| | Examine the overwing refuel adaptor | X | | | | |
| | | /cap for contamination | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the adaptor/cap | | X | | | |
| | | | | | | | |
| E.| | Examine the fuel drain mast for | X | | | | |
| | | contamination. | | | | | |
| | | (Ref. TASK 28-13-00-200-001) | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the fuel drain mast. | | X | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 636
May 01/05
R
BV
Subtask 05-51-25-210-088
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the anti-ice system | | | | | |
| | | | | | | | |
| A.| | Examine the air inlet and the outlet | X | | | | |
| | | of the pre-cooler for contamination. | | | | | |
| | | | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) If the anti-ice system was not in | | | | | |
| | | operation during or after | | | | | |
| | | volcanic ash contamination: | | | | | |
| | | (a) Disconnect and remove the | | X | | | |
| | | duct immediately upstream | | | | | |
| | | of the wing anti-ice valve. | | | | | |
| | | (b) Examine the valve for | | X | | | |
| | | contamination. | | | | | |
| | | if you find contamination: | | | | | |
| | | - Clean the duct supstream of | | | X | | |
| | | the wing anti-ice valve | | | | | |
| | | - Clean the valve and replace | | | X | | |
| | | the valve filter | | | | | |
| | | (Ref. TASK 30-11-51-000-001)| | | | | |
| | | (Ref. TASK 30-11-51-400-001)| | | | | |
| | | (Ref. TASK 30-11-51-000-002)| | | | | |
| | | (Ref. TASK 30-11-51-400-002)| | | | | |
| | | | | | | | |
| | | (2) If the anti-ice system was in | | | | | |
| | | operation during or immediately | | | | | |
| | | after volcanic ash | | | | | |
| | | contamination: | | | | | |
| | | (a) Remove the valve filter and | | X | | | |
| | | install a clean filter | | | | | |
| | | (Ref. TASK 30-11-51-000-001) | | | | | |
| | | (Ref. TASK 30-11-51-400-001) | | | | | |
| | | (Ref. TASK 30-11-51-000-002) | | | | | |
| | | (Ref. TASK 30-11-51-400-002) | | | | | |
| | | (b) Disconnect the anti-ice duct | | X | | | |
EFF :
ALL 05-51-25
Page 637
May 01/05
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | from the telescopic duct and | | | | | |
| | | do a check for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | - Clean all the anti-ice | | | X | | |
| | | ducts from the pylon | | | | | |
| | | interface to the | | | | | |
| | | telescopic duct outlet. | | | | | |
| | | - Clean the wing anti-ice | | | X | | |
| | | valve. | | | | | |
| | | - Do a check for | | | X | | |
| | | contamination at the slat | | | | | |
| | | anti-ice duct outlets. | | | | | |
| | | Clean them if necessary. | | | | | |
| | | | | | | | |
| | | (c) Disconnect the slat inter- | | X | | | |
| | | connecting ducts and do | | | | | |
| | | a check for contamination. | | | | | |
| | | If you find contamination: | | | | | |
| | | - Remove the slats for | | | X | | |
| | | component maintenance | | | | | |
| | | (Ref. TASK 27-84-63-000-001)| | | | | |
| | | (Ref. TASK 27-84-63-400-002)| | | | | |
| | | (Ref. TASK 27-84-64-000-001)| | | | | |
| | | (Ref. TASK 27-84-64-400-002)| | | | | |
| | | (Ref. TASK 27-84-65-000-001)| | | | | |
| | | (Ref. TASK 27-84-65-400-002)| | | | | |
| | | (Ref. TASK 27-84-66-000-001)| | | | | |
| | | (Ref. TASK 27-84-66-400-002)| | | | | |
| | | (Ref. TASK 27-84-67-000-001)| | | | | |
| | | (Ref. TASK 27-84-67-400-002)| | | | | |
| | | | | | | | |
| | | (d) Make sure that the telescopic | | X | | | |
| | | duct operates correctly and | | | | | |
| | | do a check for contamination | | | | | |
| | | If you find contamination: | | | | | |
| | | - Remove the telescopic | | | X | | |
| | | duct for component | | | | | |
| | | maintenance | | | | | |
| | | (Ref. TASK 30-11-41-000-001)| | | | | |
| | | (Ref. TASK 30-11-41-400-001)| | | | | |
| | | | | | | | |
| B.| | Examine the nacelle anti-ice valves | X | | | | |
| | | for contamination | | | | | |
| | | (Ref. TASK 30-21-51-000-040) | | | | | |
| | | (Ref. TASK 30-21-51-400-041) | | | | | |
| | | If you find contamination: | | | | | |
| | | (1) Clean the ducts. | | X | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 638
May 01/05
R
BV
R Subtask 05-51-25-210-085
R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | |Inspection of the air conditioning | | | | | |
R | | |system | | | | | |
R | | | | | | | | |
R | A.| |Examine the high pressure bleed valves | X | | | | |
R | | |for contamination | | | | | |
R | | |(Ref. TASK 36-11-51-000-010) | | | | | |
R | | |(Ref. TASK 36-11-51-400-010) | | | | | |
R | | |If you find contamination : | | | | | |
R | | |(1) Clean the ducts. | | X | | | |
R | | | | | | | | |
R | B.| |Examine the bleed valves for | X | | | | |
R | | |contamination | | | | | |
R | | |(Ref. TASK 36-11-52-000-010) | | | | | |
R | | |(Ref. TASK 36-11-52-400-010) | | | | | |
R | | |If you find contamination : | | | | | |
R | | |(1) Clean the ducts. | | X | | | |
R | | |(2) Replace the filters | | X | | | |
R | | | (Ref. TASK 36-11-52-000-011) | | | | | |
R | | | (Ref. TASK 36-11-52-400-011) | | | | | |
R | | | | | | | | |
R | C.| |Examine the cross-bleed valves for | X | | | | |
R | | |contamination | | | | | |
R | | |(Ref. TASK 36-12-52-000-001) | | | | | |
R | | |(Ref. TASK 36-12-52-400-001) | | | | | |
R | | |If you find contamination : | | | | | |
R | | |(1) Clean the ducts. | | X | | | |
R | | |(2) Replace the cross-bleed valve. | | X | | | |
R | | | | | | | | |
R | D.| |Examine the flow control valves for | X | | | | |
R | | |contamination | | | | | |
R | | |(Ref. TASK 21-51-51-000-001) | | | | | |
EFF :
ALL 05-51-25
Page 639
May 01/03
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R | | |(Ref. TASK 21-51-51-400-001) | | | | | |
R | | |If you find contamination : | | | | | |
R | | |(1) Clean the ducts. | | X | | | |
R | | | | | | | | |
R | E.| |Examine the primary heat exchangers, | X | | | | |
R | | |main heat exchangers, condensers, | | | | | |
R | | |reheaters and water extractors for | | | | | |
R | | |contamination | | | | | |
R | | |If you find contamination : | | | | | |
R | | |(1) Clean the related component (refer | | X | | | |
R | | | to the manufacturers instructions | | | | | |
R | | | for the cleaning procedure) | | | | | |
R | | | | | | | | |
R | F.| |Examine the trim air pressure | X | | | | |
R | | |regulating valves for contamination | | | | | |
R | | |(Ref. TASK 21-63-52-000-001) | | | | | |
R | | |(Ref. TASK 21-63-52-400-001) | | | | | |
R | | |If you find contamination : | | | | | |
R | | |(1) Clean the ducts. | | X | | | |
R | | |(2) Replace the filter. | | X | | | |
R | | | | | | | | |
R | G.| |Examine the recirculation filters for | X | | | | |
R | | |contamination | | | | | |
R | | |(Ref. TASK 21-21-41-000-001) | | | | | |
R | | |(Ref. TASK 21-21-41-400-001) | | | | | |
R | | |If you find contamination: | | | | | |
R | | |(1) Replace the recirculation filters. | | X | | | |
R | | | | | | | | |
R | H.| |Examine the water extractor drain lines| X | | | | |
R | | |for contamination and blockage. | | | | | |
R -------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 640
May 01/03
BV
R Subtask 05-51-25-210-084
R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | |Inspection of the hydraulic system | | | | | |
R | | | | | | | | |
R | A.| |Examine the filters for contamination | X | | | | |
R | | |(clogging indicators and filter | | | | | |
R | | |elements). | | | | | |
R | | |(Ref. TASK 29-10-00-200-004) | | | | | |
R | | |(Ref. TASK 29-10-00-200-007) | | | | | |
R | | |If you find contamination: | | | | | |
R | | |(1) Replace the filter elements. | | X | | | |
R | | |(2) Take a sample of fluid and make | | X | | | |
R | | | sure that contamination is in the | | | | | |
R | | | permitted limits | | | | | |
R | | | (Ref. TASK 12-32-29-281-001) | | | | | |
R | | | | | | | | |
R | B.| |Examine the RAT for contamination | X | | | | |
R | | |and/or damage. | | | | | |
R | | | | | | | | |
R | C.| |Examine the compensated slides (1010GM | X | | | | |
R | | |and 3010GM) for contamination. | | | | | |
R | | |If you find contamination: | | | | | |
R | | |(1) Clean the compensated slides. | | X | | | |
R -------------------------------------------------------------------------------
EFF :
ALL 05-51-25
Page 641
May 01/03
BV
R Subtask 05-51-25-210-086
R -------------------------------------------------------------------------------
R |ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
R | |CODE| | 1 | 2 | 3 |SIGN|FIG.|
R |----|----|---------------------------------------|-----|-----|-----|----|----|
R |1. | |Inspection of the potable water system | | | | | |
R | | | | | | | | |
R | A.| |Drain the potable water system, flush | X | | | | |
R | | |and refill with potable water | | | | | |
R | | |(Ref. TASK 12-24-38-680-002) | | | | | |
R | | |(Ref. TASK 12-15-38-613-002) | | | | | |
R -------------------------------------------------------------------------------
R 5. Close-up
________
R Subtask 05-51-25-866-055
R Subtask 05-51-25-410-053
R B. Close Access
R (1) Make sure that the work area is clean and clear of tool(s) and other
R items.
R (4) Close all the access doors, and the access panels opened during the
R inspection procedure.
EFF :
ALL 05-51-25
Page 642
May 01/03
BV
R Subtask 05-51-25-860-054
EFF :
ALL 05-51-25
Page 643
May 01/03
BV
INSPECTION AFTER ENGINE FAILURE - INSPECTION/CHECK
__________________________________________________
TASK 05-51-26-200-001
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-26
Page 601
Nov 01/06
BV
3. __________
Job Set-up
Subtask 05-51-26-481-050
A. Safety Precautions
(1) Make sure the the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
(2) Put the warning notices in position in the cockpit to tell persons
not to operate the aircraft systems.
Subtask 05-51-26-860-050
(1) Make sure that the hydraulics systems are depressurized (Ref. TASK
29-00-00-864-001).
(2) Make sure that the electrical systems are de-energized (Ref. TASK 24-
41-00-862-002).
Subtask 05-51-26-020-050
EFF :
ALL 05-51-26
Page 602
Feb 01/96
BV
4. Procedure
_________
Subtask 05-51-26-210-050
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Engine Pylon | | | | | |
| | | | | | | | |
| A.| | Examine the pylon panels, the doors | X | | | | |
| | | and the auxiliary structure. Make | | | | | |
| | | sure that there are no buckles, | | | | | |
| | | cracks, or pulled or missing | | | | | |
| | | fasteners. | | | | | |
| | | | | | | | |
| B.| | Examine the main frame. Make sure that| X | | | | |
| | | there are no distortion, cracks, | | | | | |
| | | cracked or flaked paint, loose | | | | | |
| | | rivets, or signs of shearing. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Remove or open the access doors | | X | | | |
| | | and the inspection panels and | | | | | |
| | | examine the panels and the | | | | | |
| | | adjacent structure. Make sure that| | | | | |
| | | there is no distorsion, wrinkles, | | | | | |
| | | buckles, or tearing of plates at | | | | | |
| | | the rivets. | | | | | |
| | | (2) Examine the pylon main frame. Make| | X | | | |
| | | sure that the parts that follow | | | | | |
| | | are in the correct condition: | | | | | |
| | | - the spars connected to the side | | | | | |
| | | panels, | | | | | |
| | | - the attachments between the | | | | | |
| | | ribs, the side panels and the | | | | | |
| | | upper and lower spars, | | | | | |
| | | - the electrical cables, the | | | | | |
| | | hydraulic pipes and the | | | | | |
| | | components of the engine air | | | | | |
| | | bleed system, | | | | | |
| | | - the different components | | | | | |
| | | mounted on the main frame, | | | | | |
| | | - the fire protection systems | | | | | |
| | | and specially the attachments of| | | | | |
| | | the fire extinguisher bottles. | | | | | |
EFF :
ALL 05-51-26
Page 603
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| C.| | Examine the cowl attachment fittings. | X | | | | |
| | | | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-26-210-052
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Examine the fan cowl | X | | | | |
| | | (Ref. TASK 71-13-11-200-040). | | | | | |
| | | | | | | | |
|2. | | Examine the thrust reverser cowl | X | | | | |
| | | (Ref. TASK 78-32-11-210-040). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-26-210-053
NOTE : Only do this inspection if you find damage during the Phase 1
____
inspection of the pylon and the nacelle.
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Engine-to-Pylon Attach Fittings | | | | | |
| | | | | | | | |
| A.| | Do a detailed inspection of the attach| | X | | | |
| | | fittings below the main ribs. | | | | | |
| | | (1) Make sure that there is no: | | | | | |
| | | - distortion, damage to the | | | | | |
| | | structure (cracks, rupture etc.) | | | | | |
| | | or signs of oxidation or burns. | | | | | |
| | | | | | | | |
EFF :
ALL 05-51-26
Page 604
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|2. | | Pylon-to-Wing Attach Fittings | | | | | |
| | | | | | | | |
| A.| | Remove the fillets. | | X | | | |
| | | | | | | | |
| B.| | Detailed inspection of the front | | X | | | |
| | | and rear pylon-to-wing attach | | | | | |
| | | fittings of the adjacent structure. | | | | | |
| | | | | | | | |
| C.| | If you find damage during Phase 2: | | | | | |
| | | (1) Examine the area adjacent to the | | | | | |
| | | pylon forward and aft | | | | | |
| | | attachment for: | | | | | |
| | | - cracks, | | | | | |
| | | - the correct condition of all | | | | | |
| | | fasteners and safety devices. | | | | | |
| | | (2) Examine the area adjacent to the | | | X | | |
| | | thrust-spigot attachment fitting | | | | | |
| | | for: | | | | | |
| | | - cracks, | | | | | |
| | | - damaged sealant, | | | | | |
| | | - the correct condition of all | | | | | |
| | | fasteners and safety devices. | | | | | |
| | | (3) Examine the wing bottom skin | | | X | | |
| | | adjacent to the pylon forward and | | | | | |
| | | aft attachments and the thrust | | | | | |
| | | spigot for: | | | | | |
| | | - cracks, | | | | | |
| | | - the correct condition of all | | | | | |
| | | fasteners and safety devices, | | | | | |
| | | - fluid leaks. | | | | | |
| | | | | | | | |
| | | If you find damage: | | | X | | |
| | | (1) Defuel the wing | | | | | |
| | | (Ref. TASK 28-25-00-650-001). | | | | | |
| | | (2) Get access to the internal | | | | | |
| | | structure adjacent to rib 7 and | | | | | |
| | | rib 8 | | | | | |
| | | (Ref. TASK 28-10-00-910-002). | | | | | |
| | | Do a full inspection for: | | | | | |
| | | - cracks, damage, damage paint and | | | | | |
| | | sealant and the correct condition| | | | | |
| | | of all fasteners and safety | | | | | |
| | | devices | | | | | |
EFF :
ALL 05-51-26
Page 605
Nov 01/06
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | in the following areas: | | | | | |
| | | - the rear face of the front spar, | | | | | |
| | | inboard of rib 7 and outboard of | | | | | |
| | | rib 8, | | | | | |
| | | - the front face of the rear spar | | | | | |
| | | inboard of rib 7 and outboard of | | | | | |
| | | rib 8, | | | | | |
| | | - the pylon rear attachment, | | | | | |
| | | - rib 7 and rib 8, | | | | | |
| | | - the stringers and the brackets. | | | | | |
| | | | | | | | |
| | | If you find damage: | | | X | | |
| | | - do an alignment check | | | | | |
| | | (Ref. TASK 05-56-00-200-001). | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-26-420-050
Subtask 05-51-26-942-050
(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 05-51-26
Page 606
Nov 01/06
R
BV
R INSPECTION AFTER IMPACT ON ENGINE COWLS - INSPECTION/CHECK
__________________________________________________________
TASK 05-51-27-200-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-27-941-050
A. Safety Precautions
(1) Put the warning notices in the cockpit to tell persons not to operate
the systems related to the engines.
EFF :
ALL 05-51-27
Page 601
May 01/05
BV
Subtask 05-51-27-010-050
B. Get Access
4. Procedure
_________
Subtask 05-51-27-210-050
NOTE : All the necessary inspections are visual unless the text gives
____
other instructions. Operators can refer to the Non-destructive
Testing Manual (NTM) and use non-destructive procedures.
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Inspection of the cowls after a side | | | | | |
| | | impact and damage only to the cowls. | | | | | |
| | | | | | | | |
| A.| | Externally examine the fitting related| X | | | | |
| | | to the cowl with the adjacent area of | | | | | |
| | | the pylon: | | | | | |
| | | (1) Pylon lateral panels when damage | | | | | |
| | | is on the thrust reverser or core | | | | | |
| | | cowl. | | | | | |
| | | (2) Cantilever structure when the | | | | | |
| | | damage is on the inlet cowl, fan | | | | | |
| | | cowl or thrust reverser. | | | | | |
| | | | | | | | |
|2. | | Inspection after a side impact and | | | | | |
| | | subsequent damage to the engine or the| | | | | |
| | | equipment/accessories attached to it. | | | | | |
| | | | | | | | |
| A.| | Examine pylon panels, doors and | X | | | | |
R | | | auxiliary structure for distortion, | | | | | |
R | | | wrinkles, buckles, tearing of plates | | | | | |
R | | | at the rivets and stringers attached | | | | | |
R | | | to panels. | | | | | |
EFF :
ALL 05-51-27
Page 602
May 01/05
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
R | B.| | Examine pylon main frame for | X | | | | |
R | | | distortion, cracks, cracked or flaking| | | | | |
| | | paint, loose rivets and signs of | | | | | |
| | | shearing. | | | | | |
| | | If you find damage: | | | | | |
| | | (1) Examine the panels and adjacent | | X | | | |
| | | structure for distortion, | | | | | |
R | | | wrinkles, buckles, tearing of | | | | | |
| | | plates at the rivets and stringers| | | | | |
| | | attached to the panels. | | | | | |
| | | (2) Examine the pylon main frame for | | X | | | |
| | | distortion and condition of spars | | | | | |
| | | and ribs connected to the lateral | | | | | |
| | | panels. | | | | | |
| | | If you find damage: | | | | | |
| | | (a) Remove the engine | | | X | | |
| | | (Ref. TASK 71-00-00-000-040). | | | | | |
R | | | (b) Examine the FWD and Aft engine | | | X | | |
| | | pylon attachments for distortion | | | | | |
| | | or cracks. | | | | | |
| | | (c) Remove the pylon-to-wing center | | | X | | |
| | | fillets. | | | | | |
| | | (d) Examine the pylon-to-wing attach | | | X | | |
| | | fittings for distortion or | | | | | |
| | | cracks. | | | | | |
| | | (e) Install the engine | | | X | | |
| | | (Ref. TASK 71-00-00-400-040). | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-27-410-050
A. Close Access
EFF :
ALL 05-51-27
Page 603
May 01/05
BV
Subtask 05-51-27-942-050
EFF :
ALL 05-51-27
Page 604
Feb 01/96
BV
R PROCEDURE AFTER FLUID SPILLAGE - INSPECTION/CHECK
_________________________________________________
R TASK 05-51-28-200-002
R 1. __________________
Reason for the Job
R Self Explanatory
R 2. ______________________
Job Set-up Information
R A. Referenced Information
R -------------------------------------------------------------------------------
R REFERENCE DESIGNATION
R -------------------------------------------------------------------------------
R 3. __________
Job Set-up
R Subtask 05-51-28-869-051
R A. Not Applicable
R 4. Procedure
_________
R Subtask 05-51-28-210-051
EFF :
ALL 05-51-28
Page 601
Nov 01/02
BV
INSPECTION AFTER ABNORMAL PAX/CREW DOOR MOVEMENT - INSPECTION/CHECK
___________________________________________________________________
TASK 05-51-29-200-001
1. __________________
Reason for the Job
You must do this inspection in case of abnormal pax/crew door movement like
when it is lifted or pushed down by a loader or a jetway.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-29
Page 601
Feb 01/96
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-29
Page 602
Nov 01/06
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-29-010-051
A. Get Access
Subtask 05-51-29-481-051
B. Safety Precautions
(1) Obey the special precautions before you start work on the door
(Ref. TASK 52-10-00-860-001).
Subtask 05-51-29-020-050
(1) Remove the door frame lining panels of the related door.
(a) For the left FWD passenger/crew door (Ref. TASK 25-23-45-000-
005).
(b) For the right FWD passenger/crew door (Ref. TASK 25-23-45-000-
002).
(c) For the left aft passenger/crew door (Ref. TASK 25-23-45-000-
003).
(d) For the right aft passenger/crew door (Ref. TASK 25-23-45-000-
004).
EFF :
ALL 05-51-29
Page 603
Nov 01/06
R
BV
(2) Remove the door lining panels of the related door.
Subtask 05-51-29-420-050
4. Procedure
_________
Subtask 05-51-29-210-050
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
|1. | | Visual Inspection of the Door | | | | | |
| | | | | | | | |
| A.| | Do a visual inspection of the door: | X | | | | |
| | | - skin in upper and lower areas for | | | | | |
| | | distortion, cracks or tearing, | | | | | |
| | | - door seal retainer, | | | | | |
| | | - girt bar. | | | | | |
| | | | | | | | |
| B.| | Check of the opening and closing of | X | | | | |
| | | the door. | | | | | |
| | | (1) Make sure that there are no | | | | | |
| | | unusual noises or hard points. | | | | | |
EFF :
ALL 05-51-29
Page 604
Nov 01/06
BV
Passenger/Crew Doors
Figure 601/TASK 05-51-29-991-001
EFF :
ALL 05-51-29
Page 605
Feb 01/96
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (2) Make sure that the guide arms | | | | | |
| | | move freely. | | | | | |
| | | | | | | | |
| C.| | Check of the peripheral clearance and | X | | | | |
| | | out-of-flushness between the door edge| | | | | |
| | | and the frame panel: | | | | | |
| | | (1) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-00-820-001) | | | | | |
| | | (2) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-00-820-001). | | | | | |
| | | | | | | | |
| D.| | Check of the escape-slide release | X | | | | |
| | | mechanism for absence of unsual noises| | | | | |
| | | or hard points and for free movement | | | | | |
| | | of the handle. | | | | | |
| | | | | | | | |
|2. | | Detailed Inspection Without Removal | | | | | |
| | | | | | | | |
| A.| | Examine the support arm. | | X | | | |
| | | (1) Make sure that there are no | | | | | |
| | | cracks, distortion or damaged | | | | | |
| | | paint. | | | | | |
| | | (2) Examine the fittings that attach | | | | | |
| | | the support arm to the door frame.| | | | | |
| | | Make sure that there is no | | | | | |
R | | | distortion, damaged fasteners or | | | | | |
R | | | bearing migration. | | | | | |
| | | (3) Examine the condition of the | | | | | |
| | | connection links on the door side,| | | | | |
| | | for distortion or damaged paint. | | | | | |
| | | | | | | | |
| B.| | Examine the guide arms. | | X | | | |
| | | (1) Make sure that there is no wrink- | | | | | |
| | | ling on the upper and lower guide | | | | | |
| | | arms. | | | | | |
| | | (2) Examine the fitting that attaches | | | | | |
| | | the guide arm on the frame side | | | | | |
| | | for distortion or damaged | | | | | |
| | | fasteners. | | | | | |
| | | (3) On the door side, examine the | | | | | |
| | | guide-arm attach fitting for | | | | | |
EFF :
ALL 05-51-29
Page 606
Nov 01/01
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | tearing. | | | | | |
| | | | | | | | |
|3. | | Detailed Inspection with Removal | | | | | |
| | | | | | | | |
| A.| | Remove the door. | | | X | | |
| | | (1) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-11-000-001). | | | | | |
| | | (2) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-11-000-001). | | | | | |
| | | | | | | | |
| B.| | Door Inspection. | | | X | | |
| | | Do a visual inspection of the door | | | | | |
| | | inner structure (especially at the | | | | | |
| | | frame and beam which attach the | | | | | |
| | | support arm, the support arm and the | | | | | |
| | | guide arm fittings. | | | | | |
| | | Do a visual inspection of the | | | | | |
| | | mechanism. | | | | | |
| | | | | | | | |
| C.| | Inspection of the door suspension | | | X | | |
| | | comportment. | | | | | |
| | | (1) Remove the door suspension | | | | | |
| | | compartment. | | | | | |
| | | (a) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-12-000-001). | | | | | |
| | | (b) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-12-000-001). | | | | | |
| | | (2) Examine the support arm for | | | | | |
| | | distortion, cracks, damaged paint.| | | | | |
| | | | | | | | |
| D.| | Guide Arms Inspection. | | | | | |
| | | (1) Remove the guide arms | | | | | |
| | | (a) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-12-000-003). | | | | | |
| | | (b) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-11-000-002). | | | | | |
| | | (2) Examine the guide arms for | | | X | | |
| | | buckling. | | | | | |
| | | (3) Remove the guide arm attachment | | | | | |
| | | fitting on the frame side | | | | | |
| | | (a) for the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-31-000-002). | | | | | |
| | | (b) for the aft passenger/crew door | | | | | |
EFF :
ALL 05-51-29
Page 607
May 01/02
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 52-13-31-000-002). | | | | | |
| | | (4) Examine the frame area under the | | | X | | |
| | | fitting for cracks or distortion, | | | | | |
| | | and elongated holes in the beam | | | | | |
| | | web. | | | | | |
| | | | | | | | |
| E.| | Install/Replace the Components. | | | | | |
| | | (1) Install the guide arm attachment | | | | | |
| | | fitting on the frame side. | | | | | |
| | | (a) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-31-400-002). | | | | | |
| | | (b) For the aft passenger/crew door | | | | | |
| | | - (Ref. TASK 52-13-31-400-002). | | | | | |
| | | (2) Install the guide arms. | | | | | |
| | | (a) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-12-400-003). | | | | | |
| | | (b) for the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-11-400-002). | | | | | |
| | | (3) Install the suspension-door. | | | | | |
| | | (a) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-12-400-001). | | | | | |
| | | (b) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-12-400-001). | | | | | |
| | | (4) Install the door. | | | | | |
| | | (1) For the FWD passenger/crew door | | | | | |
| | | (Ref. TASK 52-11-11-400-001). | | | | | |
| | | (2) For the aft passenger/crew door | | | | | |
| | | (Ref. TASK 52-13-11-400-001). | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
R Subtask 05-51-29-020-053-A
EFF :
ALL 05-51-29
Page 608
May 01/02
BV
Subtask 05-51-29-420-051
(3) Install the door frame lining panels of the related door.
(a) For the left FWD passenger/crew door (Ref. TASK 25-23-45-400-
006).
(b) For the right FWD passenger/crew door (Ref. TASK 25-23-45-400-
007).
(c) For the left aft passenger/crew door (Ref. TASK 25-23-45-400-
008).
(d) For the right aft passenger/crew door (Ref. TASK 25-23-45-400-
005).
Subtask 05-51-29-410-050
C. Close Access
(1) Obey the special precautions after the work on the door (Ref. TASK
52-10-00-860-002).
Subtask 05-51-29-942-050
(1) Remove all the tools and equipment from the work area.
EFF :
ALL 05-51-29
Page 609
Nov 01/06
BV
INSPECTION AFTER SIGNIFICANT MLG VIBRATION AT TOUCH-DOWN - INSPECTION/CHECK
___________________________________________________________________________
TASK 05-51-31-200-001
1. __________________
Reason for the Job
This inspection is recommended to make sure that the bottom cardan joint and
the torque link installation are in a serviceable condition if significant
MLG vibration occurs at touchdown.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-31
Page 601
Feb 01/96
BV
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-31-860-050
(1) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
(2) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).
EFF :
ALL 05-51-31
Page 602
Feb 01/96
BV
Subtask 05-51-31-481-050
B. Safety Precautions
(2) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
(3) Put a warning notice in the cockpit to tell persons not to operate
the aircraft systems.
Subtask 05-51-31-581-050
Subtask 05-51-31-010-050
D. Get Access
(1) Open and safety the main gear doors (Ref. TASK 32-12-00-010-001).
(2) Put an access platform in position near the damaged landing gear.
Subtask 05-51-31-110-050
E. Cleaning
(1) Remove the sealant from the Stalock nut on the MLG side stay bottom
cardan joints with MISCELLANEOUS (Material No. 19-003) soaked in
CLEANING AGENTS (Material No. 11-004).
4. Procedure
_________
Subtask 05-51-31-220-050
NOTE : All the necessary inspections are visual unless the text gives
____
other instructions.
Operators can refer to the Non-Destructive Testing Manual and use
non-destructive procedures.
EFF :
ALL 05-51-31
Page 603
Feb 01/96
BV
Bottom Cardan Joint - Clearances
Figure 601/TASK 05-51-31-991-001
EFF :
ALL 05-51-31
Page 604
Feb 01/96
BV
Botton Cardan Joint- Clearences
Figure 602/TASK 05-51-31-991-002
EFF :
ALL 05-51-31
Page 605
Feb 01/96
BV
NOTE : Use a feeler gauge to measure the gaps. Use a TUBE SPANNER
____
(460005834) to torque the nut.
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Inspection of the MLG Side Stay Bottom| | | | | |
| | | Cardan Joint | | | | | |
| | | (Ref. TASK 05-51-31-991-001). | | | | | |
| | | | | | | | |
| A.| | Do a visual inspection of the flanges | X | | | | |
| | | of the bottom cardan joint bushes as | | | | | |
| | | far as possible for cracks, | | | | | A |
| | | distorsion. Do not remove the cardan | | | | | |
| | | joint pins. | | | | | |
| | | Pay particular attention to the lower | | | | | |
| | | flange of the lower cardan joint | | | | | |
| | | bushes at the outboard position | | | | | |
| | | nearest the leg. | | | | | |
| | | | | | | | |
|2. | | Inspection of the Gaps of the MLG Side| | | | | |
| | | Stay | | | | | |
| | | (Ref. TASK 05-51-31-991-001) | | | | | |
| | | | | | | | |
| A.| | Compress the MLG side stay. To do this| X | | | | |
| | | manually push the gear inboard as far | | | | | |
| | | as possible to make a correct measure-| | | | | |
| | | ment of the total gap. | | | | | |
| | | | | | | | |
| B.| | Use feeler gauges to measure the | X | | | | |
| | | maximum gaps C and D at the side stay | | | | | |
| | | cardan joint installations. Make a | | | | | A |
| | | record of the values. The total | | | | | |
| | | clearance must be between 0.043 mm | | | | | |
| | | (0.001 in.) and 0.50 mm (0.0196 in.) | | | | | |
| | | NOTE: The gaps may vary around the | | | | | |
| | | pin/bush circumference. This is | | | | | |
| | | acceptable provided the sum of | | | | | |
| | | the maximum gaps is not more | | | | | |
| | | than 0.5 mm (0.0196 in.). | | | | | |
| | | If the clearance is outside the | | | | | |
| | | limits: | | | | | |
| | | (1) Measure the load on the bottom | | X | | | |
| | | Stalock nut as follows: | | | | | B |
| | | (a) Remove the circlips as follows: | | | | | |
EFF :
ALL 05-51-31
Page 606
Nov 01/00
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
Subtask 05-51-31-210-051
EFF :
ALL 05-51-31
Page 607
Nov 01/00
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Inspection of the MLG Torque Links | | | | | |
| | | | | | | | |
| A.| | Visual Inspection of the MLG torque | X | | | | |
| | | links for cracks, distortion. | | | | | |
| | | Do a Magnetic Particle NDT check for | | | | | |
| | | cracks at the apex lug of the MLG | | | | | |
| | | torque links. | | | | | |
| | | Do a check of the torque link gaps | | | | | |
| | | (Ref. TASK 32-11-27-200-001). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-31-210-052
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Inspection of the MLG Torque Link | | | | | |
| | | Damper | | | | | |
| | | | | | | | |
| A.| | Do a visual inspection of the torque | X | | | | |
| | | link damper | | | | | |
| | | (Ref. TASK 32-11-27-200-001). | | | | | |
-------------------------------------------------------------------------------
Subtask 05-51-31-410-050
D. Close Access
(1) Close the main landing gear doors (Ref. TASK 32-12-00-410-001).
EFF :
ALL 05-51-31
Page 608
Nov 01/00
BV
Subtask 05-51-31-720-050
(2) Do a functional test of the free-fall extension system (Ref. TASK 32-
33-00-720-001).
5. Close-up
________
Subtask 05-51-31-586-050
(1) Lower the aircraft onto its wheels (Ref. TASK 07-11-00-586-002).
Subtask 05-51-31-914-051
B. Protection
(1) Apply SEALANTS (Material No. 09-004) on the end of the cardan joint.
Subtask 05-51-31-942-050
(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
(3) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 05-51-31
Page 609
Nov 01/00
R
BV
______________________________________________________________________
INSPECTION AFTER ENGINE WINDMILLING (AFTER ENGINE IN-FLIGHT SHUT-DOWN)
________________
INSPECTION/CHECK
TASK 05-51-34-200-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-34-860-050
A. Not Applicable
4. Procedure
_________
Subtask 05-51-34-210-050
EFF :
ALL 05-51-34
Page 601
May 01/04
BV
INSPECTION AFTER OVERWEIGHT TAXIING - INSPECTION/CHECK
______________________________________________________
TASK 05-51-41-200-001
1. __________________
Reason for the Job
NOTE : Before flight, you must decrease aircraft weight to that specified in
____
the Aircraft Flight Manual for takeoff.
You must do this inspection if you taxi the aircraft at an overweight
of more than 2% of the Maximum design Taxi Weight (MTW).
You must do this inspection if you taxi an overweight aircraft
R (regardless of percentage over MTW) and have one of these conditions
R (or more):
- high speed ground turn
- sharp radius turn
- heavy braking
- taxi over rough pavement
R - pivot (sharp radius turn with brake on)
- deflated tire.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-41
Page 601
Nov 01/97
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-41-481-050
A. Safety Precautions
(1) Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
Subtask 05-51-41-010-050
B. Get Access
(1) Open and safety the main gears doors (Ref. TASK 32-12-00-010-001).
(2) Open and safety the nose gear doors (Ref. TASK 32-22-00-010-001).
4. Procedure
_________
Subtask 05-51-41-210-050
EFF :
ALL 05-51-41
Page 602
Nov 01/00
BV
(Ref. TASK 32-11-13-400-003) (Ref. TASK 32-11-16-000-001) (Ref. TASK 32-
11-16-400-001) (Ref. TASK 32-11-17-000-001)
(Ref. TASK 32-11-17-400-001) (Ref. TASK 32-11-21-000-001) (Ref. TASK 32-
11-21-400-001)
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
| A. | | Inspection of the NLG | | | | | |
| | | | | | | | |
| | | (1)Do a visual inspection of the | X | | | | |
| | | wheels for distorsion, cracks and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the wheels | | X | | | |
| | | (Ref. TASK 32-41-12-000-001) | | | | | |
| | | (b)Remove the axle sleeve | | X | | | |
| | | (Ref. TASK 32-41-12-000-002) | | | | | |
| | | (c)Do a visual inspection of the | | X | | | |
| | | axle and the axle sleeve for | | | | | |
| | | damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (2)Examine: | X | | | | |
| | | - the nose landing gear and all | | | | | |
| | | the components installed on it | | | | | |
| | | for cracks, scores, tears, | | | | | |
| | | rupture, leakage and damaged | | | | | |
| | | paintwork. | | | | | |
| | | - the attachment fittings of the | | | | | |
| | | nose landing gear. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | | (b)In the avionics compartment, | | X | | | |
| | | examine: | | | | | |
| | | - the gear well roof, | | | | | |
| | | - the roof-to-sidewall joint, | | | | | |
| | | - the floor support-strut | | | | | |
| | | attach-fittings for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
EFF :
ALL 05-51-41
Page 603
Nov 01/00
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
EFF :
ALL 05-51-41
Page 604
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | if you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (6)Examine the NLG actuating cylinder | X | | | | |
| | | and its attachment fittings for | | | | | |
R | | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the actuating cylinder | | X | | | |
| | | for strip-down inspection | | | | | |
| | | (Ref. TASK 32-31-22-000-01) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the strip-down | | | | | |
| | | inspection). | | | | | |
| | | (b)On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings and the gear well (all | | | | | |
R | | | the items you can see) for | | | | | |
R | | | distortion, pulled or torn | | | | | |
R | | | fasteners and damaged paintwork.| | | | | |
R
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (7)If you removed components, install | | | | | |
| | | serviceable components: | | | | | |
| | | - for the actuating cylinder | | | | | |
| | | (Ref. TASK 32-31-22-400-001) | | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-21-17-400-001) | | | | | |
| | | - for the drag strut assembly | | | | | |
| | | (Ref. TASK 32-21-16-400-002) | | | | | |
| | | - for the shock absorber | | | | | |
| | | (Ref. TASK 32-21-13-400-001) | | | | | |
| | | - for the axle sleeve | | | | | |
| | | (Ref. TASK 32-41-12-400-002) | | | | | |
| | | - for the wheels | | | | | |
| | | (Ref. TASK 32-41-12-400-001). | | | | | |
| | | | | | | | |
| B. | | Inspection of the MLG | | | | | |
| | | | | | | | |
| | | (1)Do a visual inspection of the | X | | | | |
R | | | wheels for distortion, cracks and | | | | | |
| | | damaged paintwork. | | | | | |
R | | | If you find damage: | | | | | |
EFF :
ALL 05-51-41
Page 605
Nov 01/97
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (a)Do the inspection of the axle | | X | | | |
| | | and the axle sleeve for damage | | | | | |
| | | and out-of-roundness | | | | | |
| | | (Ref. TASK 32-11-00-200-006) | | | | | |
R | | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (2)Examine: | X | | | | |
| | | - the MLG and all the components | | | | | |
| | | installed on it for cracks, | | | | | |
| | | distortion, scores, tears, | | | | | |
| | | rupture, leakage and damaged | | | | | |
R | | | paintwork (specially the drag | | | | | |
R | | | stay blend area and the forward | | | | | |
R | | | pintle pin area) | | | | | |
R
| | | - the attachment fittings of the | | | | | |
| | | MLG (on the gear rib 5 and rear | | | | | |
| | | spar) | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Tell Airbus Industrie about the | | X | | | |
| | | results. | | | | | |
| | | (b)Examine the MLG well (all the | | X | | | |
| | | items you can see) for | | | | | |
| | | distortion, cracks, pulled or | | | | | |
| | | torn fasteners and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (3)Examine the shock absorber | X | | | | |
| | | sliding rod for external oil | | | | | |
| | | leaks. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Replace the shock absorber | | X | | | |
| | | seals: | | | | | |
| | | (Ref. TASK 32-11-13-000-003) | | | | | |
EFF :
ALL 05-51-41
Page 606
Nov 01/97
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 32-11-13-400-003). | | | | | |
| | | (4)Examine the side stay assembly and | X | | | | |
| | | its attachment fittings for | | | | | |
| | | distortion, cracks and damaged | | | | | |
| | | paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the side-stay assembly | | X | | | |
| | | for overhaul. | | | | | |
| | | (Ref. TASK 32-11-16-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (b)On the aircraft, continue the | | X | | | |
| | | inspection of the side-stay | | | | | |
| | | attachment fitting. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (5)Examine the lockstay assembly, the | X | | | | |
| | | lockstay actuator and their | | | | | |
| | | attachment fittings for | | | | | |
| | | distortion, cracks, damaged | | | | | |
| | | paintwork and hydraulic leakage. | | | | | |
| | | If you find damage: | | | | | |
| | | (a)Remove the lockstay assembly | | X | | | |
| | | and lockstay actuator for | | | | | |
| | | overhaul | | | | | |
| | | (Ref. TASK 32-11-17-000-001) | | | | | |
| | | (Ref. TASK 32-11-21-000-001) | | | | | |
| | | (refer to the manufacturers | | | | | |
| | | instructions for the overhaul | | | | | |
| | | procedure). | | | | | |
| | | (b)On the aircraft, continue the | | X | | | |
| | | inspection of the attachment | | | | | |
| | | fittings for damage. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
| | | (6)If you removed components, install | | | | | |
| | | serviceable components: | | | | | |
| | | - for the lockstay actuator | | | | | |
EFF :
ALL 05-51-41
Page 607
May 01/96
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | (Ref. TASK 32-11-21-400-001) | | | | | |
| | | - for the lockstay assembly | | | | | |
| | | (Ref. TASK 32-11-17-400-001) | | | | | |
| | | - for the side-stay assembly | | | | | |
| | | (Ref. TASK 32-11-16-400-001). | | | | | |
| | | | | | | | |
| C. | | Inspection of the fuselage | | | | | |
| | | | | | | | |
| | | (1)If damage are found during the | X | | | | |
| | | inspections of the landing gears | | | | | |
| | | in phase one: | | | | | |
| | | (a)Examine the top of the | | X | | | |
| | | fuselage, from frame 31 to 35 | | | | | |
| | | between stringer 18 LH and | | | | | |
| | | 18 RH, for distortion, cracks, | | | | | |
| | | pulled or torn fasteners and | | | | | |
| | | damaged paintwork. | | | | | |
| | | If you find damage: | | | | | |
| | | - tell Airbus Industrie about | | | X | | |
| | | the results. | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-41-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 05-51-41
Page 608
May 01/96
BV
INSPECTION AFTER VERY HIGH WINDS ON GROUND - INSPECTION/CHECK
_____________________________________________________________
TASK 05-51-42-200-001
WARNING : WEAR AND ATTACH A SAFETY HARNESS WHEN YOU WORK ON HIGH SECTIONS. A
_______
FALL CAN INJURE OR KILL YOU.
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-42
Page 601
May 01/00
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-42-941-050
A. General
(1) You must do this inspection if the aircraft was in very high winds on
the ground (wind speed of more than 80 knots (150 KM/H)).
Subtask 05-51-42-481-050
B. Safety Precautions
Make sure that the safety devices are installed on the landing gears
(Ref. TASK 32-00-00-481-001).
Subtask 05-51-42-866-050
EFF :
ALL 05-51-42
Page 602
May 01/00
BV
Subtask 05-51-42-010-050
D. Get Access
(1) Open the main gear doors and install the safety devices (Ref. TASK
32-12-00-010-001).
(2) Open the nose gear doors and install the safety devices (Ref. TASK
32-22-00-010-001).
Subtask 05-51-42-860-050
(1) Make sure that the electrical circuits are de-energized (Ref. TASK
24-41-00-862-002).
(2) Make sure that the hydraulic systems are depressurized (Ref. TASK 29-
00-00-864-001).
(3) Put warning notices in the cockpit to tell persons not to operate the
flight control surfaces.
(4) Put the adjustable access platform in position near the area you must
examine.
4. Procedure
_________
Subtask 05-51-42-210-050
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | General External Inspection | | | | | |
| | | | | | | | |
| A.| | Do a general visual inspection of the | X | | | | |
| | | aircraft from the ground for | | | | | |
| | | distortion, damage and fluid leakage | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-42
Page 603
Nov 01/00
BV
Subtask 05-51-42-210-051
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Inspection of the Landing Gear | | | | | |
| | | | | | | | |
| A.| | Nose Landing Gear | | | | | |
| | | | | | | | |
| | | (1) Examine the NLG, its attachment | X | | | | |
| | | fittings on the structure and all | | | | | |
| | | the components installed on the | | | | | |
| | | NLG for: | | | | | |
| | | - distortion, | | | | | |
| | | - leakage, | | | | | |
| | | - defective attachment, | | | | | |
| | | - other damage. | | | | | |
| | | NOTE: Carefully examine the | | | | | |
| | | hydraulic and electrical | | | | | |
| | | connections and the mooring | | | | | |
| | | fitting. | | | | | |
| | | | | | | | |
| B.| | Main Landing Gear | | | | | |
| | | | | | | | |
| | | (1) Examine the MLG, its attachment | X | | | | |
| | | fittings on structure, the side | | | | | |
| | | stay, the forward and aft pintle | | | | | |
| | | fittings and all the components | | | | | |
| | | installed on the MLG for: | | | | | |
| | | - distortion, | | | | | |
| | | - leakage, | | | | | |
| | | - defective attachment, | | | | | |
| | | - other damage. | | | | | |
| | | NOTE: Carefully examine the | | | | | |
| | | hydraulic and electrical | | | | | |
| | | connections. | | | | | |
-------------------------------------------------------------------------------
EFF :
ALL 05-51-42
Page 604
Nov 01/00
BV
Subtask 05-51-42-210-052
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
R
|1. | | Inspection of the Flight Control | | | | | |
| | | Surfaces | | | | | |
| | | | | | | | |
| A.| | Rudder | | | | | |
| | | | | | | | |
| | | (1) Examine the rudder external | X | | | | |
| | | surface for distortion and damage | | | | | |
| | | | | | | | |
| | | (2) Do a detailed visual inspection | X | | | | |
| | | (Ref. TASK 55-30-00-210-001) | | | | | |
| | | of the actuator fittings 1, 2 and | | | | | |
| | | 3 at: | | | | | |
| | | - the vertical stabilizer | | | | | |
| | | center-box, | | | | | |
| | | - the rudder front spar. | | | | | |
| | | NOTE: Carefully examine the | | | | | |
| | | actuator fitting lugs and | | | | | |
| | | the areas of the fitting | | | | | |
| | | around the fasteners. | | | | | |
| | | | | | | | |
| B.| | Elevators | | | | | |
| | | | | | | | |
| | | (1) Examine the elevator external | X | | | | |
| | | surface for distortion and damage | | | | | |
| | | | | | | | |
| | | (2) Do a detailed visual inspection | X | | | | |
| | | (Ref. TASK 55-16-00-200-004) | | | | | |
| | | (Ref. TASK 55-20-00-200-003) of | | | | | |
| | | these parts in the actuator areas:| | | | | |
| | | - the actuator fittings 1 and 2 | | | | | |
| | | and their attachments, | | | | | |
| | | - the hinge fittings 2, 3 and 4 | | | | | |
| | | and their attachments, | | | | | |
| | | - the hinge arms 2, 3 and 4 and | | | | | |
EFF :
ALL 05-51-42
Page 605
Nov 01/00
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | their attachments | | | | | |
| | | at the horizontal stabilizer | | | | | |
| | | rear-spar and at the elevator | | | | | |
| | | front spar. | | | | | |
| | | | | | | | |
| C.| | Flaps | | | | | |
| | | | | | | | |
| | | (1) Do a general visual inspection of | X | | | | |
| | | each control surface and its | | | | | |
| | | attachments for distortion and | | | | | |
| | | damage. | | | | | |
| | | | | | | | |
| | | (2) Do a visual inspection of: | X | | | | |
| | | - the flap track fairings, | | | | | |
| | | - the pylon aft movable-fairings | | | | | |
| | | and their attachments | | | | | |
| | | for distortion and damage. | | | | | |
| | | | | | | | |
| | | (1) Examine the external surface and | X | | | | |
| | | the attachments of each control | | | | | |
| | | surface for distortion and damage.| | | | | |
| | | | | | | | |
|2. | | Operational Test of the Flight Control| | | | | |
| | | Surfaces | | | | | |
| | | | | | | | |
| A.| | Make sure that the work area is clean | X | | | | |
| | | and clear of tool(s) and other items. | | | | | |
| | | | | | | | |
| B.| | Do an operational test of each control| X | | | | |
| | | surface and make sure that the related| | | | | |
| | | surface(s) move(s) smoothly and freely| | | | | |
| | | | | | | | |
| | | (1) For the rudder: | | | | | |
| | | (Ref. TASK 27-24-00-710-001) | | | | | |
| | | | | | | | |
| | | (2) For the elevators: | | | | | |
| | | (Ref. TASK 27-34-00-710-001) | | | | | |
| | | | | | | | |
| | | (3) For the flaps: | | | | | |
| | | (Ref. TASK 27-54-00-710-001) | | | | | |
EFF :
ALL 05-51-42
Page 606
Nov 01/00
R
BV
-------------------------------------------------------------------------------
|ITEM|INSP| INSPECTION TASKS |PHASE|PHASE|PHASE|INSP|REF.|
| |CODE| | 1 | 2 | 3 |SIGN|FIG.|
|----|----|---------------------------------------|-----|-----|-----|----|----|
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
|----|----|---------------------------------------|-----|-----|-----|----|----|
| | | | | | | | |
| | | (4) For the slats: | | | | | |
| | | (Ref. TASK 27-84-00-710-001) | | | | | |
| | | | | | | | |
| | | (5) For the spoilers: | | | | | |
| | | (Ref. TASK 27-64-00-710-001) | | | | | |
-------------------------------------------------------------------------------
5. Close-up
________
Subtask 05-51-42-410-050
A. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 05-51-42
Page 607
May 01/00
BV
R INSPECTIONS AFTER WORK ON SYSTEM ELECTRICAL INSTALLATION - ADJUSTMENT/TEST
__________________________________________________________________________
TASK 05-51-43-700-001
1. __________________
Reason for the Job
R To give the list of all the inspections to do after work on the aircraft
R electrical installation (wiring, connectors, etc.). The purpose of this
R inspection is not to do a check of all the aircraft functions but to make
R sure that:
- basic functions of the aircraft systems operate correctly,
- there are no unwanted effects on the main functions of the systems not
directly related to the work done.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-51-43
Page 501
Nov 01/04
BV
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-43-869-050
A. Not Applicable
4. Procedure
_________
Subtask 05-51-43-710-051
R A. Do these inspections to make sure that the basic functions of the AUTO
R FLIGHT system operate correctly :
EFF :
ALL 05-51-43
Page 502
Nov 01/04
BV
(3) Operational test of the rudder travel limiting function (Ref. TASK
22-61-00-710-001).
(4) Operational test of the rudder trim function (Ref. TASK 22-62-00-710-
001).
(5) Operational test of the yaw damper function (Ref. TASK 22-63-00-710-
001).
(7) Operational test of the LAND CAT III capability (Ref. TASK 22-97-00-
710-001).
Subtask 05-51-43-710-052
(2) Operational test of the emergency generation system (Ref. TASK 24-24-
00-710-001).
(3) Operational test of the Emergency Generator Control Unit (GCU) from
Centralized Fault Display System (CFDS) (Ref. TASK 24-24-00-710-002).
(4) Operational test of the Battery Charge Limiter (BCL), (with the CFDS)
(Ref. TASK 24-38-00-710-001).
(5) Operational test of the Ground Power Control Unit (GPCU) (Ref. TASK
24-41-00-740-002).
Subtask 05-51-43-710-053
R C. Do these inspections to make sure that the basic functions of the FIRE
R PROTECTION system operate correctly :
(1) Operational test of the engine fire and overheat detection (Ref. TASK
26-12-00-710-001).
EFF :
ALL 05-51-43
Page 503
Nov 01/04
BV
Subtask 05-51-43-710-054
R D. Do these inspections to make sure that the basic functions of the FLIGHT
R CONTROLS system operate correctly :
(1) Operational test of the flap and slat systems (Ref. TASK 27-54-00-
710-002).
(2) Integrity test of the flight control system (Ref. TASK 27-96-00-710-
023).
Subtask 05-51-43-710-055
Subtask 05-51-43-710-056
R F. Do these inspections to make sure that the basic functions of the LANDING
R GEAR system operate correctly :
(2) Integrity test of the nose wheel steering system (Ref. TASK 32-51-00-
710-002).
Subtask 05-51-43-710-057
(2) Operational test of the AOA SENSOR TEST (Ref. TASK 34-13-00-710-006).
(5) Read the CFDIU for ADR CURRENT STATUS (Ref. TASK 34-13-00-740-004).
(6) Read the CFDIU for ADR INPUT STATUS (Ref. TASK 34-13-00-740-005).
EFF :
ALL 05-51-43
Page 504
Nov 01/04
BV
(8) Read the CFDIU for IR CURRENT STATUS (Ref. TASK 34-14-00-740-002).
(9) Read the CFDIU for IR INPUT STATUS (Ref. TASK 34-14-00-740-003).
Subtask 05-51-43-710-058
R H. Do these inspections to make sure that the basic functions of the ENGINE
R systems operate correctly :
(1) Operational test of the thrust reverser system (Ref. TASK 78-31-00-
710-040).
(3) Operational test of the Engine Interface Unit (1KS1,1KS2) (Ref. TASK
73-25-34-710-040).
(4) Functional test of the Electronic Control Unit (ECU) (Ref. TASK 73-
21-60-720-040).
EFF :
ALL 05-51-43
Page 505
Nov 01/04
BV
INSPECTION AFTER FLIGHT IN BAD ICING CONDITIONS - INSPECTION/CHECK
__________________________________________________________________
TASK 05-51-45-200-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-51-45-860-050
A. Not Applicable
4. Procedure
_________
Subtask 05-51-45-210-050
A. Visual Inspection
EFF :
ALL 05-51-45
Page 601
May 01/03
BV
_____________________________________________________________________________
PRESSURIZATION TEST OF FUSELAGE (LEAKAGE CHECKS) AFTER A/C ABNORMAL OPERATION
OR REPAIR - ADJUSTMENT/TEST
___________________________
TASK 05-53-00-780-001
Test for Leakage in the Repair Area at a Differential Pressure of 280 mbar
(4.06 psi)
WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.
WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.
1. __________________
Reason for the Job
To find possible leaks in the repair area after small structural repairs.
NOTE : The pressure test that follows is only necessary after the repair if
____
R the repair procedure in the SRM or in the repair instruction directly
R tells you to do it.
EFF :
ALL 05-53-00
Page 501
Nov 01/05
BV
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-53-00
Page 502
Nov 01/03
BV
3. __________
Job Set-up
Subtask 05-53-00-865-060
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-050
B. Aircraft configuration
(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.
(4) Make sure that the avionics equipment ventilation operates correctly.
(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.
EFF :
ALL 05-53-00
Page 503
May 01/06
R
BV
(9) Do the EIS start procedure (Ref. TASK 31-60-00-860-001).
(10) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.
(13) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.
(14) Close and lock the sliding windows and all access doors to the
pressurized area.
NOTE : You must close the access door 811 for this procedure.
____
Subtask 05-53-00-970-052
(1) Use the pressure indicator to measure the ambient pressure (Pamb).
EFF :
ALL 05-53-00
Page 504
May 01/06
R
BV
4. Procedure
_________
Subtask 05-53-00-780-050
WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.
WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.
WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.
NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 05-53-00
Page 505
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
2. On the CABIN PRESS section of the
panel 25VU:
- set the MAN V/S CTL switch to
DN and release, the switch
moves to the neutral position.
Do this operation several
times. This closes the outflow
valve.
EFF :
ALL 05-53-00
Page 506
May 01/06
R
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
NOTE : The cabin vertical speed
____
must not be more than 500
ft.min (152.39 m.min).
5. Close-up
________
Subtask 05-53-00-865-061
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-054
R (1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
R supply unit (Ref. TASK 12-33-21-618-001).
(3) Remove the pressure indicator and the vertical speed indicator.
EFF :
ALL 05-53-00
Page 507
May 01/05
BV
(4) Remove the safety plug from the pressure switch 16WR.
(5) Put the system and the aircraft back to the serviceable
configuration.
EFF :
ALL 05-53-00
Page 508
Nov 01/03
R
BV
TASK 05-53-00-780-001- 01
Test for Leakage in the Repair Area at a Differential Pressure of 280 mbar
(4.06 psi) (with AIDS)
WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.
WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.
1. __________________
Reason for the Job
To find possible leaks in the repair area after small structural repairs.
NOTE : The pressure test that follows is only necessary after the repair if
____
R the repair procedure in the SRM or in the repair instruction directly
R tells you to do it.
EFF :
ALL 05-53-00
Page 509
Nov 01/05
BV
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-53-00
Page 510
Nov 01/03
BV
3. __________
Job Set-up
Subtask 05-53-00-865-070
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-053
B. Aircraft configuration
(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.
(2) Make sure that the static probe covers are not installed.
(4) Make sure that the avionics equipment ventilation operates correctly.
(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.
EFF :
ALL 05-53-00
Page 511
May 01/05
BV
(10) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.
(13) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.
(15) On the MCDU, get access to the AIDS: PARAM ALPHA CALL-UP page.
Enter the alpha call-up code: (Ref. TASK 31-36-00-740-008)
- PDC to show the cabin differential pressure
- VSCB to show the cabin vertical speed
- OVP to show the outflow valve position.
(16) Close and lock the sliding windows and all access doors to the
pressurized area.
R NOTE : You must close the access door 811 for this procedure.
____
EFF :
ALL 05-53-00
Page 512
May 01/05
BV
4. Procedure
_________
Subtask 05-53-00-780-053
WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.
WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.
WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.
NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.
EFF :
ALL 05-53-00
Page 513
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 05-53-00
Page 514
Nov 01/03
R
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
On the MCDU (VSCB indication):
- the cabin vertical speed is 0.
On the MCDU (PDC indication):
- the cabin differential pressure is
280 mbar (4.06 psi).
EFF :
ALL 05-53-00
Page 515
May 01/05
BV
5. Close-up
________
Subtask 05-53-00-865-071
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-055
R (1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
R supply unit (Ref. TASK 12-33-21-618-001).
(3) Remove the safety plug from the pressure switch 16WR.
(4) Put the system and the aircraft back to the serviceable
configuration.
EFF :
ALL 05-53-00
Page 516
May 01/05
BV
TASK 05-53-00-780-002
Test for Leakage in the Repair Area at a Differential Pressure of 550 mbar
(7.97 psi)
WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.
WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.
1. __________________
Reason for the Job
To find possible leaks in the repair area after large structural repairs.
NOTE : The pressure test that follows is only necessary after the repair if
____
R the repair procedure in the SRM or in the repair instruction directly
R tells you to do it.
EFF :
ALL 05-53-00
Page 517
Nov 01/05
BV
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-53-00
Page 518
Nov 01/03
BV
3. __________
Job Set-up
Subtask 05-53-00-865-062
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-051
B. Aircraft configuration
(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.
(2) Put the vertical speed indicator and the absolute pressure
indicator/digital indication/sensitivity 1mbar(0.01PSI) in position
in the cockpit.
(4) Make sure that the avionics equipment ventilation operates correctly.
(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.
R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).
R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.
EFF :
ALL 05-53-00
Page 519
May 01/06
BV
(7) On the AIR COND panel 30VU:
- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).
(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.
(14) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.
(15) Close and lock the sliding windows and all access doors to the
pressurized area.
NOTE : You must close the access door 811 for this procedure.
____
EFF :
ALL 05-53-00
Page 520
Nov 01/03
R
BV
Subtask 05-53-00-970-051
(1) Use the pressure indicator to measure the ambient pressure (Pamb).
4. Procedure
_________
Subtask 05-53-00-780-051
WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.
WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.
WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.
NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
EFF :
ALL 05-53-00
Page 521
May 01/06
BV
to prevent sudden changes in cabin pressure.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 05-53-00
Page 522
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
Tell ground personnel to do a precheck
of the repaired area.
On the vertical speed indicator:
- the cabin vertical speed is 0.
On the pressure indicator:
- the cabin pressure is value A (Pamb +
300 mbar (4.35 psi)).
EFF :
ALL 05-53-00
Page 523
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
until you get a differential
pressure of 0 psi.
5. Close-up
________
Subtask 05-53-00-865-063
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-056
R (1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
R supply unit (Ref. TASK 12-33-21-618-001).
R (3) Remove the pressure indicator and the vertical speed indicator.
EFF :
ALL 05-53-00
Page 524
May 01/06
BV
R (4) Remove the safety plug from the pressure switch 16WR.
R (5) If you removed the crew oxygen masks, install them (Ref. TASK 35-12-
41-400-002).
(6) Put the system and the aircraft back to the serviceable
configuration.
EFF :
ALL 05-53-00
Page 525
May 01/06
BV
TASK 05-53-00-780-002- 01
Test for Leakage in the Repair Area at a Differential Pressure of 550 mbar
(7.97 psi) (with AIDS)
WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.
WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.
1. __________________
Reason for the Job
To find possible leaks in the repair area after large structural repairs.
NOTE : The pressure test that follows is only necessary after the repair if
____
R the repair procedure in the SRM or in the repair instruction directly
R tells you to do it.
EFF :
ALL 05-53-00
Page 526
Nov 01/05
BV
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-53-00
Page 527
Nov 01/03
BV
3. __________
Job Set-up
Subtask 05-53-00-865-072
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-057
B. Aircraft configuration
(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.
(2) Make sure that the static probe covers are not installed.
(4) Make sure that the avionics equipment ventilation operates correctly.
(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.
R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).
R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.
EFF :
ALL 05-53-00
Page 528
May 01/06
BV
(7) On the AIR COND panel 30VU:
- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).
(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.
(14) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.
(16) On the MCDU, get access to the AIDS: PARAM ALPHA CALL-UP page.
Enter the alpha call-up code: (Ref. TASK 31-36-00-740-008)
- PDC to show the cabin differential pressure
- VSCB to show the cabin vertical speed
- OVP to show the outflow valve position.
(17) Close and lock the sliding windows and all access doors to the
pressurized area.
EFF :
ALL 05-53-00
Page 529
May 01/06
BV
(19) Pressurize the pneumatic system:
- with the APU (Ref. TASK 12-33-21-618-001) or with the HP ground-air
supply unit (Ref. TASK 12-33-21-618-001).
R NOTE : You must close the access door 811 for this procedure.
____
4. Procedure
_________
Subtask 05-53-00-780-054
WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.
WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.
WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.
NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.
EFF :
ALL 05-53-00
Page 530
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
EFF :
ALL 05-53-00
Page 531
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
Tell ground personnel to do a precheck
of the repaired area.
On the MCDU (VSCB indication):
- the cabin vertical speed is 0.
On the MCDU (PDC indication):
- the cabin differential pressure is
300 mbar (4.35 psi).
EFF :
ALL 05-53-00
Page 532
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
pressure until you get a
differential pressure of 0 psi.
5. Close-up
________
Subtask 05-53-00-865-073
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-058
R (1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
R supply unit (Ref. TASK 12-33-21-618-001).
EFF :
ALL 05-53-00
Page 533
May 01/06
BV
(3) Remove the safety plug from the pressure switch 16WR.
R (4) If you removed the crew oxygen masks, install them (Ref. TASK 35-12-
41-400-002).
(5) Put the system and the aircraft back to the serviceable
configuration.
EFF :
ALL 05-53-00
Page 534
May 01/06
BV
TASK 05-53-00-780-003
WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.
WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.
1. __________________
Reason for the Job
NOTE : The pressure test that follows is only necessary after the repair if
____
R the repair procedure in the SRM or in the repair instruction directly
R tells you to do it.
EFF :
ALL 05-53-00
Page 535
Nov 01/05
BV
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-53-00
Page 536
Nov 01/03
BV
3. __________
Job Set-up
Subtask 05-53-00-865-068
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-052
B. Aircraft configuration
(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.
(4) Make sure that the avionics equipment ventilation operates correctly.
(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.
R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).
R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.
EFF :
ALL 05-53-00
Page 537
May 01/06
BV
(7) On the AIR COND panel 30VU:
- make sure that the PACK 1 and PACK 2 pushbutton switches are pushed
(the FAULT legends are on).
(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.
(14) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.
(15) Close and lock the sliding windows and all access doors to the
pressurized area.
NOTE : You must close the access door 811 for this procedure.
____
EFF :
ALL 05-53-00
Page 538
Nov 01/03
R
BV
Subtask 05-53-00-970-050
(1) Use the pressure indicator to measure the ambient pressure (Pamb).
4. Procedure
_________
Subtask 05-53-00-780-052
WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.
WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.
WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.
NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
EFF :
ALL 05-53-00
Page 539
May 01/06
BV
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
- adjust the cabin temperature - make sure that the FAULT legend of
control as necessary. the PACK 1 and PACK 2 pushbutton
switches is off.
Air blows into the fuselage.
3. With the MAN/V/S CTL switch in Tell ground personnel to walk around
the UP or DN position, keep the the aircraft and do a check for
pressure stable at value A (Pamb leakage.
+ 280 mbar (4.06 psi)) for 5 On the vertical speed indicator:
minutes. - the cabin vertical speed is 0.
On the pressure indicator:
- the cabin pressure is value A (Pamb +
280 mbar (4.06 psi)).
EFF :
ALL 05-53-00
Page 540
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- the cabin vertical speed must not be
R NOTE : The cabin vertical speed
____ more than 500 ft.min (152.39 m.min).
R must not be more than 500
ft.min (152.39 m.min).
6. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
- release the PACK 1 pushbutton - the OFF legend of the PACK 1
switch. pushbutton switch comes on.
On the CABIN PRESS section of the On the vertical speed indicator:
panel 25VU: - the cabin vertical speed is 0.
- with the MAN/V/S CTL switch, On the pressure indicator:
keep the pressure stable at - the cabin pressure is value B (Pamb +
value B (Pamb + 580 mbar (8.41 580 mbar (8.41 psi)).
psi)).
7. On the CABIN PRESS section of the On the lower ECAM display unit, on the
panel 25VU: CAB PRESS page:
R - with the MAN/V/S CTL switch in - the outflow valve is in the fully
R DN position, fully close the closed position.
R outflow valve. On the AIR COND panel 30VU:
On the AIR COND panel 30VU: - the OFF legend of the PACK 2
- release the PACK 2 pushbutton pushbutton switch comes on.
switch when the outflow valve On the pressure indicator:
is closed. - the cabin pressure indication
decreases.
EFF :
ALL 05-53-00
Page 541
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
The leakage rate is permitted
if less than 0.8 mbar/s (0.7
PSI/min)
5. Close-up
________
Subtask 05-53-00-865-069
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-061
R (1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
R supply unit (Ref. TASK 12-33-21-618-001).
EFF :
ALL 05-53-00
Page 542
May 01/06
BV
R (3) Remove the pressure indicator, the vertical speed indicator and the
R stop-watch.
R (4) Remove the safety plug from the pressure switch 16WR.
R (5) If you removed the crew oxygen masks, install them (Ref. TASK 35-12-
41-400-002).
(6) Put the system and the aircraft back to the serviceable
configuration.
EFF :
ALL 05-53-00
Page 543
May 01/06
BV
TASK 05-53-00-780-003- 01
WARNING : THERE MUST BE TWO PERSONS IN THE COCKPIT DURING THE PRESSURIZATION
_______
TEST.
IF A CHANGE IN PRESSURE HAS AN UNWANTED EFFECT (PAIN, NOISE IN THE
EARS , HEADHACHE, OR OTHER) ON ONE PERSON, THE OTHER PERSON CAN
ADJUST THE PRESSURE TO AVOID INJURY.
WARNING : DO NOT OPEN THE DOORS WHILE THE RED WARNING LIGHT FLASHES. IF THE RED
_______
WARNING LIGHT FLASHES, REMAINING PRESSURE COULD CAUSE THE DOOR TO
OPEN SUDDENLY AND COULD :
- KILL OR CAUSE SERIOUS INJURY TO PERSONS
- CAUSE DAMAGE TO THE AIRCRAFT.
1. __________________
Reason for the Job
NOTE : The pressure test that follows is only necessary after the repair if
____
R the repair procedure in the SRM or in the repair instruction directly
R tells you to do it.
EFF :
ALL 05-53-00
Page 544
Nov 01/05
BV
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
R Subtask 05-53-00-865-054
R -------------------------------------------------------------------------------
R PANEL DESIGNATION IDENT. LOCATION
R -------------------------------------------------------------------------------
R 122VU DOORS/PAX/MONG 1MQ T13
EFF :
ALL 05-53-00
Page 545
Nov 01/03
BV
Subtask 05-53-00-860-059
B. Aircraft configuration
(1) Put the safety barriers and the warning notices in position to keep
persons out of the work area.
(2) Make sure that the static probe covers are not installed.
(4) Make sure that the avionics equipment ventilation operates correctly.
(a) Put the safety plug - ref MS21913-4 with its O-ring - ref
NAS1612-4 on the air inlet of the pressure switch 16WR.
R (6) We recommend that you remove the crew oxygen masks (Ref. TASK 35-12-
41-000-002).
R NOTE : This test uses an absolute pressure higher than the cabin
____
R pressures you get during usual aircraft operations.
The crew masks have an aneroid capsule that is usually
resistant to the absolute pressures you can get during this
test.
But, to prevent high stress on the aneroid capsule, we
recommend the removal of the crew oxygen masks.
EFF :
ALL 05-53-00
Page 546
May 01/06
BV
(11) On the lower ECAM display unit, on the CAB PRESS page:
- make sure that the outflow valve 10HL is in the fully open
position.
(14) On the lower ECAM display unit, on the CAB PRESS page:
- the skin air-inlet (INLET) and skin air-outlet (EXTRACT) valves are
closed.
(16) On the MCDU, get access to the AIDS: PARAM ALPHA CALL-UP page.
Enter the alpha call-up code: (Ref. TASK 31-36-00-740-008)
- PDC to show the cabin differential pressure
- VSCB to show the cabin vertical speed
- OVP to show the outflow valve position.
(17) Close and lock the sliding windows and all access doors to the
pressurized area.
R NOTE : You must close the access door 811 for this procedure.
____
EFF :
ALL 05-53-00
Page 547
May 01/06
BV
4. Procedure
_________
Subtask 05-53-00-780-055
WARNING : DO NOT LET THE CABIN ALTITUDE CHANGE TOO FAST. SUDDEN CHANGES
_______
IN PRESSURE CAN CAUSE INJURY TO PERSONS.
WARNING : MAKE SURE THAT THE DIFFERENTIAL PRESSURE IS NOT MORE THAN THE
_______
VALUE SPECIFIED FOR THIS TEST.
WARNING : DO NOT USE THE ECAM DISPLAYS TO READ THE CABIN PRESSURE
_______
PARAMETERS (CABIN DIFFERENTIAL PRESSURE, CABIN ALTITUDE, CABIN
VERTICAL- SPEED) DURING THIS TEST.
THE PRESSURES USED IN THIS TEST ARE MORE THAN THE MAXIMUM LIMIT
OF THE RELATED PRESSURE SENSOR.
WHEN THESE PRESSURES BECOME MORE THAN THE PRESSURE SENSOR
LIMIT, ON THE ECAM DISPLAY:
R - THE CABIN DIFFERENTIAL PRESSURE INDICATION AND THE CABIN
R ALTITUDE INDICATION WILL CONTINUE TO SHOW THESE LIMIT VALUES.
R - THE CABIN VERTICAL-SPEED INDICATION IS NO LONGER CORRECT.
R IF YOU DO NOT KNOW THE CORRECT CABIN PRESSURE VALUES, YOU CAN
R MAKE UNWANTED CHANGES IN PRESSURE THAT CAN CAUSE INJURY.
NOTE : This procedure uses the MAN V/S CTL switch on the CABIN PRESS
____
section of the panel 25VU to control the cabin pressure.
This switch, spring loaded to neutral, controls the outflow valve
position:
- UP: the outflow valve moves to the open position (the cabin
pressure decreases)
- DN: the outflow valve moves to the closed position (the cabin
R pressure increases).
We recommend:
- short action on this switch (do not hold the switch in the UP or
DN position)
- that you monitor the cabin vertical speed indication
to prevent sudden changes in cabin pressure.
EFF :
ALL 05-53-00
Page 548
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
1. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
- adjust the cabin temperature - make sure that the FAULT legend of
control as necessary. the PACK 1 and PACK 2 pushbutton
switches is off.
Air blows into the fuselage.
3. With the MAN/V/S CTL switch in Tell ground personnel to walk around
the UP or DN position, keep the the aircraft and do a check for
differential pressure stable at leakage.
280 mbar (4.06 psi) for 5 On the MCDU (VSCB indication):
minutes. - the cabin vertical speed is 0.
On the MCDU (PDC indication):
- the cabin differential pressure is
280 mbar (4.06 psi).
EFF :
ALL 05-53-00
Page 549
May 01/06
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
5. With the MAN/V/S CTL switch in On the MCDU (VSCB indication):
the UP or DN position, keep the - the cabin vertical speed is 0.
differential pressure stable at On the MCDU (PDC indication):
580 mbar (8.41 psi). - the cabin differential pressure is
580 mbar (8.41 psi).
6. On the AIR COND panel 30VU: On the AIR COND panel 30VU:
- release the PACK 1 pushbutton - the OFF legend of the PACK 1
switch. pushbutton switch comes on.
On the CABIN PRESS section of the On the MCDU (VSCB indication):
panel 25VU: - the cabin vertical speed is 0.
- with the MAN/V/S CTL switch, On the MCDU (PDC indication):
keep the differential pressure - the cabin differential pressure is
stable at 580 mbar (8.41 psi). 580 mbar (8.41 psi).
7. On the CABIN PRESS section of the On the lower ECAM display unit, on the
panel 25VU: CAB PRESS page:
- with the MAN/V/S CTL switch in - the outflow valve is in the fully
DN position, fully close the closed position.
outflow valve (OVP indication On the AIR COND panel 30VU:
on MCDU). - the OFF legend of the PACK 2
On the AIR COND panel 30VU: pushbutton switch comes on.
- release the PACK 2 pushbutton On the MCDU (PDC indication):
switch when the outflow valve - the cabin differential pressure
is closed. indication decreases.
EFF :
ALL 05-53-00
Page 550
Nov 01/03
BV
-------------------------------------------------------------------------------
ACTION RESULT
-------------------------------------------------------------------------------
- with the MAN V/S CTL switch,
decrease the cabin differential
pressure until you get a
differential pressure of 0 psi.
5. Close-up
________
Subtask 05-53-00-865-055
A. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
122VU DOORS/PAX/MONG 1MQ T13
Subtask 05-53-00-860-060
R (1) Stop the APU (Ref. TASK 12-33-21-618-001) or stop the HP ground-air
R supply unit (Ref. TASK 12-33-21-618-001).
(3) Remove the safety plug from the pressure switch 16WR.
EFF :
ALL 05-53-00
Page 551
May 01/06
BV
R (4) If you removed the crew oxygen masks, install them (Ref. TASK 35-12-
41-400-002).
(5) Put the system and the aircraft back to the serviceable
configuration.
EFF :
ALL 05-53-00
Page 552
May 01/06
BV
DEMAGNETIZATION - MAINTENANCE PRACTICES
_______________________________________
TASK 05-54-00-860-001
1. __________________
Reason for the Job
Use this procedure if you are sure that incorrect deviation of the standby
compass occurs after adjustment on the compensation base.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-54-00-860-050
A. Aircraft Configuration
(1) Make sure that the A/C is not energized (batteries, engines or
external power supply).
EFF :
ALL 05-54-00
Page 201
May 01/97
BV
Subtask 05-54-00-010-050
(1) Remove the standby compass (Ref. TASK 34-22-23-000-001) from the
cockpit and keep it away from magnetic sources.
4. Procedure
_________
Subtask 05-54-00-280-050
(1) Obey the instructions from the manufacturer for the GAUSSMETER
(MGM50).
(3) With the Gaussmeter, find the magnetic zones of the external parts of
the frames of the windshield and sliding windows. Record the value
for each zone.
Subtask 05-54-00-869-050
B. Demagnetize:
(1) Obey the instructions from the manufacturer for the DEMAGNETIZER -
110V/60HZ (DM05275A) or the DEMAGNETIZER - 220V/50HZ (DM05275B).
(3) Put the demagnetizer at a very small distance (1 cm approx.) from the
part it is necessary to demagnetize. This position gives the
reference plane.
(4) Push the power supply button (indicator light on) and keep the
demagnetizer above the magnetic zone during 2 to 3 seconds.
Then move the demagnetizer away slowly at a constant speed and at
right angles to the reference plane. You must move the demagnetizer
to a minimum distance of 50 cm approx. before you release the button.
(5) Do the step (4) again for each zone that you must demagnetize.
EFF :
ALL 05-54-00
Page 202
May 01/97
BV
(6) De-energize the demagnetizer.
(7) For each demagnetized zone, read the value shown on the Gaussmeter.
Make sure that this value is near zero.
(8) If you find zones that are not fully demagnetized, do again the step
(4) until the value read on the Gaussmeter is near zero.
5. Close-up
________
Subtask 05-54-00-410-050
Subtask 05-54-00-730-050
EFF :
ALL 05-54-00
Page 203
May 01/97
BV
LEVELING AND MEASUREMENT AFTER A/C ABNORMAL OPERATION - INSPECTION/CHECK
________________________________________________________________________
TASK 05-56-00-200-001
1. __________________
Reason for the Job
This topic gives the instructions for the leveling, measurement and
alignment operations of the aircraft.
You can compare these checks with subsequent measurements to find possible
structural deformations after hard landings, too much turbulence, etc.
Do these checks after the replacement or major repair of a part of the
structure.
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 05-56-00
Page 601
Nov 01/98
BV
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-56-00-860-050
(4) Make sure that the control surfaces are in the zero position.
EFF :
ALL 05-56-00
Page 602
Feb 01/96
BV
Subtask 05-56-00-650-050
Subtask 05-56-00-581-050
(1) Lift the aircraft with jacks (Ref. TASK 07-11-00-581-001) and lift
the wheels off the ground.
Subtask 05-56-00-941-052
D. Get Access
Subtask 05-56-00-941-053
(a) Longitudinal axis XX = the line through the points 11 and 12
along the horizontal datum line of the fuselage point 22R, Z = 0.
(b) Vertical axis ZZ = the vertical line through the point 11.
(a) Table 1
(Ref. Fig. 603/TASK 05-56-00-991-003)
(b) Table 2
(Ref. Fig. 604/TASK 05-56-00-991-005)
EFF :
ALL 05-56-00
Page 603
Feb 01/96
BV
Datum
Figure 601/TASK 05-56-00-991-001
EFF :
ALL 05-56-00
Page 604
Feb 01/96
BV
Position of the Datum Points on the Fuselage
Figure 602/TASK 05-56-00-991-002
EFF :
ALL 05-56-00
Page 605
Feb 01/96
BV
Table 1 (Dimensions in Millimeters / Inches)
Figure 603/TASK 05-56-00-991-003
EFF :
ALL 05-56-00
Page 606
Feb 01/96
BV
Table 2 (Dimensions in Millimeters / Inches)
Figure 604/TASK 05-56-00-991-005
EFF :
ALL 05-56-00
Page 607
Feb 01/96
BV
Subtask 05-56-00-941-054
(c) Adjust the height of the column with a rack system to align it
with the Z datum of the aircraft.
4. Procedure
_________
Subtask 05-56-00-220-050
NOTE : For the check of the point 10, measure the radome.
____
(a) Make a projection of the points 10, 11, 12 and 13 to the floor
with the SET - PLUMBS BOBS (98A08001004000).
(b) Move the points 11 and 12 to the left by the dimension Y = 47.36
mm (1.8645 in.).
(d) Align a cord through the points 11 and 12 with the HOLDING SET -
MEASURING CORD (98A08001005000).
EFF :
ALL 05-56-00
Page 608
Feb 01/96
BV
Check of the Z Variations of the Bottom Wing Points and the Bottom Fuselage
Points
Figure 605/TASK 05-56-00-991-007
EFF :
ALL
05-56-00 Page 609
Feb 01/96
BV
Measurement of the X, Y and Z Position of the Bottom Fuselage Points
Figure 606/TASK 05-56-00-991-008
EFF :
ALL 05-56-00
Page 610
Feb 01/96
BV
(2) Y measurement
Measure the right and left variations of the points 10 and 13 from
the cord.
(Ref. Fig. 606/TASK 05-56-00-991-008)
(3) X measurement
Write down the X position of the bottom fuselage points in relation
to the point 11.
(4) Z measurement
Adjust a sight tube at Z = -3500 mm (137.7953 in.) from the
horizontal datum of the fuselage.
Write down the variations between:
- the datum of the rods of the points 10 and 13,
- the scanning plane of the sight tube.
Subtask 05-56-00-220-051
B. Twist Check
(Ref. Fig. 607/TASK 05-56-00-991-009)
(1) Write down the height of the horizontal datum points of the fuselage.
Use two sight tubes on each side of the fuselage.
(2) Calculate the twist of the fuselage from the Z variations of the
horizontal datum points of the fuselage.
Subtask 05-56-00-220-052
(1) Z values
(Ref. Fig. 605/TASK 05-56-00-991-007)
(a) Install the SIGHTING RODS SET (98D08103500000) on the left and
right points 1, 2, 3, 4, 5 and 6.
(b) Set the sight tube at Z = -3500 mm (137.7953 in.) from the
horizontal datum of the fuselage.
(c) Write down the variations between the reading on the sight rods
at points 1, 2, 3, 4, 5 and 6 L and R and the sight tube scanning
plane.
EFF :
ALL 05-56-00
Page 611
Feb 01/96
BV
Z Values of the Horizontal Datum Points of the Fuselage
Figure 607/TASK 05-56-00-991-009
EFF :
ALL 05-56-00
Page 612
Feb 01/96
BV
(2) Measure the distance between the points 5L/5R and the points 10/13.
(Ref. Fig. 608/TASK 05-56-00-991-010)
(a) Make a projection to the floor of the points 10 and 13, 5L and 5R
with the SET - PLUMBS BOBS (98A08001004000).
(b) Make a mark at the dimension 45 mm (1.7716 in.) on the floor for
the points 10 and 13.
(c) Measure the distance between the points 5L/5R and 10/13.
(a) Make a projection to the floor of the points 11 and 12 with the
SET - PLUMBS BOBS (98A08001004000). Put the theodolites in
position on these points.
(b) Make a mark at the dimension 47.36 mm (1.8645 in.) on the floor.
Subtask 05-56-00-220-053
(1) Z values
(Ref. Fig. 605/TASK 05-56-00-991-007)
(a) Install the SIGHTING RODS SET (98D08103500000) on the points 35,
36, 37 and 38 L and R.
(c) Write down the variations between the datum indications on the
rods and the scanning plane of the sight tube.
EFF :
ALL 05-56-00
Page 613
Feb 01/96
BV
Measurement of the Wing Points and the Horizontal Stabilizer Points
Figure 608/TASK 05-56-00-991-010
EFF :
ALL 05-56-00
Page 614
Feb 01/96
BV
Angular Values of the Wing Points and the Horizontal Stabilizer Points
Figure 609/TASK 05-56-00-991-011
EFF :
ALL 05-56-00
Page 615
Feb 01/96
BV
(b) Make a mark at the dimension 45 mm (1.7716 in.) on the floor for
the point 13.
(c) Measure the distance between the points 13 and 37L and the points
13 and 37R.
(b) Make a mark at the dimension 45 mm (1.7716 in.) on the floor for
the point 13.
(c) Make a mark at the dimension 47.36 mm (1.8645 in.) on the floor
for the point 12. Put the theodolites in position on these
points.
(d) Write down the angles of the points 35 and 37 with relation to
the centerline of the aircraft from the points 12 and 13 for the
left and right horizontal stabilizer.
Subtask 05-56-00-220-054
(a) Install the SIGHTING RODS SET (98D08103500000) on the points 30,
31, 32 and 33 L.
(b) Align the 0 mark of the tool with the two theodolites on each
side of the vertical stabilizer.
(c) Make a mark the two sight lines on the floor and the intersection
point.
EFF :
ALL 05-56-00
Page 616
Feb 01/96
BV
Verticality Check of the Vertical Stabilizer
Figure 610/TASK 05-56-00-991-012
EFF :
ALL 05-56-00
Page 617
Feb 01/96
BV
X Position of the Point 32L
Figure 611/TASK 05-56-00-991-013
EFF :
ALL 05-56-00
Page 618
Feb 01/96
BV
(d) Write down the X dimension in relation to the point 11.
Subtask 05-56-00-220-055
(a) Make a projection to the floor of the points of the tool with the
PLUMB LINE PYLON (98D08103501000). Measure the X dimension of
these points in relation to the point 11.
(a) Make a projection to the floor of the points of the tool with the
PLUMB LINE PYLON (98D08103501000). Measure the Y dimension of
these points in relation to the aircraft centerline.
(a) Enter the Ya and Yb values for the pylon measurements on the
measurement table.
YA : in relation to the pylon centerline for the forward external
point
YB : aft external point
YA = Y 40 - Ya
YB = Y 41 - Yb
YB - YA
tg Alpha = -----------
(X41 - X40)
(a) Measure the height of the points 40 and 41. Use a sight tube set
at -3500 mm (137.7953 in.) from the horizontal datum of the
fuselage.
EFF :
ALL 05-56-00
Page 619
Feb 01/96
BV
XY Values of the Engine Pylons
Figure 612/TASK 05-56-00-991-014
EFF :
ALL 05-56-00
Page 620
Feb 01/96
BV
Subtask 05-56-00-220-056
(a) X position
(Ref. Fig. 613/TASK 05-56-00-991-015)
1
_ Make a projection to the floor of the centerline of the NLG
jacking point with SET-PLUMB BOBS MLG NLG WHEELS
(98D08003000000)
2
_ Align a cord with HOLDING SET - MEASURING CORD
(98A08001005000) along the centerline of the aircraft through
the points 11 and 12.
3
_ Write down the X position of the jacking point in relation to
the point 11 (dimension XC).
4
_ Calculate the position of the axis of the shock strut of the
landing gear.
(b) Y position
(Ref. Fig. 613/TASK 05-56-00-991-015)
1
_ Measure the variation between the axis of the NLG shock strut
and the aircraft centerline.
2
_ The sign of the deviation is + if the offset of the axis of
the shock strut is to the right. It is - if the offset is to
the left.
1
_ Write down the angle Alpha (left side) (in a plane
perpendicular to the aircraft centerline). Write down the
angle Beta (in a plane parallel to the aircraft centerline).
Do these measurements with a clinometer.
(a) X position
(Ref. Fig. 613/TASK 05-56-00-991-015)
For each landing gear :
EFF :
ALL 05-56-00
Page 621
Feb 01/96
BV
X and Y Positions of the Landing Gears
Figure 613/TASK 05-56-00-991-015
EFF :
ALL 05-56-00
Page 622
Feb 01/96
BV
1
_ Align a cord with HOLDING SET - MEASURING CORD
(98A08001005000) along the centerline of the aircraft through
the points 11 and 12.
2
_ Write down a perpendicular line to the aircraft centerline in
relation to the point 11.
3
_ Make a projection to the floor of the axis of the MLG jacking
points with the tool SET-PLUMB BOBS MLG NLG WHEELS
(98D08003000000).
4
_ Write down the X position of the axis of the shock strut in
relation to the point 11.
R 1
_ Put the LANDING GEAR WHEEL TOE-IN LINE BAR (98D08103000000) or
R LANDING GEAR WHEEL TOE-IN LINE BAR (98D08103000001) in
R horizontal position on outboard side of the main landing gear
R wheel.
2
_ Make a projection of the two ends to the floor with the plumb
line.
3
_ Measure the distance of the projections of the points to the
aircraft centerline. Subtract the forward and aft dimensions
and calculate the toe-in of the landing gears.
1
_ Write down the angle Alpha (left side) (in a plane
perpendicular to the centerline of the aircraft). Write down
the angle Beta (in a plane parallel to the centerline of the
aircraft). Do these measurements with a clinometer.
Subtask 05-56-00-220-057
EFF :
ALL 05-56-00
Page 623
Nov 01/98
BV
Symmetry of the Main Landing Gears
Figure 614/TASK 05-56-00-991-016
EFF :
ALL 05-56-00
Page 624
Feb 01/96
BV
You must:
- make an analysis of these deviations in relation to the structure and
the aerodynamics of the aircraft,
- make an estimate of their effect on flight safety.
If there are large deviations, do a visual inspection for these
failures :
5. Close-up
________
Subtask 05-56-00-942-050
(1) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
Subtask 05-56-00-586-050
EFF :
ALL 05-56-00
Page 625
Feb 01/96
BV
AIRCRAFT STABILITY - MAINTENANCE PRACTICES
__________________________________________
TASK 05-57-00-200-001
Aircraft Stability
1. __________________
Reason for the Job
R NOTE : The stability graphs for aircraft on wheels (on dry or wet ground) in
____
R this procedure are applicable to a parked or towed aircraft.
R NOTE : With the stability graphs (A/C on wheels) in this procedure, you can
____
R do a check of shifting or tipping stability limits. Do this if it is
R necessary to know only one such limit (towing, for example).
R You can also calculate the ballast necessary for aircraft stability in
R unfavorable conditions in the configurations that follow:
- aircraft with 2 engines
- 1 or the 2 engines removed
- engine re-installation.
2. ______________________
Job Set-up Information
A. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
WBM 1-10-00
05-57-00-991-001 Fig. 201
05-57-00-991-002 Fig. 202
05-57-00-991-003 Fig. 203
05-57-00-991-010 Fig. 204
05-57-00-991-011 Fig. 205
05-57-00-991-012 Fig. 206
EFF :
ALL 05-57-00
Page 201
May 01/04
BV
3. __________
Job Set-up
Subtask 05-57-00-860-050
(1) Make sure that the flaps, the slats, the spoilers, the speed brakes
R and the thrust reversers are retracted.
4. Procedure
_________
Subtask 05-57-00-210-050
R (2) You can also refuel two wing tanks to put the aircraft back into
R balance. In this case, add the weight of the fuel to the aircraft
R weight.
R NOTE : Before you put ballasts on the aircraft, make sure that you
____
R obey the limits below (Ref. WBM 1-10-00):
- maximum weight of section 11
- maximum loads on cabin floor
- maximum load on jacking points.
EFF :
ALL 05-57-00
Page 202
May 01/04
BV
R Aircraft on its Wheels (on Dry Ground)
R (applicable to a parked or towed aircraft)
Figure 201/TASK 05-57-00-991-001
EFF :
ALL
05-57-00 Page 203
May 01/96
BV
R Aircraft on its Wheels (on Wet Ground)
R (applicable to a parked or towed aircraft)
Figure 202/TASK 05-57-00-991-002
EFF :
ALL
05-57-00 Page 204
May 01/96
BV
Aircraft on Jacks
Figure 203/TASK 05-57-00-991-003
EFF :
ALL 05-57-00
Page 205
Feb 01/96
BV
R Aircraft on Forward Jack or on Nose Wheel Jack
R Figure 204/TASK 05-57-00-991-010
EFF :
ALL 05-57-00
Page 206
May 01/96
BV
R Aircraft on one Main Gear Wheel Jack
R Figure 205/TASK 05-57-00-991-011
EFF :
ALL 05-57-00
Page 207
May 01/96
BV
R Aircraft Jacked at Main and Nose Gears for Wheel Change
Figure 206/TASK 05-57-00-991-012
EFF :
ALL 05-57-00
Page 208
May 01/04
BV
Subtask 05-57-00-210-052
R (1) Check the aircraft stability, aircraft with two engines installed:
- without crew
- without galleys
- without pallets and containers.
R For example, make a plot of point A on the chart from these
R coordinates:
- weight: 46600 kg (102735.3852 lb)
- CG: 24%.
R (a) From point A, make a horizontal line: this cuts across the weight
R axis at point B.
R (b) From this point B, subtract the weight of the two removed engines
R 7000 kg (15432.3540 lb) approx. to get point B.
R (c) From point A, make a vertical line: this cuts across one division
R of the removed engine scale at point C.
R (d) Make a line across two divisions on this scale (1 division for
R each engine) to get point C.
(e) From point C, make a vertical line and from point B, make a
horizontal line: these two lines cut at point D. For this point,
the diagram gives these values:
- aircraft weight: 39600 kg (87303.0312 lb)
- CG: 35.5%
R - permitted wind: 35 kts (65 km/h).
EFF :
ALL 05-57-00
Page 209
May 01/04
BV
(a) Continue vertical line DC until it cuts across the contact
force scale to get point E.
(b) From this point, make a line across one division (0.8
ton/division) to get point E.
(c) From this point E, make a vertical line until it cuts across the
horizontal line DB to get point F.
R The diagram shows that in these conditions, engine installation
R is possible in the open air in winds of less than 35 kts (65
km/h).
(a) Continue line BF until it cuts across the 45 kts (83 km/h)
average windspeed line at point H.
(b) Continue vertical line FE until it cuts across the ballast on
section 11 scale at point G.
R (c) From point G, make a horizontal line which cuts across the
R vertical line from H at point J.
(d) Count the number of divisions on the scale between point G and J
R (in the example, 2.3 divisions).
R The weight of ballast necessary is thus:
2.3 x 500 kg (1102.3110 lb) = 1150 kg (2535.3153 lb)
R In the example given, use the same procedure to calculate the
R quantity of ballast necessary at cabin door No 1:
1.6 x 500 kg (1102.3110 lb) = 800 kg (1763.6976 lb)
EFF :
ALL 05-57-00
Page 210
May 01/04
BV
_______________________________________________________________
NON-REVENUE FLIGHT - REQUIREMENTS FOLLOWING MAINTENANCE ACTIONS
DESCRIPTION AND OPERATION
_________________________
1. General
_______
R
R Non-revenue flight following maintenance actions are not required by AIRBUS
R except for actions involving items that cannot be properly ground tested to
R verify that the aircrafts operational characteristics have not been
R adversly affected. Service experience has shown that a non-revenue flight is
R good practice following actions or repairs which could affect the aircrafts
R inherent aerodynamic characteristics.
R 2. Engine
__________________
Replacement
R Replacement or reinstallation of both engines does not require a non-revenue
R flight providing the engines have been successfully shop tested prior to
R installation, properly installed and successfully ground tested in
R accordance with all applicable maintenance instructions. However, owing to
R the number of different interfaces concerned, AIRBUS recommends that a
R non-revenue flight be carried out after changing or installing both engines
R to check that no double maintenance induced faults have been introduced.
EFF :
ALL 05-59-00
Page 1
May 01/06
BV
FERRY FLIGHT WITH GEAR DOWN - MAINTENANCE PRACTICES
___________________________________________________
TASK 05-59-32-869-001
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-59-32-941-050
A. General
(1) You must put the aircraft systems in the ferry flight with gear
down configuration before you can do such a flight.
4. Procedure
_________
Subtask 05-59-32-860-050
A. Put the Aircraft Systems in the Ferry Flight with Gear Down
Configuration
WARNING : CUT, REMOVE AND DISCARD THE LOCKWIRE AS YOU DO THE TASK.
_______
LOOSE LOCKWIRE CAN CUT OR BLIND YOU.
EFF :
ALL 05-59-32
Page 201
Nov 01/06
BV
(a) Remove the lockwire from the safety cover of the L/G DOWN VMO/MMO
SELECTION switch 22FP.
(b) Set the L/G DOWN VMO/MMO SELECTION switch 22FP to L/G DOWN.
5. Close-up
________
Subtask 05-59-32-942-050
A. Close-Up
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Make an entry in the log book to tell the crew that :
- the L/G DOWN VMO/MMO SELECTION switch is at L/G DOWN.
EFF :
ALL 05-59-32
Page 202
Nov 01/06
BV
TASK 05-59-32-869-002
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 05-59-32-941-051
A. Not Applicable
4. Procedure
_________
Subtask 05-59-32-860-051
EFF :
ALL 05-59-32
Page 203
Nov 01/06
BV
(2) In the avionics compartment, on the panel 188VU:
(a) Set the L/G DOWN VMO/MMO SELECTION switch 22FP to L/G NORM.
(b) Lock the safety cover and safety it with lockwire MISCELLANEOUS
(Material No. 19-010).
5. Close-up
________
Subtask 05-59-32-942-051
A. Close-Up
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Make an entry in the log book to tell the crew that :
- the L/G DOWN VMO/MMO SELECTION switch is at L/G NORM.
EFF :
ALL 05-59-32
Page 204
Nov 01/06